Loading...
HomeMy WebLinkAbout20121041 Ver 2_CAMA Application_20170717Coastal Management ENVIRONMENTAL QUALITY July 14, 2017 TO: Karen Higgins 401 & Buffer Permitting Unit DWR/Water Quality Permitting ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a)-ncdenr-go v Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: River Bluffs Development Corporation MM30-13 Project Location: 2000 Chair Rd., adjacent to the NE Cape Fear River, in Castle Hayne, New Hanover County Proposed Project: to reconfigure and expand a community marina Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by August 7, 2017. If you have any questions regarding the proposed project, contact Courtney Spears at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: River Bluffs Development Corporation c/o Burrows Smith 2. LOCATION OF PROJECT SITE: 2000 Chair Road in Castle Hayne, New Hanover County, adjacent to the Northeast Cape Fear River Photo Index — 2006: 204-6663, O -X, 5-13 Lat: 340198"08.80239"N Long: 77°57"13.88234"W 3. INVESTIGATION TYPE: CAMA/D & F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 5/12/17, 5/17/17 Was Applicant Present — No, Yes 5. PROCESSING PROCEDURE: Application Received Complete — 7/12/2017 Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — Wilmington/New Hanover County Land Classification From LUP — Highground-Wetland Resource Protection Open Water- Conservation 7 (B) AEC(s) Involved: EW, ES, PTA (C) Water Dependent: Yes (D) Intended Use: Community (E) Wastewater Treatment: Existing — Municipal for upland area Planned — Marine pumpout for marina (F) Type of Structures: Existing — Access roads, homes on some lots, pool, boat ramp, portion of fixed pier, floating docks, two gazebos, golf cart raised driveway, and some shoreline stabilization complete. Planned — change portion of fixed pier to floating, kayak dock, relocate gazebo, add bench, relocate access to marina, reconfigure debris deflector, living shoreline for shoreline stabilization. (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Coastal Wetlands B Open Water () p 10, 850 s . ft. Incorporated 11,215 sq. ft. (C) Other (Highground) (D) Total Area Disturbed: 22,065 sq. ft. (0.51 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SC, Sw Open: No 8. PROJECT SUMMARY: River Bluffs Development Corporation is proposing to reconfigure and expand a community marina within the Northeast Cape Fear River. 4 River Bluffs Development Corporation c/o Burrows Smith Page 2 9. PROJECT DESCRIPTION: The project site is located at 2000 Chair Road, in Castle Hayne adjacent to the Northeast Cape Fear River (NECFR) in New Hanover County. To locate the project site from the Wilmington Regional Office (WiRO), travel south on Market Street for approximately 0.4 miles until you come to the intersection of Eastwood Road and Martin Luther King, Jr. Parkway (MLK). Merge right onto MLK and continue to travel west approximately 3.5 miles towards Downtown Wilmington. Merge right onto the off -ramp towards Castle Hayne Road (NC Highway 133) and travel north approximately 3.7 miles until you reach Chair Road, which will be located just south of 1- 140 (Wilmington Bypass). Turn left onto Chair Road and travel west approximately 1.75 miles until you reach the property of interest. The project site is located at the end of Chair Road adjacent to the NECFR, and is comprised of thirteen individual tax parcels totaling an approximately 258 acre tract owned by River Bluffs Development Corporation (applicant) and Chair Road, LLC. The project site has approximately 3,397 linear feet (LF) of shoreline frontage along the NECFR and has elevations ranging from 0 feet to 40 feet above normal high water (NHW). The highground transitions abruptly to the shoreline and appears to be currently experiencing significant erosion, especially along the northern end of the project site. The shoreline along the majority of the project site is not easily accessible from the highground due to the existing elevations. Existing structures on the project site include access roads, single and multifamily homes, a pool, a portion of the previously authorized marina that is under construction, and a boat ramp and fixed walkway with a gazebo that is under construction. There are existing overhead power lines that are located on the central portion of the project site, which cross the NECFR within a CP&L easement. There is also a small cemetery that has been identified and demarcated in the southern portion of the site. The adjacent riparian property to the north is a facility owned and developed by General Electric and 1-140 is located to the east of the project site. The property to the south is currently residential. The project site has highground vegetation consisting primarily of domestic grasses and native trees including: Bald Cypress, Magnolias, Dogwoods, Pines and Oaks. The highground slopes gradually to the edge of wetlands along the northern and southern end of the property shoreline, which consist primarily of mature Bald Cypress and Coastal Wetland plants including: Giant Cord Grass (Spartina cynosuroides), Cattails (Typha spp.), Bullrush (Scirpus spp.) and Sawgrass (Cladium jamaicense). The existing Coastal Wetlands vegetation in the southern shoreline of the project site is a dense expanse, which extends approximately 900 feet from the shoreline to the east within the interior portion of the site within a tributary known as Rock Spring Branch. A Jurisdictional Determination (JD) was approved by the US Army Corps of Engineers (USACE) for the existing Section 404 Wetlands, which are located on the project site (SAW -2009-01231, SAW -2008-00068 and SAW -2002-00617). In 2013, CAMA Major Permit 30-13 was issued to River Bluffs Devleopment Corp. for a planned unit development on the subject property including an associated marina, boat ramp, walkway along the shoreline and shoreline stabilization. Several minor modifications have been made to