HomeMy WebLinkAbout20110089 Ver 3_More Info Received_20170626Graw- TO: Division of Water Resources 450 W. Hanes Mill Rd., Suite 300 Winston Salem, NC 27105 WE ARE SENDING YOU: 'r I LETTER OF TRANSMITTAL Date: June 21, 2017 Attention: Sue Homewood RE: Airlie Industrial Park (Phase 1) DWQ# 11-0089 NC Department of Environmental Quality Received JUN 2 6 2017 alem Winston-S AS REQUESTED DRAWINGS BY UNITED PARCEL SERVICE X FOR YOUR REVIEW PRINTS BY US MAIL FOR YOUR INFORMATION CHANGE ORDER Hand Delivered THE FOLLOWING ITEMS: COPIES DATED DESCRIPTION' 1 Full size plan sheet Supplement Forms REMARKS: Since this project falls within the overall approval for Airlie Industrial Park (Phase 1), we were instructed by Mr. Alan Johnson that there is no application needed or fee. The prior approval # is referenced above. If additional information is needed, please do not hesitate to contact me. Thank you. SENDER: (to be provided by DWQ) OF W A T�c9 A& 0 O� y r NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section 111) and the I&M Agreement (Section IV) I .'PROJECT INFORMATIQN Project name Airlie Park Spec Building (Lincoln County DWQ #11-0089) Contact name David Lutz Phone number Date Drainage area number Site Characteristics Drainage area (AD) Impervious area % Impervious (IA) Design rainfall depth (RD) Peak Flow Calculations 1 -yr, 24 -hr runoff depth 1 -yr, 24 -hr intensity Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24 -hr runoff Pre/Post 1 -yr, 24 -hr peak control Storage Volume Design volume (WQV) Adjusted water quality volume (WQVAdi) Volume contained in the sedimentation basin and on top of the sand filter Top of sand filter/grate elevation Weir elevation (between chambers) Maximum head on the sedimentation basin and sand filter (hMmFilter) Average head on the sedimentation basin and sand filter (hA) Runoff Coefficient (Rv) Type of Sand Filter Open sand filter? SHWT elevation Bottom of the sand filter elevation Clearance (dSHWr) Closed/pre-cast sand filter? SHWT elevation Bottom of the sand filter elevation Clearance (dsHwT) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (dsp... ) 704-489-1500 May 20, 2015 2' 157,440.00 ft' OK 78,800.00 ft' 50.1% % 1.00 in 2.92 - in 0;12 ' in/hr 0.09 ft3/sec 0.22 ft3/sec 0.13 ft3/sec 61552.00 ft3 4,914.00 ft3 4,997.40 ft3 OK 777 ft amsl 778.5 ft amsl 2.58 ft OK 1.29 ft OK 0.50 (unitless) Y" YorN 768.00 ft amsl 775.50 ft amsl 7.5+ N/A YorN ft amsl ft amsl N/A ft Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 2 Sedimentation Basin Surface area of sedimentation basin (As) Sedimentation basin/chamber depth Sand Filter Surface area of sand filter (Ar) Top of sand media filter bed elevation Bottom of sand media filter bed/drain elevation Depth of the sand media filter bed (dF) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet discharge/flowrate Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? If not a closed bottom, is BMP located at least 1 00f from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (Wsed)? What is the depth of sand over the outlet pipe (dpipe)? (to be provided by DWQ) 952.00 Ur\. IVICCW IIIIIIIIIIUIII, UUL HWY IICCu lU UC IIIUICdLCU W ft2 ......1..;.. il...............J ....I....,... ;t ............J... 04...