HomeMy WebLinkAbout20081328 Ver 1_More Info Received_20081009a All \ T O W E R ?\ ENGINEERING PROFESSIONALS North Carolina Division of Water Quality 2321 Crabtree Boulevard, Suite 250 Raleigh, N.C., 27604 Office - (919) 773-1786 Pre-Construction Notification Application Cover Letter Second Submission October 08, 2008 J$- 13ag Page Iof I Subject: Quest Fellowship Church - 5120 Raynor Road To Whom It May Concern: Tower Engineering Professionals is submitting a response to NCDWQ comments received on September 18, 2008 for Quest Fellowship Church (DWQ Project # 2008-1328). The following items have been revised as needed 1. Owner information and signature has been added to the application. 2. All buffer impacts have been shown on sheet C-5. 3. All protected riparian buffers have been shown on sheet C-5. 4. The level spreader and construction details have been added on sheets C-5 and C-13. 5. The Level Spreader Supplement Form has been attached with required information. Sincerely, j N, John B. Goins, P. E. Tower Engineering Professionals, Inc. 0 C T 9 2008 DENR - `JYAYER QUALITY WETLANDS AND STORMWATER BRANCH 3703 Junction Boulevard, Raleigh, NC 27603-5263 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net o?0F W ATFRPG Michael F. Easley, Governor .y William G. Ross Jr., Secretary t - North Carolina Department of Environment and Natural Resources 4 C Coleen H. Sullins, Director Division of Water Quality September 18, 2008 DWQ Project # 2008-1328 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Tower Engineering Attn. Mr. John Goins 3703 Junction Blvd Raleigh, NC 27603 Subject Property: Quest Fellowship Church, Garner, NC White Oak Creek [030402,27-43-11, C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Goins: On August 28, 2008, the Division of Water Quality (DWQ) received your application dated August 29, 2008 to impact 420 square feet (ft) of Zone 1 protected riparian buffers and 280 square feet (ft) of Zone 2 protected riparian buffers to construct the proposed church at the subject property. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward returning your application as required by 15A NCAC 2H .0506 and 213 .0233(8) and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: Section 11. 1 must contain the owner's information and the owner must sign the application. Please resubmit the application form with the owner's information completed in Section I1.1 and either submit an agent authorization letter for Tower Engineering to sign the application, or have the owner sign.. 2. Please enumerate all buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc). 3. Please locate all protected riparian buffers on the site plan, clearly showing Zones 1 and 2. 4. Please clearly show the level spreader on your plan sheet. You must also provide construction details in the plan sheets for the level spreader. 5. Please submit a Level Spreader Supplement Form with all required items for the level spreader (see littp://h20.enr.state.nc.us/su/binp_forms.htm). 401 Oversight/Express Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state. nc us/ncwetlands No ehCarolina Naturally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper John Goins Page 2 of 2 September 16, 2008 Please respond within three weeks of the date of this letter by sending this information to me in writing and Lauren Witherspoon of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Ian McMillan or Amy Chapman at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Since y, L4 yndi Karoly, Supervisor 1 Oversight/Express Review Permits Unit CBK/ijm/asc cc: Lauren Witherspoon, DWQ Raleigh Regional Office DLR, Raleigh Regional Office File Copy Matt Matthews, DWQ Wetlands and Stormwater Branch Filename: 081328QuestFellowshipChurch(Wake)NBR_On_Hold Office Use Only: Form Version March 08 USAGE Action ID No. DWQ No. g -- 13 a- $ (If any particular item is not applicable to this project, please enter "Not Applicable" or 'NIA".) 1. II. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit [J] Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) requested: 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: 0 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? I . Owner/Applicant Information O i 19 2008 Name: Quest Fellowship Church _ CEROUALITY Mailing Address: P.U. Box 40057 wEnANDsgoSTORM . m4eli Raleigh, NC 27629 Applicant Information Telephone Number: (919) 832-0172 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: Page 5 of 12 III. , Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan. must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USES Topographic Quad Map and MRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USAGE requires information to be submitted on sheets no larger than I 1 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Quest Fellowship Church 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 1730238361 4. Location County: Fake Nearest Town: Garner Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Raleigh, travel East on US 70 past 1-40. Once past 1-40, Continue to the second right (Raynor Road). Site is on the Northwest comer of the intersection of Raynor Rd. & Waterlield Dr. 5. Site coordinates (Lat/Long or decimal degrees): N 35d 40.917', W 078d 33.125' (Note --- If project is linear, such as a read or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 15 7. Name of nearest receiving body of water: White Oak Creek 8. River Basin: Neuse (Note this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Vacant site- Neuse Riparian Buffer through the parcel in the middle of the parcel. Buffer runs northeast to the southwest. Residences to the west. Industrial to the South. Vacant/wooded to the West. Field to the forth. Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: Gradinq for church development. Wet detention pond will be added to the south All development will be outside and to the East of Buffer 11. Explain the purpose of the proposed work: Proposed church and required parking and utility services IV. Prior :Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.F. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. Future development may add addtional impervious surface; however, this will not occur any time soon, if at all. Stormwater Calculations mention future development. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: No wetland impact Palo 7 o 12 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, senarately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain es/no Distance to Nearest Stream linear feet Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: Approx. 1 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage. multinly length X width, then divide by 43.560. Stream Impact Number indicate on ma Stream Name Type of Impact Perennial Intermittent? Average Stream Width Before Im act Impact Length linear feet Area of Impact acres Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Site Number indicate on ma Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary ? p ? , sound, bay, ocean, etc. Area of Impact acres Total Open Water Impact (acres) Page 8 of 12 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): Wetland Impact (acres): Open Water Impact (acres): Total. Impact to Waters of the U.S. (acres) Total Stream Impact (linear feet): 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ? No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss haw impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USAGE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at 1 .,I/ ')o.etir.state.nc.rrrs/iicwetiatids/`sti-iiip,ide.htiTil. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at litter //1.2o.errr.state.(1C r.rsAv /index.htm. If use of the NCEEP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. • Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No Q 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify --- )? Yes J, J No ? 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* ' Impact ,.? Multiplier I Required. 1 420 3 (2 for Catawba) N/A 2 280 1.5 N/A Total 1 700 1 I * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. N/A Page i 1 of 12 XI.. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. 39.8% of the 4.65 acres of development. A wet pond is proposed. Stormwater calculations are included. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewage disposal accomplished by extending sewer to municipal system. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Q Is this an after-the-fact permit application? Yes ? No Q XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development which could impact nearby downstream water quality? Yes 0 No Q If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at ht! :/ h2o.enr.sta e.