the permit and it is due to expire 12/31/18. Due to an oversight a portion of the currently proposed modifications were constructed prior to receiving authorization. This Major Modification includes those changes and is part of the restoration agreement issued from this office on May 25, 2017 as part of Notice of Violation #17-11 D. The Wilmington -New Hanover County LUP classifies the upland areas of the project site as Wetland Resource Protection and the open water as Conservation. The waters of the NECFR are classified as SC, Sw by the NC Division of Water Resources (DWR). The NC Division of Marine Fisheries (DMF) has designated this area of the NECFR as Primary Nursery Area and the waters are closed to the harvesting of shellfish. The USACE federally maintained navigation channel is located approximately 250-300 waterward of the NHW level. The width of the river in the project location ranges from approximately 650 to 700 feet across the river. River Bluffs Development Corporation c/o Burrows Smith Page 3 PROPOSED PROJECT: River Bluffs Development Corporation is proposing to reconfigure and expand a community marina within the Northeast Cape Fear River. The application states that 625' of the authorized fixed walkway was constructed as of February 2017 beginning at the northernmost end of the shoreline. The applicant proposes to change the remaining 1,055' of walkway to 10' wide and floating in the same general footprint of the previously authorized elevated, fixed 8' wide walkway (See Sheet 1 of 12 and 4 of 12). The proposed floating walkway would provide side -to dockage for 42 vessels in water ranging in depth from -7' to -10' at MLW. The application states that the total slip count for the entire facility would be 188. At the northernmost water access, the concrete boat ramp would be extended from 67' to 91' in length, with gravel on the northern side measuring 53' in length and varying in width from 1' to 5', and gravel on the southern side of the ramp measuring 5' in width by 34' in length (See Sheet 2 of 12). Adjacent to the boat ramp, along the southern side, would be brick -lined steps measuring 32.5' by 8.5' leading to a 6' by 8' section of wooden walkway which would then connect to the existing wooden walkway, (See Sheet 2 of 12). A floating kayak dock located south of the existing boat ramp would contain four sections one measuring 8' in width by 32' in length, one 7' in width by 11' in length, and two 4' in width by 13' in length sections. The 8' by 32' section would extend in a westerly direction, perpendicular to the fixed walkway. The kayak launch portion, consisting of an 11' by 7' platform and two 4' by 13' fingers, would extend in a southerly direction from the 8' by 32' floating section. Along the ramp leading from the fixed walkway to the kayak launch would be a 34' section of breakwater (See Sheet 3 of 12 Inset 1). Along the existing fixed walkway, a cantilevered bench measuring 3' by 24.5' would be adjacent to a relocated gazebo measuring 19.5' by 19.5' just north of the proposed 1,055' by 10' floating walkway (See sheet 3 of 12 Inset 2). South of the proposed floating walkway a second gazebo measuring 16' by 16' would be relocated with a 6' wide access way and connect to the existing marina. Along the shoreline adjacent to the relocated gazebo, 69' of an existing retaining wall would be removed (See Sheet 3 of 12 Inset 3). A 12' wide deck is proposed on the upland area adjacent to the southernmost marina access (See Sheet 5 of 12). The applicant proposes to add floating finger piers between every boat slip, with finger piers varying in length from 20' to 35' and varying in width from 3' to 5' (See Sheets 5-7 of 12). The applicant also proposes adding 10 floating platform boat lifts in slips 53-56, 29-33 and one floating platform along the main spine south of the C access pier (See Sheet 5 of 12). The % channel width setback shown on the submitted work plan drawings appears accurate. As proposed, the marina does not appear to exceed the % width limitation. The applicant proposes several areas of shoreline stabilization. Along the drive to the boat ramp a 219' retaining wall varying in height from 2'-10' above grade and running in an east -west direction would stabilize the shoreline and upland area. At the waterward end of the retaining wall would be a 15' by 12' section of rip rap. Along the fixed walkway would be 4 sections of living shoreline, each consisting of riprap with backfill and plantings. Living shoreline area 1 would be 925 square feet in area and would extend a maximum of 25' waterward of NWL (See Sheet 8 of 12 and 11 of 12). Living shoreline area 2 would be 2,679 square feet and would extend a maximum of 28' waterward of NWL (See Sheet 8 of 12 and 11 of 12). Living shoreline area 3 would be 2,752 square feet and would extend a maximum of 24' waterward of NWL (See Sheet 9 of 12 and 12 of 12). Living shoreline 4 would be 4,494 square feet and would extend a maximum of 41' waterward of NWL (See Sheet 10 of 12 and 12 of 12). The combined backfill for all four areas is 3,772 square feet of riprap and 7,097 square feet of sand fill. None of the proposed living shoreline areas would extend beyond the authorized access walkway. No changes are proposed to the non -water dependent development previously authorized by State Permit No. 30-13. Due to an oversight a portion of the above proposed modifications were constructed prior to receiving authorization. This Major Modification includes those changes and is part of the restoration agreement issued from this office on May 25, 2017 as part of Notice of Violation #17-11 D. River Bluffs Development Corporation c/o Burrows Smith Page 4 ANTICIPATED IMPACTS: The proposed modifications to the community marina would incorporate an additional 11,215 sq. ft. of Estuarine Waters and Public Trust Area. As proposed, the marina does not appear to exceed the % width limitation. As