Loading...
HomeMy WebLinkAbout20070173 Ver 5_More Info Received_20170717Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 7/17/2017 10:58:33 AM (Supplemental Submital) Accept by Montalvo, Sheri A 7/17/2017 11:02:30 AM (NON -DOT Project) • The task was assigned to Montalvo, Sheri A 7/17/2017 10:58 AM itial Review of Submittal Staff Review: Submittal Type: r New Project r Pre -Application Submittal r More Information Response ID#* Version* 2007-0173 5 Reviewer List:* Jennifer Burdette:eads\jaburdette Select Reviewing Office:* Central Office - (919) 707-9000 Project Submittal Interim Form submtted: 7/17/2017 Project Contact Information: ............................................................................................................................................. Name: Wendy Bailey Who is subnit ing the information? Email Address: WYB@novonordisk.com Project Information: ..................................................................................................................................................................................... Existing ID #:* Existing Version:* 2007-0173 5 Project Name: Novo Nordisk -Bright Sky DAPI -US Is this a public transportation project? r Yes r No County (ies)* Johnston Describe the attachments: Letter to Johnston County documenting changes to drainage Revised Comprehensive SWPPP Please upload all files that need to be submited. Johnston County Itr 20JUN2017.pdf SWPPP Rev 4 19 June 2017.pdf Only pdr files are accepted. PF By checking the box and signing box below, I certify that 33.7KB 54.04MB Water Resources ENVIRONMENTAL QUALITY • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the form. Signature: EFDEE Enginseriny Professional Corporation License Number: C-ui4z 1000 Fiuor uaniel Drive Greenville, South Carolina 29607 USA *1 854 z81 44uO tel +1864 676 7613 fax 20, June zu1 i Novo Nordisk Pharmaceutical Industries._ Inc. Project Definition: A7ND Carlos S. Bagley, PE Environmental Manager Johnston County Department of Public Utilities PO Box 2263 309 E. Market St. Smithfield, NC 27577 Letter No: FJCL-0001 Subject: Johnston County Lang Disturbance Permit Dear Mr. Bagley: Thank you for your continued support and nnderstan'aing of the dynamic nature of the Novo Nordisk, DAPI -US project. As a design -build project on an accelerated schedule, this project would have never gotten off the ground with -out your cooperatioui. Your willingness to work with us continues to make this project successful. Enclose are copies of the plan sets for our final design for drainage, grading and paving on the Novo Nordisk, DAPI -US project for your review and comments. We are also including a revised SWPPP incorporating this final design information. If there are any questions or comments please let me know. Sinc rely, Je a an W. Heald, PE nior Civil Engineer JWH:jwh Attachment: cc: GALO, TMSZ, MWKN Novo Nordisk (Itr only) Herbert, Lamb, McCleskey, S.Ware, Norris Fluor (lir only) Paye 1 of 1 Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP) For Construction Activities: Project/Site Name: Novo Nordisk DAPI - US Project Address/Location: Powhatan Road Clayton, NC 27527 Primary Permittee: Novo Nordisk Pharmaceutical Industries, Inc. Permittee/Owner Contact: Gary Lohr 3612 Powhatan Road Clayton, NC 27527 919-457-7167 SWPPP Preparer: Donovan Norris, PE EFDEE Engineering Professional Corporation 100 Fluor Daniel Drive Greenville, SC 29607 Phone: 864-281-6008 Day-to-Day Operator: Gary Lohr 3612 Powhatan Road Clayton, NC 27527 919-457-7167 C-SWPPP Preparation Date: 06/19/2017 Revision 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 1 of 275 Table of Contents Section 1 PROJECT OVERVIEW 1.1 Narrative ..................................................................................................................3 1.2 Stormwater Management and Sediment Control .....................................................6 1.3 Sequence of Construction ........................................................................................9 1.4 Non-Numeric Effluent Limits ..................................................................................9 1.5 Certification Statement ..........................................................................................13 Section 2 SITE FEATURES AND SENSITIVE AREAS 2.1 Sources of Pollution ...............................................................................................14 2.2 Surface Waters .......................................................................................................15 2.3 Impairments And TMDLs......................................................................................15 2.4 Critical Areas .........................................................................................................15 Section 3 COMPLIANCE REQUIREMENTS 3.1 SWPPP Availability .............................................................................................16 3.2 Pre-Construction Conferences ...............................................................................16 3.3 Inspection Requirements ........................................................................................16 3.4 Maintenance Policies ............................................................................................16 3.5 Record Keeping ....................................................................................................16 3.6 Final Stabilization ..................................................................................................16 Appendices REFERENCE MATERIAL Appendix A - Site Maps ...............................................................................................17 Appendix B - Drainage Maps .......................................................................................27 Appendix C - Hydrology Report (C-SWPPP* Only) ...................................................30 Appendix D - Inspection Log and Reports (OS-SWPPP** Only) .............................260 Appendix E - Rainfall Records (OS-SWPPP** Only) ...............................................263 Appendix F - Additional Site Logs and Records (OS-SWPPP** Only)....................266 Appendix G - Construction General Permit (CGP) - ..................................................275 *C-SWPPP is acronym for Comprehensive Storm Water Pollution Prevention Plan **OS-SWPPP is acronym for On-Site Storm Water Pollution Prevention Plan Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 2 of 275 Section 1 PROJECT OVERVIEW 1.1 Narrative Construction Activities and BMP Summary The project encapsulated within this Storm Water Pollution Prevention Plan is the new construction of the Novo Nordisk Diabetes API-US (DAPI) facility in Johnston County, near Clayton NC. The site is located at coordinates N35º36’58.71” and W78º24’11.6”. The DAPI project will include construction vehicle parking, construction trailers and material laydown areas, 16 new buildings (Central Utility Building 1&2, Fermentation 1 & 2, 2 Guardhouses, Purification 1-3, Recovery 1&2, Sampling Building, GMP Archive, Spine, Warehouse, and Drug Production), utility corridor, new electrical sub-station, employee parking lots, underground utilities, and ancillary paved roads around the facility. A layout of the planned facility is shown on the Site Master Plan, drawing CL XX DAPI-US 3 10 00000 02 06 of the Master Plan drawing set. Study Area The study area covers approximately 177.94 acres. The site is located along Powhatan Road south east of Clayton, NC, approximately ½ mile from the intersection of U.S. Highway Business 70. The site is east of the existing Novo Nordisk facility and north of the Southern Railroad. The property boundary and existing conditions can be found on CL XX DAPI-US 3 10 00000 02 06 of the Master Plan drawing set. Pre-Development Conditions The site is divided into four drainage areas for analysis, refer to Drainage Maps in Appendix B. The first drainage area flows via sheet flow towards a wetlands area in the center of the site and discharges along the eastern property line. This drainage area is 123.15 acres. The drainage area consisting of primarily canopy trees within a wetland area (40.83 ac.), and agricultural row crops (82.32 ac.), and the weighted Cn for the watershed is 83. The second drainage area is 26.94 acres consisting of primarily canopy trees within a wetland area (2.18 ac.) and agricultural row crops (24.76 ac.), flows via sheet flow west to be collected within the wetland area and slowly flows into a 24” pipe culvert underneath Powhatan Road into an existing stormwater retention pond on the existing Novo Nordisk site. The weighted Cn number for drainage area #2 is 79. The third drainage area consists of 20.27 acres consisting of primarily canopy trees within a wetland area (2.71 ac.) and agricultural row crops (17.88 ac.) flows via sheet flow south to be collected within the wetland area and slowly flows into a culvert underneath the Southern Railroad where it continues south off of the property. The weighted Cn number for drainage area #3 is 80. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 3 of 275 The fourth drainage area consists of 7.58 acres consisting of primarily agricultural row crops (7.58 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 78. The weighted runoff calculations are located in the Hydrology report in Appendix D Post-Development Conditions Proposed site build out improvements will be as follows: 16 new buildings (Central Utility Building 1&2, Fermentation 1 & 2, 2 Guardhouses, Purification 1-3, Recovery 1&2, Sampling Building, GMP Archive, Spine, Warehouse, and Drug Production), utility corridor to service the facility, new electrical substation, employee parking lots, underground utilities, and ancillary paved roads surrounding the site. The post development basins are divided to maintain consistency with the pre development basins and the four analysis points, refer to Drainage Maps in Appendix B more details. The first drainage area consists of 128.46 acres. This drainage area consists of wetlands (40.83 acres), construction laid down and temporary facilities, and new facility. Part of the drainage area will flow via sheet flow towards the wetlands (77.54 acres) and then off-site along the eastern property line. Other portions of the drainage area will flow via underground piping to different detention basins. 