HomeMy WebLinkAboutSW3170701 - SMG Leasing LLC (9)PROJECT INFORMATION
ENGINEERED
KELLY HEFNER
PRODUCT
704-215-0743
MANAGER'
KELLY.HEFNER@ADS-PIPE COM
KEITH COEN
ADS SALES REP.
704-466-0135
KEITH.COEN@ADS-PI P E.COM
PROJECT NO
177632
STORMWATER CHAMBER SPECIFICATIONS
1. CHAMBERS SHALL BE STORMTECH SC -740, SC -310, OR APPROVED EQUAL.
2. CHAMBERS SHALL BE MANUFACTURED FROM VIRGIN POLYPROPYLENE.OR POLYETHYLENE RESINS.
ADVANCED DRAINAGE SYSTEMS, INC.
C
SMG PROPERTIES
STATESVILLE, NC
3. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORT PANELS THAT
WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION
4 THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE
THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1)
LONG -DURATION DEAD LOADS AND 2) SHORT -DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION
FOR IMPACT AND MULTIPLE VEHICLE PRESENCES
5. CHAMBERS SHALL MEET ASTM F2922 (POLYETHYLENE) OR ASTM F2418-16 (POLYPROPYLENE), "STANDARD SPECIFICATION FOR
THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
6. CHAMBERS SHALL BE DESIGNED AND ALLOWABLE LOADS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE
FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
7. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. THE CHAMBER MANUFACTURER SHALL
SUBMIT THE FOLLOWING UPON REQUEST TO THE SITE DESIGN ENGINEER FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE
PROJECT SITE'
A STRUCTURAL EVALUATION SEALED BY A REGISTERED PROFESSIONAL ENGINEER THAT DEMONSTRATES THAT THE SAFETY
FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM
F2787 AND BY AASHTO FOR THERMOPLASTIC PIPE
A STRUCTURAL EVALUATION SEALED BY A REGISTERED PROFESSIONAL ENGINEER THAT DEMONSTRATES THAT THE LOAD
FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET. THE 50 YEAR CREEP
MODULUS DATA SPECIFIED IN ASTM F2418 OR ASTM F2922 MUST BE USED AS PART OF THE AASHTO STRUCTURAL EVALUATION
TO VERIFY LONG-TERM PERFORMANCE
C STRUCTURAL CROSS SECTION DETAIL ON WHICH THE STRUCTURAL EVALUATION IS BASED
8. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY
ADS. INC
IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-310/SC-740 SYSTEM
1 STORMTECH SC -310 & SC -740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A
PRE -CONSTRUCTION MEETING WITH THE INSTALLERS.
2. STORMTECH SC -310 & SC -740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/SC-780 CONSTRUCTION
GUIDE"
3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS
STORMTECH RECOMMENDS 3 BACKFILL METHODS
• STONESHOOTER LOCATED OFF THE CHAMBER BED
• BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.
• BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR
4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS
5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE
6. MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS.
7. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm)
8. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN
ENGINEER.
9. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE
STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF.
NOTES FOR CONSTRUCTION EQUIPMENT
STORMTECH SC -310 & SC -740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION
GUIDE".
2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC -310 & SC -740 CHAMBERS IS LIMITED
• NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.
• NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE
WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
• WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING.
USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN
ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH
STANDARD WARRANTY.
CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT
ACCEPTABLE FILL MATERIALS: STORMTECH SC -740 CHAMBER SYSTEMS
PLEASE NOTE:
1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR 44 STONE WOULD STATE: "CLEAN, CRUSHED,
ANGULAR NO.4 (AASHTO M43) STONE".
2. STORMTECH COMPACTION REQUIREMENTS ARE MET FORA' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR
3 WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION
EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS.
PERIMETER STONE
(SEE NOTE 6)
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
12" (300
ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL
AROUND CLEAN, CRUSHED, ANGULAR STONE IN A 81 B LAYERS
SUBGRADE SOILS
(SEE NOTE 4)
6"
(150 mm) MIN
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
I
8-
18" (2.4 m)
(450 mm) MIN* MAX
all f4cl .......% RAIKI
LDEPTH OF STONE TO BE DETERMINED
BY SITE DESIGN ENGINEER 6" (150 mm) MIN
NOTES:
1 SC -740 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS",
OR ASTM F2922 "STANDARD SPECIFICATION FOR POLYETHYLENE (PE) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
2 SC -740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION
CHAMBERS".