proposed, the marina configuration would accommodate up to 135 permanent vessels and 53 temporary side - to dockage for a total of 188 slips as they are numbered on the workplan drawings (See Sheet 5 of 12). However, there appears to be potential for two vessels to dock on the end of docks 2-10 which would increase the potential slip count to 197. The application states that the existing water depths in the location of the proposed marina ranges from -10 feet to -15 feet @ MLW. Due to the linear design and floating pipes, no bottom or shading impacts are anticipated, aside from the vertical support pilings. The proposed living shorelines would incorporate approximately 10,850 sq. ft. of Estuarine Shoreline and Public Trust Area. Submitted by: Courtney Spears Date: 7/13/17 Office: Wilmington Major Modification Request - CAMA Permit 30-13 River Bluffs Community, New Hanover County, North Carolina River Bluffs Development Corporation - applicant Revisions to Previously Approved Water Dependent Structures and Construction of Living Shoreline - Marsh Sill July 11, 2017 River Bluffs Development Corporation requests modification of CAMA Permit 30-13 for revisions to previously approved water -dependent structures and shoreline stabilization. The planned unit development and its water -dependent structures are partially constructed at the time of this request. Necessary revisions to approved water -dependent structures became apparent during construction. The revisions would, in part, provide solutions to these observed conditions. All changes requested in this modification are limited to the water -dependent structures and shoreline stabilization. No changes to the upland development are requested. Water -dependent structures existing at the time of this request include (from north to south): 1. Concrete Boat Ramp (14' x 91') with brick steps (8.5' x 32.5'), gravel along the northern and southern sides (3'x 53') and (5' x 34'), rip rap stabilization (12'x 15'), breakwater along southern edge 34 Ift. Retaining wall south of ramp and ramp approach 219 Ift. 2. Floating Dock at Boat Ramp (8'x 32'). 3. Fixed Walkway with Breakwater along northern shoreline, approximately 624 to 625 Ift. 4. Gazebo along fixed walkway (19.5' x 19.5') with cantilevered bench (3'x 24.5'). S. Pilings for currently requested floating walkway/dock, 12 in total. 6. Within Previously Approved Marina Floating dock with debris deflector (6' x 145'), 10' wide floating marina access dock from debris deflector dock to "Dock 5", "Dock 5" with twelve 30' slips and one 68' 6" slip. 7. Marina Access Deck/Gazebo Central access to marina. Deck (12'x 12'), wooden walkway 54 Ift (19 ft of which is below MHW), gazebo (16' x16'). Currently requested changes include: 1. Revision of Fixed Walkway to Floating Walkway. CAMA Permit 30-13 authorized a fixed walkway along the River Bluffs shoreline to provide pedestrian access between the community marina at the southern shoreline and a boat ramp at the northern shoreline. The authorized fixed pier (boardwalk) was approximately 2,500' in length, but was shortened with a 2013 minor modification involving changes to the community marina's layout. During construction of the walkway in the fall/winter Project Narrative revised July 11, 2017- Major Modification Request- CAMA Permit 30-13 River Bluffs Communit)6 New Hanover County NC— River Bluffs Development Corporation of 2016, installation of the structural pilings became problematic. Pilings were being jetted into place. However, river currents were so swift that sediment was removed from the area before settling around the installed piling and threatened the stability of the pilings. In response to this condition, the method of piling installation was changed to be pilings driven into place. The type and size of pilings had to be revised, and given the time and cost of this revision, fewer pilings were installed along the previously approved piling alignment. The approved fixed walkway is now proposed to be floating and attached to the driven pilings. A February 2017 as -built survey shows 625 Ift of fixed walkway, beginning at the northern end of the shoreline, was constructed before the piling installation was revised. Approximately 1,055 Ift of walkway remains unconstructed between the end of the fixed walkway and the marina. This modification requests to change the previously approved fixed walkway to a 10' wide floating walkway along this 1,055 Ift section (Figures 1 and 4). A 10' width is necessary for stability and safe use. Given the length of the walkway and use by community members and guests of varying ages, additional width beyond the more common six foot width is needed for safety. The waterward edge of the floating dock may be used for dockage for residents and guests during special events at the community. Across the 1,055 Ift, approximately 42 slips would be available based on one slip per 25' of length. Water depths along the waterward edge of the floating dock range between -7' MLW and -10' MLW. Similarly, at the very south end of marina there is available waterward side -to dockage (not within fingers) that totals 266 Ift equaling approximately 11 slips. A total slip count for the entire waterfront would be: Formalized marina slips 135 Side -to slips north of marina 42 Side -to slips south of marina 11 Total slips 188 New Kayak Dock. The addition of a kayak dock is requested at the northern end of the property's shoreline. The floating kayak dock is proposed just south of the 8'x 32' floating dock along the boat ramp at the northern end of the shoreline (which exists at the time of this request). The kayak dock would provide one launching slip and would consist of three floating sections: (1) a Tx 11' dock and (2) two 4' x 13' docks. The kayak dock will be accessed by the existing ramp/gangway from the existing fixed walkway, just south of the boat ramp (Figures 1 and 3). Water depths in the area of the proposed kayak dock are more than -10' MLW. Project Narrative revised July 11, 2017- Major Modification Request- UMA Permit 30-13 River Bluffs Community, New Hanover County NC— River Bluffs Development Corporation 2 3. Relocated Marina Access from Clubhouse Area. An approved gazebo located between the upland clubhouse area and the marina would be slightly relocated. The gazebo would be moved approximately 44' south of the previously approved location. The gazebo would remain a 16' x 16' elevated structure (Figures 1 and 3). Approximately 85' of wooden boardwalk (6' wide) would extend from the gazebo to the end of the previously approved walkway at the clubhouse. 