14.93 acres will be directed into stormwater management basin 2, 35.29 acres will be directed into stormwater management basin 3, and 0.7 acres will flow into the small basin to the east of the warehouse. The outflow from the detention basins will enter the wetlands and flow over land towards the same discharge point along the eastern property line. The weighted Cn number for the analysis is 90 to incorporate future buildout to the site. The second drainage area is 35.8 acres primarily consisting of construction area. The final condition of the site will consist of buildings which will be constructed during the phase 2 sequence of the site. Storm water, during construction, will flow via sheet flow to diversion ditches and then flow underground pipes towards Storm Water Management Basin #1. The flow from the basin will exit the outflow structure into the pipe under Powhatan Road and will discharge into the existing stormwater pond on the Novo Nordisk property west of Powhatan Road. The weighted Cn number for the analysis is 82 to incorporate future buildout to the site. The third drainage area is 8.28 acres consisting of parking area and wetlands. 3.22 acres of the area will be directed into to the southwest parking lot basin. 3.0 acres will be directed into the southeast parking lot basin. All stormwater entering the basins will be managed for quantity control prior to release into the wetlands. Storm water will continue through the wetlands into a 36” culvert under the Southern Railroad easement. The weighted Cn number for the analysis is 89. The fourth drainage area consists of 5.40 acres consisting of pervious maintained areas (5.40 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 61. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 4 of 275 The improved site was evaluated to analyze the effect of the change in land use upon stormwater runoff rates. Per Johnston County regulations, post-development discharge rates shall not exceed pre-development discharge rates for the 2, 10, and 100-yr frequency 24-hour duration storm events. Peak runoff rates were calculated for pre- development and post-development conditions. The SCS 24 hour storm was used to develop the hydrology model and predict runoff rates for storms with average return frequencies of 1, 2, 10, 25, and 100 years for pre- and post-development conditions. After analyzing the study area, it shows that post-development flows are below above pre-development rates. Please refer to the summary table below, and the Appendices for detailed information. Table #1 - Peak Runoff Rates Pre Construction:   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Pre to DA#1 123.15 83 78.5 108.81 200.05 355.25 Pre to WS #2 26.94 79 26.24 37.8 73.73 136.41 Pre to WS #3 20.59 80 28.69 40.67 77.29 140.21 Pre to WS #4 7.58 78 7.45 10.83 21.52 40.3 Table #2 - Peak Runoff Rates Post Construction (Pre Detention):   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Post to DA #1 128.46 90 130.96 169.65 280.58 461.97 Post to WS #2 35.8 82 32.19 44.94 83.59 149.60 Post to WS #3 8.28 89 20.89 27.08 44.79 73.67 Post to WS #4 5.40 78 6.117 8.885 17.57 32.79 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 5 of 275 Table #3 - Peak Runoff Rates Post Construction (Post Detention):   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100- Year (cfs) Post DA#1 Detention Outflow 128.46 90 45.53 60.02 100.78 179.62 Post DA#2 Detention Outflow 35.8 82 1.146 4.324 13.19 22.15 Post DA#3 Detention Outflow 8.28 89 8.143 12.08 30.14 57.14 Post DA#4 Detention Outflow 5.40 78 6.117 8.885 17.57 32.79 Stormwater Conveyance System The proposed underground stormwater system has been analyzed using Hydraflow Storm Sewers. This includes approximately 11,500 linear feet of HDPE ranging in size from 12” to 60”, as well as structures including manholes, junction boxes, clean outs, and flared end sections. The system has been sized to convey the 10-year, 24-hour storm event. It was also analyzed to determine the functionality of the system during the 100- year, 24-hour storm event. During the 10-year storm, the system was sufficient to convey all stormwater with no flooding. Flooding did occur during the 100-year storm, but was released before damaging stormwater elevations occurred. Refer to Appendix B for land use and watershed maps and to Appendix D for Hydrology Report and all stormwater calculations. Flooding Issues The proposed project is not located in a FEMA flood zone. Refer to Appendix A for further information. 1.2 Stormwater Management and Sediment Control Erosion Prevention BMPs As the existing site is cleared, grubbed and graded to the proposed contours shown on the construction site plans, erosion prevention BMPs shall be placed throughout the construction site to aid in the prevention of sediment-laden stormwater runoff. These BMPs shall be focused in areas with high potential of erosion, areas preceding infiltration practices. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 6 of 275 Each erosion prevention measure shall be selected on a site-specific basis and details have been provided on the construction site plans. The plans identify all proposed Erosion Prevention BMPs and the recommended installation, maintenance, and inspection procedures. In order to minimize soil erosion, a phased construction approach is being implemented in order to install sediment controls prior to any major land disturbance. Refer to Early Works drawing set and Final Grading and Paving set for construction schedule. Sediment Control BMPs Sediment Control BMPs are designed to remove some of the sediment accumulated within stormwater runoff, to the best extent practicable. These BMPs help prevent sediment impacts to adjacent properties and water bodies from stormwater discharges originating from construction sites. Typically these BMPs are placed near each of the site’s outfalls and are installed prior to clearing and grubbing of the site (before large areas of soil are exposed). However, these BMPs can also be located throughout the construction site and, in these circumstances, are installed after roadway grading has occurred. Placement, sizing and modifications of Sediment Control BMPs should be left to the SWPPP preparer and/or the Site Engineer. Contractors must consult the SWPPP Preparer as listed at the front of this SWPPP before making any significant changes to these BMPs. Sediment control BMP’s to be utilized onsite are, but not limited to silt fence, sediment traps, inlet protection and sediment basins. Structural Control BMPs This site-specific SWPPP utilizes the following structural control BMPs: sediment silt fence and dry detention basin with a skimmer. These practices have been designed to either divert flows from exposed soils, to retain/detain flows, and to otherwise limit the runoff and the discharge of pollutants from disturbed areas of the construction site. Throughout the lifespan of the construction project these BMPs will be installed and maintained, as required by the SWPPP and the construction site plans, until final stabilization has been achieved for the areas draining to each BMP. Upon final stabilization, each structural control BMP must be modified to the post-construction conditions shown within the approved construction site plans or removed, if the structural BMP was a temporary structure. Silt fence will encompass the perimeter of the project in order to prevent sediment from entering the wetlands or migrating off site. The silt fence which is solely being used for sediment control has been designed to handle ¼ acre per 100 feet of silt fence. A double row of silt fence has been incorporated within the site along the wetland boarders. The double row of silt fence provides an 86% trapping rate which is greater than the 54% provided by a 75’ filter strip. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 7 of 275 Construction Entrances and Dust Control All access areas into and out of the limits of disturbance, as shown on the construction site plans, require the installation of a construction entrances and wheel washes. Any tracked sediment, along with any attached pollutants, deposited on impervious areas could be washed downstream during the next rain event. Each construction entrance must be installed as shown in the details section of the construction site plans. If a new entrance or exit is required, that is not shown on the plans, install the construction entrance as noted by the construction entrance detail, mark the location on the plans and make a record of this minor modification in the SWPPP’s modification log, which is located within one of the appendices of the On-site SWPPP. Each stabilized construction entrance should be used in conjunction with Street Sweeping measures if it becomes apparent that sediment is still being tracked onto adjacent impervious areas, even with the use of the construction entrance. During extremely dry conditions, drought, and/or excessive winds, the construction site should be treated for dust control to prevent the suspension of fine sediment particles into the air, being carried offsite, and deposited on adjacent properties or surface waters. This practice may not be directly called out for on the construction site plans. A water tanker used to spray the soil down may be an effective way to prevent excessive dust at a construction site. Water Quality BMPs During Construction During construction, water quality will be controlled with the following measures: sediment and detention basins, sediment traps, concrete washouts, and construction entrances. Should construction require maintenance facilities, berms and additional hazardous material storage and containment measures shall be constructed to prevent runoff into the drainage system. Post-Construction Water Quality No post construction water quality is required for this project. The nitrogen export from the site is under the limit of 10 lbs/year requirement. See calculation in Appendix II of the Hydrology report. Wet detention ponds have been incorporated into the design of the site in order to remove total suspended solids. The three wet detention ponds will remove 90% TSS. Surface area to drainage area ratios are provided in the table below. Surface Area (acres) Drainage Area (acres) SA/DA (%) Required SA/DA (%) Pond #1 (A&B) 1.3 33.29 3.9 2.64 Pond #2 1.47 14.92 9.9 3.25 Pond #3 4.11 33.26 12.1 2.64 All three pond provide well over any required SA/DA ratios prescribed be NCDEQ and will exceed the necessary treatment of stormwater prior to release into the wetlands. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 8 of 275 A nitrogen analysis was done to determine the amount of nitrogen released from the site per year after Phase 1 build out. The analysis showed that the nitrogen released was managed to 3.2 pounds of nitrogen per acre per year. Refer to Appendix II of the Hydrology Report for supporting calculations. Other Stormwater Management Procedures Two dry detention ponds have been proposed to mitigate runoff from portions of the parking lots on the southwestern side of the property. The existing sediment trap to the east of the warehouse will remain in place to provide additional detention for future parking areas. 1.3 Sequence of Construction This project will be phased in order to minimize the soil erosion impact from the site. 1.4 Non-Numeric Effluent Limits Stormwater Volume and Velocity Control During the implementation of construction activities, all parties performing work at this construction site whose work may affect the implementation of the SWPPP must be informed of and directed on how to comply with this Non-Numeric Effluent Limit, which requires the management of stormwater runoff within the construction site and at each outfall. The purpose of this requirement is to control the stormwater volume and velocity at these locations to minimize erosion. Specifically, each responsible party should be made aware of the practices that have been or should be implemented at the construction site to accomplish these particular stormwater management practices. Below is a list of practices that may be utilized within the disturbed area and at each outfall at construction sites to control stormwater volume and velocity: Volume Control  Limiting the amount of disturbed area and exposed soils  Staging and/or Phasing of the Construction Sequence;  Sediment Basins and Excavated Inlets  Diverting off-site flow around the construction site;  Controlling the Drainage Patterns within the Construction Site;  Temporary Stabilization of Disturbed Areas. Velocity Control  Surface Roughening and/or other Slope Stabilization Practices;  Level Spreaders, Riprap Plunge Pools and/or other Velocity Dissipation BMPS located at the Construction Site's and Sediment Basin Outfalls.  Use of Rock Checks, Sediment Tubes, Etc. in Temporary Diversions Swales and Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 9 of 275 Ditches.  Use of Erosion Control Blankets, Turf Reinforcement Mats, and other Non- Vegetative BMPs that can be used to Quickly Stabilize Disturbed Areas. The SWPPP Preparer/Engineer should approve any modifications (Additional BMPs or Changes to Existing BMPs) to address the management of stormwater volume and velocity prior to implementation. All approved SWPPPs that were issued coverage under the CGP should include ample BMPs and other control measures to address this specific Non-Numeric Effluent Limit. Soil Exposure, Compaction and Preservation Throughout construction activities, the amount of soil exposed during construction should be kept to a minimum. This may be accomplished by minimizing the amount the disturbed area within the permitted Limits of Disturbance (shown on the approved construction site plans) to only that which is necessary to complete the proposed work. For areas that have already been disturbed and where construction activities will not begin for a period of 14 days or more, temporary stabilization techniques must be implemented. Prior to implementation of any major grading activities, topsoil is to be preserved by placing it in areas designated for stockpiling until final grades are reached. Each stockpile must be equipped with proper sediment and erosion controls to preserve the topsoil and protect adjacent areas from impacts. Once final grades have been reached, the preserved topsoil should be utilized to apply to areas identified for stabilization. Topsoil contains nutrients and organisms that aid in the growth of vegetation. The Compaction of Soil should also be minimized to the degree practicable during grading activities. This is especially important during the replacement of topsoil to aid in a quick establishment of vegetative cover. Compaction of soil may also reduce rainfall's ability to infiltrate into the soil, increasing the amount of stormwater runoff. Soil Stabilization Throughout construction activities, soil stabilization techniques are to be initiated as soon as practicable whenever any clearing, grading, excavating, or other land-disturbing activities have permanently or temporarily ceased on any portion of the construction site and will not resume for a period exceeding 14 calendar days. For areas where initiating stabilization measures is infeasible, (e.g., where snow cover, frozen ground, or drought conditions preclude stabilization), initiate vegetative or non-vegetative stabilization measures as soon as practicable. Steep Slopes (Slopes of 30% grade or greater) All disturbed steep slopes (30% grade, ~3H:1V, or greater), and steep slopes to be created through grading activities must be managed in a fashion that limits the potential of erosion along the slopes. All parties whose work is/was responsible for the creation/disturbance of steep slopes must comply with the following items: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 10 of 275  Minimize the Disturbance of all steep slopes, when possible.  Divert Concentrated or Channelized Flows of stormwater away from and around steep slope disturbances.  Use Specialized BMP Controls including temporary and permanent seeding with soil binders, erosion control blankets, surface roughening, reducing continuous slope length with terracing or diversions, gradient terraces, interceptor dikes and swales, grass-lined channels, pipe slope drains, subsurface drains, level spreaders, check dams, seep berms, and triangular silt dikes to minimize erosion.  Initiate Stabilization Measures as soon as practicable on any disturbed steep slope areas where construction activities have permanently or temporarily ceased, and will not resume for a period exceeding 7 calendar days.  A Vegetative and/or Non-Vegetative Cover must be established within 3 working days from the time that stabilization measures were initiated. Stabilization of steep slopes should be a priority for those performing work at the construction site. At the very least, runoff control BMPs should be implemented to transport stormwater runoff from the top of the slope to the toe of the slope. An example of this is to install diversion swales along the top of slope and direct the runoff towards pipe slopes drains to transports the runoff to the toe of the slope. All pipe slope drain outlets are to be equipped with proper outlet protection. Sediment Discharge Minimization Permittees, Contractors, and all other parties responsible for conducting land-disturbing activities are required to install and maintain all erosion and sediment BMPs that are identified on the approved construction site plans. These BMPs have been designed and approved to address such factors as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soils particle sizes expected to be present on the construction site. Proper installation, inspection, and maintenance will allow these BMPs to operate at maximum efficiencies in order to minimize sediment discharges to the maximum extent practical. Pollutant Discharge Minimization Permittees, Contractors, and all other parties responsible for conducting land-disturbing activities are required to install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. At a minimum, the following items must be implemented:  Minimize the discharge of pollutants from dewatering trenches and excavations by managing runoff with the appropriate controls. Otherwise these discharges are prohibited;  Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge;  Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and other materials present on the site to precipitation and to stormwater; and Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 11 of 275  Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. Prohibited Discharges Permittees, Contractors, and all other responsible parties for conducting land-disturbing activities are prohibited from discharging, from the construction site, the following items:  Wastewater from washout of concrete, unless managed by an appropriate control;  Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials;  Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and  Soaps or solvents used in vehicle and equipment washing. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 12 of 275 N o v o N o r d i s k D A P I - U S D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 1 3 o f 2 7 5 Section 2 SITE FEATURES AND SENSITIVE AREAS 2.1 Sources of Pollution Throughout construction activities, each permittee, contractor, and person responsible for conducting work will need to ensure that sources of pollution are managed to prevent their discharge from the construction site. Expected pollution sources during construction have been identified in Table 2.1-A, but due to the nature of construction activities, it is often tough to predict all pollution sources that may appear throughout the life of a construction project. For that reason, the following table has also been provided to help all those performing work at this construction site identify possible sources of pollution Stormwater runoff subjected to the identified pollution sources must be treated by the appropriate BMPs as directed by this SWPPP. In the event that any additional sources of pollution are identified during construction, the person(s) with day-to-day operational control at the site is to add the new source(s) to Table 2.1-A and consult with the SWPPP Preparer to properly address this source and to prevent the discharge of it's pollutant through stormwater runoff. Table 2.1-A: Potential Sources of Pollution Source Material or Chemical Location* Appropriate Control Measures Loose soil exposed/disturbed during clearing, grubbing and grading activities Sediment All areas within the Limits of Disturbance As directed by the construction plans. This includes Silt Fence, sediment tubes, sediment basins, and sediment traps. Areas where construction equipment are cleaned, a.k.a. concrete washout Heavy Metals & pH Located adjacent to each construction entrance Concrete Washout Basin as shown in the construction plans. Water encountered during trenching Nutrients & Sediment In and around any trenching activities. Direct water into impoundments such as basins or traps to allow for the sedimentation of the listed pollutants. Paving Operations Sediment & Trash All areas to be paved. Inlet protection. Material Delivery and Storage Areas Nutrients, pH, Sediment, Heavy Metals, oils & grease All areas used as storage areas Silt fence and/or sediment dikes Equipment fueling and maintenance areas Metals, hydrocarbons, oils and greases Areas surrounding fuel tanks Provide secondary containments, locate in upland areas. Repair leaking and broken hoses. *Area where material/chemical is used on site. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 14 of 275 2.2 Surface Waters There are no rivers or open bodies of water on the site. 2.3 Impairments and TMDLs This site is within the Neuse River watershed. A special water resource plan has been implemented to protect this watershed. The Neuse River is included on the current North Carolina 303D list. The proposed construction site needs to consider the nitrogen export and reduce it below the allowable 10 pounds per year limit set for industrial sites. The site in its final configuration produced just less than 10 pounds per year, and will not require any additional water quality in order to meet the set targets. The calculations for the site are shown in Appendix II of the Hydrology Report. 2.4 Critical Areas The site has wetlands located on it, but the wetlands are not considered critical areas as defined by the North Carolina Department of Environmental Quality. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 15 of 275 Section 3 Compliance Requirements 3.1 SWPPP Availability The On-Site SWPPP (OS-SWPPP) will be located onsite during construction. 3.2 Pre-Construction Conferences A pre-construction conference will be held on-site prior to starting land disturbing activity. The Primary/Secondary Permittee or SWPPP Preparer are responsible for notifying the appropriate parties and holding the pre-construction conference. Each contractor, subcontractor, blanket utility provider, etc., who will work at the site is to attend the pre-construction meeting in person. 3.3 Inspection Requirements Site to be inspected weekly until final stabilization has been reached. Upon final stabilization the inspections may be reduced to once a month until the Notice of Termination has been submitted. Inspector to be the SWPPP Preparer, an individual directly under the SWPPP Preparer’s authority, or an individual with a registration equivalent to the SWPPP Preparer. Inspection reports are to be kept onsite with the OS- SWPPP. Refer to Appendix E for forms. Inspector to install and maintain a rain gauge and rainfall log during construction. Refer to Appendix F for rainfall log. 3.4 Maintenance Requirements Contractor to maintain silt fence, construction entrance, and other temporary BMP’s, as shown on the site plans, during construction. A detention pond maintenance agreement for the permanent ponds will be provided. 3.5 Record Keeping Appendix E, F, and G are to be utilized by all parties working onsite to track site related issues, were applicable, and document site changes as they occur. All records to remain with the OS-SWPPP at all times during construction. 3.6 Final Stabilization Final stabilization to be addressed per the site plans through the use of landscaping, grassing, and the track surface. Once final stabilization has been reached on all disturbed areas, the Notice of Termination is to be submitted. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 16 of 275 Appendix A Site Maps Location Map USGS Map County GIS Map Soils Map FEMA FIRM Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 17 of 275 Location Map Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 18 of 275 Benson Selma Garner FourOaks Powhatan FlowersClayton Edmondson FourOaks NE ADJOINING 7.5' QUADRANGLES Imagery................................................NAIP, January 2010Roads..............................................©2006-2010 Tele AtlasNames...............................................................GNIS, 2010Hydrography.................National Hydrography Dataset, 2010Contours............................National Elevation Dataset, 2010 USGS:USFS: !( #!" #!" #!" #!" #!" #!" #!" █n F 3 0 0 300 300 250 250 250 3 0 0 2 0 0 200 150 200 30 0 2 0 0 200 250 250 25 0 250 200 200 300 300 200 1 5 0 250 300 30 0 300 25 0 200 200 150 250 300 20 0 250 200 2 0 0 15 0 150 25 0 300 30 0 300 2 5 0 2 5 0 300 2 5 0 250 200 1 5 0 250 250 300 250 200 2 0 0 25 0 20 0 250 200 200 150 150 200 2 5 0 25 0 200 250 250 2 0 0 200 250 30 0 250 200 1 5 0 25 0 200 250 25 0 250 250 250 25 0 1 5 0 2 5 0 250 300 300 250 250 200 150 150 1 5 0 1 7 5 150 12 5 250 300 200 200 200 150 1 5 0 200 250 150 150 300 250 15 0 200 3 0 0 25 0 20 0 20 0 150 250 200 250 200 150 175 225 175 200 150 250 200 20 0 200 200 2 5 0 15 0 2 5 0 250 300 250 1 5 0 2 0 0 250 300 20 0 200 2 0 0 150 2 0 0 20 0 20 0 20 0 25 0 200 200 15 0 17 5 150 Johnston County Airport £¤Bus70 £¤Bus70 £¤Bus70 £¤70 £¤70 £¤70 £¤Bus70 £¤Bus70 ¬«210 ¬«210 ¬«210 ¬«210 ¬«210 S N E A D D R WINDSOR GREEN DR C O R B E T T R D C O U N T RY L NBARBER M I L L R D W I L D W O O D D R AMELIA CHURCH RD L I T T L E C R E E K C H U R C H R D G L E N L A U R E L R D W I L T S H I R E D RPALMER D R HEREFORD DR H O GAN CI R LASSITER RD J A C K R D KORAT LN H I L L S I D E D R BEA D L E C T S PA N I E L LN P O W E L L D R DUCK P O N D L N I R O N W O O D L N LEE FARM LN C A N T E R B U RY RD ELM DR N A T HAN DR I R VA N ST P E A R T R E E L N P O P L A R D R LITTLE C R E E K C H U R C H R D S A N TA G E RT R U DIS DR S W IF T C R E E K R D HOME STEAD LN C R E E K S I D E D R W A T E R O A K D R C LOVERDALE DR LAKEWOOD RD A M Y D R R U B E R T A V E B L A C K C R E E K R D J E S S E D R C R A N TO C K R D TA R A D R ALTA V I S T A C T C O L E R D APPLEWOOD DR RACHELS WAY W I L L O W L N WAHOO DR C R O O K E D C R E E K R D L E E T RACE DR WILSONS MILLS RD C O R B E T T R D SADISCO RD G L E N L A U R E L R D D I C K I N S O N R D V I L N S O M M E R S E T DR WILSON JONES RD W E S T E R M A N P L M A J E S T I C L N H U G H D R RED B U D D R L O I S L N LEE ST C O HO M E R D I L L I N O I S D R AYDEN DR W I L S O M M I L L S R D J U L I A N L N W E L L O N S R D META DR S A L L I E D R JASPER D R JACK RD V A L L E Y C R EEK DR C O L O N I A L D R LEE RD S U N R A Y D R O G B U R N R D L A N C A S H I R E R U N A R T H U R D R OLD ENGLISH CT N T E C H D R HAPPY TRAILS RD ALEXANDER LN R E D O A K D R T IFFANY CT L I TTL E CR E E K C H U R C H R D C L A Y T O N P O I N T E D R R E D S T A R L N CHALMERS DR R I D G E R D CLEVELAND RD IN D I A N C A M P R D SHADY MEA D O W L N O P A L L N S H O R T J O U R N E Y R D FREEDOM RD M O N R O E R D O L D Y O G I L N WEATHERSPOON LN HOME STEAD LN E N C H A N T E D T R L C L E V E L A N D R D JESSICA DR BEE LN IO W A D R T W IN ACRES RD C O U N T R Y L N P O W H A T A N R D B E NNY RD G LEN ST G A L I L E E R D C A NYON R D LEEWAY CT B I G P I N E R D H E D G E R O W L N M A R S H A L L L N P E E L E R D L I T T L E C R E E K C H U R C H R D T R A M L N EXIDE RD T R E N B U R G P L P L A N T A T I O N R D RUSTIC DR A U S T I N F A R M L N U Z Z I E D R P O N Y F A R M R D H U N T E R E S T S N E L S O N C T WOOD S I D E D R ROCK PILLAR RD ROBIN LN A U TU M N CT R A N C H R D W O L I V E R D S E R E N I T Y D R NOR R I S R D P O L E N TA R D H O R ATIO CT S M I T H R D S T E E L B R I D G E R D G O RDON RD CLEVELAND RD M UELLER DR H I L L T O P D R G R E E N P A T H G O V E R N M E N T R D G L A S G O W D R H A R R I S R D C A S E Y R D B A R B O U R R D S AI N T L A W R E N C E W A Y M I L L A R D D R C O N T E N D E R DR S T E PHANIE LN N I C O L E T L N MC C O Y D R B A R N E S R I D G E D R S E T H W A Y M E N D E L D R C H A R L I E L N S N O W B E R RY LN E S S E X L N S I N N S B R U