Loading...
HomeMy WebLinkAbout20150610 Ver 3_More Info Received_20170630/r DUKE ENERGY. Ms. Sue Homewood June 26, 2017 Environmental Senior Specialist NC Department of Division of Water Resources -Water Quality Programs Environmental Quality Winston-Salem Regional Office Received 450 Hanes Mill Road, Suite 300 JUN 3 0 2017 Winston-Salem, North Carolina 27105 Winston-Salem RE: Response to Request for Additional Information _Regional Office DWR # 15-0610 v3 Dan River Steam Station Stormwater Diversion Project and associated Projects Rockingham County, North Carolina Dear Ms. Homewood: Duke Energy, in consultation with Amec Foster Wheeler Environment & Infrastructure, Inc., submitted a standard permit application to the Raleigh Regulatory Field Office of the U.S. Army Corps of Engineers: (USACE) for issuance of Section 404 Individual Permit for the Dan River Steam Station Stormwater Diversion Project and associated Projects at the Dan River Steam Station in Eden, Rockingham County. The application and supporting documents were also provided to the North Carolina Department of Environmental Quality (NCDEQ), Division of Water Resources (DWR), requesting an Individual Water Quality Certification from the DWR for the project. On May 2, 2017, the DWR Water Quality Programs received the application dated April 28, 2017. Subsequent to your review of the application and supporting documents, you presented three requests for additional information (RAI) in a correspondence dated June 1, 2017, to Duke Energy at the attention of Mr. Steve Cahoon. As enumerated herein for discussion purposes, these items and respective responses are presented below with requested materials enclosed for the DWR to consider the application to be complete. In addition to the above request for additional information, you requested information on the project in a May 29, 2017 email correspondence to Mr. Cahoon. Although a response to your query was provided to you in a June 1, 2017 email correspondence from Mr. Cahoon, that response is also included herein. Item Number 1 This project includes a revision to impacts previously approved by the Division on May 12, 2016 (DWR#2016-0156v2). These impacts were for an access road for the Dan River Scarp Repair and were approved as temporary impacts. The current application for an Individual Permit requests that these impacts be approved as permanent impacts. The original review by the Division was based on temporary impacts and therefore the Division requires a more detailed analysis of the purpose and need for permanent impacts as well as a more detailed analysis of avoidance and minimization measures. In addition, this project will be placed on hold until a compliance inspection of these culverts has been conducted. [15A NCAC 02H .0506(f) and (g)] 1 DUKE ENERGY® Response Access via the two culverted stream crossings (road crossings) to the northern shoreline of the Dan River is necessary for scarp repair. Permanent access via these two crossings is necessary to facilitate future maintenance of the Primary and Secondary Ash Basins embankments along the Dan River. Such maintenance would include future scarp repair. The two road crossings will be maintained for future necessity and emergency access to the shoreline areas along the Dan River. If the road crossings are not permanently established (i.e., if the culverts are removed and re -contouring is completed), future scarp repairs, as they arise, would necessitate the reinstallation of the culverts. Such continued impacts to the stream channel would be cumulative. The installation is to support minimization of erosion along the Dan River. Use of rock instead of soil to improve installation and the improvement of the existing temporary crossings (via a change to permanent crossing) are proposed. These actions will facilitate minimization of impacts, present and future. Item Number 2 Your application indicates that 130 linear feet of stream stabilization will occur of location DR -134 however Plan Sheet DR -134 Section Detail, Figure 02 shows riprap shading throughout the entire channel bed. Please clarify whether riprap will be extended throughout the channel bed, Response Riprap will be placed in the channel bed only as required to provide a working platform. Ideally, the riprap will be placed from the top of the stream channel and the only encroachment into the stream will be to extend the slope tie-in at the base of the channel. Item Number.3 As requested in the pre -application, please provide a detailed analysis of the velocity expected at outfall SW -010, the riprap pad specifications and details, and an analysis of the impact this additional