Loading...
HomeMy WebLinkAboutSW3170701 - SMG Leasing LLC (9)PROJECT INFORMATION ENGINEERED KELLY HEFNER PRODUCT 704-215-0743 MANAGER' KELLY.HEFNER@ADS-PIPE COM KEITH COEN ADS SALES REP. 704-466-0135 KEITH.COEN@ADS-PI P E.COM PROJECT NO 177632 STORMWATER CHAMBER SPECIFICATIONS 1. CHAMBERS SHALL BE STORMTECH SC -740, SC -310, OR APPROVED EQUAL. 2. CHAMBERS SHALL BE MANUFACTURED FROM VIRGIN POLYPROPYLENE.OR POLYETHYLENE RESINS. ADVANCED DRAINAGE SYSTEMS, INC. C SMG PROPERTIES STATESVILLE, NC 3. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORT PANELS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION 4 THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG -DURATION DEAD LOADS AND 2) SHORT -DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES 5. CHAMBERS SHALL MEET ASTM F2922 (POLYETHYLENE) OR ASTM F2418-16 (POLYPROPYLENE), "STANDARD SPECIFICATION FOR THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 6. CHAMBERS SHALL BE DESIGNED AND ALLOWABLE LOADS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 7. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. THE CHAMBER MANUFACTURER SHALL SUBMIT THE FOLLOWING UPON REQUEST TO THE SITE DESIGN ENGINEER FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE' A STRUCTURAL EVALUATION SEALED BY A REGISTERED PROFESSIONAL ENGINEER THAT DEMONSTRATES THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY AASHTO FOR THERMOPLASTIC PIPE A STRUCTURAL EVALUATION SEALED BY A REGISTERED PROFESSIONAL ENGINEER THAT DEMONSTRATES THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET. THE 50 YEAR CREEP MODULUS DATA SPECIFIED IN ASTM F2418 OR ASTM F2922 MUST BE USED AS PART OF THE AASHTO STRUCTURAL EVALUATION TO VERIFY LONG-TERM PERFORMANCE C STRUCTURAL CROSS SECTION DETAIL ON WHICH THE STRUCTURAL EVALUATION IS BASED 8. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY ADS. INC IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-310/SC-740 SYSTEM 1 STORMTECH SC -310 & SC -740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE -CONSTRUCTION MEETING WITH THE INSTALLERS. 2. STORMTECH SC -310 & SC -740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/SC-780 CONSTRUCTION GUIDE" 3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS STORMTECH RECOMMENDS 3 BACKFILL METHODS • STONESHOOTER LOCATED OFF THE CHAMBER BED • BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. • BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR 4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS 5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE 6. MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS. 7. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm) 8. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. 9. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. NOTES FOR CONSTRUCTION EQUIPMENT STORMTECH SC -310 & SC -740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC -310 & SC -740 CHAMBERS IS LIMITED • NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. • NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". • WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT ACCEPTABLE FILL MATERIALS: STORMTECH SC -740 CHAMBER SYSTEMS PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR 44 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO.4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FORA' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR 3 WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. PERIMETER STONE (SEE NOTE 6) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) 12" (300 ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A 81 B LAYERS SUBGRADE SOILS (SEE NOTE 4) 6" (150 mm) MIN PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) I 8- 18" (2.4 m) (450 mm) MIN* MAX all f4cl .......