C K D R B A R B E R M I L L R D RUSS RD C A R O L I N A O A KS AVE DEER RUN P A T R I C I A D R WAY M O N WAY PEELE RD R A N C H R D S W I F T C R E E K R D S T E R L I N G D R P E N N Y L N S W I F T C R E E K D R W I L D W O O D L N K A R E N DR B O U L D ER DR BARBOUR RD W IL S O M M I L L S R D S T R I C K L A N D R D P A Y D A Y L N G R E E N L Y N D R F A R R I N GTON D R B E S S D R L A N D O V ER LN D E E P C R E E K D R D E E P C A N Y O N D R R O C K PILL A R R D SA N DY LN I R V A N ST CITA T I O N L N M O H I C A N T R L HICKOR Y DR SL A T E T O P R D CONNER DR SMITHFIELD SMITHFIELD C oo p e r B r Steep Hill Br Sassa r i x a S w a m p Little Po p lar C r Steep Hill Br Reedy Br C o o p e r B r Sassari x a S w a m p Little Cr L i t t l e C r S t e e p H ill B r Little Cr R e e d y B r Reedy Br S t e e p H i l l B r Little Poplar Cr L i t t l e P o p l a r C r R e e d y B r S wi f t C r S w i f t Cr Neuse R i v e r S w i f t C r Swift C r Swift Cr N e u s e R i v e r S w i f t C r M iddle Cr Middle C r M i d d l e C r PowellLake Johnson CountyWildlife Pond BrownsPond Tar HeelFarm Pond PantherLake LangdonPond DavisCem PineyGrove Cem OakeyGrove Cem BarhamCem Knollwood Cem LangdonCem PooleCem Powhatan Rose Manor Westview Whitley Heights 37 000m 7 35° 25' 000 34 38 39 29 35 30" 36 35' 777 39 42 40 27 7 N 7 7 45 7 39 30' 39 7 180 7 39 39 28 30" 39 33 78° 30' 39 640 35° 35 37' FEET 39 31 39 29 32 37' 7 34 7 38 30" FEET 32 000 E 35' 39 30' 42 FEET 39 39 44 41 7 30 7 78°36 39 39 30" 000 35° 39 78° 39 39 22' 35 32' 7 30' 2 37 39 43 000m 40 000 30"33 N 7 39 39 37 39 000m 43 27' 7 35° 37 32 3439 28 27'25' 39 35 78° 39 2730" 30" 33 E 7 33 32' 44 73032 FEET 39 000m 39 30" 31 150 7 39 347 45 680 2 22' POWHATAN, NC 2013 Expressway Local Connector ROAD CLASSIFICATION Ramp 4WD Secondary Hwy Local Road Interstate Route State RouteUS RouteWX./H POWHATAN, NC 2013 ROAD CLASSIFICATION Check with local Forest Service unitfor current travel conditions and restrictions. FS Primary Route FS High Clearance RouteFS PassengerRouteJK L Interstate Route State RouteUS RouteWX./H Expressway Local Connector Ramp 4WD Secondary Hwy Local Road POWHATAN QUADRANGLENORTH CAROLINA-JOHNSTON CO.7.5-MINUTE SERIES U.S. DEPARTMENT OF THE INTERIOR U. S. GEOLOGICAL SURVEY NORTHCAROLINA QUADRANGLE LOCATION This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011.A metadata file associated with this product is draft version 0.6.11 CONTOUR INTERVAL 10 FEETNORTH AMERICAN VERTICAL DATUM OF 1988 SCALE 1:24 000 1 0.5 0 MILES 1 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 FEET 1000 500 0 METERS 1000 2000 21KILOMETERS00.51 Imagery...................................................NAIP, May 2012Roads..............................................©2006-2012 TomTomNames..........................................................GNIS, 2013Hydrography....................National Hydrography Dataset, 2012Contours............................National Elevation Dataset, 2008Boundaries....................Census, IBWC, IBC, USGS, 1972 - 2012 North American Datum of 1983 (NAD83)World Geodetic System of 1984 (WGS84). Projection and1 000-meter grid: Universal Transverse Mercator, Zone 17S Produced by the United States Geological Survey 10 000-foot ticks: North Carolina Coordinate System of 1983 North American Datum of 1983 (NAD83)World Geodetic System of 1984 (WGS84). Projection and1 000-meter grid: Universal Transverse Mercator, Zone 17S Produced by the United States Geological Survey 10 000-foot ticks: North Carolina Coordinate System of 1983 Imagery<IMG_LEADER><IMG_CITATION>Roads<TRANS_LEADER>©2006-2012 TomTomRoads within US Forest Service Lands.............FSTopo Data with limited Forest Service updates, 2013Names...............................................................GNIS, 2013Hydrography<HYDRO_LEADER>National Hydrography Dataset, <HYDRO_DATE>Contours<HYPSO_LEADER><HYPSO_CITATION>Boundaries....................Census, IBWC, IBC, USGS, 1972 - 2012<OPTIONAL_CITATIONS> U.S. National Grid 100,000-m Square ID Grid Zone Designation QV 17S × ØMN GN UTM GRID AND 2013 MAGNETIC NORTHDECLINATION AT CENTER OF SHEET 1° 29´26 MILS 9° 10´163 MILS Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 19 of 275 * * * DISCLAIMER * * * Johnston County assumes no legal responsibility for the information represented here. Scale: 1:20120 - 1 in. = 1676.66 feet (The scale is only accurate when printed landscape on a 8 1/2 x 11 size sheet with no page scaling.) Johnston County GIS January 11, 2016 Result 1 id:05I05008A Tag:05I05008A Tax Unique Id:4418463 NCPin:167804-60-8595 Mapsheet No:167804 Owner Name 1:NOVO NORDISK PHARM IND Owner Name 2: Mail Address 1:3612 POWHATAN RD Mail Address 2: Mail Address 3:CLAYTON, NC 27527-0000 Site Address 1: Site Address 2: Book:01486 Page:0001 Market Value:1615650 Assessed Acreage:174.92 Calc. Acreage:174.92 Sales Price:1556500 Sale Date:1995-12-15 Powered by TCPDF (www.tcpdf.org) Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 20 of 275 Hydrologic Soil Group—Johnston County, North Carolina (DAPI Soil Map) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/5/2016 Page 1 of 4 39 4 3 8 0 0 39 4 4 0 0 0 39 4 4 2 0 0 39 4 4 4 0 0 39 4 4 6 0 0 39 4 4 8 0 0 39 4 5 0 0 0 39 4 3 8 0 0 39 4 4 0 0 0 39 4 4 2 0 0 39 4 4 4 0 0 39 4 4 6 0 0 39 4 4 8 0 0 39 4 5 0 0 0 39 4 5 2 0 0 734000 734200 734400 734600 734800 735000 735200 735400 735600 735800 736000 736200 734000 734200 734400 734600 734800 735000 735200 735400 735600 735800 736000 736200 35° 37' 21'' N 78 ° 2 5 ' 0 ' ' W 35° 37' 21'' N 78 ° 2 3 ' 2 7 ' ' W 35° 36' 32'' N 78 ° 2 5 ' 0 ' ' W 35° 36' 32'' N 78 ° 2 3 ' 2 7 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 500 1000 2000 3000 Feet 0 150 300 600 900 Meters Map Scale: 1:10,700 if printed on A landscape (11" x 8.5") sheet. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 21 of 275 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 19, Sep 29, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 14, 2011—Mar 3, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Johnston County, North Carolina (DAPI Soil Map) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/5/2016 Page 2 of 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 22 of 275 Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Johnston County, North Carolina (NC101) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AmB Appling-Marlboro complex, 1 to 6 percent slopes B 1.2 0.3% Bb Bibb sandy loam, 0 to 2 percent slopes, frequently flooded A/D 0.2 0.1% CoB Cowarts loamy sand, 2 to 6 percent slopes C 8.4 1.9% FaB Faceville sandy loam, 2 to 6 percent slopes B 1.8 0.4% GeB Gilead sandy loam, 2 to 8 percent slopes C 8.3 1.9% GoA Goldsboro sandy loam, 0 to 2 percent slopes B 14.4 3.2% MaB Marlboro sandy loam, 2 to 8 percent slopes B 10.8 2.4% McB Marlboro-Cecil complex, 2 to 8 percent slopes B 4.0 0.9% NoA Norfolk loamy sand, 0 to 2 percent slopes A 97.4 21.6% NoB Norfolk loamy sand, 2 to 6 percent slopes A 11.8 2.6% PaE Pacolet loam, 15 to 25 percent slopes B 3.1 0.7% Ra Rains sandy loam, 0 to 2 percent slopes A/D 155.2 34.5% Tn Toisnot loam, 0 to 2 percent slopes C/D 25.6 5.7% VrA Varina loamy sand, 0 to 2 percent slopes C 99.7 22.1% VrB Varina loamy sand, 2 to 6 percent slopes C 8.2 1.8% Totals for Area of Interest 450.2 100.0% Hydrologic Soil Group—Johnston County, North Carolina DAPI Soil Map Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/5/2016 Page 3 of 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 23 of 275 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Johnston County, North Carolina DAPI Soil Map Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/5/2016 Page 4 of 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 24 of 275 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 25 of 275 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 26 of 275 Appendix B Drainage Maps Pre Development Watershed Map Post Development Watershed Map Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 27 of 275 PLOT DATE:P:\CAD\210\DWG\XREF\Watershed maps 170525.dwg 06-20-17 8:11 am Printed By: mcc13489 R O W R O W E F D E E E n g i n e e r i n g P r o f e s s i o n a l C o r p o r a t i o n 1 0 0 F l u o r D a n i e l D r i v e , G r e e n v i l l e , S C 2 9 6 0 7 L i c e n s e N o . C - 0 7 4 2 F I G U R E 1 O F 2 C - S W P P P A P P E N D I X B E X I S T I N G D R A I N A G E A R E A M A P 0 8 J U N 1 7 A C M A F Z G R A P H I C N o v o N o r d i s k D i a b e t e s A P I - U S D r a w n B y : S c a l e : P a g e n o . : D e s i g n B y : R e v i s i o n d a t e : C r e a t i o n d a t e : N o v o N o r d i s k A / S P o w h a t a n R o a d C l a y t o n , N o r t h C a r o l i n a U S A P O W H A T A N R O A D POWHATAN ROAD N O R T H C A R O L I N A R A I L R O A D C O M P A N Y EXISTING DRAINAG E AREA #2AREA = 26.94 ACCN=79 E X I S T I N G D R A I N A G E A R E A # 1 A R E A = 1 2 3 . 1 5 A C C N = 8 3 E X I S T I N G D R A I N A G E A R E A # 4 A R E A = 7 . 5 8 A C C N = 7 8 E X I S T I N G D R A I N A G E A R E A # 3 A R E A = 2 0 . 