Loading...
HomeMy WebLinkAbout20170626 Ver 1_Approval Letter_20170717ROY COOPER (,�,irrnur MICHAEL S. REGAN �.,,rr„ � S. JAY ZIMMERMAN Environnten (ui p��.E•� �,,,. Quality July 17, 2017 Union County NCD W R Project No. 20170626v. I Pipes 189 on SRI I28 State Project No. 176P10.0 I APPROVAL of-t01 WATER QU.4LITY CERTIFICATION, with ADDPPION.AL CONDITIONS Mr. Louis Mitchell, PE Division En�ineer NCDOT, Division 10 716 Wes[ Main S�ree[ Albemarle, NC ?8001 Dear Mr. Mitchell: You have our approval, in accordance with the conditions listed below. for the followin� impacts replacin� pipes 189 on McWhorter Road (SRl 128) in Union County: Siream Impac[s in lhe Catawba Rirer Basin Permanen[ Fill 'I�emporer�� hill Permanent Fill Temporary FII Stream Impac[s Total 5[ream Bank in Intermitten[ in Intermit[ent in Perennial in Perennial Requiring Im �act Sitc Stabilization Strcam Strcam Stream 5tream ���near R) Mitigation (linear fp (linear Pt) pinear fY) pinear k) (linear R) SI I?0 16 192 ?08 0 5? i 15 �0 0 0 0 0 0 TO'fAL I20 5 15 16 192 228 0 Total Stream Impacl for Nrojech ?28 linear feet. Wetland Impacts in the Catawba River f3asin Fi11 Tocal lm�racts k:xcavation Mechanized Rand tiire Fill (ac� (tempirary) We[land Requiring (ac) Clearing (ac) Clearing (ac) �Ai) Im�ct(ac) M1titigation(ac) W I 0.01 U.01 0.(N) �y� UAI U.01 0.(x) O.IA) O.00 o.a� o.iro r�cai o.oi o.00 o.00 aoo o.oi o.02 0.00 Totul Wetland Impact for ProjecL• 0.02 acres. The project shall be constructed in aceordance with your application dated received May ?2, 2017. After reviewing State ol Nonh Carolma I Emironmental Rualit� I t,17 Mail Scrvme Center I Raleigh, Nonh Carohna D6Y9-1617 your application, we have decided that these impacts are covered by General Water Quality Certification Number 4085 and 4087. This certification corresponds to the Nationwide Permit 3 and Nationwide Permit 13 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDW R and submit a new applicatioa If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of rotal impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Coodition(s) of Certification: Project Specific Conditioos I. The NCDOT Division Environmental O�cer or Environmental Assistant will conduct a pre-construction meeting with aIl appropriate staff to ensure that the project supervisor and essential staff understand the potential issues with stream and pipe alignment at the pertnitted site. NCDWR staffshall be invited to the pre-construction meeting. [ISA NCAC 02H.0506(bx2) and (b)(3) 2. Turbidity curtains shall be used to isolate all work areas from the stream at Waxhaw Creek, including pile or casement installation, placement of riprap, excavation or filling. Strict adherence to the ConsWction and Maintenance Best Management Practices will be required. Sediment and Erosion Control 15A NCAC 02H .0506 (bx3) and (cx3) 3. This project has the potential to impact trout waters or other aquatic species of concem (federally endangered Lasmigona decorate). No conslruction activities shall begin until the NCWRC makes a determination regarding moratoria. Should the NC WRC determine that a moratorium is applicable then the requirements of any moratorium(s) shall be a condition of this 401 Certification. If the NCDOT dces not wish to honor the morarorium, then a written modification shall be submitted. Trout Waters/Other Species of Concem [15A NCAC 02H A506(bx2) and 15A NCAC 04B.0125] 4. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams, shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, ro allow low Flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. If [his condition is unable to be met due to bedrock or other limiting features encoun[ered during wnsWction, please contact the NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. [ I SA NCAC 02H.0506(bx2)] 5. [f multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation and/or sills where appropriate. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end of swctures typically decreases water velociry causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. [ I SA NCAC 02H.0506(b)(2)] 6. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bicengineering boulders or structures should be properly designed, sized and installed. [ 15A NCAC 02H.0506(bx2)J 7. For the 207 linear feet of streams being impacted due to site dewatering activities, the site shall be graded to its preconstruction contours and revegetated wi[h appropriate native species. [ISA NCAC 02H.0506(b)(2)] 8. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum extent practicable. Efforts must be made to minimize impacu to the stream banks, as well as to vegetation responsible for maintaining the stream bank stability. My applicable riparian buffer impact for access to stream channel shall be temporary and be revegetated with native riparian species. [ I SA NCAC 02H.0506(bx2)] Generel Conditions Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culveR diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conduc[ed in a manner that may result in dis-equilibrium of weUands or streambeds or banks, adjacent ro or upstream and downstream of the above strucnves. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWR. If this condition is unable to be met due to bedrock or other limiting featutes encountered during wnstruction, please contact NCDWR for guidance on how to proceeA and to detertnine whether or not a permit modification will be requ'ved. [ I SA NCAC 02H.0506(bx2)] 2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertenNy contacts uncured concrete shall not be discharged ro surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [ 15A NCAC 026.0200] 3. During the conswction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [ 15A NCAC 02H.0506(bx2)] 4. The dimension, pattem and profile of the sueam above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [ I SA NCAC 02H.0506(b)(2)] 5. The use of rip-rap above the Normal High Water Mark shall be minimized. My rip-rap placed for stream stabil'vation shall be placed in stream channels in such a manner that it dces not impede aquatic life passage. [ I SA NCAC 02H.0506(bx2)] 6. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drewings submitted for approvaL [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (bx2) and (�XZ)1 7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT ConsWction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used ro prevent excavation in flowing water. [ I SA NCAC 02H.0506(bx3) and (cx3)] 8. Heavy equipment shall be operated from the bar�ks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(bx3)] 9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(bx3)] 10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAC 02H.0506(b)(3)] I l. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506@x3)] 12. The permittee and its authorized agents shall conduct its activities in a manner consis[ent with State water qualiry standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR detertnines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [ISA NCAC 02B.0200] 13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certificatioa [15A NCAC 02H.0506(bx2)] 14. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project managec [ 15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (bx2) and (cx2)j 15. The outside buffer, wetland or water boundary Iceated within the wnstruction corridor approved by this authoriTation shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacu to areas within the fencing are prohibited unless otherwise authorized by this certification. [ISA NCAC 02H.0501 and .0502] 16. The issuance of this certification dces not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other govemment agencies (i.e. local, state, and federal) having jurisdiMion, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 17. 'I'he Pertnittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [ 15A NCAC 02B.0506(bx2)] I S. Upon completion of the project (including any impacu at associated bo�row or waste sites), the NCDOT Division Engineer shall complete and rehun the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(�] 9. Native riparian vegetation must be reestablished in the riparian areas within the constrvction limits ofthe project by the end of the growing season following completion of construction. [ I SA NCAC 02B.0231(ax6)] 10. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow si[es, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activiHes.[15A NCAC 02H.0506(bx3) and (cx3)] 19. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operatian and maintenance of such Best Management Practices in orcler to protect surface waters standards [15A NCAC 02H.0506(bx3) and (cx3j): a. 7'he erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolrna Sedrment and Erosion Con[rol Plannirtg and Desrgn Manual. b. T'he desigy installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Condo! Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow piu assaciated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surjace Mrning Manual. d. 7'he reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 20. Sediment and erosion control measures shall not be placed in wetlands or waters unless othenvise approved by this Certification. [15A NCAC 02H.0506(bx3) and (cx3)) 21. Where placement of sediment and erosion control devices in wetlands and/or waters is unavoidable at site of the turbidiry curtain downstream of the work area, it shall be removed and the natural g�ade restored upon completion of the project. [ I SA NCAC 02H.0506(b)(3) and (c)(3)] If you wish to contest any statement in the attached Certification you must file a petition for an administra6ve hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petidon with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Adminislrative Hearings during nortnal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of S:OOam and S:OOpm, except for official state holidays. 7'he original and one (1) copy of the petition must be filed with the Office of AdministraHve Hearings. T'he petition may be faaced-provided the original and one copy of the document is received by the Office of Adminishative Heariugs within five (5) business days following the faxed transmission. The mailing address for the Ofiice of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6'I14 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Bill Lane, General Counsel Depardnent of Env'vonmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of [he Clean Water Act. If you have any questions, please contact Joanne Steenhuis at (910) 796-7306 orjoanne.steenhuis@ncdenr.gov. ' cerelyr � S.1ay Zi rtnan, Dire or Division of Water Resources Electronic copy only distribution: Crystal Amschler, US Army Corps of Engineers, Asheville Field Office Larry Thompson, Division 10 Env'vonmental O�cer Mazella Buncick, US Fish and Wildlife Service Mazla Chambers, NC Wildlife Resources Commission Donna Hood, NC Division of Water Resources Mooresville Regional Office File Copy Envu��onmenfa( Qualrty NCDWR ProjeM No.: Applican[: Project Namc: Date of Issuance of 401 Water Quality Certification: Cuunty: _ ROY COOPER c„rlrmn� MICHAEL S. REGAN Scv�etar,- S. JAY ZIMMERMAN n;,,,,<�, Certificate of Completion Upon compleiion of all work approved within the 401 Warer Quality Certification or applicable Buf7er Rules, and any subsequent modifications. the applicant is required ro retum �his certiticate ro the 401 Transportation Permitting UniL North Carolina Division of Water Resources, 1617 Mail Service Cen[er, Raleigh, NC. 27699-1 6 1 7. This form may be re[urned ro NCDWR by the applican[, [he applicanYs authorized a�en[, or the project engineer. It is not necessary ro send certificates 1'rom all of these. Applicunt's Certificnfion I, , hereby sta[e [hat, to [he bes[ of my abilities, due care and dilieence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Qualiry Certification and Buffer Rules, the approved plans and specifications, and other supportine materials. Si�nature: Da[e: .Agent's Certifica�ioir 1, , herebv s[are that, ro[he best of mv abilities, due care and dilieence was used in the observation of the construction such that the construction was observed ro be built within substantial compliance and intent of the 401 Water Quality Certification and l3uffer Rules, the approved plans and specifica[ions, and o[her supporting ina[erials. Signature: Engineer's Certificntion Partial Final Date: I, , as a duly registered Professional Engineer in the State of Nonh Carolina, havine been authorized to observe (periodically, w�eekly, full time) the construction of the project Yor the Permittee hereby state that, [o the best of my abilities, due cam and diligence was used in the observation of the construction such that the construction was observed ro be huilt within substantial compliance and intent of the 401 W'ater Qualiry Cenification and Buffer Rules, the approved plans and specihcations, and other supporting materials. Signa[ure Date Recisvation No. Sinic ofNorth Carohna I F.nuironmental Guality 1617 Mad Servme Centzr I Raleigh. Nonh Carohna 27h99-I6I7