4. Construction of living Shoreline for Shoreline Stabilization. The River Bluffs shoreline is a steep bluff along the NE Cape Fear River. The intertidal area at the base of the bluff is an erosive environment subject to river currents and is largely unvegetated. Shoreline stabilization in the form of riprap, to be placed underneath the previously -approved fixed walkway, is currently authorized. Following Hurricane Matthew, the applicant noted several distinct areas along the shoreline where storm erosion had resulted in depressional areas. Four such areas have been identified and are requested with this modification to be stabilized with a living shoreline. Riprap marsh sills with plantings of Spartina cynosuroides (living shoreline) would be installed in these four areas. Prior to planting, minor grading (cut/fill) of the planting areas above the sills will mimic the existing elevations of S. cynosuroides naturally occupying other portions of the River Bluffs shoreline. Plan and cross sectional views of the proposed marsh sills are provided in Figures 8-12. 5. Single -loaded marina slips. The slips within the marina were originally double - loaded with a floating finger dock between every other boat. The design has been revised to provide for single -loading with floating fingers between every boat. This revision adds a measure of safety for boats entering and leaving their slips during rapid river flow conditions, reducing unintentional contact with neighboring boats in their slips. This design also allows for more convenient boarding by residents and guests. All floating fingers are either 5' or 3' wide and run the length of the slips (Figures 6 and 7). 6. Floating dock platforms. The addition of ten floating dock platforms (7' x11.5') to be located within the marina. Project Narrative revised July 11, 2017- Major Modification Request- CAMA Permit 30-13 River Bluffs Community, New Hanover County NC— River Bluffs Development Corporation 3 .?1.'D. DCM MP-1 APPLICATION for Major Development Permit im. (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) River Bluffs Development Corporation River Bluffs Applicant 1: First Name MI Last Name Burrows G Smith Applicant 2: First Name MI Last Name NA Mailing Address PO Box If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State River Bluff Development, 3571 Hansa Drive ZIP Castle Hayne NC ZIP Country Phone No. FAX No. 28429 USA 910 - 675 - 7991 ext. - Street Address (if different from above) City State ZIP NA NA - Email burrows@riverbluffsliving.com 2. Agent/Contractor Information Business Name Land Management Group Inc. Agent/ Contractor 1: First Name MI Last Name Steve Morrison Agent/ Contractor 2: First Name MI Last Name Laura Stasavich Mailing Address PO Box City State 3805 Wrightsville Ave, Suite 15 Wilmington NC ZIP Phone No. 1 Phone No. 2 28403 910 - 452 - 0001 ext. - ext. FAX No. Contractor # 910 452 0060 Street Address (if different from above) City State ZIP NA - Email smorrison@lmgroup.net; Istasavich@lmgroup.net <Form continues on back> 2 � ?9� "�) 2UWW1.2'3yS 1 1 1 ?33,6-R'-0AZT „ wwwy nccoastaIm.anagernant.nat Form DCM MP -1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # New Hanover Chair Road at 1-140 (Wilmington Bypass) NA Subdivision Name City State Zip River Bluffs Castle Hayne NC 28429 - Phone No. Lot No. (s) (if many, attach additional page with list) NA - - ext. NA, No additional lots proposed, I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project f. Northeast Cape Fear River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Northeast Cape Fear River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. New Hanover County 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 3,397 linear ft 11,280,600 sf River Bluffs c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 7941.15 sf (average), NWL (normal water level) (if many lot sizes, please attach additional page with a list) 0' to 40' ®NHW or ❑NWL e. Vegetation on tract Intertidal shoreline along the proposed living shoreline/sill areas is unvegetated. f. Man-made features and uses now on tract Development of the approved subdivision and open water marina is underway. Roads, utilities and homes are being constructed. Water -dependent structures installed at the time of this major modification include one boat ramp, one floating dock at ramp, approximately 625 Ift of fixed walkway along the northern shoreline with breakwater, a 19.5'x 19.5' gazebo with cantilevered bench, and a portion of the marina which includes the northern dock with debris deflector, half of the 10' wide access dock, and Dock 5. Please see narrative for additional description of existing water -dependent structures. g. Identify and describe the existing land uses adjacent to the proposed project site. Industrial to the north (General Electric), residential and/or undeveloped to the south, Interstate 1-140 (Wilmington Bypass) to the east, Northeast Cape Fear River to the west. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Planned Development (PD) (Attach zoning compliance certificate, if applicable) ®Yes ❑No []NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ®Yes ❑No [INA If yes, by whom? NC Department of Cultural Resources I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA - National Register listed or eligible property? i 252-8013-2808 -. 