2 7 A C C N = 8 0 Novo Nordisk DAPI-US D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 2 8 o f 2 7 5 XXXXXXXXX X X X X X X X X " G " S T R E E T " F " S T R E E T "J" AVENUE "G" AVENUE PHASE 2 "N" AVENUE "L" AVENUE E A S T S T R E E T X X X X X X X X X X X X X X X X X X X X X X X X X X R e c o v e r y U t i l i t i e s & R a w M a t e r i a l s N a O H N a O H A m m o n i a 1 0 0 m 3 1 0 0 m 3 1 0 0 m 3 1 0 0 m 3 5 0 m 3 1 0 0 m 3 Et h a n o l S y s t e m C o l u m n s P u r i f i c a t i o n 1 0 0 m 3 5 0 m 3 5 0 m 3 1 0 0 m 3 5 0 m 3 5 0 m 3 E t h a n o l R e c o v e r y ( G L ) F o r m i c A c i d N M P N a O H 3 6 % 25 m 3 25 m 3 25 m 3 Et O A c 25 m 3 25 m 3 H N O 3 6 2 % 50 m 3 50 m 3 2 4 0 0 m 3 Y e a s t C r e a m P u m p H o u s e P r o c e s s + F i r e W a t e r T a n k Ca r b o h y d r a t e S t o r a g e F 1 (D e x t r o s e ) ( 0 7 5 ) Et h a n o l Sy s t e m C o l u m n s R 1 ( 0 9 2 ) P u r i f i c a t i o n U t i l i t i e s & R a w M a t e r i a l s E t h a n o l P u r i f i c a t i o n ( G J ) (0 8 1 ) (0 7 6 ) (0 8 5 ) 1 0 0 m 3 1 0 0 m 3 1 0 0 m 3 1 0 0 m 3 5 0 m 3 (1 1 3 ) 1 0 0 m 3 p u r e fe e d f e e d f e e d bl e e d fe e d fe e d f e e d r e g e n 1 0 0 m 3 r e g e n 1 5 8 A r e g e n p u r e r e g e n r e g e n H N O 3 5 0 m 3 5 0 m 3 p u r e f e e d f e e d 5 0 m 3 r e g e n re g e n r e g e n re g e n ( 0 8 1 ) p u r e ( 0 9 1 ) (0 9 2 ) (0 8 3 ) 5 0 m 3 (1 1 2 ) 1 0 0 m 3 r e g e n 1 0 0 m 3 (0 9 1 ) r e g e n C I P S k i d N a O H 2 5 % 50 m 3 50 m 3 50 m3 50m3 50 m 3 50 m 3 25 m 3 25 m 3 P u m p H o u s e 5 0 m 3 Secondary Pipe rackabove to Recovery1 Bldg Secondary Pipe rackabove to Purification N 2 C r y o S t o r a g e V e n d o r U n i t M o d i f i c a t i o n w a s t e c o l l e c t i o n 40 m3 Secondary Pipe RackFermentation 1, Clean/Blackutilities and Row Materials F e r m e n t a t i o n 1 R a w M a t e r i a l s 25m 3 1 0 0 m 3 r e g e n ( 1 5 5 ) (1 5 7 ) F o r m i c A c i d W a s t e ( 1 5 6 ) 1 0 0 m 3 25 m 3 25 m 3 C o o l i n g T o w e r s G M O W a s t e W a t e r G M O S l u d g e Ina c t i v a t i o n S k i d Sl u d g e G M O 5 0 m 3 G M O W a s t e W a t e r T a n k s (1 5 4 ) 2 5 0 m 3 W a s t e W a t e r G M O ( 1 5 2 ) (7 0 0 ) CI P S k i d 25 m 3 25 m 3 Te p i d W a t e r S k i d 25 m 3 C I P S k i d 1 0 0 m 3 1 0 0 m 3 Br i n e T a n k 25 m3 p H A c i d ( 0 7 7 ) 25 m 3 p H C a u s t i c (0 8 8 ) 5 0 0 m 3 W a s t e W a t e r T a n k s (1 5 0 ) G M O S l u d g e Ina c t i v a t i o n S k i d In a c t i v a t i o n S k i d G M O W a s t e W a t e r In a c t i v a t i o n S k i d 5 0 0 m 3 5 0 0 m 3 25 m 3 25 m325 m 3 25 m 3 25 m 3 25 m 3 W a s t e W a t e r N e u t r a l i z e r s 1 0 0 m 3 1 0 0 m 3 H C l ( 0 7 2 ) 25 m3 25 m3 R e s e r v e d fo r F u e l Oi l T a n k 1 0 0 m 3 f e e d f e e d re g e n A B P Q T D G N S C F R U E H M KK GG E K P A F M Q B D H N R C R E D U C T I O N S T A T I O N D o m e s t i c W a t e r P i t Secondary Pipe rackabove to Warehouse " H " S T R E E T " E " S T R E E T "E" STREET PHASE 2"F" STREET PHASE 2"H" STREET PHASE 2PLOT DATE:P:\CAD\210\DWG\XREF\Watershed maps 170525.dwg 06-20-17 10:52 am Printed By: mcc13489 R O W R O W E F D E E E n g i n e e r i n g P r o f e s s i o n a l C o r p o r a t i o n 1 0 0 F l u o r D a n i e l D r i v e , G r e e n v i l l e , S C 2 9 6 0 7 L i c e n s e N o . C - 0 7 4 2 F I G U R E 2 O F 2 C - S W P P P A P P E N D I X B P R O P O S E D D R A I N A G E A R E A M A P 0 8 J U N 1 7 A C M A F Z G R A P H I C N o v o N o r d i s k D i a b e t e s A P I - U S D r a w n B y : S c a l e : P a g e n o . : D e s i g n B y : R e v i s i o n d a t e : C r e a t i o n d a t e : N o v o N o r d i s k A / S P o w h a t a n R o a d C l a y t o n , N o r t h C a r o l i n a U S A C O U N T Y : J O H N S T O N W A T E R W A Y : R I V E R B A S I N : N E U S E R I V E R D A T E O F P U B L I C N O T I C E : P O W H A T A N R O A D POWHATAN ROAD N O R T H C A R O L I N A R A I L R O A D C O M P A N Y P R O P O S E D D R A I N A G E A R E A # 4 A R E A = 5 . 4 0 A C C N = 6 1 P R O P O S E D D R A I N A G E A R E A # 1 A R E A = 1 2 8 . 4 6 A C C N = 9 1 PROPOS E D D R A I N A G E A R E A # 3 AREA = 8 . 2 8 A C C N = 9 0 PROPOSED DRAINAG E AREA #2AREA = 35.8 ACCN=89 P R O P O S E D D R A I N A G E A R E A # 1 S U B B A S I N # 3 A R E A = 1 4 . 9 3 A C C N = 9 8 P R O P O S E D D R A I N A G E A R E A # 1 S U B B A S I N # 2 A R E A = 3 5 . 2 9 A C C N = 9 8 P R O P O S E D D R A I N A G E A R E A # 1 S U B B A S I N # 1 A R E A = 7 7 . 5 4 A C C N = 8 5 P R O P O S E D D R A I N A G E A R E A # 1 S U B B A S I N # 4 A R E A = 0 . 7 0 A C C N = 8 5 P R O P O S E D D R A I N A G E A R E A # 3 S U B B A S I N # 3 A R E A = 3 . 0 A C C N = 9 5 P R O P O S E D D R A I N A G E A R E A # 3 S U B B A S I N # 2 A R E A = 2 . 0 6 A C C N = 7 7 PROPOSED DRAINAGE ARE A # 3 SUB BASIN #1AREA = 3.22 ACCN=95Novo Nordisk DAPI-US D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 2 9 o f 2 7 5 Appendix C Engineering Reports Hydrology Report Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 30 of 275 HYDROLOGY REPORT for Diabetes API Project for Novo Nordisk Powhatan Road Clayton, NC Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 31 of 275 Novo Nordisk Clayton, NC TABLE OF CONTENTS Project Narrative 3-7 Soil Information 8 FEMA 8 Waters of the State 8 Hydrological Analysis 8-10 Detention Analysis 10 As-built 10 Detention Waiver 10 Permanent Water Quality 11 Sedimentology 11 Navigable Waters 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 32 of 275 Novo Nordisk Clayton, NC Stormwater Hydrographs Appendix I Existing Conditions Hydraflow Table of Contents Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1-Year Hyrdrographs 3-11 2-Year Hydrographs 12-16 10-Year Hydrographs 17-21 25- Year Hydrographs 22-26 100- Year Hydrographs 27-31 Proposed Condition Pre Detention Hydraflow Table of Contents Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1-Year Hydrographs 3-11 2-Year Hydrographs 12-16 10-Year Hydrographs 17-21 25- Year Hydrographs 22-26 100-Year Hydrographs 27-31 Proposed Condition Post Detention Hydraflow Table of Contents Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1-Year Hydrographs 3-31 2-Year Hydrographs 32-49 10-Year Hydrographs 50-67 25- Year Hydrographs 68-85 100-Year Hydrographs 86-103 Nitrogen Calculations Appendix II Pipe and Swale Calculations Appendix III Silt Fence Calculations Appendix IV Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 33 of 275 Novo Nordisk Clayton, NC Project Narrative: The project on this site is to construct a new pharmaceutical facility for Novo Nordisk to manufacture an oral tablet to treat type 2 diabetes. The main facility will include four buildings attached within the main plant (Purification, Recovery, Fermentation, and Office). Associated buildings on the site will include a Warehouse, Central Utility Building, Sampling building and two guardhouses. Additional improvements to the site include a utility corridor as well as a new electrical substation, and a wastewater treatment facility for process waste. Future plans include the addition of seven more buildings. All future buildings have been accounted for in the following calculations. Site Description: Pre The site is divided into four drainage areas for analysis, refer to Drainage Maps in Appendix B. The first drainage area flows via sheet flow towards a wetlands area in the center of the site and discharges along the eastern property line. This drainage area is 123.15 acres. The drainage area consisting of primarily canopy trees within a wetland area (40.83 ac.), and agricultural row crops (82.32 ac.), and the weighted Cn for the watershed is 83. The second drainage area is 26.94 acres consisting of primarily canopy trees within a wetland area (2.18 ac.) and agricultural row crops (24.76 ac.), flows via sheet flow west to be collected within the wetland area and slowly flows into a 24” pipe culvert underneath Powhatan Road into an existing stormwater retention pond on the existing Novo Nordisk site. The weighted Cn number for drainage area #2 is 79. The third drainage area consists of 20.27 acres consisting of primarily canopy trees within a wetland area (2.71 ac.) and agricultural row crops (17.88 ac.) flows via sheet flow south to be collected within the wetland area and slowly flows into a culvert underneath the Southern Railroad where it continues south off of the property. The weighted Cn number for drainage area #3 is 80. The fourth drainage area consists of 7.58 acres consisting of primarily agricultural row crops (7.58 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 78. The weighted runoff calculations are located in the Hydrology report in Appendix D Post-Development Conditions Proposed site build out improvements will be as follows: 16 new buildings (Central Utility Building 1&2, Fermentation 1 & 2, 2 Guardhouses, Purification 1-3, Recovery 1&2, Sampling Building, GMP Archive, Spine, Warehouse, and Drug Production), utility corridor to service the facility, new electrical substation, employee parking lots, Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 34 of 275 Novo Nordisk Clayton, NC underground utilities, and ancillary paved roads surrounding the site. The post development basins are divided to maintain consistency with the pre development basins and the four analysis points, refer to Drainage Maps in Appendix B more details. The first drainage area consists of 128.46 acres. This drainage area consists of wetlands (40.83 acres), construction laid down and temporary facilities, and new facility. Part of the drainage area will flow via sheet flow towards the wetlands (77.54 acres) and then off-site along the eastern property line. Other portions of the drainage area will flow via underground piping to different detention basins. 14.93 acres will be directed into stormwater management basin 2, 35.29 acres will be directed into stormwater management basin 3, and 0.7 acres will flow into the small basin to the east of the warehouse. The outflow from the detention basins will enter the wetlands and flow over land towards the same discharge point along the eastern property line. The weighted Cn number for the analysis is 90 to incorporate future buildout to the site. The second drainage area is 35.8 acres primarily consisting of construction area. The final condition of the site will consist of buildings which will be constructed during the phase 2 sequence of the site. Storm water, during construction, will flow via sheet flow to diversion ditches and then flow underground pipes towards Storm Water Management Basin #1. The flow from the basin will exit the outflow structure into the pipe under Powhatan Road and will discharge into the existing stormwater pond on the Novo Nordisk property west of Powhatan Road. The weighted Cn number for the analysis is 82 to incorporate future buildout to the site. The third drainage area is 8.28 acres consisting of parking area and wetlands. 