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 1.2 Quest Fellowship Church Authorization Letter September 25, 2008 Russell Talley Public Utilities Department P.O. Box 590 Raleigh, NC, 27602 Office: (919) 8574550 Subject: Quest Fellowship Church Signature Authorization Mr. Talley: Mr. Allen Hicks is authorized to act on behalf of the collective interest for Quest Fellowship Church. His capacity with the church is Chairman of The Elders. He has the authority to act on behalf of Quest Fellowship Church per Article IV, Section 2 of the by-laws. Sincerely, -? O?O? WAT eR?G ? -y WDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I 1. PROJECT INFORMATION Project name Quest Fellowship Church Contact name Mr. John Goins Phone number 919-661-6351 Date October 1, 2008 Drainage area number 1 IL DESIGN. INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Wet Pond Drawdown flow from the BMP 0.10 cfs For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area ftz Do not complete this section of the worksheet. Impervious surface area ft2 Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 in/hr storm cfs Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 10-yr storm in/hr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cfs Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretention cell? N (Y or N) To a mulched bioretention cell? N (Y or N) To a wetland? N (Y or N) To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass 0.00 ft Width of dense ground cover 0.00 ft Width of wooded vegetation 54.00 ft Total width 54.00 ft Elevation at downslope base of level lip 296.20 fmsl Elevation at top of bank of the receiving water 293.00 fmsl Slope (from level lip to to top of bank) 5.93 % OK Are any draws present? N (Y or N) OK Level Spreader Design Forebay surface area 25.00 sq ft No forebay is needed. Feet of level lip needed per cfs 65 ft/cfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? N (Y or N) Length based on the 10-yr storm? N (Y or N) Length based on the BMP discharge rate? Y (Y or N) Design flow 0.10 cfs Is a bypass device provided? Y (Y or N) OK Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and ll. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material 13.00 ft N (Y or N) N (Y or N) Y (Y or N) 3.00 ft 2.00 ft 14.00 ft 2.00 ft 8.64 cfs Vegetation w/ matting #VALUE! t M 1 M B l Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Inip"pls Sheet No. GL 4 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. C-5 ?O 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build-out. G_ 3. Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), - Level lip, Upslope channel, and Downslope filter fabric. %7l 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. `0 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. A ` 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. N!h 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 G MIN Wv Amp OWNr- '001 v r^ s. .%AFA ell AMA �'� .d"�X � p ;¢,a�" ��,.�;s�" x'ax. `'ZaAF • as yr �"�°i q,.�s�1, � ^«. i $"5 % ,e°, aY ,4ia * O � L 1 a y � P �.. ,day � vo ..� <ry es. , Isp 4 Y'i'p q •- ��. ,; fJ► .;,j: tms`s „L `� � T* �a. z ma w•} w R fi �Awlf fill mgr . s V _. r, m _7 O i— „...�. �"x .icr r� �„? 8 ,� Ai saw �4 , I by ji "` lIS' ,'����I _ .s'!rt �P m,. �' - Q �',3,.p.;g ,.r _.✓� " d i 3•i `�^., n r ,. �. ' �� � o _, OPERATIONS AND MAINTENANCE MANUAL November 2004 BEST MANAGEMENT PRACTICES Garner, NC Project Name: Date: 5 A- o P Property Owner/Responsible Party: &%esj? Address: PO. Aox 0n1Z-7 J Telephone: ?gi9) The maintenance of any Best Management Practice (BMP) installed to achieve nitrogen loading and/or flow attenuating requirements for a development shall be the responsibility of the property owner or other identified responsible party. In the case of residential or commercial subdivisions, Home Owners Associations or Merchants Associations must be established in order to identify the responsible party. This manual establishes general procedures for maintenance and operation of the allowed BMP types in accordance with the Town of Garner Stormwater Program for Nitrogen Control. It is important to note that only general maintenance tasks are identified here. All devices shall be maintained to original design standards. This agreement shall be signed and notarized by the responsible party to perform the tasks specified in the plan, including inspeetions, operation, and any needed maintenance activities. L BMP Identify the types of BMPs located on the site and give a brief description on their design. Ifyou need additional space please attach separate pages to this document. BMP Type Check which Brief Description apply Wet Pond ? Two oil- St ?i we-- non ds elf Phase J E PAa s e- Z Stormwater Wetland Sand Filter Bioretention Grass Swale Vegetated Filter Strip ?rw5 S CAA nC t cti7 ntr leoo f*rtior? w/Level Spreader o 41-9 58' Restored or Additional Riparian Buffer w/Level Spreader Dry Detention Page I of 4 OPERATION AND MAINTENANCE North Carolina stormwater rules require annual Inspections by the regulating agency of wet detention ponds as a minimum. More frequent inspections by the land owner or pond operator are strongly encouraged to ensure the proper operation of a wet detention pond. The Town of Gamer can require more frequent Inspections. All Town of Gamer and North Carolina Department of Environment and Natural Resources codes shall be consulted. The Town of Garner will Inspect BMP's on an annual basis and forward a list of any required deficiencies or repairs to the property owner/responsible party. The property owner/responsible party will have 90 days to correct all deficiencies and make all repairs to the satisfaction of the Town Engineer. Failure to satisfactorily complete the repairs within the 90 days will cause the bmp to be declared a nuisance as provided for in Section 6-17 of the Gamer Town Code. Abatement of the nuisance will proceed as provided for in Chapter 6, Article II of the Gamer Town Code. A. Rainfall Event 1. Inspect the basin after every runoff-producing rainfall event. 2. Remove debris from the trash rack, inlet pipes and outlet pipes. 3. Check and clear the orifice of any obstructions. B. Monthly Inspection 1. Inspect the basin monthly 2. Remove debris from the trash rack, inlet pipes and outlet pipes. 3. Check and clear the orifice of any obstructions. 4. Check the pond side slopes; remove trash and repair eroded areas before the next rainfall event. 5. Check the vegetative and rock filters for sediment accumulation, erosion and proper operation of the flow spreader mechanism and repair as necessary. C. Quarterly inspection 1. Inspect the collection system (i.e. catch basin, pipes and grass swales) for proper functioning. Clear accumulated trash from basin grates and basin bottoms. Check piping for obstructions. 2. Check pond inlet pipes for undercutting, replace rlprap and repair broken pipes. 3. Reseed grassed swales, Including the vegetated filter If applicable, twice a year as necessary. Repair eroded areas immediately. D. Six Month Inspection 1. Remove accumulated sediment from the bottom of the outlet structure or other areas where accumulated sediment Is noted. 2. Check the pond depth at various points in the pond. If the depth Is reduced to 75% of the original design depth, sediment Is to be removed to at least the original design depth. 3. Operate any valves or mechanical components to verify they are in working order. 4. Inspect the embankment taking note of any wet areas where water may be seeping through the soil. Contact the Town Engineering Department If seepage is noted. 5. Remove deposited sediment along vegetated filter strip and concrete level spreader, especially from the upstream edge, to maintain original contours and grading. Repair channels that form and regrade the filter strip to ensure that the runoff flows evenly in a thin sheet over the concrete level spreader. Repair concrete level spreader as necessary and reseed and regrade the filter strip to maintain a dense growth of vegetation. E. General Inspection 1. Mow the side slopes, not Including normally submerged vegetated shelf, according to the season. Maximum grass height is to be 61n. 2. Cattails and other Indigenous wetland plants are encouraged along the perimeter; however, they must be removed when they cover the entire surface area of the pond. 3. No woody vegetation shall be allowed to grow on the embankment without special design provisions. 4. Debris shall be removed from blocking the inlet and outlet structures and from areas of potential clogging. 5. Periodic removal of dead vegetation shall be accomplished. 6. The orifice is designed to draw down the pond in 2-5 days. If draw down is not accomplished in that time, the system must be clogged. The source of the clogging must be found and eliminated, 7. All components of the detention pond system must be kept In good working order. STORMWATER BEST MANAGEMENT PRACTICES OPERATIONS AND MAINTENANCE AGREEMENT Property Ow r/Responsible Party Sign: a? 4.4 Print: L ICJ zo ???1• - STATE OF NORTH CAROLINA COUNTY OF WAKE I, C16( • t7 eg+e ? a Notary Public for said County and State, do hereby certify tbat ' r- Al-en Ad c personally appeared beFore me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this theh day of klal-, Qa. ?. GAP H. Iq ?. Official Seal fQ?.?,r•"' TARS ?F•? r ? -n ?r t U 9 Notary Public . My commission expires t; Page 4 oF4 Stormwater & Erosion Control Design Calculations 11 July 2, 2008 ?I Quest Fellowship Church Raynor Road' Garner, NC Prepared for: Quest Fellowship Church P.O. Box 40057 Raleigh, NC 27629 (919) 832-0172 Prepared by: Triangle Site Design, PLLC 165 Trantham Trail Clayton, NC 27527 (919) 55 3-6570 0 [; ; OCT 9 2008 DOC - WAFER QUALI V RC;;'s tMF ? LAICS AP10 STORMWATER BRA ?