--- 2.58 ft 952.00 II IUICdJC QUI IQUC c1ICd. I IIIA VV III QIJU IIIUMMU UIC ft2 ......L......1....M;lii.. L........l..l.. LL......J;. �..i...J .....L... ......II{.. 777.00 ft amsl OK 775.50 ft ams] YorN 1.50 ft Y 3.50 (ft/day) OK 6.00 in YorN 3.56 ft3/sec 0.50 hours OK. Submit drainage calculations. 0.02 days Y YorN OK N YorN Insufficient flow splitter. NIA Y or N Enter Data ft YorN Y YorN OK Y YorN OK Y YorN OK y YorN OK 30.00 ft OK 1.50 ft OK Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 2 of 2 (to be provided by DWQ) OF 11A TF,,, O� 6 NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section Ill) and the I&M Agreement (Section IV) L . PROJECT,INFORMATION .r. Project name Airlie Park Spec. Building (Lincoln County DWQ #11-0089) Contact name David Lutz Phone number 704-489=1500 Date Drainage area number May 20, 2015 1 II,,DESfGN'.INFORMATION. 2.92 in Site Characteristics 0.12 in/hr Drainage area (AD) 57,200.00 ft' OK Impervious area 18,990.00 ft2 % Impervious (IA) 33.2%% Design rainfall depth (RD) 1.00 in Peak Flow Calculations 1 -yr, 24 -hr runoff depth 2.92 in 1 -yr, 24 -hr intensity 0.12 in/hr Pre -development 1 -yr, 24 -hr runoff 0.03. ft3/sec Post -development 1 -yr, 24 -hr runoff 0.08 ft3/sec Pre/Post 1 -yr, 24 -hr peak control 0.05 ft3/sec Storage Volume ft ams] Design volume (WQV) 1,700.00 ft' Adjusted water quality volume (WQVAdi) 1,275.00 ft' OK Volume contained in the sedimentation basin and on top of the sand filter 2,162.00 ft3 Top of sand filter/grate elevation 772 ` ft amsl Weir elevation (between chambers) 773.5 ft amsl Maximum head on the sedimentation basin and sand filter (hMaxRer) 2.00 ft OK Average head on the sedimentation basin and sand filter (hA) 1.00 ft OK Runoff Coefficient (Rv) 0.35 (unitless) Type of Sand Filter Open sand filter? 'Y " Y or N SHWT elevation 765.30 ft ams] Bottom of the sand filter elevation 770.50 ft amsl Clearance (dsHwT) 4.8+ Closed/pre-cast sand filter? N/A Y or N SHWT elevation ft ams] Bottom of the sand filter elevation ft amsl Clearance (dSHwT) If this is a closed, underground closed sand filter; The clearance between the surface of the sand filter and the bottom of the roof of the underground N/A ft structure (dsp,.) IVC Department of Environmental Quality Received ,;f;, t D JUN 2 6 2017 Winston-Salem ,i Regional ®ffice Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and 11. Project Design Summary, Page 1 of 2 Sedimentation Basin Surface area of sedimentation basin (As) Sedimentation basin/chamber depth Sand Filter Surface area of sand filter (AF) Top of sand media filter bed elevation Bottom of sand media filter bed/drain elevation Depth of the sand media filter bed (dF) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet discharge/flowrate Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3;1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (WSed)? What is the depth of sand over the outlet pipe (dpipe)? (to be provided by DWQ) Y YorN OK N YorN Insufficient flow splitter, N/A VI\. IVICCLJ IIIIIIIIIIUIII, UUL Illdy IMM LU UC IIIUII7dbCU LV 253.00 ft2 ......I...i.. LL.........,.�....J ....I�,..�... if ........ .,.. d... C+L...--- 2.00 ft 253.00. ft' IIIUWCIWW QUI IQUtl dlCd. I IIID WIII CIIDV II IUItldbC II IC .., ...t...,,.i....l.:ll7.. i........l..l.. ll......II�...a...I ,....L... ......Ill,. 