3 "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL
MATERIALS.
4 THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE
WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.
5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS
6 ONCE LAYER'C' IS PLACED, ANY SOILIMATERIAL CAN BE PLACED IN LAYER'D' UP TO THE FINISHED GRADE MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL
REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
U) g
LU U d
Z z w
w w
LU
0NA- ; 0 0
LL W
'^� F N
V N (h
U) o
U
F-
U
Lu
LLI
o d
z
0
a z
E
U �
w <
� W
W
Lu
o:
❑co
JN
m0
Z
<_
20
w
<
O J
V =
O U
0
z
0
U
z
z
U
0
a
0
z
o �
W
z
J
2
W
z fA
U' Z
W LL1
Cw
W =
oW
wF
mU
2
H0
wLL
>o
�z<
Z Z
W 0
�g
it W
U K
W uj
0
a
w J
W p�
0
0Q
W�
z<
5 w
Z
w2
0 J
00
WW
H
In
W
W Q
1=. U
LL �
0w
z<
o�
U<
Luin
gg Q
w
olW
�0
WW
Z �
00
¢o
00
ow
w°
0W
>�
cc
a<
z�
ow
oZ
W
Z0
z
ow
oz
w V'
< W
m
Z
110
ao
ww
aN
ww
wx
m�
SLL
0
Qz
Kz
00
�w
SHEET
3 of 6
AASHTO MATERIAL
COMPACTION / DENSITY
MATERIAL LOCATION
DESCRIPTION
CLASSIFICATIONS
REQUIREMENT
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS
FROM THE TOP OF THE'C' LAYER TO THE BOTTOM
ANY SOILIROCK MATERIALS, NATIVE SOILS, OR PER
PREPARE PER SITE DESIGN ENGINEER'S PLANS
D
OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED
ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT
N/A
PAVED INSTALLATIONS MAY HAVE STRINGENT
GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE
SUBGRADE REQUIREMENTS
MATERIAL AND PREPARATION REQUIREMENTS.
MAY BE PART OF THE 'D' LAYER
AASHTO M145'
BEGIN COMPACTIONS AFTER 12" (300 mm) OF
MATERIAL OVER THE CHAMBERS IS REACHED.
INITIAL FILL: FILL MATERIAL FOR LAYER'C'
GRANULAR WELL -GRADED SOIL/AGGREGATE MIXTURES, <35%
A -1 A-2 4 A-3
, ,
COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX
STARTS FROM THE TOP OF THE EMBEDMENT
FINES OR PROCESSED AGGREGATE.
OR
LIFTS TO A MIN. 95% PROCTOR DENSITY FOR
C
STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE
WELL GRADED MATERIAL AND 95% RELATIVE
TOP OF THE CHAMBER. NOTE THAT PAVEMENT
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU
AASHTO M43'
DENSITY FOR PROCESSED AGGREGATE
SUBBASE MAY BE A PART OF THE 'C' LAYER.
OF THIS LAYER
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89,
MATERIALS- ROLLER GROSS VEHICLE WEIGHT
9,10
NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC
FORCE NOT TO EXCEED 20,000 lbs (89 kN).
EMBEDMENT STONE: FILL SURROUNDING THE
AASHTO M43'
B
CHAMBERS FROM THE FOUNDATION STONE (W
CLEAN, CRUSHED, ANGULAR STONE
3, 357, 4, 467, 5, 56, 57
NO COMPACTION REQUIRED
LAYER) TO THE 'C' LAYER ABOVE.
FOUNDATION STONE: FILL BELOW CHAMBERS
FROM THE SUBGRADE UP TO THE FOOT (BOTTOM)
CLEAN, CRUSHED, ANGULAR STONE
AASHTO M43'
PLATE COMPACT OR ROLL TO ACHIEVE A FLAT
A
3, 357, 4, 467, 5, 56, 57
SURFACE 23
OF THE CHAMBER.
PLEASE NOTE:
1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR 44 STONE WOULD STATE: "CLEAN, CRUSHED,
ANGULAR NO.4 (AASHTO M43) STONE".