> 1A C 1? 0, e ®ea?oc?c® s V SEAL 244 .?S ?N lh?E,. % 5/16/08 Revised per Town review comments 6/16/08 Revised site drainage, storm water management & erosion control 7/2/08 Revised per Town review comments 7/11/08 Revised per Town review comment r U ?I TABLE OF CONTENTS OVERVIEW FIGURES WAKE COUNTY GIS MAP SOILS SURVEY & SOIL INFORMATION PRE-DEVELOPMENT & POST-DEVELOPMENT DRAINAGE AREAS FUTURE DEVELOPMENT MAP (FUTURE PHASE 2) STORM SEWER CALCULATIONS INLET DATA FOR DRAINAGE STRUCTURES PIPE DESIGN DATA STORM PIPE PROFILES WATER QUANTITY/QUALITY POND OPERATION AND MAINTENANCE PLAN PHASE i POND 'TIME OF PEAK' CN VALUES PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION-VOLUME-FLOW SUMMARY POND OUTLET/STRUCTURE SUMMARY a NITROGEN CALCULATIONS EROSION CONTROL CALCULATIONS TEMPORARY BASIN DESIGN RIP-RAP APRON DESIGN 1 OVERVIEW Background This report contains the storm water and erosion control calculations for the proposed Quest Fellowship Church site. The project site is located at the intersection of Raynor Road and Waterfield Drive. The project consists of approximately 15 acres of undeveloped area. Approximately 4.9 acres will be developed to construct Phase 1 of Church building, the associated parking areas, and the storm water management facility. The seating capacity for i Phase 1 inside the building is 300 seats. The remaining site area includes existing streams/wetlands/Neuse River buffers as well as future development areas. The proposed i storm water management facility outlined in this report has been designed to treat 4.65 's acres of the site. The storm water management facility has been designed to treat the runoff associated with the development of Phase 1 of the development. The conceptual site plan for future development of the site shows a building expansion in the area of the proposed storm water management pond. When and if the building is expanded the storm water management facility will need to be relocated and resized to accommodate the water quality and quantity requirements for the site. It is anticipated that the site will require two storm water management facilities - one located along WaterFeld Drive to the south of the utility easement and the other across the stream that bisects the property. The new storm water management facilities will need to be in place before storm water runoff from the site is routed to them and the existing pond constructed as part of Phase 1 is removed. Erosion Control Erosion control measures have been designed in accordance with the NCDENR, Wake County and Town of Garner erosion control standards and regulations to minimize sediment laden runoff from exiting the site. Silt fence will be installed along the low sides of the site prior to construction. The construction entrance will be installed prior to construction commencing. Inlet protection will be installed around all existing inlets and will be utilized for the proposed curb inlets and drop inlets. Soils The Wake County Soils Survey indicates that Appling sandy loam and Worsham sandy loam soils are present onsite. Appling sandy loam is classified as Soil Hydrologic Group B and Worsham sandy loam is classified as Soil Hydrologic Group D. Site Stabilization After final grading is completed, permanent vegetation shall be applied in accordance with the seeding requirements and landscape plan for this site. A 1 I Stormwater Analysis Runoff from the site currently drains to an existing stream/wetland area that bisects the property via existing topography. Approximately 11.6 acres drains to the site from off-site properties to the north. This area drains through the site within the existing stream/wetland area. A wetland/stream delineation has been prepared to show the limits of existing wetland/stream features as shown within the civil construction drawings. Storm water runoff from the developed areas of the site will be treated within a wet detention pond. The pond has been designed to treat a drainage area of 4.65 acres. The site grading and storm drainage pipe systems are used to divert storm water runoff from the site to the wet pond. The storm water management pond is designed for an impervious area of 1.85 acres that includes the Phase 1 improvements as shown in the civil construction drawings. Water Quantity Post-development peak flows from the site will not exceed pre-development flows for the 1- year and 25-year storms. The wet detention pond will utilize a concrete riser structure with a low flow orifice, intermediate weir, and an open top riser will serve as the principal and emergency spillway to reduce peak flows. Please reference the Water Quantity section of this report for details regarding drainage areas and stormwater routing. Water Quality For water quality purposes the site is designed so that storm water runoff is treated in a wet detention BMP pond (the existing on-site wetlands are not included in the water quality calculations for additional treatment credit). The proposed wet detention pond will provide a Total Nitrogen removal efficiency of 25% and 85% removal of Total Suspended Solids (TSS). Given the size and impervious cover of the area occupied by Phase 1 of the development, I the Nitrogen reduction provided by the BMP Pond brings the total export to approximately 2.65 Ibs/ac/yr. The Nitrogen calculations do not include the development of the future ?I Phase 2. The future development of Phase 2 will require an analysis of the Nitrogen control at the time of th t d l a eve opment. ?I Methods The stormwater conveyance system was analyzed using "Hydraflow Storm Sewers" and "Hydraflow Hydrographs" computer software program. ?I Conclusion ?I Based on the analysis provided herein, this design meets the stormwater and erosion control requirements of the Town of Garner. Pre-development flows will not exceed post- development flows for the 1-year and 25-year storm and Nitrogen export from the site will be less than 10 lb/ac/yr. 1 1 1I http://imaps.co.wake.nc.us/imaps/printnian.asp?pin=&pinept=&mi iN 3 % WKE +J lot `1 CfF`UtAk 1 61Rit2 HE CITY OF RALEIGH CC7lt?F!' ?f Raleigh Elevation Contours(fopo) ff Cary Elevation Contours(Topo) ff Wake County Elevation Contours(Topo) Streets Lakes Parcels Sec Wtty Screen 2005 &W Orthophotography (zoom to see) 2005 Color Orthos: County-wide (roam to see) E Wake County Boundary %i pose s ;l - l/t),-tee Copyright 2008. City of Raleigh, Wake County. 0 297 ft ,,/p: inti,nap.asp?pin=&pinext=&:niri. WAKE / Raleigh Elevation Contours(Topo) / Cary Elevation Cvntours(Topo) / Wake County Elevation Coontours(Topo) Streets Lakes Parcels Security Screen 2005 EM Q° rthophotography (zoom to see) 2005 Color Orthos: County wide (zoom to see) 1 Wake County J BDLmdary 11.? QLCrCS 'IA C?re0, -/V Si Copyright 2008. City of Raleigh, Wake County. 0 259 ft .if CO M O O O N O ch E 0 IL co C 0 Ut L ? 0 7 ZU w L C y 00 0 U N N LL Y f0 o N 0 CoU Co - 0 LO nl N Z 7 oU N O N (n Z> oa (n 0 ,Do U a? co 0 z 0 N O O w .Z U? o O O C N O Lo am 7 h « QCC :? zV ' Z 0 0 Z IL Q t i CC C co c 2 ?i O U ? O ZU f a c L s ? S , U o m ti Y l9 N) CL ?1 cca G O co 13 Z W W J a m m o m a y c U O O V1 m a N C > O N N O o m? v 3=o mo il- C6 'a roc (D 0 ?o a) Z y - Y m C - U a> N O s" U (0 m O 2.0 m m m, E m e o rn m 2? Eo Q2)a of o? mow. 0- j N cn: 2 Q t N = E co m v o Z O N 0. 3` m C °. 3 0 N •on - c m .c (0 U-O Z l0 O a"O 3 > O m m g, 2 C 'p N> 3 c w c Tam CD n-0 aNiaN Eo oc a ya m L mm ?t? ?? U C m > acs R yv a) (D 0 aL E E- c c w m > 3 a`> m Z 12 N y m O N O .C O m E GTi in m m N O .0) T O au, E y N m a >. y O 'a N O (0 Z fn V Q O a O O 0 0 N ?? •? afcU N d 0 U) 76 O). m O C O !` ¢ O L 7 ccu E 0. ?n ° a> c'n m o o 'C N r (6 0 m co m - d m E ca E O> o` E v1?U :FE- :S (0(n 0' F- 00 E o tll N a v? uJ U m L T O O ` O a m co N O ? C O 0) N _N N "ON L O 'Na O N N d L_ d LL T O L_ N N v N _N m C N C N E O N O:01 N N U N L > O e (7 tq O U 7 i O (A o c CO Z) O (n ° 3 m O L i _ O W M . L o LL 0 u, co c N O m a 3 F.. o W W G1 y j n M o R a Q o m d 3 a a >. = O CJ m -6.2 vaj co m m oa m 0 l0 U. 3 O T N m > w LL L O N C O m T O o Q In a, a To 'q 'a o a m c m m v v J J a4) 2a co u) ? fn <n c°n 0') a o " ?>>C a co CO m 0 0 0 N CV N ?t m m 0- >1 m 7 o_U N O mU) Z > co lV (n O o ?mU > (0 c 0 W Z m v N •Z 0 c 0 m N 3 m O Z V Q i i l t1 i? n? n? Soil Map-Wake County, North Carolina Map Unit Legend Quest Fellowship Church ake County, North Carolina (NC183) Unit Name Acres in AO.1 Percent of AOI dy loam, 2 to 6 3.9 61.3% opes, moderately r r ApC2 Appling dy loam, 6 t o 10 1.8 29.0% opes, moderately ndy loam, 0 to 3 0.6 9.8% percent slopes Totals for Area of Interest(AOI) I 6.41 100.0% Natural Resources Web Soil Survey 2.0 4/2/2008 Conservation Service National Cooperative Soil Survey Page 3 of 3 , Q , z _ ? "ter-"•',.' ? .? _-?.? ? ", i 3 F SiSi P n? tt 1 1 `w ? `? ww 4 'A• w 1, w \ yyyA Sy w \\w`\ ?A. +°1+ \w w? \A ?'; ?? J ? 