1-888-4RCOAST ., www,riccoastalmanagement,net Form DCM MP -1 (Page 3 of 5) <Form continues on next page> APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. None existing. Cape Fear Public Utility Authority upon project completion. Marina pumpout will be routinely serviced through qualified contracting service and waste will be taken off-site for treatment. o. Describe existing drinking water supply source. None exisiting. Cape Fear Public Utility Authority upon project completion. p. Describe existing storm water management or treatment systems. NA 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Purpose of proposed modifications is to provide water access to residents of the community and their guests; living shoreline will stabilize eroded shoreline. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Standard marine construction techniques and equipment including barge; backhoes for minor grading of living shoreline areas. d. List all development activities you propose. (1) Installation of a floating kayak dock at the northern end of the shoreline, near the existing boat ramp (2) Revision of a previously -approved fixed walkway to a floating walkway. Floating walkway 10' wide with 1,055 linear feet of side -to dockage. (3) Revision of previously -approved marina layout and access pierstplatforms. (5) Construction of living shoreline (shoreline stabilization with sill and planting) at four highly eroded sections of the shoreline. e. Are the proposed activities maintenance of an existing project, new work, or both? New work for on-going development f. What is the approximate total disturbed land area resulting from the proposed project? construction of living shoreline all four areas total 10,850 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No [INA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. No other discharges into waters of the state are known to exist or are proposed. i. Will wastewater or storrnwater be discharged into a wetland? ❑Yes ®No [INA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ®NA "='L•= � i 252-808-2808 „ 9-998-4RCOAST ,. www,nccoastalmanagement.net r -i Form DCM MP -1 (Page 4 of 5) APPLICATION for Major Development Permit j. Is there any mitigation proposed? ❑Yes []No ®NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Martha P Loughlin, Rev Trust Phone No. Address 1300 Rockhill Road Castle Hayne, NC 28429 Name General Electric Co. Phone No. Address PO Box 4900 Scottsdale, Arizona 85261-4900 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. SW8 101108, River Bluffs Development Corp (05/23/11) SAW -2008-00068, Chair Road Associates, LLC (01/08/2008) SAW -2002-00617, Chair Road Associates, LLC (01/08/2008) SAW -2009-01231, Elizabeth B. Kerr (07/28/2009) h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date rev July 11, 2017 Print Name _Land Management Group, Inc. (agent) Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts 252-808-2808 -. 1-8138-4RCOAST .. www.AcaoastalmanaSamant-gest Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1 _ Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yams. c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV OSB OWL ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV OSB OWL ❑None (ii) Describe the purpose of disposal in these areas: d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii) If yes, how much water area is affected? 252-808-2808 ;: 1-888-4RCOAST :: www nccoastaimanagement.net revised: 12/26/06 Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length N/A N/A N/A N/A N/A N/A N/A Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yams. c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV OSB OWL ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV OSB OWL ❑None (ii) Describe the purpose of disposal in these areas: d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii) If yes, how much water area is affected? 252-808-2808 ;: 1-888-4RCOAST :: www nccoastaimanagement.net revised: 12/26/06 Form DCM MP -2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE STABILIZATION ❑This section not applicable Of development is a wood groin, use MP -4 — Structures) a. Type of shoreline stabilization: []Bulkhead ®Riprap ®Breakwater/Sill ®Other: Approximately 625 lit of fixed walkway with breakwater existing as previously approved. Existing rip rap south of existing boat ramp approximatelv180 saft. Living Shoreline currently Proposed. c. Average distance waterward of NHW or NWL: Living Shoreline Area 1= 25 ft; Living Shoreline Area 2= 28 ft; Living Shoreline Area 3 = 24 ft; Living Shoreline Area 4 = 41 ft. e. Type of stabilization material: Living shoreline/marsh sill with riprap, clean fill sand and marsh vegetation. g. Number of square feet of fill to be placed below water level. Bulkhead backfill NA Riprap Four living shoreline areas combined =3.772 sgft Breakwater/Sill Other Sand four living shoreline areas combined = 7.097 sgft i. Source of fill material. Rip rap and clean sand (as needed) per contractor b. Length: Living Shoreline Area 1= 36 Ift: Living Shoreline Area 2= 96 Ift: Living Shoreline Area 3 = 99 Ift: Living Shoreline Area 4 = 99 Ift. Width: Livino Shoreline Area 1= X 25 ft: Livino Shoreline Area 2= X 28 ft: Living Shoreline Area 3 = X 24 ft: Living Shoreline Area 4 = X 41 ft. d. Maximum distance waterward of NHW or NWL: Living Shoreline Area 1= 27 ft; Living Shoreline Area 2= 31 ft; Living Shoreline Area 3 = 30 ft; Living Shoreline Area 4 = 45 ft. f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes []No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. amount unknown, visually apparent h. Type of fill material. Rip -rap and clean sand for living shoreline 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes E] No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW). If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? For installation