Loading...
HomeMy WebLinkAbout20170915 Ver 1_401 Application_20170726OF WA7F9 pG Office Use Only: Corps action ID no. o < DWQ project no. Form Version 1.4 January 2009 D- A R Rfn Oni ES 401 B FF P • MI Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 2 0 1 7 0 9 1 5 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: NW 3 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? NX Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes NX No For the record only for Corps Permit: NYes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. N Yes 0 No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. Yes E] No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? N Yes ❑ No 2. Project Information 2a. Name of project: Caw Caw Drainage District Maintenance Shingletree and Hickman Rd Canals 2b. County: Brunswick 2c. Nearest municipality / town: Carolina Shores 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: No 3. Owner Information 3a. Name(s) on Recorded Deed: Brunswick County Operation Services Department - Caw Caw Swamp Drainage Distr 3b. Deed Book and Page No. See As buitld Plans from 1964 3c. Responsible Party (for LLC if applicable): Brunswick County Operation Service Department 3d. Street address: 179 March 911764 Drive NE 3e. City, state, zip: Bolivia North Carolina 28422 3f. Telephone no.: 910-253-2507 910-253-2539 3g. Fax no.: 3h. Email address: Jeff.Brown@Brunswickcountync.gov D- A R Rfn Oni ES 401 B FF P • MI Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: N/A 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: N/A 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): See As built plans from 1964 1 b. Site coordinates (in decimal degrees): Latitude: Longitude: 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Waccamaw River 2b. Water Quality Classification of nearest receiving water: 2c. River basin: Lumber 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Caw Caw Drainage ditch current site condition has an open 30 ft maintenance right of way with minimal vegetation over hang. Slopes are stable with vegetation's/ground cover. Water flow in drainage ditch as sandbar blockage in described areas in scope of work. The general use of this area during the time of this application is drainage for developed and undeveloped areas. 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: Public Safety Flood Mitigation 3e. Describe the overall project in detail, including the type of equipment to be used: To excavate proposed sandbars from Caw Caw drainage ditch (HWY 17 & Shingletree RD, Hickman RD & Meadowlands GC, #5 School House RD). S O 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? 0 Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. S. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes ❑ No El Unknown 5b. If yes, explain in detail according to "help file" instructions. The Caw Caw Swamp watershed was initiate in 1964 with the state of North Carolina, Us Department of Agricultures and Brunswick County. The Wate 6. Future Project Plans 6a. Is this a phased project? ❑ Yes Q No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) ) W1 Choose one Choose one Yes/No - W2 Choose one Choose one Yes/No - W3 Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 Choose one Choose one Yes/No - W6 Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T Excavation Shingletree PER Corps 26 709 S2 - Excavation #5 Schoolhouse PER Corps 12 350 S3 - Choose one S4 - Choose one S5 - Choose one _ S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: Both Projects involve the removal of accumulated sand to reestablish the original 1964 design. No excavation will be below the ordinary high water mark. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indiv, ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. 5e. Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet 61 Yes/No B2 Yes/No B3 Yes/No B4 - Yes/No 65 Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All sandbars will be excavated in sections (stepped back) to minimize erosion/sediment leaving defined target area. Erosion matting and riprap will be used on a case by case bases along with silt fence in areas of concern. Matting may be used on portion of right of way to minimize impact to soils and integrity of slope. Spoils material's will be placed on uplands of right of way and will be spread and seeded. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Each sandbar's slope will be benched back one section at a time. A buffer will be left in place between excavated area and flow of ditch. Buffer will reduce materials from entering flow of ditch and buffer will be excavated/graded to slope in final step towards completion of sandbar. All areas will be seeded and will have erosion prevention materials added as needed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ❑ No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is this project? 3b. Which of the following locally -implemented stormwater management programs apply (check all that apply): ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs applyHSession (check all that apply): ❑Coastal counties ❑HQW ORW Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? El Yes ®No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) —F— 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? �rUn Sw,CA(- v r,\. �nw\ a. �6 � Applicant/Agent's Date Applicant/Agent's Printed Name Signciture (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Approved as to Form. Asst, County Attorney Page 10 of 10 Appendix 1 Shingletree and Hickman Rd Canals Project PCN Section Text Clarification 3e. Describe the overall project in detail, including the type of equipment to be used: Objective :To excavate proposed sandbars from Caw Caw drainage ditch (HWY 17 & Shingletree RD, Hickman RD & Meadowlands GC, #5 School House RD). Sandbars are above the normal high water mark and will be excavated in sections (stepped back) to minimize erosion. All materials will be placed on uplands to dry and then spread along right of way. All disturbed areas will be seeded and erosion matting/ riprap used as needed. Stepped Back or bench slope action: Each sandbar's slope will be benched back one section at a time. A buffer will be left in place between excavated area and flow of ditch. Buffer will reduce materials from entering flow of ditch and buffer will be excavated/graded to slope in final step towards completion of sandbar. All areas will be seeded and will have erosion prevention materials added as needed. 5b. If yes, explain in detail according to "help file" instructions. The Caw Caw Swamp watershed was initiated in 1964 with the state of North Carolina, Us Department of Agricultures and Brunswick County. The Watershed work plan and the as built plans are on record with the USACE regulatory branch. �Z Op m � �xD O r D A ; � A N OY ifYi l9NIH1 f� SPD ZZZZZ Ohm v co .�r77 m m D x z D D D D O ;oMA �p AI p 4 N A W N moy i 0 1�1 W M D N D e c O O W N Z 0 00 ON !1 > ��.PP�� v '.... � M� ` Y 2 m 0 \ by y G W± < r O � N O z Z r O O O O N = y r� r j CAW CAW SWAMP WATERSHED SHINGLETREE ROAD COUNTY10FBRUNSWICK =-...lc��, USACE (PCN) BRUNS�WICKoCOUNTY 3a SANDBAR REMOVAL NAME AREA (FT -2) REMOVAL LENGTH (FT) (YDS"3) SANDBAR #6 3,537 131 131 SANDBAR #7 1 498 25 83 SANDBAR LOCATION HICKMAN ROAD NORTH SANDBAR REMOVAL NAME AREA (FT^2) REMOVAL LENGTH (FT) (YDS 3) SANDBAR #6 3,537 131 131 SANDBAR #7 498 25 83 TYPICAL CANAL CROSS KCTION SANDBAR LOCATION HICKMAN ROAD Revisions QrW By: N'LP Z yr c U T N N ,, ZU A N 3,=<� z zO .. 7 Oa K m m NORTH 26' TYPICAL CANAL CROSS SECTION SANDBAR LOCATION SHINGLETREE RD Revisions s� o, B' AM �wBy. u SANDBAR REMOVAL NAME AREA (FT" 2) REMOVAL (YDS -3) LENGTH (FT) SANDBAR #1 1,485 165 165 SANDBAR #2 2,250 250 150 SANDBAR #3 180 233 60 SANDBAR #4 800 52 100 SANDBAR #5 100 111 1 20 26' TYPICAL CANAL CROSS SECTION SANDBAR LOCATION SHINGLETREE RD Revisions s� o, B' AM �wBy. u