Loading...
HomeMy WebLinkAbout20131200 Ver 5_More Info Received_20170718Burdette, Jennifer a From: Kaylie Yankura <kaylie@cwenv.com> Sent: Tuesday, July 18, 2017 10:02 AM To: Burdette, Jennifer a Cc: Clement Riddle; amandajones@wetlands-epg.com; David Odom Subject: Tryon International Equestrian Center - Request for Additional Information; Written Response 7.17.17 Attachments: DWR Response Letter & Attachments - 071817.pdf Jennifer, Please see the attached written response to the DWR request for additional comments regarding the Tryon International Equestrian Center. A hard copy is in the mail as well. Thank you, Kaylie 32 Clayton Street Asheville, NC 28801 Office: 828-698-9800 Mobile: 724-994-8917 kaylie(cD.cwenv.com Odom Engineering Puc July 17, 2017 NC Division of Water Resources 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Attn: Jennifer Burdette Re: Tryon International Equestrian Center Request for Additional Information Dear Ms. Burdette: 169 Oak Street • Forest City, NC 28043 office 828.247.4495 • fax 828.247.4498 In response to your Request for Additional Information, dated July 12, 2017, please review the following: Although Session Law 2017-10 removed the Division's 401 Water Quality Certification (WQC) requirement for on-site stormwater control measures to provide protection of downstream water quality standards, it does not apply retroactively to projects or portions of projects that were required to have a stormwater management plan (SMP) as a condition of a previously approved 401 WQC. On April 10, 2015, the Division of Energy, Mineral and Land Resources (DEMLR) approved a SMP as part of the 401 Water Quality Certification issued February 17, 2014, to Tryon Equestrian Center for the first phase of the project. Prior to receipt of your response to the Division's request for additional information, this office believed that these revisions were underway based on consultation with Annette Lucas in DEMLR. Your response indicated that the overall site is no longer subject to stormwater management rules and shows that the wetland pond/level spreader for Area 7 (White Horse Inn Area in the modification request) in the approved SMP will not be constructed and a parking lot is now proposed in that location. The first phase of this project is required to meet the conditions of the 401 WQC that was issued for this area. Therefore, you are obligated to treat stormwater from the amount of built upon area (BUA) included in the approved SMP. New BUA proposed within the first phase of the project does not require the same level of treatment requ ired by the approved SMP. However, provide calculations to show that the new BUA will not cause failure of the existing stormwater control measures (SCM) or SCM(s) proposed to replace the wetland pond/level spreader. An equivalent amount of treatment of new BUA within any of the high-density areas is acceptable in lieu of treating BUA required by the approved SMP if it's not possible to treat the BUA as required by the approved SMP with the new development plan. [15A NCAC 02H .0506 (b)(5)] • A new wet pond will be constructed at the Salamander Hotel to replace the pond/level spreader for Area 7. In the SMP dated April 10, 2015, Drainage Area 7 is shown to have an impervious area of approximately 3.61 acres. The new wet detention pond shown will treat a drainage area with approximately 3.87 acres Odom Engineering Puc 169 Oak Street • Forest City, NC 28043 office 828.247.4495 • fax 828.247.4498 2. For portions of the project that are outside of the first phase of the project, provide calculations used to determine that the flows will be at non-erosive velocities based on the land cover receiving the discharge or will not overwhelm the receiving streams and cause erosion where direct discharges are proposed. We suggest using the NC Erosion and Sediment Control Planning and Design Manual, Chapter 8 (Appendices) for non- erosive velocities based on the receiving land cover and NRCS National Engineering Handbook, Part 654. • Calculations are attached to this letter showing discharge velocities for the respective outlets. Stream Restoration Design, Threshold Channel Design for stream channels. Links to these references will be emailed to the project consultant and engineer for their convenience. [15A NCAC 02H.0506 (b)(3) & (4)] • Please see the attached calculations for the outlets at each of these locations. The locations, culvert size, and slope has been added to the attached revised drawings. The riprap apron sizes for each is shown in the table "Channel Outlet Protection" in the calculations. The calculations for each of the culverts show the low velocities of these low slope sections. 4. The conceptual stormwater plan for the Salamander Hotel directs stormwater runoff to the northwest and southwest corners of the site. A discharge is not proposed for the stream channel due west of the facility. In addition to the information requested in Item #2, explain how the hydrology of this stream channel will be maintained if stormwater from the stream's watershed is diverted away. [15A NCAC 02H.0506 (b)(3) & (4)] • The drainage from the pool area and roof drains will be diverted to this stream channel to maintain the existing hydrology. The existing drainage area above the head of the small stream is 6.08 acres. For the 25 -year storm, that will generate 10.4 cfs. The area to be directed to the stream is 2.73 acres, however, with the construction of impervious area, the 25 -year storm will generate 11.7 cfs. PRE -DEVELOPMENT 25 -YR RUNOFF Drainage Area (Ac) I (in./hr.) C Q (cfs) 6.08 8.56 0.2 10.4 POST -DEVELOPMENT 25 -YR RUNOFF Drainage Area (Ac) I (in./hr.) C Q (cfs) 2.73 8.56 0.5 11.7 5. The proposed plans indicate the culvert leading to the rip rap outlet downstream of the proposed barns will be installed at a 0.5%slope. Explain how this slope will be achieved based on topography which appears to show an approximately 50' elevation change over approximately 120' horizontal feet. [15A NCAC 02H.0506 (b)(3) & (4)] This proposed stormwater culvert also appears to cross a gas line right-of-way. Is this type of infrastructure allowed within a natural gas line right-of-way? Odom Engineering Puc 169 Oak Street • Forest City, NC 28043 office 828.247.4495 • fax 828.247.4498 Please see the attached storm drain profile to show how this elevation change is achieved. This same type of storm drain has already been installed within a natural gas right-of-way on this property and is allowed. Please contact me if you need any additional information. Thank you, t -- David Odom, P.E. STORMWATER CALCULATIONS 7.7:1 TRYON INTERNATIONAL EQUESTRIAN CENTER Tryon, North Carolina July 17, 2017 Odom Engineering PLLC NC FIRM# P-0880 169 Oak Street Forest City, N.C. 28043 828-247-4495 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Stablehouse