772.00 ft amsl OK 770.50 ft amsl YorN 1.50 ft Y 3.50 (ftlday) OK 6,00 in YorN 0.77: ft3/sec 1.00 hours OK. Submit drainage calculations. 0.04 days 1.50 It Y YorN OK N YorN Insufficient flow splitter, N/A YorN Enter Data ft YorN Y Y or N OK Y YorN OK Y YorN OK y YorN OK 16.00 It OK 1.50 It OK Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 2 of 2 AIRLIE PARK PHASE I SAND FILTER #1 DA=57,200 SF=1.31 AC Impervious =18,990 SF = 0.44 AC C = 0.34 WQv = (0.05 + 0.9(0.34)) * 1.31 * 43560 * 1 * 1/12 = 1,700 CF WQv adj = WQv *.75 = 1,275 CF As min =(240*Rv*Ad)Rd=(240*0.356*1.31)*1=112 SF Af min = ((WQv * dF) / (1<* t * (hA + df))) = ((1700 * 1.5) / (3.5 * 1.66 * (1.5 + 1.5))) = 146.3 WQv adj As + Af Hmax = 3' 1,275 428 As = 214 sf As proposed = 253 sf DA =157,440 SF = 3.61 AC Impervious = 78,800 SF =1.81 AC C = 0.50 Af = 214 sf Af proposed = 253 sf SAND FILTER #2 WQv = (0.05 + 0.9(0.5)) * 3.61 * 43560 * 1 * 1/12 = 6,552 CF WQv a dj = WQv * .75 = 4,914 CF As min =(240*Rv*Ad)Rd=(240*0.5*3.61)*1=433 SF Af min = ((WQv * dF) / (I<* t * (hA + df))) = ((4,914 * 1.5) / (3.5 * 1.66 * (1.5 + 1.5))) = 422 SF WQv adj As + Af Hmax = 2.58' 4,914 1,904 As = 952 sf Af = 952 sf As proposed = 952 sf Af proposed = 952 sf GRADING AND DRAINAGE NOTES: EARTHWORK QUANTITIES HAVE BEEN ESTIMATED AND SITE AS SHOWN IS ASSUMED TO REPRESENT A BALANCED 13. ALL PROPOSED CONTOURS IN ALL "FILL" AREAS SHOWN ON THIS PLAN REPRESENT COMPACTED STRUCTURAL FILL NOTE: PROVIDE 4" CLEANOUTS FOR SAND FILTER UNDERDRAIN SYSTEM EVERY 50 -FT AND ALL BENDS FILTER FABRIC CUT / FILL CONDITION. PROJECT OBJECTIVE IS TO GRADE AS MUCH OF FUTURE ADDITION AS MATERIAL AND SHALL BE CONSTRUCTED WITH SATISFACTORY MATERIAL COMPACTED TO THE STANDARDS OUTLINED IN THE (CLEAN WASHED ALLOWS. SPECIFICATIONS. 2. CONTRACTOR SHALL PERFORM HIS OWN ESTIMATE AND SHALL PROVIDE ALL EARTHWORK NECESSARY TO 14. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN FILTER FABRIC ACHIEVE THE DESIGN GRADE, INCLUDING ANY OFFSITE BORROW OR SPOILS REQUIRED. ADDITION TO OTHER APPLICABLE CRITERIA AND SPECIFICATIONS: WITH NORTH 1.5' OF CLEAN 14.1 NO MORE THAN 500 LF OF TRENCH MAY BE OPENED AT ONE TIME. 3. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE IN ALL GRADED AREAS, INCLUDING PAVING, LAWN AND 14.2 EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. OR APPROVED EQUAL. LANDSCAPE AREAS. 14.3 EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED FILTER FABRIC SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT VIOLATE EROSION 4. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL AND SEDIMENT CONTROL LAW OR ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. UNDERDRAIN FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTIONS PRIOR TO 14.4 MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE COMPACTED PER THE SPECIFICATIONS. AMERICAN PROCEEDING. 14.5 APPLICABLE SAFETY REGULATIONS SHALL BE FOLLOWED, AND ARE THE SOLE RESPONSIBILITY OF THE TURF R - Provide 95% Compaction CONTRACTOR TO IMPLEMENT. 5. CONTRACTOR SHALL VERIFY LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING WORK, BOTH have 8 -inch perforations, spaced at 6" centers, with a minimum of 4 -holes PUBLIC AND PRIVATE. CONTRACTOR IS FULLY RESPONSIBLE FOR ALL UNDERGROUND UTILITIES AND SHALL must have 0.5 % slope min. Underdrain may be HDPE REPAIR ANY DAMAGE AS A RESULT OF THIS CONTRACT. - Underdrain pipe shall be 6. