Loading...
HomeMy WebLinkAbout20170864 Ver 1_stream impacts for R-5752_20170802 Carpenter,Kristi From:Rerko, James J Sent:Wednesday, August 02, 2017 12:31 PM To:Steenhuis, Joanne; Hair, Sarah E SAW (Sarah.E.Hair@usace.army.mil) Subject:stream impacts for R-5752 Attachments:Copy of R5752Wetland ImpactSummarySheet.xlsx Joanne Attached is the revised Wetland Impact Summary sheet for R-5752. The discrepancies have been addressed: 1. Permit Site #2 – the total impact is 461LF – 110LF for the pipe and 361LF for the relocation of the stream. The Surface Water Impacts are duplicate impacts that the consultant showed impacts in acres and linear feet. The Surface Water Impacts were removed. 2. Permit Site #3 – The rip-rap is shown on the slopes at the outlet, not within the stream. 3. Your comment regarding the <0.01 acre of impact is moot since the duplicate impacts, i.e. stream vs. Surface Waters, has been eliminated for Permit Sites #1, #2, #3 and #4. If you should have any questions, please contact me. Jim James J. Rerko, PWS Division 6 Environmental Officer North Carolina Department of Transportation 910 364-0834 office 910 486 1959 fax jjrerko@ncdot.gov Email 1000 Transportation Drive Fayetteville, NC 28302 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ From: Steenhuis, Joanne Sent: Tuesday, August 01, 2017 9:14 AM 1 To: Rerko, James J Subject: stream impacts for R-5752 Jim, There is a discrepancy between the stream impacts on the application (PCN form) and what is in your wetland and surface waters impact summary sheet. Here are my issues Site 1 is fine Site 2 on the PCN you have 461 LF of permanent impacts and 50 LF of temporary impacts on the impacts summary sheet you break out the stream impacts for the 30” RCP as 110 LF of permanent impacts and 50 LF or temporary impacts. For the relocated ditch impacts you have 361 LF of permanent impacts. This comes to 471 LF of permanent impacts for site two NOT 461 LF. So, I think you added 10 feet in there somewhere. Site 3 on the PCN you have 145 LF of permanent impacts and 70 LF of temporary impacts. You also have 14 LF of riprap. Is the 14 LF a part of 145 LF of impacts or in addition to? The 14 LF of riprap impacts is not mentioned in the impact summary sheet. Could you also let me know the real amounts for the <0.01 impacts Thanks Joanne Steenhuis Environmental Senior Specialist Transportation Permitting Branch Department of Environmental Quality (910) 796-7306 (office) (910) 308-4021 (mobile) joanne.steenhuis@ncdenr.gov Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2