flow and velocity may have on wetlands that are present immediately downslope of this area. Response The peak flow at Outfall SW -010 is anticipated to be about 0.9 cubic feet per second (cfs) with a velocity of about 4.5 feet per second (fps). The anticipated flow rate and velocity is nominal as evidenced by the fact that the calculated values (0.9 cfs and 4.5 fps) are less than the minimum values shown on the riprap apron sizing nomograph. A riprap apron will be used to further dissipate flows prior to discharge to the receiving land area. The selected riprap apron dimensions exceed the minimum required design dimensions. Based on these considerations, there are no anticipated negative impacts to the receiving drainage pathway, including wetlands that are located downgradient of the 2 /r DUKE ENERGY® riprap apron. Note: the nearest wetland area to the proposed riprap apron is located more than 50 feet from the proposed structure. The attached document Riprap Area Calculation provides details on the analysis, including objective, method, calculations, discussion, and references. May 29, 2017 Email Correspondence from Ms. Homewood to Mr. Cahoon Does SW -010 exist in your NPDES permit? If so, how will the stormwater diversion project effect sampling with regards to that permit. If you have already been discussing this with the stormwater unit please let me know who you've talked to so that I may discuss this with them and make notes in my file. Response Outfall SW -010 is in SW Permit (NCS000572) as a future outfall. Ms. Joyce Dishmon, Duke Energy, spoke to various NCDEQ staff. She spoke to Mr. Ken Pickle (retired) in early 2016 and Ms. Bethany Georgoulias, Mr. Michael Randall, and Mr. Bradley Bennett (retired) in late 2016 to discuss the future outfall. The permitted parameter list and sampling frequency should follow requirements outlined for CCR influence in other permits and sampled semi-annually. For illustration, the "Analytical Monitoring Requirements for SW027" table from Permit No. NCS000573 for Craig Road Landfill parameters is attached herein for your review. Thank you in advance for your assistance with this project. If you have any questions or need additional information, please contact me at telephone number (919) 546-7457 or email address steve.cahoon@duke-energy.com. Sincerely, Steve Cahoon Enclosures Cc: David Bailey (USACE) Eric Kinstler (Duke Energy) Cedric Ruhl (Amec Foster Wheeler) Josh Bell (Amec Foster Wheeler) Richard Harmon (Amec Foster Wheeler) 3 RIPRAP APRON CALCULATION Riprap Apron Calculation Duke Energy — Dan River Steam Station Dan River Stormwater Diversion Calculation Title: Riprap Apron Calculation Summary: The peak flow at Outfall SW -010 is anticipated to be about 0.9 cfs with a velocity of about 4.5 feet per second (fps). The anticipated flow rate and velocity is nominal as evidenced by the fact that the calculated values (0.9 cfs and 4.5 fps) are less than the minimum values shown on the riprap apron sizing nomograph. A riprap apron will be used to further dissipate flows prior to discharge to the receiving land area. The selected riprap apron dimensions exceed the minimum required design dimensions. Based on these considerations, there are no anticipated negative impacts to the receiving drainage pathway, including wetlands that are located downgradient of the riprap apron. Notes: Revision Log: No. Description Originator Verifier Technical Reviewer 00 Initial Submittal /� A t n i�- 1`'As 4-- C,4o*-- Cedric Ruhl John Wrona Chrf6 Jordan Amec Foster Wheeler Project No. 7810-17-0895 1 of 3 6/15/17 (Initial Submittal) amec4v foster wheeler Riprap Apron Calculation Duke Energy — Dan River Steam Station OBJECTIVE: Dan River Stormwater Diversion The objective of this calculation is to design the riprap apron for stormwater diversion noncontact water pumped flow to Outfall SW -010. METHOD: The riprap apron was designed in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual. CALCULATIONS: 1.0 Calculate flow conditions Noncontact stormwater will be pumped to Outfall SW -010 at an approximate rate of 400 gpm through a 6 -inch diameter pipe. The peak flow rate and velocity are shown in the following table: Table 1: Calculated Flow Conditions Pumped Pumped Downstream Pipe Pipe Discharge Velocity Flow Rate Flow Rate Pipe Diameter Diameter Area at Pipe Outlet (gpm) (cfs) (in) (ft) (ft) (ft/s) 400 0.89 6 0.5 0.196 4.54 2.0 Calculate minimum required riprap apron dimensions The minimum required riprap apron dimensions and riprap median particle diameter (d50) was designed in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual [Ref. 1 ]. The maximum particle diameter (dmax) is 1.5 times the median particle diameter (d50). The riprap apron thickness is 1.5 times the maximum particle diameter (dmax). The minimum required riprap apron dimensions are shown in the following table: Table 2: Minimum Design Riprap Apron Size Pumped Downstream Minimum Minimum Minimum Apron Minimum Minimum Flow Pipe Length of Upstream Downstream Minimum dso Minimum dso dmax Riprap Riprap Rate Diameter Apron Width of Apron Width of Apron Riprap Size Riprap Size Size Thickness (cfs) (�n) (ft) (ft) (ft) (ft) (�n) (in) (ft) 0.89 6 6 1.5 6.5 0.2 2.4 3.6 0.5 3.0 Define selected riprap apron dimensions The riprap apron dimensions were selected to be greater than the minimum design riprap apron sizing criteria as shown in the following table: Table 3: Selected Riprap Apron Size Length of Upstream Downstream NCDOT Riprap dso Riprap dmaxRipra10.8 Apron Width of Apron Width of Apron Class Size Size (ft) (ft) (ft) [Ref. 2] (in) (in) 10 2 10 A 4 6 Amec Foster Wheeler Project No. 7810-17-0895 2 of 3 "- 6/15/17 (Initial Submittal) amec faster wheeler Riprap Apron Calculation Dan River Stormwater Diversion Duke Energy — Dan River Steam Station DISCUSSION: The peak flow at Outfall SW -010 is anticipated to be about 0.9 cfs with a velocity of about 4.5 feet per second (fps). The anticipated flow rate and velocity is nominal as evidenced by the fact that the calculated values (0.9 cfs and 4.5 fps) are less than the minimum values shown on the riprap apron sizing nomograph. A riprap apron will be used to further dissipate flows prior to discharge to the receiving land area. The selected riprap apron dimensions exceed the minimum required design dimensions. Based on these considerations, there are no anticipated negative impacts to the receiving drainage pathway, including wetlands that are located downgradient of the riprap apron. REFERENCES: 1. North Carolina Department of Environment and Natural Resources, Sediment Control Planning and Design Manual", Revised May 2013. 2. "Standard Specification for Roads and Structures", North Carolina Transportation, Raleigh, January 2012. Amec Foster Wheeler Project No. 7810-17-0895 3 of 3 6/15/17 (Initial Submittal) "Erosion and Department of amec foster wheeler REFERENCEI North Carolina Department of Environment and Natural Resources, "Erosion and Sediment Control Planning and Design Manual", Revised May 2013. Appendices Riprap (large stones of various sizes) is often used to prevent erosion at the ends of culverts and other pipe conduits. It converts high -velocity, concentrated pipe flow into low-velocity, open channel flow. Stone should be sized and the apron shaped to protect receiving channels from erosion caused by maximum pipe exit velocities. Riprap outlet structures should meet all requirements in Practice Standards and Specifications: 6.41, Outlet Stabilization Structure. Several methods are available for designing riprap outlet structures. The method presented in this section is adapted from procedures used by the USDA Soil Conservation Service. Outlet protection is provided by a level apron of sufficient length and flare to reduce flow velocities to nonerosive levels. Design Procedure for The following procedure uses two sets of design curves: Figure 8.06a is used Riprap Outlet for minimum tailwater conditions, and Figure 8.06b for maximum tailwater conditions. Protection Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classified minimum tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b, and determine d50 riprap size and minimum apron length (La). The d50 size is the median stone size in a well -graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape, and the apron width at the outlet end from the same figure used in Step 2. Step 4. Determine the maximum stone diameter: dmax = 1.5 x d50 Step 5. Determine the apron thickness: Apron thickness =1.5 x dmax Step 6. Fit the riprap apron to the site by making it level for the minimum length, La, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Rev. 12/93 8.06.1 Appendices A 3 5 10 20 50 100 200 500 1000 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 REFERENCE "Standard Specifications for Roads and Structures", North Carolina Department of Transportation, Raleigh, January 2012. Section 1043 1 All stone shall meet the approval of the Engineer. While no specific gradation is required, 2 there shall be equal distribution of the various sizes of the stone within the required size 3 range. The size of an individual stone particle will be determined by measuring its long 4 dimension. 