Inn Outlet Circular Diameter (ft) = 5.00 Invert Elev (ft) = 895.00 Slope (%) = 0.01 N -Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 26.60 Elev (ft) 901.00 900.00 899.00 898.00 897.00 896.00 895.00 894.00 0 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Culvert #1 1 2 3 4 5 6 Reach (ft) Monday, Jul 17 2017 = 4.20 = 26.60 = 17.62 = 1.51 = 11.60 = 1.43 = 3.66 = 4.24 Depth (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 -1.00 7 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Village Outlet Circular Diameter (ft) = 6.00 Invert Elev (ft) = 905.00 Slope (%) = 0.01 N -Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 37.20 Elev (ft) 912.00 911.00 910.00 909.00 908.00 907.00 906.00 905.00 904.00 0 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Culvert #2 1 2 3 4 5 6 7 Reach (ft) Monday, Jul 17 2017 = 4.36 = 37.20 = 22.06 = 1.69 = 12.27 = 1.60 = 5.34 = 4.40 Depth (ft) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 -1.00 8 Culvert Report Culvert #3 Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Jul 17 2017 White Horse Inn Outlet (Culvert #4) Invert Elev Dn (ft) = 845.49 Calculations Pipe Length (ft) = 50.00 Qmin (cfs) = 0.00 Slope (%) = 0.50 Qmax (cfs) = 92.00 Invert Elev Up (ft) = 845.74 Tailwater Elev (ft) _ (dc+D)/2 Rise (in) = 36.0 Shape = Circular Highlighted Span (in) = 36.0 Qtotal (cfs) = 10.00 No. Barrels = 2 Qpipe (cfs) = 10.00 n -Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.09 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.99 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 847.34 HGL Up (ft) = 846.44 Embankment Hw Elev (ft) = 846.68 Top Elevation (ft) = 855.00 Hw/D (ft) = 0.31 Top Width (ft) = 0.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 El -(R) 857.00 a55.00 8630❑ 851 00 a49 ❑0 847.00 945 on 943 on <Name7 Hw Depth (R) 11.26 9.26 726 526 5 10 15 20 25 30 35 40 45 50 55 60 65 Ci -1w Calvert HGL Embank 326 1.26 -074 -274 70 Reach (R) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Salamander Hotel Outlet Circular Diameter (ft) = 5.00 Invert Elev (ft) = 850.00 Slope (%) = 0.01 N -Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 23.00 Elev (ft) 856.00 855.00 854.00 853.00 852.00 851.00 850.00 849.00 0 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 1 2 3 4 5 6 Reach (ft) Culvert #4 Monday, Jul 17 2017 = 3.65 = 23.00 = 15.37 = 1.50 = 10.25 = 1.33 = 4.44 = 3.68 Depth (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 -1.00 7 CHANNEL OUTLET PROTECTION Channel # Flow (cfs) Wetted Perimeter Dia (ft) d50 Riprap Size (ft) Riprap Width at Pipe Outlet (ft) Apron Length (ft) Apron Width at End (ft) Culvert 1 26.6 11.6 1 12 21 33 Culvert 2 37.2 12.27 1 13 21 34 Culvert 3 92 18.28 1 19 21 40 Culvert 4 23 10.25 1 11 21 32 PROPOSED OUTLET WITH RIPRAP ARPON CULVERT #1 AT 0.50% SLOPE, INV. 895.0, 60" PIPE A� STORMWATER COLLECTION PIPING (TYP) STORMWATER INLET (TYP) Ir f f 0,00 _ v _ rggLF-------- J'— / o o---- �-E.ICV g�8SFjNN �__ o v ■ i // r _----- --� �50 r wl 00 — — — — —adb — \�yi %II��� - r `` JOB NAME: TRYON INTERNATIONAL EQUESTRIAN CENTER SCALE: 1" = 100' DRAWN BY: JCW ` ,�``��� STORMWATER MANAGEMENT SYSTEM 16120 1 OF 4 0 P-0880 IAI CULVERT #4 AT 0.50% SLOPE' INV. 914.0' 60" PIPE PROPOSED OUTLET YNTH R|PRAP ARP[)N STORMWATER COLLECTION PIPING (TYP) 37607111 Engineering . ��^Y���l yl����Y~1 �l�r --��---- -- ----c� ��� � �� � ������ /mOak Street, Forest City, N.c2804y ph: 828.247.4495 fax: 828.247.4498 