1 VA- -k s t ? 1 t t eA iil i ? t ? t ? ? ? 1 , h I ? AA 1? w?yy ? 4 ? A A 1 1 w } 1 s t ??E ?r e fr 1 1 i ? ? t 1 1 1 J {{f1 1 1 J I J J I O! I ? _c 1 ? r 1 i ? ? \ O ' n e e { _T "t 3 /? 11 J t y A? A a a 4?i °? "'i 1 i 4i S A,y b ZA ?+w °.. ; : • `? ?,?.? ?a via ? ? ?... '??`'`+. ° `* .._ . ,; 1-T \ Aw\ 1 4?' t l / f f ? ?`a A+^?A?A ;• ? 1 a 0A '"w A + t i t ,e yt ?e t 2 1 rt?'?tl _ - ONOU SON, .p t r i Ii rh?? „ if11 ? i i _ Q 1 I77 't`J t,, ` T 1 ? t? ?.•.'r ??t t t -l- i ?1 ?t ????1? tit •:? t?'t \ IS M 1 `t '4v?it*t lu, tt 1 1 , t \t'tt',?\?t t t% % y? t 1 i i -?-?. 't't... / Y t 1 I .i r`I I ` t - t ?i t 7 2 t 1 d f t S j I 1 11 t 1 1 i 1 t 1 f? o t 1) i 3 ? t t y ? w 1 , .?;??•.;'°:;:;?•. ? tit --. t t 1 t ?t t ! r ?r r { 1 I { ? ? 1 10 1 ?I { IUI?w Q2 1 \ 1 1 t I 1 I 1 1 r? r i A/ I 3:? {f r r? ? r f ! J 1 1 f 1 ? t r ? r Ir ? f , \ 1 l N 64 I? 1 I - r t i t t - O, N Qu 1 \ t 1 ? r 1 1 1 I, I i r r i / i t r t k 4 /a Ir ? 1 J tf ?t t 1 STORM-SEWER CALCULATIONS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 v« ni3"-- - V AM EDGY: ;FF 'M3 r9`af??i1S1 _ a 0 2B a0 212 am aM S -M71 1I X' ff 1_..3.-0. M«b8ak_2AI Raab Ma6giAa PY«iutU Li.MW SabyFaed flonaN.a Awr. pa ohm Siw« SMr5w. BHOA Ptl0 Vp«at«? 2 D Ruch BO 1.h 4.18 STABLE 7faabE Sal OdLaa« 2tl0 6/tl tatl STABLE m,, L. G1G+U7<9-e/ BadtbkNS.- n***************************************************************************** NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. USER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS PROJECT NAME: Quest Church PROJECT NO.: COMPUTED BY: DATE: 10/2/2008 FROM STATION/REACH: TO STATION/REACH: 'DRAINAGE AREA: DESIGN FREQUENCY: ***************************************************************************** INPUT PARAMETERS ***************************************************************************** Channel Discharge Peak Flow Period hannel Slope Channel Bottom Width eft Side Slope ight Side Slope 3.5 cfs (.10 m^3/s) 6 hours 0.047 ft/ft 2.0 ft (.61 3:1 3:1 (0.047 m/m) m) Channel Lining : P300 Staple E Bunch 50-75% ?ermi. Shear(Tp) :7.00 psf (335.2 Pa) Phase = 2 Class = D Vegetation ' Soil = Clay Loam Allowable Soil Shear(Ta):2 psf (95.76 Pa) **************************************************************************** CALCULATIONS **************************************************************************** nitial Depth Estimate = 0.16 * (3.5 /(0.047^0.5))^0.375 = 0.45 ft (.14 m) inal Channel Depth (after 7 iterations) = .48 ft (0.15 m) Flow Area = (2.0 * 0.5)+(0.5 *0.48^2 * (3.0+3.0)) = 1.6 sq.ft (0.2 m^2) et Per. =2.0 +(0.5*(((3.0^2)+1)^.5 +((3.0^2)+1)^.5)) = E 5.0 ft (1.5 m) ydraulic Radius = (1.6 / 5.0) = 0.3 ft (0.1 m) Channel Velocity =(1.486/0.072)*(0.3^0.667)*(0.047^.5) = 2.1 fps (0.6 m/s) hannel Effective Manning's Roughness = 0.072 alculated Shear (Td) = 62.4 * 0.48 * 0.047 = 1.41 psf (67.3 Pa) Safety Factor = (Tp/Td) = (7.00 /1.41) = 4.98 Iffective Stress on Blanket(Te) = 1.4*(1-0.40)*(/0.072)^2 = 0.19 psf (9.0 Pa) Safety Factor = (Ta/Te) = (2.00 /0.189) = 10.60 1 1 1 i D jf p± /. i f i N O O. rol L N a Q r O N N C O N C UI X W 3 O O N 3 ? c m C T CD- _ co Q Cl) U) N C O N m E 7 z m N .C Or v c 0 a m 0 a` *.' O O O O O ' O ull to LO LO O (`'J _ ; 4! Lq M IC! O O N N O O CA C 0 0 0 o 0 0 0 0 0 0 0 0 Cl) mm mm m m mm m m O m OD O O N C LO _ w U UU UU U U UU U U U CD J ? N M Q C a) N= w LO N N - N N N to 00 mr LO 00 CO) ZZ, O O O LO O O tO 0 tO 0 N m O d It W CU O f? m ti 00 OD 'It N t` O O O O N M C6 L6 V L6 6 CV O O O O O O O O O O O O M Cl) Cl) M m Cl) m m m M M m M m r N 7 U ? C CL l0 U U U U U U U U U U U U U .? w .J ? O L ? c G 7 z N N N N N N N - - co - - - Z. O O O O O O O O O O O O Ut O LO O to to O to O LO to m CO N M N Cli 6 N CO CV Cq 6 CV N C L 7 'j C O O O O O O O O O O O O J ^,? O O LO O O to O LO O O to LO CO M v cM a CM a M V' V M M C G U U U U U U U U t U U U ? d N N N ' N N N m d N d N l0 ? ? ? ? CL LY ? LY [C CC CC [r [Y C E O O O O O O O O O O O O CU _ M O OD o to m to to to 00 to N R W c t? rn ?t w rn rn o rn rn ao m o M M 0 M co Cl) Cl) Cl) m co M M M O CO O O 0 O n0 _ O .O. O Y O . O _ 0 O N V C CL C C C C C L C C ? . C N T a :$ C7 :o :a C7 ? C7 a :n C7 a ? AF o o ° o o Q o 2 o o 2 o a U U ? U U ? U ? U U ? U O ? C r ? O a 2 0 CN ro m co r` 9) o r co 4 ? , s v im U U ? ? s U H Z ' - N M V LO CD t- 00 C) - - -- 04 r ? V) d C N n 0 c w X w m 3 d E 0 m a x 0 i ? ( i ? i t Li E co W AA3+ V? co E L r0 n O o O O O O O o 3 p - _ N al O O _ - p i m co c m c -f6 m c 6 c to c 6 m c m c m c co = T :o (? o a C7 n C9 o C7 :Q T- co --j F- E E o E E CL E o E E o E (D U U U U U U U U D 0 a O N c o a o Z c w ?-• N M M U') w I-- I-- m ° N r cu cl O W In lO co Ll7 h LO O (D t? N cr C7 C' O 'ct 00 M CO N O N O) tt) (D _ N ce) Cl) O' d d 0 co co (O f? M M ' O O O O O O O O O O O O Cl) M M M Cl) M M Cl) Cl) Cl) Cl) Cl) Cl) v O h C N O r (o M N N t` d Cl) d LO N O Cl) (0 d O Cl) O 2 O O O C O O O c c; c O O O J _ Ur d `oO N LO t-- N t` (O It m M m = OR OD (0 M O UO O OO M O N N N (M O d d d (fl W (0 (ti (M Cl) N O O O O O O O O O O O O c Cl) Cl) Cl) M M Cl) M M Cl) M Cl) M M w O C J 3 Cl) pl O CO 0) d lO OO tO M co (O tO N co N to N O to o) d n Uf N _ 'a V O M N M (o M c) M M M 't M d to LO O co M M E M M M N M M M Z d Q. ^ O d n M OO O O O N O to d O C O o 0 ? O M to O O N O N O J ? tri ) to h tO O tq O tq to to O O 0 to O O O N O O O O O O d O CO O 00 to O O t` O M tO t` LO M tO M to d tO N M n O O > J = w O O r M M co M M M co M M co M M M L'' C N .- O M O tt O w O 0 O O O O to LO tO N LO N w O O O O M M co a E > J w of O - N M N M (M r d d tn. u -7 N M M M M M M M M M M T L 'C O O O O O O O O O O O O O N c • C OF O O O O O O O O O O o a C) 0 O ? J d M CO 00 N M O O O 00 OD N dd O ?- tO tO d IT OO 0 0 w M (? O) O C J N U U U U U U U U U U U U U ..I 1 •_ E t o _ C N C N N N N N N U) M - - co co U j J M L:. r co O a td J O d 'V O7 to W to N t- M N M a- O N N V W •a LL Lo (p O C T M O d N lO (D O OO r` O (O ui N N N co (O .r- 10 7 N 0 C II e O a 0 •° t c 7 O ? Z U a w m C ° ~ z J Z r N M d lO O OD p) ?-- r r a ji 1=_) L 3 as E O AW R, co 7 d J co O O N > N Q O O O O O M O CO to O M O tO O to O to O M O U) O N r _ lJ1 = ? O O O ;t O O O O O O O O ? O E Cl) Cl) CO M Cl) co M M Cl) M Cl) Cl) O O O O O O tO M O O O tO O M O tO O tO O tO O CO O 7 O N O C Q tO co h O O O O O O O to h (O 7 O O O O O co M M Cl) M O Cl) O Cl) O Cl) O M O M O M O M O co C' . co M N In h co co CO M O * N to h h O O W m M O O In M lO O ' Q N M _O 8 O O O <Y O 'ct O o O u O (6 O o O M O M O ( yJ M M M M Cl) Cl) M Cl) M M M Cl) M J 2 C ^, M O rn to to h CO ?F W CR c} (o o (O to N (o N t0 N O O m V h to ? .? o CN Cl) Cl) Cl) O O O O O ?f O It O t0 O tO O co O Co O M O M O M co M M M M M M Co co Cl) Cl) M M O O O U) O V: M cq q h O M U) h to CO LO CO to tt LO N M h O O O O o N O O O O M O m O t0 O V' O to O (o O O N O w W (D Cl) Cl) Cl) Cl) M M Cl) Cl) Cl) Cl) Cl) co O N O O O O O M V to o O O O to to tO N tO N to O O tT O M M CO ? rn O o O O O O O O O O O O Z N Cl) co M Cl) Cl) M Cl) M M M Cl) co d >? O c r 1 to (A to r 0 O Lo co O to U) O CL 6 0 6 t6 o 6 o N o 6 o c; o N N N N r N N N N 00 O CO (O O h O O 14: M (P (O m d' (P CO t? (O N tO CO ?t V O X O N V Ch ?t cl' 'd' N c 11 d- tyo O N C) COO 0) 0) <M- 0 N (MD (00 dM d V w v lA CA CO lO O O ? CA h CO tt h h N 11 ,? 3 y co O N U) N to h M N M ?- O N N st m N i . w v 0 Cp N 0 M O tt to to V: ? T O h O Co (O N N N 11 C i O CO N M CA O N O N <- N _ to to o h LO tri co r.- h 1- h h h } h n to (h o (o M o E ° 0 i 0 0 0 i (A O o It o v r tr <- tr tri t0 to t0 t0 11 f , v , to c E o 0 0 0 0 0 0 0 0 0 0 0 0 .?o LO t0 t0 t0 N tr) LO to tri to to tri t0 A. E () O co co o (p O CO h O 0) N N v O Co CO h h to m co m V' M d K F' N CV N O r r r O O O O O O M Q V O co CO co CA CA N M <t O CA O N tO M N O V' M O - O O O O O O O O O O O o 0 < C C U LO LO to LO to O Cb cq O CO to O to OJ IO CO tO OD LO O (O Cb tO cq V) CO V O O o 0 0 o 0 0 o O O O O t 0 V {0 CO h O M N lO O N CO CO to O .- O O o r V N O m a ?- co m N o N .- o ?- o 0 0 0 Q C m O M N O lMO N M O st O ' VO "a ` N - o 0 0 0 0 0 0 0 0 0 0 0 . o 0 m 0 0 O O O o ° 0 0 O ° ° ° a 00 11 J • (6 p6 (6 0* 0 ° , 0 o 0 N co r 0 ?t VO' C°D COo c00o ONO Cl) ,= rn t: O ? ~ ? = C J LL! - N M M LO CO h h 0) N ~ a? (q d yy 4f H J r N M V 1O (O O CA ° C'1 z N to cj O O1 3 (n 3 m v 2 u O U) .C a C O a ?O f to L 0. L CO E L ' ^ 0 v? 0 °o °o °o °o ° o 0 C) N to o V) O . C) O In m M M M CO L O M N ! In0 SZ'90£ '13 'AUI 09,80C '13 WN i ( ltt l l 1 ? 1 w \° j i ( -- T LO l l :ul - 00'OZ+L elS if T c o = 0 ul 06'90£ '13 'nul 3n0 Sti'SOE '13 'AUI 08'60£ '13 WIN ° o ° OG :ul 0079+9 IRIS _ co UI SO'SOE '13 'AUJ In0 98'170£ '13 'AUI 02'60E'13 WQJ o O ° m UO 0 0 LO ul 9Z'170E '13 'AUI V ° LO iD >n0 9L'EOE '13 'AUI N LO o 09'60£ I3 WN 0 L :ul - 0 ' ° 0 o 6L+y M 0 V N U') ul 99'EOS '13 'AUI w o ° ln0 OE'EOE '13 'AUI ' ' o 0 OE 60E 13 WIcl v 9 :Ul - 00'6£+y eIS o O ul OO £0£ '13 'AUI °c v v In0 OL'ZO£ l3 'AUI ' ' c: c 09 60£ 13 wI?j ° S •ul - 00 66+E e)S C9 UI 00'ZO£ '13 'AUI ° }n0 08' l0E '13 'AUI M 00'60£ '13 WIH £ :Ul - 00'69+Z eIS O N ul OS' LOE '13 'AUI , , ' o0 00C 13 in0 09 nut N 0VLO£'13 WIN Z :ul - 00' L L+Z e3S UI Ob'OOE '13 'AUI ln0 Ob'OOE '13 'AUI ° OE'90£ '13 IAN 6 :ul - 00'99+? e}S 0 °o J (7 S o ° ?O ul OE'66Z '13 'AUI OS'SOE '13 •PWE) Ilepn0 - 00'00+0 e3S 0 °o °o °o o° C) a) M a) ui M o M • L M o M LO N W 0 0 U) W 3 m E O 0 m CD C) 0 0 o O O w U7 O O M co Cl) Cl) Cl) lnO 91 OS 8 :ul -- ul SZ }n0 SLT 09'60 00 ? 