of living shorelines, rip rap will be installed first with Standard equipment, backhoe, etc. additional silt fencing during grading as needed. c. (i) Will navigational aids be required as a result of the project? []Yes ®No [INA (ii) If yes, explain what type and how they will be implemented. N/A d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. N/A 252-808-2808:: 1-888-4RCOAST :: www.nccoastaimana6ement.net revised: 12/26/06 Form D.CM MP -2 (Excavation and Fill, Page 3 of 3) July 11, 2017 Date River Bluffs Project Name River Bluf!p Development Corporation Appli ame - Applicant Signature VEE D 2017 252-808-2808 :: 1-888-4RCOAST :: www.riccoastalmanagernent.net revised: 12126106 Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑PubliclGovemment ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number Please See MP -4 Supplement (iii) Length Please See MP -4 Suoplement (iv) Width Please See MP -4 Supplement (v) Floating []Yes []No e. (i) Are Platforms included? ®Yes []No If yes: (ii) Number Please See MP -4 Supplement (iii) Length Please See MP -4 Supplement (iv) Width Please See MP -4 Supplement (v) Floating []Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 188 (ii) Number of slips existing Previously authorized open water marina partially constructed at time of this application. Updated slip layout proposed with this modification. i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel ®Open water; no dredging required []Other; please describe: k• Typical boat length: No change from that previously authorized: With currently requested addition of kayaks. [I This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? ®Yes []No If yes: (ii) Number Please See MP -4 Supplement (iii) Length Please See MP -4 Supplement (iv) Width Please See MP -4 Supplement (v) Floating ❑Yes ❑No f. (i) Are Boatlifts included? []Yes ®No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ( wet slips") only, number of slips: 188 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). No change from previous authorization; With currently requested addition of kayaks and small runabouts. I. (i) Will the facility be open to the general public? ❑Yes ®No 252-808-2808 ;: 1-888-4RCOAST :: www..nccoastaimanagement.n_et revised: 12/27/06 Foran DCM MP -4 (Structures, Page 2 of 4) m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? N/A 2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: No change from original permit authorization. ❑ Showers ❑ Boathokling tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? 252-808-2808 :: 1-888-4RCOAST :: www.nccoast9kimanagement.net revised: 12/27/06 Form DCM MP -4 (Structures, Page 3 of 4) I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? []Yes []No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes []No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. i + r 252-808-2808 :: 1-888-4RCO AST :: www.nccoastaimanagement.net revised: 12/27ro6 Form DCM MP -4 (Structures, Page 4 of 4) e. Arc of the swing 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines Proposed kayak dock addition would be 32' from the northern riparian property line. The proximity of water dependent structures along southern shoreline (the marina) will not change with this Major Modification request. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body varies. —775' to 935' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No [INA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. Will remain unchanged. From permitted marina, —500 ft (to the 80' x 6' docking structure to the south) d. Water depth at waterward end of structure at NLW or NWL Water deaths ranoe between -8' MLW to -15' MLW 18. OTHER [I This section not applicable a. Give complete description: Floating Access Structure - A 1,055 linear foot floating wooden walkway to replace a portion of the previously authorized fixed walkway. Previously approved fixed walkway was constructed along the northern portion of the shoreline. The proposed floating walkway would provide access from the end of the existing fixed walkway and the marina. The floating walkway will be 10' in width to provide safe use and stability along the length. Side -to dockage along the length will be permitted for guests and during special events at the marina/community (total of 42 side -to slips). Please see MP -4 supplement also. revised July 11, 2017 Date River Bluffs Project Name River Bluffs Development Corporation Applica Name Applicant Signatu a,i i -4 . 252-808-2808 :: 1-888-4RCOAST :: www..occoastaima_ nagement.net revised: 12/27/06 River Bluffs Major Modification DCM-MP4 Supplement July 11, 2017 See Figure 5 for reference. * Indicates Measurement from MHW 1. Docking Facility/Marina Characteristics c. Docks i and/or Pier(s) Structure INumber Width ftLength ft Marina Access Dock 10 1409 *S Marina Access Pier 6 47 *C Marina Access Pier 6 19 *N Marina Access Pier 6 11 Marina Dock 1 L Dock 1 8 28.3 Dock Spine 1 8 74 Marina Dock 2 T Dock 1 8 48.5 Dock Spine 1 8 66 Marina Dock 3 T Dock 1 8 48.5 Dock Spine 1 8 94 Marina Dock 4 T Dock 1 8 78.5 Dock Spine 1 8 93 Marina Dock 5 T Dock 1 8 68.5 Dock Spine 1 8 103 Marina Dock 6 T Dock 1 8 58.5 Dock Spine 1 8 108 Marina Dock 7 T Dock 1 8 68.5 Dock Spine 1 8 122 Marina Dock 8 T Dock 1 8 48.5 Dock Spine 1 8 79 Marina Dock 9 T Dock 1 8 48.5 Dock Spine 1 8 94 Marina Dock 10 T Dock 1 8 48.5 Dock Spine 1 8 79 Debris Deflector 6 145.4 Floating Dock -Riverwalk 10 1055 Kayak Dock 1 8 31.8 1 7 11 21 41 13 d. Are Finger Piers included? Notes floating fixed fixed fixed floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating Finger Piers Number Width ft Length ft Marina Dock 1 2 3 20 19.5 2 5 20 Marina Dock 2 5 3 20 16 5 5 20 Marina Dock 3 6 3 20 Floating Dock Platforms 10 within marina 6 5 20 Marina Dock 4 4 4 35 4 5 35 Marina Dock 5 5 3 30 5 5 30 Marina Dock 6 6 3 25 6 5 25 Marina Dock 7 6 3 30 6 5 30 Marina Dock 8 7 3 20 6 5 20 Marina Dock 9 6 3 20 6 5 20 Marina