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. above Filter Media 7. THE PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN IN DRIVES, PARKING LOTS AND SIDEWALKS ARE NOTE: Drainage Area must be stabilized prior to filtration controls and filter FINISHED ELEVATIONS INCLUDING ASPHALT. REFER TO PAVEMENT CROSS SECTION DATA TO ESTABLISH brought online. SAND CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. N.T.S. 8. ALL "STD." NUMBERS REFER TO THE (AGENCY) DEVELOPMENT STANDARDS. M H 2 9. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 10. MAXIMUM CROSS SLOPE OF SIDEWALKS SHALL BE 1/4" /FT. 792 11. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. W/ OUT ADDITIONAL STABILIZATION MEASURES AND PRIOR APPROVAL. NOTE: CONVERSION OF SKIMMER 12. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD BASINS TO SAND FILTERS SHALL NOT CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OCCUR UNTIL SITE CONSTRUCTION 3 OWNERS. ACTIVITIES ARE COMPLETED AND GROUNDCOVER IS FULLY STABILIZED. NOTE: PROVIDE 4" CLEANOUTS FOR SAND FILTER UNDERDRAIN SYSTEM EVERY 50 -FT AND ALL BENDS FILTER FABRIC 1" DEBRIS SCREEN AROUND (CLEAN WASHED PERIMETER & STONE) BOTTOM WEIR EARTHEN BERM. FILTER FABRIC 1.5' SAND FILTER WITH NORTH 1.5' OF CLEAN GREEN P300 WASHED TURF REMENT CONCRETE SAND OR APPROVED EQUAL. ASTM -C33 OF WEIR FILTER FABRIC 6" GRAVEL LAYER COMPACTED EARTH/ 6" PERFORATED EMERGENCY UNDERDRAIN LINE WRAPPED IN AMERICAN FILTER FABRIC DETAILS: TURF R - Provide 95% Compaction OR APPROVED EQUAL. - Underdrain shall be 6" perforated PVC pipe in a 12" gravel layer. Pipe shall have 8 -inch perforations, spaced at 6" centers, with a minimum of 4 -holes per row. Perforated pipe must have 0.5 % slope min. Underdrain may be HDPE (AASHTO M252) - Underdrain pipe shall be wrapped with filter fabric - Cleanouts shall extend 6" above Filter Media - Minimum of 12" of filter media over drainage pipe. NOTE: Drainage Area must be stabilized prior to filtration controls and filter media being installed and brought online. SAND FILTER MEDIA N.T.S. STM 1.65' SF #2 COMPACTED SOIL 3:1 SIDE SLOPE SECTION A -A Copyright 2015 CES Group Engineers, LLP 1.5' SIF #1 SAND FILTER NOTES: Line Size Slope Invert In Invert Out 1. OVERFLOW WEIR EARTHEN BERM. EMERGENCY SPILLWA(FORCEMENT E LIN WITH NORTH AMERICAN GREEN P300 PERMANENT TURF REMENT MAT, OR APPROVED EQUAL. 5'Wx3O'L. TOP OF WEIR ELEVATI4'. 2. OVERFLOW WEIR EARTHEN BERM. EMERGENCY SPILLWE LINE WITH NORTH AMERICAN GREEN P300 PERMANENT TURF R AT, OR APPROVED EQUAL. 12'Wx17'L. TOP OF WEIR ELEVAT79.58' MH 1 Inlet ID Length Line Size Slope Invert In Invert Out Rim Elev Material PIPE 09.25.14 (ft) (in.) (%) (ft) (ft) (ft) Class FES1 772 772 73.5 15 5 RCP -3 STM 1 MH 1 780.5 775.68 783.5 39 15 5.13 RCP -3 STM 2 M H 2 789 782.5 792 90 15 1 RCP -3 STM 3 CI 1 791.25 800.8 FES 2 777 777 64 24 2 RCP -3 STM 4 MH 3 786 780.1 789 28 24 3 RCP -3 STM 5 DCI 1 1 1 787.4 1 796.6 o � �NGLE50[1-11JE REAL ESTATE li 77�"I �/ MV. PAIF\ D � � � � EEO 2203/541 tDO \\ \I III III I U P 1 / SEE\ NOTE \1 \4603-22-0287I II o I iii I 1 2 PIN I CLEARING