Loading...
HomeMy WebLinkAbout20170921 Ver 1 _Mac's- Field Notes- RS _20170725Major Hill (RS) Post Contract Field Notes- July 25, 2017 Alamance County DWR#- 20170921 COE-Todd, Kim WRC- Travis DMS- Melonie, Lindsay, Jeff S. RS- Worth, JD Axiom- Grant, Keenan 1. UT 1 and pond removal section ok, told them about our pond removal observations 2. Proposed wetland work ok 3. Rest of the project proposed as Ell. Don't think any planting proposed, or very little, however, there was a lot of evidence of cattle in the easement proposed for Ell. 4. Would be a good project to show WQ uplift both with macrobenthic and nutrients/fecal 5. Used to be Octobank site previously