Dock 10 7 3 20 6 5 20 e. Are Platforms included? Structure Width ft Length ft Ex. Gazebo N Shore 19.5 19.5 Bench at Ex. Gazebo N Shore 3 24.5 Marina -S Ramp Platform irregular Marina -Gazebo Clubhouse 16 16 Marina- N Ramp Platform irregular Marina- N Gazebo 16 16 Floating Dock Platforms 10 within marina 7 11.5 Notes floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating floating Notes fixed fixed floating fixed floating fixed floating New Kayak Dock Figure 3, Inset 1 x x Permitted Marina with Proposed Modifications Figures 5, 6, 7 a 0 Z Ex. Boat Ramp Figure 2 Proposed Living Shoreline Area 1 Figures 8 & 11 Ex. Fixed Walkway Existing Gazebo and Cantilevered Bench Figure 3, Inset 2 Proposed Ramp/Gangway Proposed 10' -Wide Floating Dock 1,055 Ift side -to dockage (42 slips) Figure 4 Relocated Gazebo Figure 3, Inset 3 Proposed Living Shoreline Area 2 Figures 8 & 11 Revised Deck Figure 5 Baseline drawing provided by Talbot Land Surveying. Proposed changes to water -dependent structures added by LMG for CAMA permitting only. 'Not for Construction. LMG LAND MANAGEMENT GROUP mc. -) Environmental Consultants Post Office Box 2522 Wilmington, North Carolina 28402 Telephone: 910152-0001 Proposed Living Shoreline Area 3 Figures 9 & 12 Proposed Living Shoreline 4 Figures 9 & 12 MHW MHW CP&L R/,y Legend: • Existing Piling ® Existing Fixed Walkway MHW (added by LMG) Talbot Land Surveying, P.C. 170 Lafayette Street Wilmington, North Carolina 28411 Firm License C-2722 Phone: (810) 270-9824 Fax: (810) 270-9826 0 100 200 400 Major Modification -Kayak Dock, Living Shoreline 06/28/2017 07/11/2017 Revised Water Access Walkways & Gazebos Scale: Job Number: itle: 1" = 200' 02-11-189 Overview of Proposed Revisions Drawn By. LES Figure: 1 of 12 Baseline drawing provided by Talbot Land Surveying. Proposed changes to water -dependent structures added by LMG for CAMA permitting only. Not for Construction. Inset 1 Existing Ramp/ Ga \ \ Gangway \_ Existing \ \ Floating Dock \ \ �\ \\ \ � 8'x32' \ �1 .9 \ \ \ 31.8 \ Existing Fixed \ \ \ \ \ Walkway \ \ Proposed Kayak Launch \ 8 \ 7. \ 11' x 7' Floating Dock \ \ \ \41. Existing \ \ \ \ 1 \ \ \ Breakwater Legend: \ \ \ \ \ 0 \ \ \ ® Existing ling --- \ \ + \ \ ® Existing Fixed -Walkways; \ \ 0 \ ` Proposed Kayak Launch 0 \ \ (2) 4' x 13' Floating Docks 4. 0 5 10 Inset 2 \ 1 Existing Breakwater Existing \\ Gazebo \ 19.5'x 19.5' \ t \\ \ \ Legend: "I/fX 'X \ ® Existing Fixed Walkway / J Inset 3 10 20 40 Proposed Ramp/Gangway \\ to Proposed Floating Walkway --------145. Pre -Existing Retaining Wall 39 ift) to be removed Z 3\\� o l s i .5S ~ "-3 Proposed Ramp/Gangway 61 sqft Ramp Platform -'" . 5 Baseline drawing provided by Talbot Land Surveying. Proposed changes to water -dependent structures added by LMG for CAMA permitting only. Not for Construction. I AAK T T ,r n Existing Cantileve Bench 3' x 24.5' n Proposed Gazebo (relocated)16' x 16' MHW l,91MIUM Approved Stairs from Clubhouse (not constructed) - Proposed 6' Wide Boardwalk, Stairs as required. Depth contours (1) 2012 by Talbot Land Surveying. Datum is NAVD29. Adjustment factor to NAVD88 is -0.95'. 3of12 182 Proposed 10' -Wide Floating Walkway (1,055 Ift). Tie -Up Allowed, 42 slips. MHW Existing Pilings MATCHLINE MATCHLINE MATCHRINE Existing Pilings �� II 1J� III \ � I Proposed 10' -Wide LL11 MHW Floating Walkway (1,055 Ift). II DJ$ I Tie -Up Allowed, 42 slips. � IIII (IIII i�/ 11111 I I 1 III III CP&L11 �6/ / II R/W � l� I 28 .6 1\54 J I MATCh 8 145. 6.0 Depth contours (1) 2012 by Talbot Land Surveying. Baseline drawing provided by Talbot Land Surveying. Datum is NAVD29. Adjustment factor to NAVD88 is -0.95' Proposed changes to water -dependent structures added by LMG for CAMA permitting only. Project: cAMA Permit 30-13, River Bluffs Not for Construction. LMG Major Modification -Kayak Dock, Living Shoreline LAND MANAGEMHNT GROUP ,+ Revised Water Access Walkways & Gazebos Environmental Consultants Title: Proposed Revision Post Office Box 2522 Wilmington, North Carolina 28402 Water Access Fixed Walkway Telephone: 910452-0001 — --- River Bluffs, u ows mi ator o _ _ZUI 7—r lodt,rlgwalKway—UoLcK\majormoa—revuu/21—master. w 06/28/2017 07/11/2017 , Jo umber: V = 50' 02-11-189 By. Figure: LES 4 of 12 Depth contours (1') 2012 by Talbot Land Surveying. Datum is NAVD29. Adjustment factor to NAVD88 is -0.95'. Baseline drawing provided by Talbot Land Surveying. Propos changes to water -dependent structures added by LMGfor LAMA permitting only. NO for dov'�ru ction. E L:\LAMA\LUII LAMA rILr0\UL-II-I0U --- Rlvur owns, ourruwU annul\muivamuu_.,_cv�._nuuunynu�nwuy_vv,.n �m���nnv�_F. aa,._ usl / Dock 10 ' / / /4 .5 / 0.0 .0 3 .0 / / `3 .0 Dock 9 ' 4 .5 / 0.0 .0 3 .0 / / Dock 8 ° ~5` 4 .5 94 0 / �-3 0.0 5 Dock 7 ° ' ~5�1 / 6 .5/ / 1 .0 / 14. / 3 .0 5 .0 / 3 .0 Dock 6 ' / 5 / 12.0 116 0 1-3 .0 / 2 .0 / 5 .0 / / `3 / 2 .0 0.0 5 /' ° Floating JQ�J / Dock .5 3 ° Platforms 11.5'x7' 14.0 \ 6 .5 �3 0 / 3 .0 ~5 ' C, 1 1 0 C Access Pier and Ramp Platform 3.0 P��� 16 3 .0 9 loating ~4� Dock 5 41,0 Platform 12 11.5' x 7' Depth contours (1') 2012 by Talbot Land Surveying. Datum is NAVD29. Adjustment factor to NAVD88 is -0.95'. Baselin�_�rawing provided by Talbot Land Surveying. Proposedlchanges to water -dependent structures added by LMG-lbr,(;AMA permitting only. N4for Cnn#ruction. 0 10 - Project: CAMA Permit 30-13, River Bluffs Date: Revision Date: p ! LMG Major Modification -Kayak Dock, Living Shoreline 06/28/2017 07/11/2017 , LAND MANAGEMENT GROUP mc. Revised Water Access Walkways & Gazebos Scale: Job Number: Title: V = 50' 02-11-189 Environmental Consultants Post Office Box 2522 Proposed Revision Drawn KYLES Figure: Wilmington, North Carolina 2&102 Community Marina Details 6 Of 12 Telephone: 910 -452 -OMI L:\LAMA\LUII LAMA rILr0\UL-II-I0U --- Rlvur owns, ourruwU annul\muivamuu_.,_cv�._nuuunynu�nwuy_vv,.n �m���nnv�_F. aa,._ usl L: �I.MMM�LVII Damn n .. ..,...� �y...��....�_........ ��...