3.22 acres of the area will be directed into to the southwest parking lot basin. 3.0 acres will be directed into the southeast parking lot basin. All stormwater entering the basins will be managed for quantity control prior to release into the wetlands. Storm water will continue through the wetlands into a 36” culvert under the Southern Railroad easement. The weighted Cn number for the analysis is 89. The fourth drainage area consists of 5.40 acres consisting of pervious maintained areas (5.40 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 61. The improved site was evaluated to analyze the effect of the change in land use upon stormwater runoff rates. Per Johnston County regulations, post-development discharge rates shall not exceed pre-development discharge rates for the 2, 10, and 100-yr frequency 24-hour duration storm events. Peak runoff rates were calculated for pre- development and post-development conditions. The SCS 24 hour storm was used to develop the hydrology model and predict runoff rates for storms with average return frequencies of 1, 2, 10, 25, and 100 years for pre- and post-development conditions. After analyzing the study area, it shows that post-development flows are below above Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 35 of 275 Novo Nordisk Clayton, NC pre-development rates. Please refer to the summary table below, and the Appendices for detailed information. Table #1 - Peak Runoff Rates Pre Construction:   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Pre to DA#1 123.15 83 78.5 108.81 200.05 355.25 Pre to WS #2 26.94 79 26.24 37.8 73.73 136.41 Pre to WS #3 20.59 80 28.69 40.67 77.29 140.21 Pre to WS #4 7.58 78 7.45 10.83 21.52 40.3 Table #2 - Peak Runoff Rates Post Construction (Pre Detention):   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Post to DA #1 128.46 90 130.96 169.65 280.58 461.97 Increase/(Decrease) Un-detained Flow 52.46 60.84 80.53 106.72 Post to WS #2 35.8 82 32.19 44.94 83.59 149.60 Increase/(Decrease) Un-detained Flow 5.95 7.14 9.86 13.19 Post to WS #3 8.28 89 20.89 27.08 44.79 73.67 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 36 of 275 Novo Nordisk Clayton, NC Increase/(Decrease) Un-detained Flow (7.8) (13.59) (32.5) (66.54) Post to WS #4 5.40 78 6.117 8.885 17.57 32.79 Increase/(Decrease) Un-detained Flow (1.333) (1.945) (3.95) (7.51) Table #3 - Peak Runoff Rates Post Construction (Post Detention):   Storage Pond 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Post DA#1 Detention Outflow 2, 3 & Warehouse 45.53 60.02 100.78 179.62 Increase/(Decrease) Detained Flow (32.97) (48.79) (99.27) (179.62) % Change to DA #1 Pre vs Post -42.00% -44.84% -49.62% -49.44% Post DA#2 Detention Outflow 1 1.146 4.324 13.19 22.15 Increase/(Decrease) Detained Flow (25.094) (33.476) (60.54) (114.26) % Change to DA #2 Pre vs Post -95.63% -88.56% -82.11% -83.76% Post DA#3 Detention Outflow SW & SE PKLOT PONDS 8.143 12.08 30.14 57.14 Increase/(Decrease) Detained Flow (20.547) (28.59) (47.15) (83.07) % Change to DA #3 Pre vs Post -71.62% -70.30% -61.00% -59.25% Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 37 of 275 Novo Nordisk Clayton, NC Post DA#4 Detention Outflow None 6.117 8.885 17.57 32.79 Increase/(Decrease) Detained Flow (1.333) (1.945) (3.95) (7.51) % Change to DA #4 Pre vs Post -17.89% -17.96% -18.36% -18.64% Soils Information: Soils for the project watershed area as follows: Goldsboro Sandy loam, 0-2% slopes, Classification B Marlboro Sandy loam, 2-8%, Classification B Marlboro-Cecil Sandy loam, 2-8%, Classification B Norfolk Loamy Sand, 0-2% slopes, Classification A Norfolk Loamy Sand, 2-6% slopes, Classification A Rains Sandy Loam, 0-2% slopes, Classification A/D Toisnot Loam, 0-2% slopes, Classification C/D Varina Loamy Sand, 0-2% slopes, Classification C Varina Loamy Sand, 2-6% slopes, Classification C Refer to Appendix A of the C-SWPPP for further information. FEMA: The proposed disturbance from the project is located in Zone X, a non-flooding area. Refer to Appendix A of the C-SWPPP for FEMA maps . Waters of the State: There are wetlands located upon the site. A permit has been filed with the US Army Corps of Engineers, refer to permit # SAW-2015-02127. Hydrological Analysis: Proposed development conditions will drain to the same 4 drainage areas, although the sizes of the drainage areas may change slightly. An SCS 24-hour storm analysis was performed using Hydraflow 2016 modeling software. Refer to Appendix I for hydrographs. Following is a summary of the data input. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 38 of 275 Novo Nordisk Clayton, NC Soils: Agricultural Soils (Soils group A), Wetlands (Soils group D) Curve Numbers1: 93 Wetlands 78 Agricultural 98 Pavement & Buildings 85 Gravel 61 Grass (Good condition) Rainfall Data: 1 Year = 2.89 inches (Clayton, NC) 2 Year = 3.50 inches 10 Year = 5.24 inches 25 Year = 6.32 inches 100 Year = 8.11 inches Pre Area to DA #1: Total Area: 123.15 Ac. Wetland 40.83 Ac. Agricultural 82.32 Ac. Curve Number: 83 Post Area to DA #1: Total Area: 128.43 Ac. Impervious 31.29 Ac. Pervious 57.52 Ac. Wetlands 39.62 Curve Number: 90 Pre Area to DA #2: Total Area: 26.94 acres Wetland 2.18 Ac. Agricultural 24.76 Ac. Curve Number: 79 Post Area to DA #2: Total Area: 35.8 acres Impervious 20.63 Ac. Pervious 15.17 Ac. Curve Number: 82 Pre Area to DA #3: Total Area: 20.27 acres 1 Refer to Hydrographs in Appendix I for Cn calculations (Phase 1 Buildout) Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 39 of 275 Novo Nordisk Clayton, NC Wetland 2.71 Ac. Agricultural 17.88 Ac. Curve Number: 80 Post Area to DA #3: Total Area: 8.28 acres Impervious 4.78 Ac. Pervious 1.89 Ac. Wetlands 1.61 Curve Number: 89 Pre Area to DA #4: Total Area: 7.58 acres Wetland 0 Ac. Agricultural 7.58 Ac. Curve Number: 78 Post Area to DA #4: Total Area: 5.40 acres Impervious 0.00 Ac. Pervious 5.40 Ac. Curve Number: 61 Detention Analysis: There are 6 detention basins on the property for three of the drainage areas. Three of the detention basins will be wet basins to provide peak runoff attenuation. Refer to Appendix I for the hydrographs showing the peak runoff attenuation. The ponds have been designed to handle a 10 year storm with a foot of freeboard. The ponds have been routed for the 100 year storm and all ponds contain the 100 year storm with at least ½’ of freeboard. Detention Waiver: The site does not qualify for a detention waiver as the final constructed condition will have a higher peak runoff versus existing conditions, and four detention basins have been proposed to reduce peak runoff and volume. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 40 of 275 Novo Nordisk Clayton, NC Permanent Water Quality: No post construction water quality is required for this project. The nitrogen export from the site is under the limit of 10 lbs/year requirement. See calculation in Appendix II of the Hydrology report. Wet detention ponds have been incorporated into the design of the site in order to remove total suspended solids. The three wet detention ponds will remove 90% TSS. Surface area to drainage area ratios are provided in the table below. Surface Area (acres) Drainage Area (acres) SA/DA (%) Required SA/DA (%) Pond #1 (A&B) 1.3 33.29 3.9 2.64 Pond #2 1.47 14.92 9.9 3.25 Pond #3 4.11 33.26 12.1 2.64 All three pond provide well over any required SA/DA ratios prescribed be NCDEQ and will exceed the necessary treatment of stormwater prior to release into the wetlands. Undetained areas draining into existing wetlands will be treated with infiltration bio- swales prior to discharging to a wetlands. This will treat the first flush and remove any contaminants prior to entering a wetland area. Sedimentology: Silt fence will encompass the perimeter of the project in order to prevent sediment from entering the wetlands or off site. The silt fence which is solely being used for sediment control has been designed to handle ¼ acre per 100 feet of silt fence. A double row of silt fence has been incorporated within the site along the wetland boarders. The double row of silt fence provides an 86% trapping rate which is greater than the 54% provided by a 75’ filter strip. In addition to the silt fence, the site has been designed with 3 wet detention basins which will double as sediment basins during construction. Four sediment traps have been designed for use on the site as well, with each area trapping 5 acres of runoff and designed to hold 3,600 cu/ft of sediment per acre. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 41 of 275 Novo Nordisk Clayton, NC The requirements for a sediment basin, per the NC DENR BMP Manual, are the basin needs to store 1,800 cu-ft of sediment per contributing acre. Refer to table below for basin details. Contributing Area (acres) Volume Provided (cu-ft) Volume Required (cu-ft) Basin 1 39.83 561,224 71,694 Basin 2 14.54 395,934 26,172 Basin 3 44.74 1,085,439 80,532 Navigable Waters: There are no navigable waters on the property. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 42 of 275 Novo Nordisk Clayton, NC Appendix I Hydrographs Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 43 of 275 Novo Nordisk Clayton, NC Existing Conditions Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 44 of 275 Hydraflow Table of Contents Novo Nordisk Existing.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Existing Watershed #1.......................................................... 