HomeMy WebLinkAbout20170921 Ver 1 _Todd's-COE Field Notes _20170725Date: July 25,2017
Meeting Type: Preliminary (Post -Contract) Field Review
Site Name: Major Hill
Provider: NCDMS/RES
Action ID:
County: Alamance
Attendees
Todd Tugwell, USACE
Kim Browning, USACE
Mac Haupt, DWR
Jeff Shaeffer, DMS
Lindsay Crocker, DMS
Melonie Allen, DMS
Worth Creech, RS
Grant Lewis, Axiom
Travis Wilson, WRC
Keenan, RS
JD, RS
Notes from Field Review
• Previous review of site under Octabank - RS Cape Fear 02 UMBI Major Hill Site
• UT1 through pond ok. Discussed proper method to restore pond Bend.
• E2 reach fully forested. Has s me scour areas and approx. 1.5 BHR but no real need for
channel work due to relatively stable banks.
• Recommended removal of barbed wire fencing strewn throughout buffer.
• Need some invasive especially near upper end of larger trib.