1 ? t s 4 ? I l 906 13 'nul MUG WN DO'08+0 LIS 0 CV e r O 06 13 'AUI 06 '13 'nul 6 '13 W18 00+0 e3S ti o o ? M N O O N 0 Cl) O O O O 0 0 0 ti 0 O L U R3 O O M O N O J 2 O °o• o°, °o o°, 00 v to C*4 M M M M M C 0 cn c 0 X W N 3 E 0 0 0 N I.L.1 j 2 I F # tj Q ?i a L 3 E to L CO 3n0 17:u. W 09 in0 08 00' 00*00 LLI 0 Q 00 N M 0 0 0 0 O O O O N (O O V M M M O(M 0 O co O) N O r O r O r Q 0 co O U (6 U 0 (D O Lo 0 O M O N o = 0 O co N 0 c m X W 3 a? E O C0 O m T 2 0 0 0 0 co N (O 0 C V) M Cl) M Cl) t a 1 ?t a ? u L a L ?.r a 3 a E L ?0 v / ;n( CL :I u inc Zl .u ul 0 3n0 0 0i 0 0 v M 0 0 0 0 0 0 0 0 co to N co C) M m 0 0 m 0) N O `N- O 0 0 T 0 0) 0 0 0 t U o ? co U LO 0 v 0 M O N J o= O q O O N C c x w 3 Cl) E O O m -`o T C) 0 0 0 ?t M M M M M N W L 1. I'll ?l 1 WATER QUALITY/ QUANTITY 11 k U z z 0 z Q Z. ui O c G) O O C ?y1 b O E 3 c 'cmE y O n to N y pCp d_C G. ? qO O ?v N v £ Z ? 3 p?vm O N y ?a0+ E m m L ? L cO u o 7 N ~ o' 1= F m¢ m ° c C m O N C c G ? _ eO' 7 G C n L m O ° C y ?! U oc?.a L 'o LU N N L7 y 17 G? s£E m 3 ? 22 P, o N m T. 0 U c F m ? ='.o z 0 0c z w CL M N m ? m m N,?$6 P n CL aMV zo N nb> L' m d O Edn d O N ? y d C 'V n V A pd1 7 C Y '? u C C Ts Y_£ m T 3 's -c Yno no o, m N p N pogw $?r?Q O 3 aYi a v n c7?$ c m y C H§a zo :2 ' -P C , C N VI ?p C ??pp C ? N N d m c s t y ° ?. a d •; n? °$ NCJ C, w C d dF d C E y yb m maV' c w?0-:5 w Fr_ or9,c¢ Q c 'C d a>i ,m o C c m m O1 c C i Q O d n C d Y ? O T C m Z+ h m E w C ? £ W W ? v ° Y CCa S °' 6 7Tr1 C f d m N 0 L Y > C W L 10 Lo ° yy5Lo C n W £ C LL, m a to .2 N N N `a m o .o - n d1=2 w E p v C ? c m y {%1 b E mo N G ? o- W 0 ryry? c E w 2 T t+ v C. A c wu L y If C O V' y am.. ° m Fs v o > G y vi d .2O yc v m L] £ v m££ E >O V Y Y C Evm 66iv v .-? N M th vi E T a EN?OO J3 y 10 m E V y m v V ? C r o ;Cuxii C CL .n m _O m V H Y ._ N 2A 4.0 Roo 0) woCL _a •c w nc?•? •fN0 ,YC W yV l3 C W y ai E p o' _ o v c Ero c o N V h??tcn C.O xI ?? C n 8??- Y ?L W Iy0 Nd d 9 ova E .; .k ni c+i E N O fl O m c M y ? gyp b yy m b d O £ m 5 7 E o E c m C ?+ n d O N r £ O d ?'.Od N £ W W o C y? d _ N O N 0/ n N ( n cx 0 •py O N Q O m C C TJ E v m S Yn c ?'3 ?'pn . o °-?? ,.. ar ai m y £Q V ao`r v :E o o £ £ 3 n tw LO o '13 N C N a + d O m > o c> ``n"o £.= r- A ? £ .a N c O wccc E cLE o $ E G> v$ o b 2 FLU g= 2 O ? -q C o E ccm B.rccw ? ? Y N 'p H O? N N y mv E y E o E d ° n YE c V) G V) E m a,E°J $cn _ m p E E c N p,yp m C y O. p C N•C G .G m d m 0v E Toy E a°iwvnamiE m'o g S 0 C 6C E 3 cm L L .-1 N N M •cF U Li 2 ? f a x L 01 v W L E 3 L .0 N y 01 E £ E rn E ` N a + 7 N f E c '? £ o m = m c £ p c v d n ?+ L L b u I b p m N E ° o c E rn m y N ° b r b ` ' p N p r3 r ?• d 1 ? L 3 y b C f /1 N •pp G w .?+ L° •Q O V rn m r o-,n b C >> E?78 wci p u $0avo N 2 cc E E O C O O a '828r- nE ' v 3: w m E y m o c 01 a n ° £ /0 N C p ? C •C N N i O G o ?gt C 17ot C y 7 3 R m L 3 ,? O V O m E q u O C ? o acit b asp pv N t yy a C N C O b r ,C "6 im N r+L • ?' O O 1- y f L y O d A O v v c vd>=E!!'rnw In- vi £ N£ pT t l28 g ro- h>° N w 1 1?. n 7 3a 8 J3= ?i x s 0 ??pp V y ? a F ¢ .4 D N5M?ui lp r= t,: 1 j ' Pond Summary - Phase 1 Pond Drainage Area (acres): Curve Number: Time of Concentration (minutes): Q 1-year (cfs): s Q 25-year (cfs): Q 100-year (cfs): f I Outlet Controls: I ?i Permanent Pool Elevation: Min. Required Surface Area (sf): 3 Surface Area provided (sf): 1" storm storage volume required (cf): i Storage volume provided (cf): Storage volume draw-down time (days): 1-year storm control: E Q 1-year routed through pond (cfs): ?i 1-year storm elevation: Incremental Weir elevation: Incremental Weir width (in): Incremental Weir height (in): Top of riser structure: i Riser structure outfall: Riser structure crest length (ft): Q 25-year routed through pond (cfs): 25-year storm elevation: 10 Q 0-year routed through pond (cfs): 100-year storm elevation: Top of dam elevation: Level Spreader: Design Storm: Runoff coefficient: Drainage Area (acres): Q-1" storm runoff (Q=CIA cfs): Level spreader length (13'/cfs)(If): 1 Pre-Developed 4.65 58.7 12 0.119 8.855 13.82 299.3 3,267 6,395 6,725 14,343 2.37 1.75" PVC orifice @ 299.3 0.103 301 301 30 303.5 18" RCP 20 8.642 303.44 18.81 303.77 305 1" 0.85 4.65 3.95 52 Post-Developed 4.65 7 5 3.873 28.83 35.73 12" PVC outlet pipe to level spreader < Q 1-year pre-developed < Q 25-year pre-developed Proposed Wet Pond #1 ' Project Information Ul" 1 Site Information Project Name: Quest Fellowship Church Project #: 003001 Designed by: MEL Date: Revised by. Date: Checked by: Date: Sub Area Location: Drainage To Proposed Pond#1 Drainage Area (DA) = 4.65 Acres Impervious Area (IA) = 1.85 Acres Percent Impervious (1) = 39.8 % Required Surface Area Permament Pool Depth: 3 ft SAIDA = 1.613 (85% TSS Removal via Wetlands) Min Req'd Surface Area = 3267 sf (at Permanent Pool) Required Storage Volume Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +.009 (1) = 0.41 in/in Storage Volume Required = 6888 cf (above Permanent Pool) Elevations Top of Pond Elevation = 303.50 ft Temporary Pool Elevation = 301.00 ft Permanent Pool Elevation = 299.30 ft Shelf Begining Elevation = 299.80 ft Forebay Weir = 298.00 ft Shelf Ending Elevation = 298.80 ft Bottom Elevation = 295.30 ft Permanent Pool Area Area @ Top of Permanent Pool = 6,395 sf Volume of Temporary Storage = 14,343 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 6395 > 3267) sf Volume of Storage for 1" Storm = 14,343 Yes ( 14343 > 6888) cf 1 1 1 1 11! 11'? Ili a? n? A STORMWATER POND INCREMENTAL DRAWDOWN METHOD Project Information Project Name: Quest Fellowship Church Project #: 003001 Designed by: Date: Checked by: Date: Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Q3 = 0.0437 Co * D2 (Z-D/24-Ei)At"2l Q2 = 0.372 Co * D*(Z-Ei)At-"2I QJ = 0 Orifice Diameter (D) = 1.72 in Cd = 0.6 Ei = 299.3 Orifice Inv. Zone 1 Range = to 299.3 Zone 2 Range = 299.3 to 299.4 Zone 3 Range = 299.4 to 301 Inrramanfnl n-ri- MafhnA Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time s ft cu ft ft cfs min 299.30 6,395 0 0.00 2.00 0.000 -- 299.80 8260 3,664 0.50 3.00 0.051 1,203 300.00 8470 1,673 0.70 3.00 0.061 453 300.20 8680 1,715 0.90 3.00 0.071 405 300.40 8895 1,757 1.10 3.00 0.079 372 300.60 9110 1,801 1.30 3.00 0.086 349 301.00 9550 3,732 1.70 3.00 0.099 628 Total -- 14,342 - - - 3,411 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 14,342 cf Total Time = 3,411 min Total Time = 2.37 days 6/5/2008 Prop Wet Pond-Phasel Incremental Drawdown Time 3of5 Proposed Wet Pond #1 F t m j1 Project Information Site Information Project Name: Quest Fellowship Church Project #: 003001 Designed by: MEL Date: Revised by: Date: Checked by: Date: Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 4.65 Acres Impervious Area (IA) = 1.85 Acres Percent Impervious (1) = 39.8 % (Drainage Area) Emergency Spillway Runoff Coefficient (C) = 0.70 Rainfall Intensity (1100) = 9.72 in/hr (100-Yr Intensity) Drainage Area = 4.65 acres Flow Rate (q,00) = 31.6 cfs qw = 31.6 cfs h = 1.00 ft Cw = 3.2 L = 10 ft (5'x5' Square Riser Box) Orifice Sizing Orifice Size = 1.75 in (Diameter) Drawdown Time = 2.4 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes 411 Anti-Flotation Device 5'x 5' Inlet Structure Area: 25.0 sf Volume: 205.0 cf Weight: 1279 Ibs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 15350 Ibs Volume of Concrete Req'd: 102.3 cf Volume Provided: 118.5 cf Sediment Storage L20=2.3CA(.0091+.05) C = 50.00 mg/I A = 4 .6.65 5 4 ac ac I = 39.78 % L20 = 218.21 cf depth 1.00 ft Area required 218 sf Area Provided 6,274 sf Depth of Sediment Storage Required 0.03 ft Depth of Sediment Storage Provided 1.00 ft (Water Displaced- Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (5'x5' riser x 1.8'= 45cf, 7'x7' footing x 1.5'= 73.5cf) n V---fj R"d, of F A .e C. 2 0 1 a5E STAKE StmYE 4d Wlern 3? S92t 575 STAKE Eta 6 4pI `x?em ' !NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 `NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. USER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS g *ict***ttir?cic***kick****ic*ic*****Ft?cic**k*ick?cic*k****ttt*ic*t**icic*icF*F*********icFic** r t PROJECT NAME: PROJECT NO.: COMPUTED BY: ` DATE: 7/11/2008 FROM STATION/REACH: TO STATION/REACH: DRAINAGE AREA: DESIGN FREQUENCY: ************** INPUT PARAMETERS Channel Discharge : 8.7 cfs (.25 m^3/s) eak Flow Period : 6 hours hannel Slope : 0.043 ft/ft (0.043 m/m) hannel Bottom Width : 2.0 ft (.61 m) Left Side Slope : 3:1 U ight Side Slope : 3:1 Channel Lining : C350 Staple E Bunch 50-75% U ermi. Shear(Tp) :9.00 psf (430.9 Pa) Phase = 2 Class = D Vegetation Soil = Clay Loam Allowable Soil Shear(Ta):3 psf (143.64 Pa) ***************************************************************************** CALCULATIONS nitial Depth Estimate = 0.16 * (8.7 /(0.043^0.5))^0.375 = 0.65 ft (.20 m) inal Channel Depth (after 5 iterations) = .67 ft (0.20 m) low Area = (2.0 * 0.7)+(0.5 *0.67^2 * (3.0+3.0)) = 2.7 sq.ft (0.2 m^2) et Per. =2.0 +(0.7*(((3.0^2)+1)^.5 +((3.0^2)+1)^.5)) = 6.2 ft (1.9 m) Elydraulic Radius = (2.7 / 6.2) = 0.4 ft (0.1 m) annel Velocity =(1.486/0.054)*(0.4^0.667)*(0.043^.5) = 3.2 fps (1.0 m/s) annel Effective Manning's Roughness = 0.054 lculated Shear (Td) = 62.4 * 0.67 * 0.043 = 1.81 psf (86.8 Pa) Safety Factor = (Tp/Td) = (9.00 /1.81) = 4.96 fective Stress on Blanket(Te) = 1.8*(1-0.40)*(/0.054)^2 = 0.52 psf (25.0 Pa) fety Factor = (Ta/Te) = (3.00 /0.521) = 5.75 n i W--ry + UVOY.Yo ,.?