2. STORMTECH COMPACTION REQUIREMENTS ARE MET FORA' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR
3 WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION
EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS.
PERIMETER STONE
(SEE NOTE 6)
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
12" (300
ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL
AROUND CLEAN, CRUSHED, ANGULAR STONE IN A 81 B LAYERS
SUBGRADE SOILS
(SEE NOTE 4)
6"
(150 mm) MIN
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
I
8-
18" (2.4 m)
(450 mm) MIN* MAX
all f4cl .......% RAIKI
LDEPTH OF STONE TO BE DETERMINED
BY SITE DESIGN ENGINEER 6" (150 mm) MIN
NOTES:
1 SC -740 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS",
OR ASTM F2922 "STANDARD SPECIFICATION FOR POLYETHYLENE (PE) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
2 SC -740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION
CHAMBERS".
3 "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL
MATERIALS.
4 THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE
WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.
5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS
6 ONCE LAYER'C' IS PLACED, ANY SOILIMATERIAL CAN BE PLACED IN LAYER'D' UP TO THE FINISHED GRADE MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL
REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
U) g
LU U d
Z z w
w w
LU
0NA- ; 0 0
LL W
'^� F N
V N (h
U) o
U
F-
U
Lu
LLI
o d
z
0
a z
E
U �
w <
� W
W
Lu
o:
❑co
JN
m0
Z
<_
20
w
<
O J
V =
O U
0
z
0
U
z
z
U
0
a
0
z
o �
W
z
J
2
W
z fA
U' Z
W LL1
Cw
W =
oW
wF
mU
2
H0
wLL
>o
�z<
Z Z
W 0
�g
it W
U K
W uj
0
a
w J
W p�
0
0Q
W�
z<
5 w
Z
w2
0 J
00
WW
H
In
W
W Q
1=. U
LL �
0w
z<
o�
U<
Luin
gg Q
w
olW
�0
WW
Z �
00
¢o
00
ow
w°
0W
>�
cc
a<
z�
ow
oZ
W
Z0
z
ow
oz
w V'
< W
m
Z
110
ao
ww
aN
ww
wx
m�
SLL
0
Qz
Kz
00
�w
SHEET
3 of 6
UNDERDRAIN DETAIL
STORMTECH
NTS
STORA"T�^"
CHP
UTLET MANIFOLD
I
FOUNDATION STONE
BENEATH CHAMBERS
ADS GEOSYNTHETICS 601
NON -WOVEN GEOTEXTIL
STORMTECH
END CAP
I
FOUNDATION STONE
BENEATH CHAMBERS
ADS GEOSYNTHETICS 601T
NON -WOVEN GEOTEXTILE
�..,... ��..�. .... �.. .. DESIGN ENGINEER
4" (100 mm) TYP FOR SC -310 & SC-160LP SYSTEMS
6" (150 mm) TYP FOR SC -740, DC -780, MC -3500 & MC -4500 SYSTEMS
SECTION B -B
L WALL
FORATED
E
ERDRAIN
SC -740 TECHNICAL SPECIFICATION
NTS
r— 90 7" (2304 mm) ACTUAL LENGTH
85.4" (2169 mm) INSTALLED LENGTH
<BUILD ROW IN THIS DIRECTION
OVERLAP NEXT CHAMBER HERE
(OVER SMALL CORRUGATION)
ACCEPTS 4" (100 mm) SCH 40 PVC PIPE FOR INSPECTION
PORT FOR PIPE SIZES LARGER THAN 4" (100 mm) UP TO
10" (250 mm) USE INSERTA TEE CONNECTION CENTERED
ON A CHAMBER CREST CORRUGATION
29.3" 1
(744 mm) G o
