From:Rerko, James J
Sent:Wednesday, August 02, 2017 12:31 PM
To:Steenhuis, Joanne; Hair, Sarah E SAW
(Sarah.E.Hair@usace.army.mil)
Subject:stream impacts for R-5752
Attachments:Copy of R5752Wetland ImpactSummarySheet.xlsx
Joanne
Attached is the revised Wetland Impact Summary sheet for R-5752. The discrepancies
have been addressed:
1. Permit Site #2 – the total impact is 461LF – 110LF for the pipe and 361LF for the
relocation of the stream. The Surface Water Impacts are duplicate impacts that
the consultant showed impacts in acres and linear feet. The Surface Water
Impacts were removed.
2. Permit Site #3 – The rip-rap is shown on the slopes at the outlet, not within the
stream.
3. Your comment regarding the <0.01 acre of impact is moot since the duplicate
impacts, i.e. stream vs. Surface Waters, has been eliminated for Permit Sites #1,
#2, #3 and #4.
If you should have any questions, please contact me.
Jim
James J. Rerko, PWS
Division 6 Environmental Officer
North Carolina Department of Transportation
910 364-0834 office
910 486 1959 fax
jjrerko@ncdot.gov Email
1000 Transportation Drive
Fayetteville, NC 28302
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
_____________________________________________________________
From: Steenhuis, Joanne
Sent: Tuesday, August 01, 2017 9:14 AM
1
To: Rerko, James J
Subject: stream impacts for R-5752
Jim,
There is a discrepancy between the stream impacts on the application (PCN form) and
what is in your wetland and surface waters impact summary sheet. Here are my issues
Site 1 is fine
Site 2 on the PCN you have 461 LF of permanent impacts and 50 LF of temporary
impacts on the impacts summary sheet you break out the stream impacts for the 30”
RCP as 110 LF of permanent impacts and 50 LF or temporary impacts. For the relocated
ditch impacts you have 361 LF of permanent impacts. This comes to 471 LF of
permanent impacts for site two NOT 461 LF. So, I think you added 10 feet in there
somewhere.
Site 3 on the PCN you have 145 LF of permanent impacts and 70 LF of temporary
impacts. You also have 14 LF of riprap. Is the 14 LF a part of 145 LF of impacts or in
addition to? The 14 LF of riprap impacts is not mentioned in the impact summary sheet.
Could you also let me know the real amounts for the <0.01 impacts
Thanks
Joanne Steenhuis
Environmental Senior Specialist
Transportation Permitting Branch
Department of Environmental Quality
(910) 796-7306 (office)
(910) 308-4021 (mobile)
joanne.steenhuis@ncdenr.gov
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
2