HomeMy WebLinkAboutNC0022406_Updated Accel Remediation Schedule Signed Letter_20170717/ DUKE
ENERGY,
July it, eu l t
Mr. S. Jay simmer man, Director
Division of Water RGsourctas
Nardi Carolina Department of Environmental Quality
1611 Mail Service Canter
Raleigh, NoRh Carolina 27699-1611
Subject: Initerim Acidan Plan Schedule Upda-to
Bola..a Creak Steam Station
Dear Mr. Zimmerman:
M; soutR Church street
RI -11 CoBv EC 139
Chario«e, North Carolina zazUz
aov-373-3r1 to
In a letter dated March zu, 20 1 1, DEQ documented acceptance of Duke Energy's milestone
schad-ulao for the Accalarted Rarnadizdicn sitar scbrnittad in February 2017. In that lett-Or DF U
stated that, "if the anticipated milestune dates in this request are altered. please inform the
appropriate DEu Regional Office and Central Office via email, documenting the reasons for any
changas."
Duke Energy is pra.iding the umcloaad updated schedule fur the Balc..a Crack pr_c'act tc
formally request schedalu extension. The schedule has been adjusted for the fallowing two
items:
1) the extended DEU revievv period fur the 60% Basis of Design,
2) uncelTainty with timing of NPDLS permit modifications that are required LU Complete
start-up of the ayatur„a.
If you nave comments and/or questions, please direct tflem to me at 980-oi;j-o, 19.
Sincctely,
Q Z/ � /z/,
D. Ed.vin M. Salli„an, PE
DireUtor - Waste & Groundwater Programs
Environmental, Health & Sa.ety
EnclUsure: Interim Action Plan Schedule Updates - Belews Creek Steam Station
Cc: Jim Wells - Dake Energy
Enclosure
Belevvzi CreeR Steam Station
Interim Aetiun Plan Schedule Update to DEQ
.July 17, 2017
• 30% Design Submitted to DEQ Completed December cy, zG 115
60% Design Submittal to DE_r
SDi'C1 review comments receiver rune z30,;40 i i)
• 100% Design Submittal to DEQ
Final Regulatory Approvals for Construction
(Inciu'ues iuuu% Soo, well Recovery, Eazz, etc. exclut]es MPDE5 Permit Mot]irication)
• Begin Extrautim, Well and Treatment System Construction
NPDES Permit or DEu Authorization Anticipated
Extraction Well and Trcv;atmGnt System Begin Operation
Currlpleted March 31, 2017
September cc, cQ i i
October 13, 2017
October ,e0, .e0 i r
N%„ernbur 1, 2017
January 26, 2018
Dote: For scrieOuLng purposes ant] as 11recten t], DEC! in roe uane..;,, a0,03i i ceniorcneG c -Ii, .rG uuuamv DEQ . 'II ,eTia aA stern
comments to the Basis of Design packages within 10 business days. Extractuon Well anti , reaLment System operation scneuuule is
Conti„gent epon ;aoelpt of tMe IQYDES permit modification or other DEQ authorization to direct the extracted groundwt;ter Me the ash basin
on or i3eiore the anticipatet] t]ate. t ne current scne'uule 'noes not anticipate at]t]itlonal sut]mittals anter comments are receivet] Tor me TOO
BOR (i.e. any additional re.tuired submittals after 100% BOD will delay she anLicipaled staff date.)