IL 45 9" (1166 mm) ---I
NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH)
CHAMBER STORAGE
MINIMUM INSTALLED STORAGE'
WEIGHT
30 0"
(762 mm)
1
51 0"
f`— (1295 mm)
51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm)
45.9 CUBIC FEET (1.30 m')
74 9 CUBIC FEET (2.12 m')
75 0 lbs (33.6 kg)
'ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS
PRE -FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"
PRE -FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"
PRE -CORED END CAPS END WITH "PC"
START END
PART #
STUB
A
B C
SC740EPE06T / SC740EPE06TPC
6" (150 mm)
10.9" (277 mm)
18.5" (470 mm) —
SC740EPE06B / SC740EPE06BPC
— 0.5" (13 mm)
SC740EPE08T /SC740EPE08TPC
8" (200 mm)
12.2" (310 mm)
16 5" (419 mm)
SC740EPE08B / SC740EPE08BPC
-- 0 6" (15 mm)
SC740EPE10T / SC740EPE10TPC
10" (250 mm)
13 4" (340 mm)
14 5" (368 mm)
SC740EPE10B / SC740EPE10BPC
-- 0.7" (18 mm)
SC740EPE12T / SC740EPE12TPC
12" (300 mm)
14.7" (373 mm)
12 5" (318 mm) —
SC740EPE12B / SC740EPE12BPC
– 12" (30 mm)
SC740EPE15T / SC740EPE15TPC
15" (375 mm)
18.4" (467 mm)
9.0" (229 mm) --
SC740EPE15B / SC740EPE15BPC
-- 1 3" (33 mm)
SC740EPE18T / SC740EPE18TPC5
18" (450 mm)
19 7" (500 mm)
0" (127 mm) —
SC740EPE18B / SC740EPE18BPC
1 6" 41 mm
_ ( )
SC740EPE24B'
24" (600 mm)
18.5" (470 mm)
_ 0 1" (3 mm)
ALL STUBS, EXCEPT FOR THE SC740EPE24B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF
THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT
1-888-892-2694
. FOR THE SC740EPE24B THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm).
BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL
NOTE ALL DIMENSIONS ARE NOMINAL
x
w
W
zF
�z
Z
F-
W
U
o
a
o Z
~
W
D_
Z
J
Z
❑
w°
Y I
w
U 0
o
>
o
w�
0
J
�
W
�
j
J
`n
G
c/)
Nt�0
C)
a
^ 3
w.
❑
w
wa
> cl
U
~z
a
Lu
O
EL
x
w
SHEET
5 of 6
zF
�z
Z
zw
W
o
a
zw
z
w O
w�
0
U
W
u�
U
j
J
N
w
F
w.
❑
w
wa
> cl
~z
a
w
z z
0
Y LL
wF
ag
w
Z
g
Um
�g
In
a
wW
x�
M
0°
C
¢a
p
0
w I
w
z
®
2WW
o
o
z
O
m
3
o
F W
V ~
fr
w Fa-
❑ o
W_ O
J 0
yw
E
y
V
�o
�
V
O
LLy
O N
2
K
z<
p
w
F N
(~7a
w ❑
DQ:
ul ao
Z
❑ <
O m
°J
W w
®
Ow
m
W U
z d
ww
°o m
o a
U
o g
ao
�0
❑�
wa
❑W
0
JOca
Z r
Z V
a�
Z
w O
Z0
Z) p
w
OZ
O Jwz
J
c�0
=
G W
m
Z
w C9
O
K w
a
U
�
W
a N
w
W W
W 2
m
=LL
0
0 T
Z J
Q
U
t
Z
00
SHEET
5 of 6
NYLOPLAST DRAIN BASIN
NTS
INTEGRATED DUCTILE IRON
FRAME & GRATE/SOLID TO
MATCH BASIN O D
12" (610 mm) MIN
(FOR AASHTO H-20)
INVERT ACCORDING TO
PLANS/TAKE OFF
VARIOUS TYPES OF INLET AND
OUTLET ADAPTERS AVAILABLE
4-30" (100-750 mm) FOR
CORRUGATED HDPE
WATERTIGHT JOINT
(CORRUGATED HDPE SHOWN)
3
18" (457 mm)
MIN WIDTH
AASHTO H-20 CONCRETE SLAB
8" (203 mm) MIN THICKNESS
TRAFFIC LOADS: CONCRETE DIMENSIONS
ARE FOR GUIDELINE PUPOSES ONLY.
ACTUAL CONCRETE SLAB MUST BE
DESIGNED GIVING CONSIDERATION FOR
LOCAL SOIL CONDITIONS, TRAFFIC
LOADING & OTHER APPLICABLE DESIGN
FACTORS
ADAPTER ANGLES VARIABLE 0°- 360°
ACCORDING TO PLANS
VARIABLE SUMP DEPTH
ACCORDING TO PLANS
[6" (152 mm) MIN ON 8-24" (200-600 mm),
10" (254 mm) MIN ON 30" (750 mm)]
4" (102 mm) MIN ON 8-24" (200-600 mm)
6" (152 mm) MIN ON 30" (750 mm)
A I BACKFILL MATERIAL BELOW AND TO SIDES
OF STRUCTURE SHALL BE ASTM D2321
CLASS I OR II CRUSHED STONE OR GRAVEL
AND BE PLACED UNIFORMLY IN 12" (305 mm)
LIFTS AND COMPACTED TO MIN OF 90%
NOTES
1 8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536
GRADE 70-50-05
2. 12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05
3. DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS
4 DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212
FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC
5. FOR COMPLETE DESIGN AND PRODUCT INFORMATION WWW.NYLOPLAST-US.COM
6. TO ORDER CALL- 800-821-6710
A
PART #
GRATE/SOLID COVER OPTIONS
8.1
2808AG
PEDESTRIAN LIGHT
STANDARD LIGHT
SOLID LIGHT DUTY
(200 mm)
O>
DUTY
DUTY
N�y
10"
2810AG
PEDESTRIAN LIGHT
STANDARD LIGHT
SOLID LIGHT DUTY
(250 mm)
�
DUTY
DUTY
12
PEDESTRIAN
STANDARD AASHTO
SOLID
(300 mm)
2812AG
AASHTO H-10
H-20
AASHTO H-20
15"
PEDESTRIAN
STANDARD AASHTO
SOLID
(375 mm)
2815AG
AASHTO H-10
H-20
AASHTO H-20
181,2818AG
PEDESTRIAN
STANDARD AASHTO
SOLID
(450 mm)
AASHTO H-10
H-20
AASHTO H-20
24
PEDESTRIAN
STANDARD AASHTO
SOLID
(600 mm)
2824AG
AASHTO H-10
H-20
AASHTO H-20
30"
PEDESTRIAN
STANDARD AASHTO
SOLID
(750 mm)
2830AG
AASHTO H-20
H-20
AASHTO H-20
.J
7
W
W
z 1
q
Z Zw
W
o Zw
E- z w n
a
U O
W
G W W�
w K
❑ wa
W >�
rn a�
ZN
Z
w
O
o wg
U 0 wo
x w
WWI
W J
2
W O
0a
o Oad
W�w
E FS
W W V Z 2
a�'N' Z!3
W
WE
o �o
W C� c
> O L w
� LiZx wQ
Q x —
co CIL u~.0
00
, wo o
w o
❑o
w
U
co
O W W
z O
1�-1� 0 0
00
❑(f
wa
❑ W
s�
ca
—� O Z I
m C7 O W
z� a�
Z
W Zo
� o -
0' � p W
E Q w
O J wZ5
CCD J Q W
v 2 m
Z
C3
ez Sao
W
w z y
t2 W W
H W F
m F-
=o
0
3m
;o 00
N N
x W
FSHEET F �
6 of 6
3
o
W_ U
o Z
~ z
Uj
W
d J
Z
❑
Yop
U
= y
U o
O>
0
O
N�y
LL W
if
r ^
C U)
N
CD
M O
rco
r 0
3
�
� o
U
W
o
a
W
z 1
q
Z Zw
W
o Zw
E- z w n
a
U O
W
G W W�
w K
❑ wa
W >�
rn a�
ZN
Z
w
O
o wg
U 0 wo
x w
WWI
W J
2
W O
0a
o Oad
W�w
E FS
W W V Z 2
a�'N' Z!3
W
WE
o �o
W C� c
> O L w
� LiZx wQ
Q x —
co CIL u~.0
00
, wo o
w o
❑o
w
U
co
O W W
z O
1�-1� 0 0
00
❑(f
wa
❑ W
s�
ca
—� O Z I
m C7 O W
z� a�
Z
W Zo
� o -
0' � p W
E Q w
O J wZ5
CCD J Q W
v 2 m
Z
C3
ez Sao
W
w z y
t2 W W
H W F
m F-
=o
0
3m
;o 00
N N
x W
FSHEET F �
6 of 6