-_..,.,.,,,._,_.. ''^.,, ??'` \ \\ \ ?``•,,,, „A?`'^-.. ""'?,.? ?? ?` `?? O obi c?,Q r r ? 4 Y t t ,??? ? tt I ? ? \N` ? i Y y i •? ` '? ? t` ? ? ti? E ? i r 4 ? ? i Ir ? ? 4 ? ? 9 l ` 1 I 4 1 ` r ' • ?} `?\ 1`\L\ ~? ?. `? r I ? S' \. ?? ?`'y `\ ?•?: j j s l t { `\ Ilk NN, L_ J t j \ i y ` `k 4 ....____ ??g ?? rJ ? ? f f'? e f J??i ?! JJJfJ J ? i ? \ p-: ? : :: • ??? 4 `,? ?\?s `..--,.? ` = .. ? ! ? f frf ' f!! J'J J iJ JJ ? ?/ Ir 4:?? t ' ' ' • ;t ; \ ??? '.._.,,, •? '='? ?" ____-'? ! ?rJ/ / /?, // JI,/fJ tIli ffJ1 J J/1 I /r! •?` ??, , • `'" ,? i ?` ?`` „ • ...y_...,«...-°' J `J JJ `! ?J / JJ !!, l ?t ( f, ! !/ •!?1 ff ? • 5 . /rsi t1 4 ? ? 7'' ?h'`'^'^'°" ? l ! ? / ?f I 1 t 1 ? i? • 1r?"e..• 1 • • • ''?#• ? • ??• _ ,C !IS 4 ? I ?i "'+..? 1 i s 1 } i If 08 ?r o E o E E ° •- F ~ EE O f CV4 q E o Z a > N 16 s, gE o mil C In o Mu C ? E a W g C m z ?? 4 w p p g -' U O LLfWiJf> ii Fpq E g 8 ? 0 N w FS E N M C? O q?q W O y, N A ? W O O o w O L. 1I U O el g 3 b F x m ? m X X ? Z 1= ? o u E o E E E ? F Q ? pE r r r7 E o o N o ? N O a K o 2 E a ro 3 z -? - Q Ws OM rg E o ? n F a r S N O o ? t9 U o x F £ tV r E E P ? r g?4 K ?5 a lG eil A m T J?J m. L p r LLWy O W v N E m u a IbL £ X • S V ? 3 9 u }I ?J { Quest Fellowship Church Triangle Site Design, FLLC Curve Number Calculation (CN) Pre-Developed Conditions Pond-Phase 1 Drainage Area (acresL 4.65 Existing Soil GrOUDS. Soil Groua Map Symbo! Soi! Description B ApB2 Appling Sandy Loam B ApC2 Appling Sandy Loam D WyAO Worsham Sandy Loam Existing Land Uses: Land Use Description Woods - Good Condition Woods - Good Condition Meadow Existing Soil Group Acres D-Worsham 0.2 B - Appling 0.25 B - Appling 4.2 Acres 3.25 1.2 0.2 Curve # 77 55 58 Cumulative Curve # = Percent of DA 59% 27% 14% Weighted CN 3.3 3.0 52.4 58.7 Ifl Quest Fellowship Church Triangle Site Design, PLLC Curve Number Calculation (CN) Post-Developed Conditions Pond-Phase 1 Oraina e Area (acresL 4.65 Existina Soil GrouDs: Soil Grouv Map Symbol Soil Description Acres B ApB2 Appling Sandy Loam 3.25 B ApC2 Appling Sandy Loam 1.2 D WyAO Worsham Sandy Loam 0.2 Proposed Land Uses• Land Use Description Impervious Areas Open Space-Good Stormwater Pond Existing Soil Group D&B B - Appling B - Appling Acres Curve # 1.8 98 2.7 79 0.15 100 Cumulative Curve # _ Percent of DA 59% 27% 14% Weighted CN 37.9 45.9 3.2 87.0 Hydrograph Report 1 ' Hydraflow Hydrographs Fxtension for AutoCADO Civil 31DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 1 ' Pre-Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 4.650 ac Basin Slope = 0.0% t } Tc method = USER Total precip. = 2.10 in ?i Storm duration = 6.00 hrs Thursday, Jun 5, 2008 Peak discharge = 0.119 cfs Time to peak = 360 min Hyd. volume = 1,081 cuft Curve number = 58.7 Hydraulic length = 0 ft Time of conc. (Tc) = 12.00 min Distribution = SCS 6-Hr Shape factor = 484 1-1 ?f ' Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year i I u. 5u r 0 45 ' . 0 40 . 0 35 . 0 30 . 25 0 "i . 0 20 . t? 0 15 . 0 10 . 0 05 . 0 00 - Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 60 120 180 240 300 -- Hyd No. 1 t_ 360 420 Time (min) Precipitation Report 2 ' Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2008 by Autodesk, Inc. v6 052 Hyd. No. 1 Pre-Developed Storm Frequency = 1 yrs Time interval Total precip. = 2.1000 in Distribution Storm duration = 6.00 hrs Thursday, Jun 5, 2008 = 2 min = SCS 6-Hr i I Precip (in) Pi 'ecip (in) 0.10 0.09 0.08 0.07 0.10 09 0 - . 0 08 . 07 0 . 0 06 . - 0 05 . 04 0 . 0 03 . 02 0 . 0 01 . 0.00 - 0 40 80 - SCS 6-Hr Design Storm Incremental Rainfall Precipitation Hyd. No. 1 : Pre-Developed - 1 Year 120 160 200 240 280 320 360 Time 0.06 0.05 0.04 0.03 0.02 0.01 0.00 (min) R s oil ki, Fy 3J Hydrograph Report 1 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2008 by Autodesk, Inc x6.052 Hyd. No. 1 Pre-Developed Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 4.650 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.50 in Storm duration = 24.00 hrs Thursday, Jun 5, 2008 Peak discharge = 8.855 cfs Time to peak = 730 min Hyd. volume = 26,197 cuft Curve number = 58.7 Hydraulic length = 0 ft Time of conc. (Tc) = 12.00 min Distribution = Synthetic Shape factor = 484 Q (cfs) 10.00 8.0 6.0( 4.00 2.00 0.00 -' I I I / I I I I Q (cfs) 10.00 8.00 6.00 4.00 2.00 n nn 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 1 Pre-Developed Hyd. No. 1 -- 25 Year ' Precipitation Re por ' Hydraflow Hydrographs Extension for AutoCADn Civil 3D® 2008 by Autodesk, !nc. v6.052 Hyd. No. I ' Pre-Developed Storm Frequency = 25 yrs Time interval Total precip. = 5.4995 in Distribution Storm duration = 24.00 hrs z 1 Precip (in) .?i Precip (in) 0.50 0.50 0 45 . 0.45 ki 0 40 ? . 0.40 0 35 . 0.35 ?z 0 30 . 0.30 0 25 . 0.25 # 20 0 . 0.20 0 15 . 0.15 0 10 . 0 0.10 0 05 . 0.05 1 0.00 n nn 0 140 280 420 -- Synthetic Design Storm 2 Thursday, Jun 5, 2008 = 2 min = Synthetic Incremental Rainfall Precipitation Hyd. No. 1 : Pre-Developed - 25 Year 560 700 840 980 1120 1260 1400 1540 Time (min) yd rograph Report ' Hydraflow Hydrographs Extension for AutoC^.D® Civil 3D® 2008 by Autodes'., Inc. v6.052 Hyd. No. 1 ' Pre-Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 4.650 ac Basin Slope = 0.0% i Tc method = USER Total precip. = 6.70 in Storm duration = 24.00 hrs 3 Thursday, Jun 5, 2008 Peak discharge = 13.82 cfs Time to peak = 730 min Hyd. volume = 39,571 cuft Curve number = 58.7 Hydraulic length = 0 ft Time of conc. (Tc) = 12.00 min Distribution = Synthetic Shape factor = 484 i cfs Q( ) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 - Pre-Developed Hyd. No. 1 -- 100 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 n nn 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 v Time (min) -- Hyd No. 1 Precipitation Report ' Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2008 by Autoriosk, Inc. v6.052 Hyd. No. 1 ' Pre-Developed Storm Frequency = 100 yrs Time interval Total precip. = 6.7015 in Distribution Storm duration = 24.00 hrs Incremental Rainfall Precipitation Hyd. No. 1 : Pre-Developed - 100 Year i P E 6 } j ( Precip (in) 4 Pi 'ecip (in) 0.50 0.45 0.40 0.35 0.50 0 45 . 40 0 . 0 35 . 0 30 . 0 25 . 0 20 . 15 0 . 0 10 . 0 0 05 . 0.00 - 0 140 280 420 - Synthetic Design Storm Thursday, Jun 5, 2008 = 2 min = Synthetic 0.30 0.25 0.20 0.15 0.10 0.05 n nn 560 700 840 980 1120 1260 1400 1540 Time (min) is 's 5 e 4 j fill, ydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2008 by Auiodesk, Inc. v6.052 Hyd. No. 2 Post-Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (cfs) 4.0" 3.0 2.0( 1.00 0.00 U 6u 120 180 240 300 360 -- Hyd No. 2 2 min 4.650 ac 0.0% USER 2.10 in 6.00 hrs 1 Thursday, Jun 5, 2008 Peak discharge = 3.873 cfs Time to peak = 144 min Hyd. volume = 15,578 cuft Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6-Hr Shape factor = 484 Post-Developed Hyd. No. 2 -- 1 Year Q (cfs) 4.00 3.00 2.00 1.00 0.00 420 Time (min) ti_ , Precipitation Report 2 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Hyd. No. 2 Post-Developed Storm Frequency = 1 yrs Time interval Total precip. = 2.1000 in Distribution Storm duration = 6.00 hrs i i } t ? f Precip (in) I 0.10 i 0 09 . 0 08 . i 0 07 . 1 0 06 . 0 05 . jj 0 04 . .l -ecip (in) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.03 0 02 . 0.02 0 01 . 0.01 0.00 0 00 0 40 80 - SCS 6-Hr Design Storm Incremental Rainfall Precipitation Hyd. No. 2: Post-Developed - 1 Year Thursday, Jun 5, 2008 = 2 min = SCS 6-Hr 120 160 200 240 280 320 360 Time (min) I Hydrograph Report ' Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 200R by Autodesk, Inc. v6.052 Hyd. No. 2 Post-Developed Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 4.650 ac Basin Slope = 0.0% ' Tc method = USER Total precip. = 5.50 in Storm duration = 24.00 hrs Post-Developed Hyd. No. 2 -- 25 Year Q cfs 30.00 25.01 20A 15.00 i #j 10.00 5.00 0.00 1 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0 00 0 120 240 360 480 600 720 840 960 ?? - Hyd No. 2 Thursday, Jun 5, 2008 Peak discharge = 28.83 cfs Time to peak = 724 min Hyd. volume = 63,930 cuft Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Synthetic Shape factor = 484 1080 Time (min) ' Precipitation Report 2 ' Hydraflow Hydrographs Extensi on for AutoCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Thursday, Jun 5, 2008 Hyd. No. 2 ' Post-Developed Storm Frequency = 25 yrs Time interval = 2 min Total precip. = 5.4995 in Distribution = Synthetic Storm duration = 24.00 hrs i , x f Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 2: Post-Developed - 25 Year t? 0.50 0 45 0.50 f . 0 40 0.45 d` . 0 35 0.40 . 0 30 0.35 oil . 25 0 0.30 . 20 0 0.25 . 0 15 0.20 . 0 10 0.15 . 0 05 0.10 . 0.00 - 0.05 n nn 0 140 280 420 560 700 840 980 1120 1260 1400 1540 __ Time (min) -- Synthetic Design Storm .t Hydrograph Report ' Hydraflow Hydrographs Extension for AutoCAD® Civil 31)n 2008 by Autodesk, Inc. v6.052 Hyd. No. 2 Post-Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 4.650 ac Basin Slope = 0.0% Tc method = USER Total precip. = 6.70 in I r Storm duration = 24.00 hrs F 2 ' Q cfs ' 40.00 ?t I + 30.00 - 20.00 A? i l 10.00 Q (cfs) 40.00 30.00 20.00 10.00 0.00 - 0 00 0 120 Hyd No. 2 t '.I Post-Developed Hyd. No. 2 -- 100 Year 3 Thursday, Jun 5, 2008 Peak discharge = 35.73 cfs Time to peak = 724 min Hyd. volume = 82,147 cuft Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Synthetic Shape factor = 484 240 360 480 600 720 840 960 1080 Time (min) Precipitation Report ' Hydraflow Hydrographs Extension for AutoCADO Civil 2DO 2008 by Autodesk, Inc. v6.C52 Hyd. No. 2 ' Post-Developed Storm Frequency = 100 yrs Time interval Total precip. = 6.7015 in Distribution Storm duration = 24.00 hrs 3 tgi 3 t s ' Precip (in) Precip (in) 0.50 I 0 45 0.50 ' . 0 40 0.45 . 35 0 0.40 . E 0 30 0.35 . 0 0 25 0.30 . 0 20 0.25 . 0 15 0.20 . 0 10 0.15 . 0 05 0.10 . 0.00 0.05 n nn 0 140 280 420 -- Synthetic Design Storm 4 Thursday, Jun 5, 2008 = 2 min = Synthetic Incremental Rainfall Precipitation Hyd. No. 2: Post-Developed - 100 Year 560 700 840 980 1120 1260 1400 1540 v Time (min) Pon Report z Hydrafiow Hydrographs Extension for AutoCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Thursday, Jun 5, 2008 Pond No. 3 - Pond#1-Low Flew Pond Data Contours - User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 299.30 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 299.30 0.50 299.80 0.70 300.00 0.90 300.20 1.10 300.40 1.70 301.00 2.70 302.00 3.70 303.00 4.70 304.00 5.70 305.00 Contour area (sqft) 6,395 8,260 8,470 8,680 8,895 9,550 10,690 11,885 13,135 14,442 Incr. Storage (cuft) 0 3,664 1,673 1,715 1,757 5,534 10,120 11,288 12,510 13,789 Total storage (cuft) 0 3,664 5,337 7,052 8,809 14,343 24,463 35,750 48,260 62,049 Culvert i Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 1.75 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 1:75 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 299.30 0.00 0.00 0.00 Weir Type = -- - --- --- Length (ft) = 0.50 0.00 0.00 0.00 Multi-Stage = No No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi-Stage = n/a No No No TW Elev. (ft) = 0.00 Note: CulvertfOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Civ A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 299.30 0.00 -- --- -- - --- --- -- -- - 0.000 0.05 366 299.35 0.00 oc -- -- -- --- -- -- --- --- -- 0.002 0.10 733 299.40 0.00 oc - -- --- -- --- --- - --- --- 0.004 0.15 1,099 299.45 0.01 oc -- - - - -- --- -- -- -- 0.008 0.20 1,466 299.50 0.02 oc --- -- --- - --- -- -- -- --- 0.024 0.25 1,832 299.55 0.03 oc ___ ___ - 0.034 0.30 2,198 299.60 0.04 is -- - - -- - - -- --- -- 0.038 0.35 2,565 299.65 0.04 is -- - --- -- -- --- --- -- --- 0.042 0.40 2,931 299.70 0.05 is --- - ___ ___ --- 0.046 0.45 3,297 299.75 0.05 is 0.049 0.50 3,664 299.80 0.05 is -- -- --- -- -- - - --- -- 0.053 0.52 3,831 299.82 0.05 is --- --- -- --- --- -- -- --- --- 0.054 0.54 3,998 299.84 0.05 is -- -- - - --- -- -- -- --- 0.055 0.56 4,166 299.86 0.06 is --- ___ ___ -- 0.056 0.58 4,333 299.88 0.06 is --- -- -- -- --- -- - -- --- 0.057 0.60 4,500 299.90 0.06 is --- -- -- -- -- --- --- --- --- 0.058 0.62 4,668 299.92 0.06 is -- --- -- -- --- --- --- --- --- 0.059 0.64 4,835 299.94 0.06 is ___ ___ ___ ___ ___ ___ 0.061 0.66 5,002 299.96 0.06 is -- -- -- --- -- --- - -- -- 0.062 0.68 5,169 299.98 0.06 is - -- --- - --- --- --- -- -- 0.063 0.70 5,337 300.00 0.06 is -- - - -- -- -- -- -- -- 0.064 0.72 5,508 300.02 0.06 is - --- -- - -- - -- - - 0.065 0.74 5,680 300.04 0.07 is -- -- --- -- --- --- - -- - 0 066 0.76 5,851 300.06 0.07 is --- -- -- -- - - . --- --- -- 0 067 0.78 6,023 300.08 0.07 is - --- -- --- -- -- . --- --- --- 0 068 0.80 6,194 300.10 0.07 is -- --- - - -- -- . -- -- -- 0.069 0.82 6,366 300.12 0.07 is -- -- -- -- --- - -- -- - 0.070 0.84 6,537 300.14 0.07 is -- - - --- --- -- --- -- --- 0.070 0.86 6,709 300.16 0.07 is -- -- -- --- -- - --- -- - 0 071 0.88 6,880 300.18 0.07 is - -- - - - - . -- -- -- 0 072 0.90 7,052 300.20 0.07 is . 0 073 0.92 7,228 300.22 0.07 is -- - - -- -- --- . -- -- - 0.074 Continues on next page... Pond#1 -Low Flow Stage / Storage / Discharge Table ' Stagg Storage Elevation Clv A Clv B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.94 7,403 300.24 0.07 is - --- --- --- 0.075 ' 0.96 7,579 300.26 0.08 is - 0.076 0.98 7,755 300.28 0.08 is --- --- --- --- --- 0.077 1.00 7,931 300.30 0.08 is --- --- --- --- --- --- --- --- --- 0.077 ' 1.02 1.04 8,106 8,282 300.32 300.34 0.08 is 0.08 is --- --- --- - 0.078 0.079 S 1.06 8,458 300.36 0.08 is -- -- - --- --- --- --- -- --- - 0.080 1.08 8,634 300.38 0.08 is --- --- --- --- --- --- --- -- --- 0.081 1.10 8,809 300.40 0.08 is --- --- --- -- --- --- --- --- --- 0.081 1.16 9,363 300.46 0.08 is --- --- --- --- --- --- -- --- -- 0.084 1.22 9,916 300.52 0.09 is --- --- --- --- --- --- --- --- --- 0.086 1.28 10,469 300.58 0.09 is --- --- --- --- --- --- --- --- --- 0.088 1.34 11,023 300.64 0.09 is -- --- --- --- - --- -- --- --- 0.091 1.40 11,576 300.70 0.09 is --- -- --- -- - -- --- --- --- 0.093 1.46 12,129 300.76 0.09 is - - - - - - 0.095 1.52 12,683 300.82 0.10 is --- --- __ =_ _ _ ? = 0.097 1.58 13,236 300.88 0.10 is -- --- --- - -- -- --- --- --- 0.099 1.64 13,789 300.94 0.10 is --- --- --- -- --- --- - --- --- 0.101 l 1.70 14,343 301.00 0.10 is - - +- - - - 0.103 1.80 15,355 301.10 0.11 is - ' ? -= -- -- 0.106 1.90 16,367 301.20 0.11 is --- 0.109 2.00 17,379 301.30 0.11 is --- --- --- --- --- --- --- --- --- 0.112 2.10 18,391 301.40 0.11 is - 0.114 l 2.20 19,403 301.50 0.12 is -- 0 117 2.30 20,415 301.60 0.12 is -- --- --- --- -- -- _ . 0.120 J 2.40 21,427 301.70 0.12 is -- -- - -- - -- --- - -- 0.123 2.50 22,439 301.80 0.13 is -- --- --- --- -- -- --- -- -- 0.125 2.60 23,451 301.90 0.13 is 0.128 ' I 2.70 24,463 302.00 0.13 is - - - - - 0.130 2.80 25,592 302.10 0.13 is - - - -- - -- --- --- --- 0.133 2.90 26,720 302.20 0.14 is --- -- --- -- -- - -- --- - 0.135 3.00 27,849 302.30 0.14 is --- - -- - --- - -- -- --- 0.138 3.10 28,978 302.40 0.14 is 0.140 3.20 30,107 302.50 0.14 is -- - -- -- -- -- -- -- - 0.142 3.30 31,235 302.60 0.14 is --- ___ 0.144 3.40 32,364 302.70 0.15 is 0.147 3.50 33,493 302.80 0.15 is 0.149 3.60 34,622 302.90 0.15 is __ __ -- -- 0.151 3.70 35,750 303.00 0.15 is -- --- - --- -- --- 0.153 3.80 37,001 303.10 0.16 is --- -- -- --- --- --- --- --- -- 0.155 3.90 38,252 303.20 0.16 is --- - - 0.157 4.00 39,503 303.30 0.16 is - --- - --- --- --- -- - - 0.159 4.10 40,754 303.40 0.16 is 0.161 4.20 42,005 303.50 0.16 is -- -- --- --- --- -- --- --- --- 0.163 4.30 43,256 303.60 0.17 is -- --- --- ___ ___ ___ - -- 0.165 4.40 44,507 303.70 0.17 is 0.167 4.50 45,758 303.80 0.17 is 0.169 4.60 47,009 303.90 0.17 is _-- --- -- 0.171 4.70 48,260 304.00 0.17 is --- -- -- -- --- -- --- -- 0.173 4.80 49,639 304.10 0.17 is --- 0.175 4.90 51,018 304.20 0.18 is 0.177 5.00 52;397 304.30 0.18 is -- L= `- --- _ - -- --- -- -- 0.179 5.10 53,776 304.40 0.18 is -- --- --- -- --- -- --- --- --- 0.180 5.20 55,155 304.50 0.18 is - -- --- -- -- --- -- -- --- 0.182 5.30 56,533 304.60 0.18 is 0.184 5.40 57,912 304.70 0.19 is -- - --- --- -- --- -- --- - 0.186 5.50 59,291 304.80 0.19 is -- --- -__ --- 0.187 5.60 60,670 304.90 0.19 is --- - - -- -- -- --- - --- --- 0 189 ? 5.70 62,049 305.00 0.19 is -- - -- --- - - - --- - . 0.191 ? End ii. rr ?q rp n? n? ?o Hydrograph Report Pond#1-1 yr low flow Hyd. No. 4 -- 1 Year Hydraflow Hvdrographs Extension for AutoCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Hyd. No. 4 Pond#1-1yr low flow Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post-Developed Reservoir name = Pond#1-Low Flow Storage Indication method used. Q (cfs) 4.00 3.0 2.0( 1.00 0.00 0 10 - Hyd No. 4 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Thursday, Jun 5 2008 = 0.103 cfs = 6.10 hrs = 14,992 cuft = 301.00 ft = 14,361 cuft 1 Q (cfs) 4.00 3.00 2.00 1.00 n nn 20 30 40 -- Hyd No. 2 50 60 70 80 90 Total storage used = 14,361 cuft 100 Time (hrs) Pond Report 2 ?i Ili Ill UI ne u Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Thursday, Jun 5, 2008 Pot-id No. 1 - Pond#1 Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begini ng Elevation = 301.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 301.00 9,550 0 0 1.00 302.00 10,690 10,114 10,114 2.00 303.00 11,885 11,281 21,395 3.00 304.00 13,135 12,504 33,898 4.00 305.00 14,445 13,783 47,682 Culvert/ Orifice Structures Weir Structures [A] [B] [C] [PrfRSr] [A] [B] [C] [D] Rise (in) = 18.00 30.00 0.00 0.00 Crest Len (ft) = 20.00 0.00 0.00 0.00 Span (in) = 18.00 8.00 0.00 0.00 Crest El. (ft) = 303.50 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 295.30 301.00 0.00 0.00 Weir Type = Riser - --- Length (ft) = 50.00 0.50 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 0.50 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 ExfiI.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage (ft) 4.00 3.0 2.0( 1.00 0.00 0.00 3.00 Total Q Stage / Discharge Elev (ft) 305.00 304.00 303.00 302.00 301 00 6.00 9.00 . 12.00 15.00 18.00 21.00 24.00 27.00 Discharge (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Hyd. No. 3 Route thru pond Hydrograph type = Reservoir ' Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post-Developed Reservoir name = Pond#1 Storage Indication method used. Q (Cfs) 30.00 25.00 20.00 15.00 10.00 5.00 oil 0.00 ' I I I I I 10 00 0 2 4 --- Hyd No. 3 1 Thursday, Jun 5, 2008 Peak discharge = 8.642 cfs Time to peak = 12.30 hrs Hyd. volume = 63,916 cuft Max. Elevation = 303.44 ft Max. Storage = 26,872 cuft 6 8 10 12 14 16 18 20 22 24 -- Hyd No. 2 U= Total storage used = 26,872 cuft 26 Time (hrs) HYd rograph Repoft ' Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 200R by Autodesk, Inc. v6.052 Hyd. No. 3 Route thru pond Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post-Developed ' Reservoir name = Pond#1 Storage Indication method used. F g ? f Elev (ft) 305.00 i {) I 304.00 - 303.00 i 302.00 301.00 r- 0 2 4 - 1. Pond#1 Route thru pond Hyd. No. 3 -- 25 Year Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Thursday, Jun 5, 2008 = 8.642 cfs = 12.30 hrs = 63,916 cuft = 303.44 ft = 26,872 tuft Elev (ft) 305.00 304.00 303.00 302.00 301 00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) j j S i i i j i t I I i i l 1 I I Hydrograph Report 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Thursday, Jun 5, 2008 Hyd. No. 3 Route thru pond Hydrograph type = Reservoir Peak discharge = 18.81 cfs Storm frequency = 100 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 82,133 cuft Inflow hyd. No. = 2 - Post-Developed Max. Elevation = 303.77 ft Reservoir name = Pond#1 Max. Storage = 30,898 tuft Storage Indication method used. Q (cfs) 40.00 30.0( 20.00 10.00 Q (cfs) 40.00 30.00 20.00 10.00 0.00 - 4 I I 1 1 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 -- Hyd No. 3 -- Hyd No. 2 Total storage used = 30,898 cult Time (hrs) Route thru pond Hyd. No. 3 -- 100 Year i Hy ' Hydraf Hyd ' Rout Hydr y Stor Time Inflo Res 9 11ji Elev ft f 305.00 F' 304.00 303.00 302.00 301.00 - 0 2 4 1. Pond#1 drograph Report low Hydrographs Fxtension for AutoCAD® Civil 3E) 10 2008 by Autodesk, Inc. v6.05? . No. 3 o thru pond ograph type = Reservoir m frequency = 100 yrs e interval = 2 min w hyd. No. = 2 - Post-Developed ervoir name = Pond#1 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Thursday, Jun 5, 2008 = 18.81 cfs = 12.17 hrs = 82,133 cuft = 303.77 ft = 30,898 tuft Storage Indication method used. Route thru pond Hyd. No. 3 -- 100 Year Elev (ft) 305.00 304.00 303.00 302.00 301 00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) 1. i f n? m t? t? ti Nitrogen Control Plan - September 2007 Method 2: CommerciaVIndustt?rieeal/Residential/Sites with Known Impervious Area Project Name: CAY",--4z - ?/?" / Date: Applicant: &Pst Fe/ovS rP 6"cl-, Telephone: Part I. Riparian Buffers Does site contain riparian buffers? [ ] No [ ] Yes (show buffers on plan) Part II. Nitrogen Calculation ? // t' /0'F `?Iq- f3R - 0/ -7.;? [ ] Exempt (show basis for exemption) Item Proposed Site Information Area acres 1 Total project acreage 14.9 2 Total proposed impervious area /.006 3 Existing impervious area (prior to 3/9/01 RI 4 New impervious area Item 2 - Item 3] A A, 5 Permanently protected undisturbed open sace 6 Permanentl protected managed open space Pre-Develo me nt Loading Type of Land Cover Area acres TN export coefficient lbs/ac/r TN export from use lbs/ r Existing forest land G 1.7 14,77 Existing pasture 4.4 017. 3 Existing residential 7.5 Existing cropland 13.6 Existing commercial/industrial 13 TOTAL / a, V9 Nitrogen Loading Rate' bs/ac/ r -5- ...,.. --6 -1LLU YLJ -A V? A IN cxpvn uum use kiosiyr/ - i orai ruea tacres/ ?--4 -deuelopwtet4 IoeA'n4 Js 4r (?k.- I " Post-Development Loadin before BMPs and/or Offset Payments Type of Land Cover Area TN export coefficient TN export from acres lbs/ac/ r use lbs/ r Permanently protected undisturbed open space (forest, unmown meadow, wetlands buffers Item S 2/00/ 0.6 4 .6,7 Permanently protected managed open space (grass, landscaping, etc. (Item S. a¢ 1.2 &. a.9 Impervious surfaces (roads, parking lots, driveways, roofs, paved storage areas etc. Item 4 1.95 21.2 3 9, 0702 TOTAL l ?, 9 ------------- - SO. 02 - Item 7 -------------------- Item 8 Nitrogen Loading Rate (lbs/ae/yr) (Equals Item 8 _ Item 7) 3 , 3 BMP T e TN Removal Rate % Check which a 1 Pond 25 water Wetland 40 Filter k 35 tention 35 Swale 20 ated Filter Strip w/Level Spreader 20 50' estored or Additional Ri arian buffer w/Level Spreader 30 D Detention 10 Post-Development Loading after BMPs and/or Offset Payments Item Description Nitrogen Loading Rate (lbs/ac/ r 9 -Nitrogen load after BMPs show separately in detail a, ?5 10 Nitro en load offset b payments Item 9 - 3.6 j 9 1.' i Amount of Offset (Pounds of Nitrogen) [Item 10 x (Item 1- Item 3)] 0 *To Calculate the Amount of the Nitrogen Offset Payment Required to Be Paid to the NC EEP Use The Following Formula: Amount of Offset Payment [Pounds of Nitrogen x $28.35 x 30 years] 0 Part III. Control of Peak Stormwater Flow Calculated Pre-development Peak Flow (1-year) Calculated Post-development Peak Flow without Controls (1-year) 3. $ 73 Calculated Post-development Peak Flow with Controls (1-year) p. / 0 3 Calculations and details showing control of nitrogen and peak stormwater runoff control must be included. Part IV: Watershed Development Permit 1. Total project acreage (in Lake Benson Watershed) 0 2. Total proposed impervious surface (in Lake Benson Watershed) 3. Existing impervious surface (in Lake Benson Watershed) 4. Equivalent project acreage (Item 1- Item 3) 5. New impervious surface (Item 2 - Item 3) 6. Percent impervious [(Item 5 _ Item 4) x 100] * Limited to impervious surface existing before 7/1/93 `011111111111111., a? ' 01A CAR ' #090080 ezz I, the undersigned, certify that to the best of my knowledge that the above information is correct (affix seal) ?I$?F'1"SS/p?•-? SEAL • 24434 ° Q GIVE -Z, % son* *6 % S1 I t ???!! ,,,.! E S? 11`1'`\ To be filled in by staff Project Watershed Protection Requirements ? Project Exempt: Explain ? Project Located in Lake Benson Conservation District - LBCD (Critical Area) Standards Apply ? Project Located Outside LBCD - On-site treatment required. ? Minor Variance Requested (WRB) Approved (date): Disapproved (date): ? Major Variance Requested (EMC) Approved (date): Disapproved (date): Recommended by WRB (circle one): YES NO Comments (use additional sheet if necessary) Approved by Watershed Administrator: (sign) Date: u v Ul co r4 VN Ln I V Lr? N N N M O z N m N N O O a° a ° ~ o o z z N to pMj M N ? N M M n N C N a 0 d m C) N ttoo C) ry N ? ? .-L ~ N m a d L L w m H P1 co co Ln 0 %DD N N N N *t N a .-1 U V E m m N Ln O) t0 OR 'O 'ir rl Vi i C OI ?C± G C ? ?'' p \ O C V O7 O O Cl Iy0 C a ~ o 0 m 0) 3 ?id yai c?' I z- om 3 ?o oL m of c O N w v a G G G a OL fu LO 0 c: M CL N C = w^ E E c? O O' -0 12 78 c`3 B G3 d!A ?R v,> om -k a? CL m Sri o L [? .C a ? v Aj O ? 10 7 v y V C 0 CL Q m C: w E vaf E vai m v ..-1 pL ,-? V O) y a 3 m m t; E i L° m d a ao a to 45 aaEL EROSION CONTROL CALCULATIONS f ? 3 Vill" X1.7 y ? 4 1 a 4 I i SEDIMENT TRAP CALCULATIONS EROSION CONTROL CALCS -CUSTOM BASIN Project Information Project Name: Quest Church Project #: 003001 Designed by: Date: Revised by: Date: Checked by: Date: Temporary Custom Basin 10-year Runoff (Q10) A = 4.65 Ac C = 0.50 T? = 5.00 min I10 = 7.50 in/hr Q1o = 17.4 cfs Surface Area Required SA = 435 x Q10 SA = 7585 sf Volume Required VR = 1800 cf/Ac x Ao VR = 8370 cf Sediment Trap Dimensions L = 150 ft W= 55 ft D = 2.0 ft Sideslopes = 2 :1 La L„P= 156 ft WxP= 61 It W" Wye L bot = 142 it L ya W ba = 47 ft Description Elevation Area Elevations & Areas Top of Berra 305.0 9516 Spillway 303.5 8250 Surface Area Provided Bottom 301.5 6674 Volume Provided VP = 14920 cf Spillway -10Year Storm h = 0.5 ft CW = 3.1 LW = 16.0 ft (sized to pass 010) (10.0' Minimum) Custom Basins 6115/2008 Page 1 of 1 EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Quest Church Project #: 003001 Designed by: Date: Revised by: Date: Checked by: Date: FES-1 Pond Outfall Pipe Diameter d= 24 Pipe Slope $= 0.71 % Manning's number n= 0.013 Flow Q= 16.47 cfs velocity V = 5.73 ft/s Dissipator Dimensions ' Zone = 2 Stone Filling Class = B Entry Width ( 3 X Do ) = 6.0 ft Length (6 X Do) = 12.0 It Width (La + Do) = 14.0 ft Min. Thickness = 22 inches Min. Stone Diameter- 6 inches Pipe Diameter Pipe Slope Manning's number Flow Velocity Dissipator Dimensions d= 18 in s= 3% n= 0.013 Q= 8.65 cfs V = 5.90 ft/s Zone = 2 Stone Filling Class = B Entry Width ( 3 X Do) = 4.5 ft Length (6 X DO) = 9.0 ft Width (La + Do) = 10.5 ft Min. Thickness = 22 inches Min. Stone Diameter- 6 inches 4. 2007 NCDENR EC Spreadsheet - complete 7/18/2008 Page 1 of 1 All units are in feet Dissipator pad designed for full now of pipe Aii units are in feet Dissipator pad designed for full flow of pipe 1 1 t. ? t e:_7 a r_f 111"I ?r 111 111 rill ?q ?I 0