% RAIKI LDEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN NOTES: 1 SC -740 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS", OR ASTM F2922 "STANDARD SPECIFICATION FOR POLYETHYLENE (PE) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2 SC -740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3 "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS. 4 THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS 6 ONCE LAYER'C' IS PLACED, ANY SOILIMATERIAL CAN BE PLACED IN LAYER'D' UP TO THE FINISHED GRADE MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. U) g LU U d Z z w w w LU 0NA- ; 0 0 LL W '^� F N V N (h U) o U F- U Lu LLI o d z 0 a z E U � w < � W W Lu o: ❑co JN m0 Z <_ 20 w < O J V = O U 0 z 0 U z z U 0 a 0 z o � W z J 2 W z fA U' Z W LL1 Cw W = oW wF mU 2 H0 wLL >o �z< Z Z W 0 �g it W U K W uj 0 a w J W p� 0 0Q W� z< 5 w Z w2 0 J 00 WW H In W W Q 1=. U LL � 0w z< o� U< Luin gg Q w olW �0 WW Z � 00 ¢o 00 ow w° 0W >� cc a< z� ow oZ W Z0 z ow oz w V' < W m Z 110 ao ww aN ww wx m� SLL 0 Qz Kz 00 �w SHEET 3 of 6 AASHTO MATERIAL COMPACTION / DENSITY MATERIAL LOCATION DESCRIPTION CLASSIFICATIONS REQUIREMENT FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE'C' LAYER TO THE BOTTOM ANY SOILIROCK MATERIALS, NATIVE SOILS, OR PER PREPARE PER SITE DESIGN ENGINEER'S PLANS D OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT N/A PAVED INSTALLATIONS MAY HAVE STRINGENT GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE SUBGRADE REQUIREMENTS MATERIAL AND PREPARATION REQUIREMENTS. MAY BE PART OF THE 'D' LAYER AASHTO M145' BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. INITIAL FILL: FILL MATERIAL FOR LAYER'C' GRANULAR WELL -GRADED SOIL/AGGREGATE MIXTURES, <35% A -1 A-2 4 A-3 , , COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX STARTS FROM THE TOP OF THE EMBEDMENT FINES OR PROCESSED AGGREGATE. OR LIFTS TO A MIN. 95% PROCTOR DENSITY FOR C STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE WELL GRADED MATERIAL AND 95% RELATIVE TOP OF THE CHAMBER. NOTE THAT PAVEMENT MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU AASHTO M43' DENSITY FOR PROCESSED AGGREGATE SUBBASE MAY BE A PART OF THE 'C' LAYER. OF THIS LAYER 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, MATERIALS- ROLLER GROSS VEHICLE WEIGHT 9,10 NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). EMBEDMENT STONE: FILL SURROUNDING THE AASHTO M43' B CHAMBERS FROM THE FOUNDATION STONE (W CLEAN, CRUSHED, ANGULAR STONE 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED LAYER) TO THE 'C' LAYER ABOVE. FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) CLEAN, CRUSHED, ANGULAR STONE AASHTO M43' PLATE COMPACT OR ROLL TO ACHIEVE A FLAT A 3, 357, 4, 467, 5, 56, 57 SURFACE 23 OF THE CHAMBER. PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR 44 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO.4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FORA' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR 3 WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. PERIMETER STONE (SEE NOTE 6) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) 12" (300 ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A 81 B LAYERS SUBGRADE SOILS (SEE NOTE 4) 6" (150 mm) MIN PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) I 8- 18" (2.4 m) (450 mm) MIN* MAX all f4cl .......% RAIKI LDEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN NOTES: 1 SC -740 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS", OR ASTM F2922 "STANDARD SPECIFICATION FOR POLYETHYLENE (PE) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2 SC -740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3 "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS. 4 THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS 6 ONCE LAYER'C' IS PLACED, ANY SOILIMATERIAL CAN BE PLACED IN LAYER'D' UP TO THE FINISHED GRADE MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. U) g LU U d Z z w w w LU 0NA- ; 0 0 LL W '^� F N V N (h U) o U F- U Lu LLI o d z 0 a z E U � w < � W W Lu o: ❑co JN m0 Z <_ 20 w < O J V = O U 0 z 0 U z z U 0 a 0 z o � W z J 2 W z fA U' Z W LL1 Cw W = oW wF mU 2 H0 wLL >o �z< Z Z W 0 �g it W U K W uj 0 a w J W p� 0 0Q W� z< 5 w Z w2 0 J 00 WW H In W W Q 1=. U LL � 0w z< o� U< Luin gg Q w olW �0 WW Z � 00 ¢o 00 ow w° 0W >� cc a< z� ow oZ W Z0 z ow oz w V' < W m Z 110 ao ww aN ww wx m� SLL 0 Qz Kz 00 �w SHEET 3 of 6 UNDERDRAIN DETAIL STORMTECH NTS STORA"T�^" CHP UTLET MANIFOLD I FOUNDATION STONE BENEATH CHAMBERS ADS GEOSYNTHETICS 601 NON -WOVEN GEOTEXTIL STORMTECH END CAP I FOUNDATION STONE BENEATH CHAMBERS ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE �..,... ��..�. .... �.. .. DESIGN ENGINEER 4" (100 mm) TYP FOR SC -310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC -740, DC -780, MC -3500 & MC -4500 SYSTEMS SECTION B -B L WALL FORATED E ERDRAIN SC -740 TECHNICAL SPECIFICATION NTS r— 90 7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH <BUILD ROW IN THIS DIRECTION OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) ACCEPTS 4" (100 mm) SCH 40 PVC PIPE FOR INSPECTION PORT FOR PIPE SIZES LARGER THAN 4" (100 mm) UP TO 10" (250 mm) USE INSERTA TEE CONNECTION CENTERED ON A CHAMBER CREST CORRUGATION 29.3" 1 (744 mm) G o IL 45 9" (1166 mm) ---I NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) CHAMBER STORAGE MINIMUM INSTALLED STORAGE' WEIGHT 30 0" (762 mm) 1 51 0" f`— (1295 mm) 51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm) 45.9 CUBIC FEET (1.30 m') 74 9 CUBIC FEET (2.12 m') 75 0 lbs (33.6 kg) 'ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS PRE -FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE -FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE -CORED END CAPS END WITH "PC" START END PART # STUB A B C SC740EPE06T / SC740EPE06TPC 6" (150 mm) 10.9" (277 mm) 18.5" (470 mm) — SC740EPE06B / SC740EPE06BPC — 0.5" (13 mm) SC740EPE08T /SC740EPE08TPC 8" (200 mm) 12.2" (310 mm) 16 5" (419 mm) SC740EPE08B / SC740EPE08BPC -- 0 6" (15 mm) SC740EPE10T / SC740EPE10TPC 10" (250 mm) 13 4" (340 mm) 14 5" (368 mm) SC740EPE10B / SC740EPE10BPC -- 0.7" (18 mm) SC740EPE12T / SC740EPE12TPC 12" (300 mm) 14.7" (373 mm) 12 5" (318 mm) — SC740EPE12B / SC740EPE12BPC – 12" (30 mm) SC740EPE15T / SC740EPE15TPC 15" (375 mm) 18.4" (467 mm) 9.0" (229 mm) -- SC740EPE15B / SC740EPE15BPC -- 1 3" (33 mm) SC740EPE18T / SC740EPE18TPC5 18" (450 mm) 19 7" (500 mm) 0" (127 mm) — SC740EPE18B / SC740EPE18BPC 1 6" 41 mm _ ( ) SC740EPE24B' 24" (600 mm) 18.5" (470 mm) _ 0 1" (3 mm) ALL STUBS, EXCEPT FOR THE SC740EPE24B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694 . FOR THE SC740EPE24B THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL NOTE ALL DIMENSIONS