LIMITS (TYP.) I II II I _ I-AAREMAINDER OF TRACT #1 3:1 MAX. I �; III ► d � \\ �` 1 1 SIDE SLOPES X66 I P 2A BI10 0'IK ;1 6 ;1 2; I i C'RIPRAP OUTFALL � I �'IC� �% 3:1 SIDE SEE SHEET C9 W O O D SLOPES FES 1 Vk/ 0 (DCJ E D 11111111 -�------------- _ MH 2 S' 8 a' 12'50/"E ' 558.52 ' _ --- -- I I ' -dVE FLOW WEIR ----r----- --- ---- - ---- - --- \IVINSTONE SIZE=0.5' MH YD �_ - --- DD _ ADD - ----- -------------- -- --- - _ Cl 1 - DDS -- ------ ------- - 6" OLID PVC SSM 1 ----------- t----- ;\SAND FILTER 253 -SF / STM 3 TC: 802.4' C 801.9' T 802.4' TC: 8012.4' N FOREBAY \ 01.9BC: 801.9' cc) _-34LF OF 6" r ARFQRATED PVC ' NTH CLEAN OUTS \ V_ l� � -�� .,�. - IS �1� x 'II SAND �JLTER #1 _ I 15" HDPE SLO DRAIN1 0 o (,DRAINAGE` LIMITS �p I O O cc 0 i R50 7 1 3:1 SIDE SLOPES \ l ! i CO I 5 \ I i LOT #'1 1 I 'co A I 5J6 AC.+ ; TOTPIL �� P O RTI O N OF 1,RACT� # "I 1 '1 X11 C LAIC\ BOOK 1,6 167 I � I I \ I I UTURE BUILDING( ( w PROPOSED BUILDING a 50, 000 SF I 1 ADDITION O I , 0 crP li �� I o 0 50,000 -SF 11 ci I FFE=802.50' I LL. I Q7 I I 0RD I I ,• I cc - II �� �(0 I I I I I N C DOT i �, I 15" HDPE SLOPE DAIN I ' I I I �ONUMENT',' 00 1 C \ I I SAND FILTER #2 f ,' II DRAINAGE LIMITS I (�' I FOREPAY (952 II p� 00 7S8. I Il 58LF OF 5 - :]ERF ORATIED "gE?FORATED PVC ® rI OUTS 7,3 p I/ 1 I SANG FILTER --952 SF / _ 1I 16 FES 2 I 1� I 1 I I T 11 SF '11 1 1 ELEV: 775' 1 774 / SF 2 ELEV: 780' I 1, s" soup PVC � d 44 -LF 1 STM 4 7j 1 ---L__ 1 MH 3 I 1 I WOOO_U_ STM 5 DCI 1 I 1 � -�----+_I -. SF 1 ELEV: 772 � I 'I,� �---- .._,__ i -i-----___-_ !/ SF 2 ELEV: 777' I OVERFLOW V0.5' --_--_x__20 SIDE -_-_- 800 � I MIN. STONE SIZE=0.5 I---___,1� I SAND FILTER NOTE 2 / N 82°28 / ------ __ \ % 1,2 W 5 - -__ WOODED --� --80 IRIPRAP OUTFALL R E M A N 2/ E R / -__ SEE SHEET C9 --- P N 4622-206 2203/541 I N G E2 D E REAL- ESTATE I RIM =806,28' I dl/ I II INV 794,88' I I I II I rl + I i u u , di TC: i 80 .55' BC:i 80 .05' ii 1 i;` i r 111 iLIJ � I I I II II it II } iI Iii I I I I I I I I I III o � O I �I II Ili I i LLJ 1 III I �11- I 1 I�J I 'I III I I 0 II Q l- i`r�I I I i i it , d Z i I'� � I i I I i I II Q0 I � JAI �I I 1 �I , d 1 1 1 QO � l a _ L � 1>f i11 ,Ili Z P z - I C) 1 I I ni I W �' ,j 1 I I J � III I I Qi L II d Q WI C, , li I �Or� u izEI I i LJ 1 I II I III I1 0 I ; �II III I I i 0 11 I / � 'MH THE S�GMON 1 I I I 1 II „ 1 � III 111 \ I RIM 805.12 LMNG TRUST INV 791 .87' 111 2146/031 I U II 4�11 i o Q / I � II � Ill �i III o I Ili III �� IIID � � • I I I IIIA iii � I I • 00 III II III o I I � IIIA 1 1 � II 1 Know what's below. Q0 '' Call before you dig. I I � .Iu � III � � ,II � v NORTH CAROLINA 'III I;;; ONE -CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING ' www.nc8ll.or � I 0 25 • 100 %//// '//////// Graphic- • SEAL: ���\ CAR `O //�i �pQ:'aSSS16 �.'ti,'� cL SEAL 9r; 3 866 5��1 • l.j 'i •:�GINti�' �� 'IDI 1v,�,\\``` REVISIONS NO: ISSUE: DATE: 1 ADDED STORM 09.16.14 2 REVISED STORM 09.25.14 3 SAND FILTER 09.26.14 4 SAND FILTER 05.21.15 O a° J W JEts a, :3 IL to Ul 0 OW •U 0�W Z 19 Z I EIIF W NL Z L3WN0 L L u U LLJ U 2 Z 0 Z Z 0 Q 2 Z O Q_0 M � W W L-31 U F - w 0 OIL:Cl- Q DRAWN BY.- DPW Y.DPW CHECKED BY: DSL PROJECT NO: 6583.0414CD COMMENTS: DATE APPROVED: 1 SCALE: 50 DRAWING TITLE: GRADING PLAN DRAWING NUMBER: