Loading...
HomeMy WebLinkAbout20140513 Ver 1_USACE Permit_20140801 Carpenter,Kristi From:Wheeler, Tracey L SAW Sent:Friday, August 01, 2014 11:44 AM To:Willis, Thomas C Cc:Ward, Garcy; Lane, Stephen Subject:Bride 3 Dare County (UNCLASSIFIED) Attachments:NWP3_3-23.pdf; NWP12_3-23.pdf; Email NCDOT Bridge 3 US 264 Low Impact Bridge.pdf Classification: UNCLASSIFIED Caveats: NONE The above project qualifies for a Nationwide Permit 3 and 12 authorization. NCDOT is authorized to replace the existing 100ft by 26 ft Bridge #3 over Deep Creek with a 150 ft by 30 ft bridge and to replace associated utilities. The project is located on US Highway 264 approximately 2.2 miles from the Dare County/Hyde County line southwest of Stumpy Point, Dare County, North Carolina. The project will impact 0.107 acres of jurisdictional wetlands, which were designated Coastal Wetlands by NCDCM. All terms and conditions for NWP #3 and 12 apply. The following Special Conditions apply: 1. In order to avoid adverse impacts to the West Indian Manatee , NCDOT must comply with Guidelines for Avoiding Impacts to the West Indian Manatee: Precautionary Measures for Construction Activities in North Carolina Waters. 2. All utilities must be installed a minimum of 40 feet below the canal bottom, as shown on the project plans. 3. In order to protect fishery resources, no in-water work may occur between April1 and September 30 of any year. 4. Permit must be obtained from NCDCM prior to initiation of construction. Action ID SAW-2014-01401 Tracey L. Wheeler Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 West 5th Street Washington, North Carolina 27889 (910) 251-4627 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://regulatory.usacesurvey.com/. Classification: UNCLASSIFIED 1 Caveats: NONE 2