WET DETENTION POND ' SALAMANDER HOTEL 4 STORY 0\�� —7=—| 13 13 CUL SLOPE, - PROPOSED OUTLET WITH R|PRAP ARPON LOT 13 IAD AD 47.20 Sq \ LOT 12 ` 1.22 AC 51242 Sq Ft 1.41 AC LOCATION: TRYON' N.C. DESCRIPTION: SALAMANDER HOTEL STORMWATER MANAGEMENT SYSTEM DATE: 06/05/17 ICHECKED BY: DWO PROJECT NUMBER I SHEET | �� 16120 | � OF 4 �� PROPOSED OUTLET WITH ; x' - RIPRAP ARPON ----------------- CULVERT #2 AT 0.50% - - -SLOPE INV. 905.0 72------------ r — f =PIPE _ - _"�� STORMWATER DETENTION SYSTEM --____ _ - - -- _== STORM WATER DETENTION SYSTEM .; - _ - STORMWATER JUNCTION — - -_ a - - STORM WATER �-_ - - � - •f = -_ - JUNCTION v ilzt 11 y Qe \ A tom, p'1m 0 J'' � r C k „ ,, , VILLAGE HOTEL 110 4 'CDMMERICAL' STORY - � - � ' N ' ' COMMERICAL COMMERICAL `� I _ 87D ■ -' 987 ' nk - � -,,COMMERICAL 964 �- vk2u , a pu'' 6 CR r5 T W ro AC W -J O W iii U i'�� ' rdr i✓ A // pp 'e O 9'✓ En 01 b I ➢ N Y' O) H O d _ Ilp - STORM WATER JUNCTION o AMPHITHEATER ,✓�hl„��ub4°ii hr ll,al _ ',,II,I"'' STORMWATER DETENTION SYSTEM; '�n`,�`°�'� a II ,rx'PELEV. ,_ 1, a I X71; r xJ� f � r b ® ay 3 STORMWATER JUNCTION = C) uD y _ _ _ tiw _ y - ”/nA — _' 7 W rh = 4 ek f o. STORM WATER DETENTION SYSTEM qR£ Nq XI El u 400' 0 AP 0 ' .F ,r S •E sa 1 w 4ft c 2 a, F oM AOR / .F `I- \�r � s VILLAGE HOTEL w , F. 4 STORY ST — � - __- .�`I--------- • ^� � py f�'s____>,>_ "';; ,,=-='�Cr� - _ __ �� ____- _ _ wS 19 O RES Wo. ma �'F� ----- _ _ - _ ,__ __,__ - _ as m� ���'=^----_� __ ��� _ '�,';'' PROPOSED JUNCTION BOX ����-_==s�n�=sz --_-_- ��� Ma �lll -fir%� �_���_�_ - i CONNECTS TO EXISTING SAN aa4 NCDOT CULVERT µix SSEPREq NSEC. o, 14 CONDOS III, SFE - a9,9 'A / �" 4 ��_ _ . ..��� STORY ,y ���„�--�,�as 4 STO � �` STORMWATER MANAGEMENT SYSTEM 16120 3 OF 40 P-0880 �rdw_v ft -4, iot :11F�_ HIGHW,4y 74 77 - ----------- PROPOSED JUNCTION BOX CONNECTS TO EXISTING NCDOT CULVERT STORMWATER JUNCTION 121 ro O&S�,, ANN PROPOSED OUTLET WITH RIPRAP ARPOW 376 me, I Engineering PLLC 169 Oak Street, Forest City, N.C. 28043 ph: 828.247.4495 fax: 828.247.4498 P-0880 STORMWATER JUNCTION is wa ft -4, iot :11F�_ HIGHW,4y 74 77 - ----------- PROPOSED JUNCTION BOX CONNECTS TO EXISTING NCDOT CULVERT STORMWATER JUNCTION 121 ro O&S�,, ANN PROPOSED OUTLET WITH RIPRAP ARPOW 376 me, I Engineering PLLC 169 Oak Street, Forest City, N.C. 28043 ph: 828.247.4495 fax: 828.247.4498 P-0880 STORMWATER JUNCTION 7/ ill I f%A I I I I 771 7 77 F.F.E� 967F.FMERICALCONNERICAL E. 970 y, C, 'Alk �!��!lI,AMi4THEATER( 40 L tjA 4,fto 4 4010,' Lu PRIOR APPROVED BMP OUTLET S, X VILLA 4 Z11 S TORY NOTEL f STORMWATER JUNCTION J%AL 7! W4R)4 q00. X UP R"wa 140, ma _CULVERT #3 AT 0.50% SLOPE. INV. 850.01 "DOUBLE 36" r17RR %% %% JOB NAME: TRYON INTERNATIONAL EQUESTRIAN CENTER SCALE: 1 200' LOCATION: TRYON, N.C. DESCRIPTION: WHITE HORSE INN AND COVERED ARENA BARNS STORMWATER MANAGEMENT SYSTEM - DATE 06/05/17 ZZVF//-/ 1 —7'--`--- 'Qu — DRAWN BY: JCW CHECKED BY: DWO I PROJECT MGR: DWO PROJECT NUMBER I SHEET 16120 14 OF 4� 910 900 890 880 870 860 850 840 830 0+ BARN STORM DRAIN PROFILE CTA -�-4-dd -�7 _..._,.._ ___...._ Odom Engineering PLLC 169 Oak Street, Forest City, N.C. 28043 ph: 828.247.4495 fax: 828.247.4498 P-0880 01ne uers JOB NAME: TRYON INTERNATIONAL EQUESTRIAN CENTER ARENA BARNS STORMWATER MANAGEMENT SYSTEM 910 900 :•8 880 )0% SLOPE 870 860 850 840 830 45 SCALE: 1" = 100' DRAWN BY: JCW DATE: 06/05/17 CHECKED BY: DWO PROJECT MGR: DWO PROJECT NUMBER SHEET 16120 4 OF 40