�..,.,...._,,...,.,«,._................y \ 6 .5 / ~`3 3 .0 5` AI', Dock 4 \�Z/1 „° / ti / 7 .5 / \ /"1'5. 0 \ / 3 .0 \ 6 .5 / 3 .0 �\ Dock 3 ' / / ' 1 10 4 .5 4 1.0 �0.0 Dock 2 3 ° / /`� Floatin Dock / o PI or 4 .5 / 0 •5' 7' / 0. / >0.0 Dock 1 3 0 2 .3 / 5 / 0.0 / 74 0 26 Ift Side -To Doc ge (11 Slips) Marina / Access Dock / 27 .5 / 1 1.9 - S Access Pier and Ramp Platform Depth contours (1') 2012 by Talbot Land Surveying. Datum is NAVD29. Adjustment factor to NAVD88 is -0.95'. Baseline drawing provided by Talbot Land Surveying. Proposed changes to water -dependent structures added by LMG for., CAMA permitting only. Not for Construction. 1111J, 50 10 Project: CAMA Permit 30-13, River Bluffs Date: Revision Date: LMG Major Modification -Kayak Dock, Living Shoreline 06/28/2017 07!11!2017 LAND MANAGEMENT GROUP iNc. Revised Water Access Walkways & Gazebos Scale: Job Number: 1" = 50' 02-11-189 Title: Environmental Consultants Proposed Revision Post Office Box 2522 Drawn By. Figure: Wilmington, North Carolina 28402 Community Marina Details LES 7 of 12 Telephone: 910452-0001 L: �I.MMM�LVII Damn n .. ..,...� �y...��....�_........ ��...�..,.,...._,,...,.,«,._................y HW Proposed Living Shoreline - Area 1 %3057 30320 925 sqft CS _AI X-0.8 GS -Al 30322 MeW P` Legend: 16 " .4 • Existing Piling GS= 303 303 3Hw Existing Fixed Walkway P G5.5 — MHW 38.0 Proposed Living Shoreline 30375 X-0.4 Al 30370 -4.9 30371 X-030378.7 -5.8 Al MHW 30377 30372 x n 0.7 30375 X -0.9 30350 30373 Al 3.7 -5.5 Al-MHW 30330 HW 30370 x-1.3 Al 30374 L-7,3 --- Proposed Living Shoreline - Area 2 2,679 sq.ft. Spot elevations provided by Talbot Land Surveying, April 2017. Datum is NAVD29. Adjustment factor to NAVD88 is -0.95'. Baseline drawing provided by Talbot Land Surveying. Proposed shoreline stabilization details added by LMG for CAMA permitting only. A2 95.5 30332 3.9 W 30336 X -0.0 GS -A3 30334 -1.s 0 10 2 0 Project: CAMA Permit 30-13, River Bluffs Date: ____7]Revision Date: T A R /n Maior Modification -Kayak Dock, Living Shoreline 05/01/2017 L: \1. HMH\LVII VHMM fILCJ\VL-II-IU' - -11-..hill.. W G • .5 S-- 2 i 130332 30.7 HW Legend. • Existing Piling X 69 GS -A2 �- e 28.3 M Existing Fixed Walkway 95.5 3033e — M H W 3.7 HW ® Proposed Living Shoreline -0. S A3 A3 30337 3.9 HW 30338 X -0.0 GS -A3 30334 S -A3 Proposed Living Shoreline - Area 3 303" 2,752 sq.ft. 30343 X-0.1 GS -A4 30348 303393.7 -1.2 HW S -A4 G _5 X 1. S_ G A4 9 2 9 MHW G x 8 1 5-A4 - 6 GS - 30350 3.7 HW 0 S -A1 4 99.0 24.8 X 7 20 A MH 1 0.5 _ 1 A5 X- 5 7.0 5 19 3.9 A5- HW 33003 33004 X - 0.5 A5 -3.2 A5 MHW Spot elevations provided by Talbot Land Surveying, April 2017. Datum is NAVD29. Adjustment factor to NAVD88 is -0.95'. Baseline drawing provided by Talbot Land Surveying. Proposed shoreline stabilization details added by LMG for CAMA permitting only. 33007 X -0.4 33018 33008 AS 0 10 20 40 Project: CAMA Permit 30-13, River Bluffs Date: Revision Date: �� Major Modification -Kayak Dock, Living Shoreline 05/01/2017 Revised Water Access Walkways & Gazebos Scale: Job Number: LAND MANAGEMENT GROUP INC. Title: 1" = 20' 02-11-189 Environmental Consultants Post Office Box 2522 Proposed Living Shoreline Drawn By. Figure: Wilmington, North Carolina 28402 LES 9 of 12 Plan View - Area 3 Telephone: 910-452-0001 L: \1. HMH\LVII VHMM fILCJ\VL-II-IU' - -11-..hill.. x-0.4 3301E AS x38 a3 A5-MHW AS Legend: 380 • Existing Piling X -0.8 3300E AS -4.7 AS Existing Fixed Walkway 017 X— MHW A5-MHW 33011 33010 x-0.6 AS S A 0 ® Proposed Living Shoreline 16 33013 x35 MHW X-0.4 33012 A5 -2,9 AS x 335 0015 3814 AS MHW X-4,5 A5 Proposed Living Shoreline - Area 4 4,494 sq.ft. 30357 W 30358 3.7 HW 4 x G -A6 G A6 O� 7.1 -8.2 GS -A 30 O GS- 3.8 -A6 MHW 45.4 98.8 41.0 30360 MHW 30361 3.6 HW Spot elevations provided by Talbot Land Surveying, April 2017. Datum is NAVD29. Adjustment factor to NAVD88 is -0.95'. Baseline drawing provided by Talbot Land Surveying. Proposed shoreline stabilization details added by LMG for CAMA permitting only. 0 10 2n 40 Project: CAMA Permit 30A 3, River Bluffs Date: Revision Date: 05/01/2017 L* ,�� Major Modification -Kayak Dock, Living Shoreline Job Number: jyl Revised Water Access Walkways & Gazebos Scale: 1 " LAND MANAGEMENT GROUP.-. = 2O' 02-11-189 Environmental Consultants Title: Post Office Box 2522 Proposed Living Shoreline Drawn By. Figure: Wilmington, North Carolina 28402 Plan View -Area 4 LES 10 of 12 Telephone: 910-052-0001 nn n nv 14k'Molormod U62 e a za 0n_ ca ons. wg ' A Cross Section A Living Shoreline - Area 1 A, MHw Elev 4.6' Cil 8.4 Elev 0' MLW — — CD z —4 Fill RiD Ra 0+00 0+10 0+20 0+30 0+40 Cross Section B Living Shoreline - Area 2 Scale 1 "=6' 0 3 6 12 W Elev 4.6' Oi N0 Elev 0' 13.0 z - 2 Fill Rip Ra 0+00 0+10 0+20 0+30 0+40 r`A\AA 7x111 r`A\AA 1 7(117 na,7017 I nnnfinnc ilwn LMG LAND MANAGEMENT GROUP Inc Environmental Consultants Post Office Box 2522 Wilmington, North Carolina 28402 Telephone: 910452-0001 Project: CAMA Permit 30-13, River Bluffs Major Modification-Kayak Dock, Living Shoreline Revised Water Access Walkways & Gazebos Date: 05/01/2017 Revision Date: Scale: 1" = 6' Job Number: 02-11-189 Title: Proposed Living Shoreline- Cross Sections A and B Drawn B y' LES Figure: g 11 of 12 Cross Section C Living Shoreline - Area 3 15.5 ev 4. MHW N W C)7.2 — — 0 Cut Fill Rep Rap C9 C9 0+00 0+10 0+20 0+30 0+40 Cross Section D Living Shoreline - Area 4 ng for , Floating Walkway 19.1 6 MHW 47 0o mg Elev 4.6 � Not Shown Elev 0' J/ N W — — 0 z - Fill Rip Rap — _1 -10 14.8 12- 0+00 0+00 0+10 0+20 0+30 0+40 0+50 0+60 �LMG LAND MANAGEMENT GROUP,.,c Environmental Consultants Post Office Box 2522 Wilmington, North Carolina 28402 Telephone: 910452-0001 sWMII Project: CAMA Permit 30-13, River Bluffs Date: Revision Date: Major Modification -Kayak Dock, Living Shoreline 05/01/2017 Revised Water Access Walkways & Gazebos Scale: Job Number: Title: 1" = 6' 02-11-189 Proposed Living Shoreline- Drawn By: Figure: Cross Sections C and D LES 12 of 12