ARE NOMINAL x w W zF �z Z F- W U o a o Z ~ W D_ Z J Z ❑ w° Y I w U 0 o > o w� 0 J � W � j J `n G c/) Nt�0 C) a ^ 3 w. ❑ w wa > cl U ~z a Lu O EL x w SHEET 5 of 6 zF �z Z zw W o a zw z w O w� 0 U W u� U j J N w F w. ❑ w wa > cl ~z a w z z 0 Y LL wF ag w Z g Um �g In a wW x� M 0° C ¢a p 0 w I w z ® 2WW o o z O m 3 o F W V ~ fr w Fa- ❑ o W_ O J 0 yw E y V �o � V O LLy O N 2 K z< p w F N (~7a w ❑ DQ: ul ao Z ❑ < O m °J W w ® Ow m W U z d ww °o m o a U o g ao �0 ❑� wa ❑W 0 JOca Z r Z V a� Z w O Z0 Z) p w OZ O Jwz J c�0 = G W m Z w C9 O K w a U � W a N w W W W 2 m =LL 0 0 T Z J Q U t Z 00 SHEET 5 of 6 NYLOPLAST DRAIN BASIN NTS INTEGRATED DUCTILE IRON FRAME & GRATE/SOLID TO MATCH BASIN O D 12" (610 mm) MIN (FOR AASHTO H-20) INVERT ACCORDING TO PLANS/TAKE OFF VARIOUS TYPES OF INLET AND OUTLET ADAPTERS AVAILABLE 4-30" (100-750 mm) FOR CORRUGATED HDPE WATERTIGHT JOINT (CORRUGATED HDPE SHOWN) 3 18" (457 mm) MIN WIDTH AASHTO H-20 CONCRETE SLAB 8" (203 mm) MIN THICKNESS TRAFFIC LOADS: CONCRETE DIMENSIONS ARE FOR GUIDELINE PUPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED GIVING CONSIDERATION FOR LOCAL SOIL CONDITIONS, TRAFFIC LOADING & OTHER APPLICABLE DESIGN FACTORS ADAPTER ANGLES VARIABLE 0°- 360° ACCORDING TO PLANS VARIABLE SUMP DEPTH ACCORDING TO PLANS [6" (152 mm) MIN ON 8-24" (200-600 mm), 10" (254 mm) MIN ON 30" (750 mm)] 4" (102 mm) MIN ON 8-24" (200-600 mm) 6" (152 mm) MIN ON 30" (750 mm) A I BACKFILL MATERIAL BELOW AND TO SIDES OF STRUCTURE SHALL BE ASTM D2321 CLASS I OR II CRUSHED STONE OR GRAVEL AND BE PLACED UNIFORMLY IN 12" (305 mm) LIFTS AND COMPACTED TO MIN OF 90% NOTES 1 8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 2. 12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 3. DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS 4 DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC 5. FOR COMPLETE DESIGN AND PRODUCT INFORMATION WWW.NYLOPLAST-US.COM 6. TO ORDER CALL- 800-821-6710 A PART # GRATE/SOLID COVER OPTIONS 8.1 2808AG PEDESTRIAN LIGHT STANDARD LIGHT SOLID LIGHT DUTY (200 mm) O> DUTY DUTY N�y 10" 2810AG PEDESTRIAN LIGHT STANDARD LIGHT SOLID LIGHT DUTY (250 mm) � DUTY DUTY 12 PEDESTRIAN STANDARD AASHTO SOLID (300 mm) 2812AG AASHTO H-10 H-20 AASHTO H-20 15" PEDESTRIAN STANDARD AASHTO SOLID (375 mm) 2815AG AASHTO H-10 H-20 AASHTO H-20 181,2818AG PEDESTRIAN STANDARD AASHTO SOLID (450 mm) AASHTO H-10 H-20 AASHTO H-20 24 PEDESTRIAN STANDARD AASHTO SOLID (600 mm) 2824AG AASHTO H-10 H-20 AASHTO H-20 30" PEDESTRIAN STANDARD AASHTO SOLID (750 mm) 2830AG AASHTO H-20 H-20 AASHTO H-20 .J 7 W W z 1 q Z Zw W o Zw E- z w n a U O W G W W� w K ❑ wa W >� rn a� ZN Z w O o wg U 0 wo x w WWI W J 2 W O 0a o Oad W�w E FS W W V Z 2 a�'N' Z!3 W WE o �o W C� c > O L w � LiZx wQ Q x — co CIL u~.0 00 , wo o w o ❑o w U co O W W z O 1�-1� 0 0 00 ❑(f wa ❑ W s� ca —� O Z I m C7 O W z� a� Z W Zo � o - 0' � p W E Q w O J wZ5 CCD J Q W v 2 m Z C3 ez Sao W w z y t2 W W H W F m F- =o 0 3m ;o 00 N N x W FSHEET F � 6 of 6 3 o W_ U o Z ~ z Uj W d J Z ❑ Yop U = y U o O> 0 O N�y LL W if r ^ C U) N CD M O rco r 0 3 � � o U W o a W z 1 q Z Zw W o Zw E- z w n a U O W G W W� w K ❑ wa W >� rn a� ZN Z w O o wg U 0 wo x w WWI W J 2 W O 0a o Oad W�w E FS W W V Z 2 a�'N' Z!3 W WE o �o W C� c > O L w � LiZx wQ Q x — co CIL u~.0 00 , wo o w o ❑o w U co O W W z O 1�-1� 0 0 00 ❑(f wa ❑ W s� ca —� O Z I m C7 O W z� a� Z W Zo � o - 0' � p W E Q w O J wZ5 CCD J Q W v 2 m Z C3 ez Sao W w z y t2 W W H W F m F- =o 0 3m ;o 00 N N x W FSHEET F � 6 of 6