5 Stone or broken concrete for rip rap shall meet Table 1042-1 for the class and size 6 distribution. TABLE 1042-i i ACCEPTANCE CRITERIA FOR RIP RAP AND STONE FOR EROSION CONTROL ? Required Stone Sizes, inches Class Minimum Midrange i Maximum i _. A 2 4 6 _. B 5 8 12 . 17 _. 9. . ;., ,. _.,..14. _.._.__... 23 7 No more than 5.0% of the material furnished can be less than the minimum size specified nor 8 no more than 10.0% of the material can exceed the maximum size specified. 9 SECTION 1043 10 AGGREGATE FROM CRUSHED CONCRETE 11 1043-1 GENERAL 12 Aggregate from crushed concrete is a recycled product made by crushing concrete obtained 13 from concrete truck clean out, demolition of existing concrete structures or pavement, or 14 similar sources and transported from a crushing facility. It does not include concrete 15 pavements that are rubblelized, broken or otherwise crushed in place on the roadway. 16 The crushed material must meet all sources approval requirements described in Sections 1005 17 and 1006 with the exception of the sodium sulfate test requirement. Deleterious materials 18 shall not be more than 3%. 19 Sampling and acceptance for the determination of gradaction, LL and PI will be performed as 20 described in the Aggregate QC/QA Program Manual and the Aggregate Sampling Manual. 21 1043-2 AGGREGATE BASE COURSE 22 The material shall meet the ABC gradation. The LL of the material shall be raised 5 points to 23 no more than 35. 24 1043-3 AGGREGATE SHOULDER BORROW 25 The material shall meet Section 1019. 26 1043-4 CLEAN COARSE AGGREGATE FOR ASPHALT 27 The material shall meet the gradation of a standard size in Table 1005-1. Use of the material 28 shall be approved by the Engineer, and the mix shall meet all requirements. 29 1043-5 CLEAN COARSE AGGREGATE FOR CONCRETE 30 The material shall meet the gradation of a standard size in Table 1005-1. Use of the material 31 is restricted to Class B concrete mixes only. Use of the material shall be approved by the 32 Engineer, and the concrete shall meet all requirements. 33 SECTION 1044 34 SUBSURFACE DRAINAGE MATERIALS 35 1044-1 SUBDRAIN FINE AGGREGATE 36 Subdrain fine aggregate shall meet No. 2S or 2MS in Table 1005-2. 10-62 NCDOT 2012 Standard Specifications ANALYTICAL MONITORING REQUIREMENTS TABLE Permit No. NCS000573 The permittee's application reports that no industrial activity takes place in the drainage area south of the FGD Residuals Landfill discharging via outfall SW026. A stormwater discharge permit is not required under the reported site conditions and operating mode. The following parameters shall be monitored during a measurable storm event discharging from the Craig Road Landfill via outfall SW027 into West Belews Creek/Belews Lake. Table 4 Analvtical Monitorine Reauirements for SW027 = Discharge; Measurement Sample Sample Characteristics Units Fre 'uenc ;1- T e2 Location3 Total Suspended Solids TSS m L semi-annual Grab SDO H standard semi-annual Grab SDO 40 CFR Part 423 Appendix A: Additional Priority Pollutant Metals - mg/L semi-annual Grab SDO Ag, As, Be, Cd, Cr, Cu, Hg, Ni, Pb, Sb, Se, Tl, Zn5 Boron m L semi-annual Grab SDO Total Rainfa114 inches semi-annual Rain _ gauge Footnotes: 1 Measurement Frequency: Twice per year (unless other provisions of this permit prompt monthly sampling) during a measureable storm event, until either another permit is issued for this facility or until this permit is revoked or rescinded. If the facility is monitoring monthly because of Tier Two or Three response actions under the previous permit, the facility shall continue a monthly monitoring and reporting schedule in Tier Two or Tier Three status until relieved by the provisions of this permit or the Division. 2 Grab samples shall be collected within the first 30 minutes of discharge. When physical separation between outfalls prevents collecting all samples within the first 30 minutes, sampling shall begin within the first 30 minutes, and shall continue until completed. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) specified above unless representative outfall status (ROS) has been granted. The permittee may petition the Director for ROS using DEMLR's ROS Request Form. DEMLR may grant ROS if stormwater discharges from a single outfall are representative of discharges from multiple outfalls. Approved ROS will reduce the number of outfalls where the analytical sampling requirements apply and will be documented in a letter to the permittee. A copy of the Division's letter granting ROS shall be kept on site. 4 For each sampled measureable storm event, the total precipitation must be recorded. An on-site rain gauge is required. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on-site reading. 5 Mercury shall be measured by EPA Method 1631E. Part II Page 10 of 20