HomeMy WebLinkAbout20170934 Ver 1_B5691CVLPCN_20170727STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATTON ROY COOPER GOVERNDR July 24, 2017 Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Avenue Wilxnington, NC 28403 ATTN Subject: Liz Hair, NCDOT Coordinator Nationwide Permit #3 Pre-Conshuction Notification Replace Bridge 250052 over South River Cumberland County, North Cazolina NCDOT TIP B-5691 JAMESH.TROGDON,III SECRETARY The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 250052 over South river on SR 1006 (Maxwell Road) in Cumberland County. The structure is to be replaced by a bridge on its current location. The existing structure is 211 foot long (1 @ 35"4”, 4@ 35', 1@ 35'4") with steel planks and I-beams with wooden vertical abuhnents. The proposed bridge is a 227 foot long 21" cored slab bridge (1 @ 58' 10.5", 1@50'0", 1@ 60'0", 1@ 58' 10.5") with 4'0" bent caps and spill trough abuhnents. An off-site detour is proposed. No deck drains are proposed. Two stormwater outfalls are proposed with a Rip Rap pad to dissipate the energy at the end of the outfall. Construction of this project will require impacts to waters of the United States in the Cape Fear River Basin. The existing bridge crosses South River, a Class C;Sw water. Please find attached a Pre-Construction Notification (PCN), Stormwater Management Plan, and Permit Drawings. A US Army Corps of Engineers Preliminary Jurisdictional Determination was obtained May 4, 2016 (SAW-2016-00756). Proposed impacts to wetlands include <0.01 acre (400 sq ft) of wetland fill, 0.01 acre of wetland excavation, 0.10 acre of Hand Clearing with 7 LF of permanent stream impacts. MailingAddress: NC DEPARTMENT OF TRANSPORTATION DNISION 6 558 GILLESPIE STREET FAYETTEVQ,LE, NC 28302 Te(ephorte: (910) 3640834 Fax:(910)437-2577 Customer Service: 1-8773684968 Website: www.ncdm.gov Location: 500 TRANSPORTATION DRIVE FAYEI"I'EVILLE, NC 28312 Please see enclosed copies of the Pre-Construction Notification (PCN), Preliminary Jurisdictional Determination Form, stormwater management plan, and the permit drawings for the above-referenced project. The project was let on Apri13, 2017 and construction will begin as soon as possible. Regulatory Approvals Section 404 Permit: The NCDOT requests that these activities be authorized under Nationwide 3 permit. Section 401 Permit: The NCDOT requests that these activities be authorized under Water Quality General Certification Numbers 4085 (Maintenance). We anticipate that written approval from the NC Deparhnent of Water Resources will not be required. If you haue any questions or need additional information, please contact me at (910) 364- 0834. S n�rylY� C/ \� � Pw5 James J.� erko, PWS Division Environmental Officer — Division 6 Cc: Joanne Steenhuis Greg Burns Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1 d. Type(s) of approval sought from the DWQ (check all that appiy): ❑x 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit: because written approval is not required? 401 Certification: ❑X Yes ❑ No ❑ Yes ❑X No if. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank � Yes � No or in-lieu fee program. 1 g. Is the project located in any of NC's lwenty coastal counties. If yes, answer 1 h � Yes �X No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes �X No 2. Project Information 2a. Name of project: Replacement of Bridge No. 250052 on SR 1006 (Maxwell Rd.) over South River 2b. County: Cumberland/Sampson 2c. Nearest municipality / town: Stedman 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: TIP No. B-5691 (Bridge 250052) 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if not applicable applicable): 3d. Street address: 500 Transportation Drive (PO Box 1150) 3e. City, state, zip: Fayetteville, NC 28301 (PO Zip 28302) 3f. Telephone no.: (910) 364-0834 3g. Fax no.: (910) 486-1959 3h. Email address: prerko@ncdot.gov Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: 4b. Name: 4c. Business name 4d. Streetaddress: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: ❑ Agent ❑ Other, specify: not applicable 5. Agent/Consultant Information (if applicable) 5a. Name: � not applicabie 5b. Business name (if applicable): Sc. Street address: Sd. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5a. Email address: Page 2 bf 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (t 1b. Site coordinates (in decimal 1c. Propertysize: 2. SurFace Waters PIN or parcel ID): :grees): Latitude: 2a. Name of nearest body of water to proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: not applicable Longitude: 1.5 acres South River C; Sw Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing condidons include SR 1006 (Ma�vell Road) and Bridge No. 250052, wetlands, undevelopetl forest, residential properly and disturbed/ maintained right-of-way. 3b. List the total estimated acreage of all existing wetlands on the property: 0.44 3c. List the total estimated linear feet of all existing streams (intermittent and pere 3d. F�cplain the purpose ofthe proposed project: To replace Bridge No. 250052 with an improved, modern struclure. on the property: 108 3e. Describe the overall project in detail, including the type of equipment to be used: This project consists of replacing bridge 52, a 211' long bridge with a 227' 9" long four span britlge on the same alignment. See attachment. 4. Jurisdic6onal Determinations 4a. Have jurisdictional wetiand or stream determinations by the � Yes ❑ No ❑X Unknown Corps or State been requested or obtained for this property / ro'ect includin all rior hases in the ast? Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased proje� 6b. If yes, explain. ❑Yes ❑ Yes ❑ No ❑X No OX Unknown Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands 0 Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland ImpacTs If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type ofwetland Forested Type ofjurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Tem ora W1 P Fill Riverine Swamp Forest Yes Corps 0.01 �/UZ P Excavation Riverine Swamp Forest Yes Corps 0.01 y�/3 T Hand Clearing Riverine Swamp Forest Yes Corys 0.1 N/4 - Choose one Chaose one YesMo - W5 - Choose one Choose one YesMo - W6 - Choose one Choose one YeslNo - 2g. Total WeUand Impacts: 0.12 2h. Comments: Total permaneM wetland impacts: 0.02 acre 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (IN'I)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P FIII South River PER Corps 75 7 S2 T ConstructioNremoval South River PER Corps 75 67 S3 - Choose one _ _ S4 - Choose one - - S5 - Choose one _ _ S6 - Choose one - _ 3h. Total stream and tribupry impacts 7a 3i. Comments: Total permanent surface water Impacts: 7 linear feet Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Tem ora O1 - Choose one Choose 02 - Choose one Choose 03 - Chooseone Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. Sb. Sc. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feei) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one p2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? � Yes � No If yes, permit ID no: Si. F�cpected pond surtace area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse � Tar-Pamlico � Catawba ❑ Randleman ❑ Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number— mitigation impact impact Permanent (P) or required? (square (square Tem ora feet feet B1 - Yes/No B2 - Yes/No B3 - YesMo B4 - Yes/No BS - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: raye o oi i � D. ImpactJustification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in desig�ing project. Best management practices (BMPs) and appropriate erosion and sedimeMation controls will be installed and maintained during construction activities to allow for the least adverse effect on the stream channel as well as wetlands within the project area. The new structure will remain on the existing alignment to retluce impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Removal of the existing sWcture as well as construction of the new bridge will take place from uplands which will minimize impacts. Hand clearing will also be pedormed within the wetlands. 2. Com ensato Miti ation for Im acts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑X No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this � payment to in-lieu fee program projecY? ❑ Permittee Responsible Mitigation 3. Com lete if Usin a Miti ation Bank 3a. Name of Mitigation Bank: Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: Type: Choose one Quantity: 3c. Comments: 4. Com lete if Makin a Pa mentto In-lieu Fee Pro ram 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ oniy): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. rage ti or � u PCN Form — Version 1.4 January 2009 6. Buffer MitigaGon (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multip�ier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 7. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one ofthe NC Rioarian Ruffer Pmtacfinn R�dac� 1 b. If yes, then is a diffuse flow plan included? If no, explain why. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? a Stormwater ❑ Yes ❑X No ❑ Yes � No 38 % ❑ Yes 0 No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The project is a bridge replacement antl is considered a're-developmenY procetlure. For this consideration, the prqect does not require a state stormwater permit BMP's and runoff controls will be implemented during construction to reduce the stormwater impacts to the receiving stream due to erosion and runoff. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? is 3b. Which of the following locally-implemented stormwater management programs apply (check alI that apply): 3c. Has the approved Stormwater Management Plan with proof of approval been attached? 4. 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): 4b. Has the approved Stormwater Management Plan with proof of approval been 5a. Does the Stormwater Management Plan meet the appropriate requirements? 5b. Have all of the 401 Unit submittal requirements been met? ❑ Phase II ❑ NSW � USMP � Water Supply Watershed � Other: ❑Yes ❑ No �Coastal counties ❑HQW ❑ORW ❑Session Law 2006-246 ❑Other: ❑ Yes ❑ No ❑ Yes � No ❑ Yes � No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement► 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes X❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Ciearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. �olations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes X❑ No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in �Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact anaiysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Due to minimal transportation impact from this bridge replacement this project will neither influence nearby land use or slimulate grow[h. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or availabie capacity of the subject facility. not applicable Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ❑X Yes ❑ No ❑Yes ❑X No 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Field sludies and USFWS county list 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? � ❑ Yes 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA EFH Webpage 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes 0 No OX No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Please see NCDOT "No Survey Required Forms". 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain? 0 Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Hydraulic calculations have been prepared based on the placement of the britlge. No increase in the upstream flood elevalions is anticipated 6ased on these calculations. Basetl on the results of the HEC-RAS model for SR 1006 over South River, ihe existing bridge can be replaced without causing a rise to the established 100.year Flood elevations and meets the requirements of Federal Hlghway Administration, Federal-Aid Policy Guide, 23 CFR 650A, Location and Hydraulic Design of Encroachments on Floodplains, and the NCDOT MOA. 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM maps on-line James J. Rerko, PWS ApplicanUAgenYs Printed Name I �' ApplicanUAgenYs Signature (Ag,enPs signatuie is valid only'rf an aufhorization Page 10 of 10 Date