Loading...
HomeMy WebLinkAboutNC0000396_Updated Accel Remediation Schedule Signed_20170728DUKE tMERGY, July 28, 2017 Mr. S. Jay Zimmerman, Director Di,,Wun cf Water Resources North Carolina Departme,it of Enviirm.mental wual ty 1611 Mail Service Center Raleigh, Nurth CaruGna 27699-1611 Subject: Interim Actium Plan Schedule Update Asheville Steam Electric Plant Dear Mr. Zimmerman: 525 5va1n C.rlalerl btPavt: Mai; Coue r -v i 3R CH-Rattn. NeRR Uarolna ;eae0e 95U-373-3119 In a later dated Marsh 28, 2017, DEu documented acceptance of Dake Energy'5 milestuns scrledales for the Accelerated Remediation 5itz-5 Submitted in February 2017. In than letter DF --Q 5tatad that, "if the anticipated milestone dues in this ruque5t are altered, please intvrm the appropriate DEQ Regional Office and Cantil Office via email, aocamenting the reasons foF any changes. Dake Energy is providing the e, iulubed updated 5chedole fur the Asheville project to formally req-Ue3t achadula extension. The schedule has been adjasted for the folluning two items: 1) the extended DEQ I uvievv pariud fur the 60% Basis of Design: 2) uncertainty with timing of NPDES permit modifi;.,atian5 that are required to complete start-up ur tha systems. If yea ha.a comments and/or gnesduna, please direct them tU me at 980 -373 -3719 - Sincerely, Z) ,. . D. Edwin M. Sullivan, PE Director - Waste & Gruondwate, Prgram5 Envirunntai .tal, Health & Safety Enclosure: Interim ,Action Plan Schedule Updates - A5hevifla St -ani -ii Electric Plant Cc: Jim Wells - Dake Energy Enc1cSarc Ashgvillp Steam Elegt. ie Plant Inturim A.-tiu. t Plan Schedule Update to DEu July 28, 2017 • 300/w Design SabmiMd to DEQ 60% Design Submittal to DEc,.,t 10E0 review comments received July 19, 2017) • 100% Design Submittal tu DEu Completed November 21; 2016 Cumplzted Marsh 17, 2017 October 4, 2017 • Final Regulatury Approvals for Cut tstraztiuFi Ortubea 27, 2017 (Includes 100% BOD, Well Recovery, E&SC, etc. excludes NPDES Permit Modification) Bergin Extractlzn Well and Treatment System Construction Navember 100, 0 r i NPDES Permit a, DEU Aatharizatiun At tticipated February 1, 2018 i Ext, actian Well and Treatment Systet t t Beg in Operatiun Feb+ aary 14, 2018 IVvie: For —n.euLng purposes ane as eireciee By DEM In irle aanuary 30, cu t i conference call, we assume 17E0 wid review anu return comments to the Basis of Design packages within 10 bw mess days. Extraction Well and Treatment System operation =11vi3aly i� vvnt"nycnt "pyre rMulpt of irte NPOE5 perma mMllicaiion or oirler DE0 amilorization to direct trle extractee grounewater into d7e ash basin on or before the anticipated da,e. The current schedule does not anticipate additional subm n tls after uvrnr erne ons mvvi; sA lar Trio lOt3% 1500 ti.e. ..n, Aultional requ:reu suUminals aver t v0% 1900 will Belay Me andclpatea start tiate.)