4 TR-55 Tc Worksheet............................................................................................................ 5 Hydrograph No. 2, SCS Runoff, Existing Watershed #2.......................................................... 6 TR-55 Tc Worksheet............................................................................................................ 7 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR............................. 8 TR-55 Tc Worksheet............................................................................................................ 9 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 10 TR-55 Tc Worksheet.......................................................................................................... 11 2 - Year Summary Report....................................................................................................................... 12 Hydrograph Reports................................................................................................................. 13 Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 13 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 14 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 15 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 16 10 - Year Summary Report....................................................................................................................... 17 Hydrograph Reports................................................................................................................. 18 Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 18 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 19 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 20 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 21 25 - Year Summary Report....................................................................................................................... 22 Hydrograph Reports................................................................................................................. 23 Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 23 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 24 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 25 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 26 100 - Year Summary Report....................................................................................................................... 27 Hydrograph Reports................................................................................................................. 28 Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 28 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 29 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 30 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 31 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 45 of 275 1234 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Project: Novo Nordisk Existing.gpw Tuesday, 06 / 6 / 2017 Hyd.Origin Description Legend 1 SCS Runoff Existing Watershed #1 2 SCS Runoff Existing Watershed #2 3 SCS Runoff Existing Watershed #3 - South under RR 4 SCS Runoff Existing Watershed #4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 46 of 275 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No. type hyd(s)Description (origin)1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 78.50 108.81 ------- ------- 200.05 259.79 305.31 355.25 Existing Watershed #1 2 SCS Runoff ------ 26.24 37.80 ------- ------- 73.73 97.74 116.15 136.41 Existing Watershed #2 3 SCS Runoff ------ 28.69 40.67 ------- ------- 77.29 101.48 119.94 140.21 Existing Watershed #3 - South under 4 SCS Runoff ------ 7.450 10.83 ------- ------- 21.52 28.70 34.22 40.30 Existing Watershed #4 Proj. file: Novo Nordisk Existing.gpw Tuesday, 06 / 6 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 47 of 275 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 78.50 1 759 607,311 ------ ------------ Existing Watershed #1 2 SCS Runoff 26.24 1 732 108,421 ------ ------------ Existing Watershed #2 3 SCS Runoff 28.69 1 724 86,315 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 7.450 2 730 28,472 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 1 Year Tuesday, 06 / 6 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 48 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 78.50 cfs Storm frequency = 1 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 607,311 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 4 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 1 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 49 of 275 TR55 Tc Worksheet 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 1 Existing Watershed #1 Description A B C Totals Sheet Flow Manning's n-value = 0.170 0.240 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 43.42 + 0.00 + 0.00 = 43.42 Shallow Concentrated Flow Flow length (ft) = 2176.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) =1.14 0.00 0.00 Travel Time (min) = 31.79 + 0.00 + 0.00 = 31.79 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................75.20 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 50 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 26.24 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 108,421 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 6 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 1 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 51 of 275 TR55 Tc Worksheet 7 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 2 Existing Watershed #2 Description A B C Totals Sheet Flow Manning's n-value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 18.87 + 0.00 + 0.00 = 18.87 Shallow Concentrated Flow Flow length (ft) = 863.00 0.00 0.00 Watercourse slope (%) = 0.60 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.25 0.00 0.00 Travel Time (min) = 11.51 + 0.00 + 0.00 = 11.51 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................30.40 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 52 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 28.69 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 86,315 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 8 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 1 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 53 of 275 TR55 Tc Worksheet 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 3 Existing Watershed #3 - South under RR Description A B C Totals Sheet Flow Manning's n-value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 1.10 0.00 0.00 Travel Time (min) = 13.77 + 0.00 + 0.00 = 13.77 Shallow Concentrated Flow Flow length (ft) = 468.00 0.00 0.00 Watercourse slope (%) = 1.10 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.69 0.00 0.00 Travel Time (min) = 4.61 + 0.00 + 0.00 = 4.61 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................18.40 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 54 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 7.450 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 28,472 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 10 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 1 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 55 of 275 TR55 Tc Worksheet 11 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 4 Existing Watershed #4 Description A B C Totals Sheet Flow Manning's n-value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 15.64 + 0.00 + 0.00 = 15.64 Shallow Concentrated Flow Flow length (ft) = 765.00 0.00 0.00 Watercourse slope (%) = 0.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 8.84 + 0.00 + 0.00 = 8.84 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................24.50 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 56 of 275 Hydrograph Summary Report 12 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 108.81 1 759 830,841 ------ ------------ Existing Watershed #1 2 SCS Runoff 37.80 1 732 153,141 ------ ------------ Existing Watershed #2 3 SCS Runoff 40.67 1 724 120,915 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 10.83 2 730 40,557 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 2 Year Tuesday, 06 / 6 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 57 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 108.81 cfs Storm frequency = 2 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 830,841 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 13 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 2 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 58 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 37.80 cfs Storm frequency = 2 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 153,141 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 14 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 2 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 59 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 40.67 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 120,915 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 15 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 2 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 60 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 10.83 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 40,557 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 16 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 2 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 61 of 275 Hydrograph Summary Report 17 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 200.05 1 759 1,516,362 ------ ------------ Existing Watershed #1 2 SCS Runoff 73.73 1 731 294,291 ------ ------------ Existing Watershed #2 3 SCS Runoff 77.29 1 724 229,307 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 21.52 2 728 78,997 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 10 Year Tuesday, 06 / 6 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 62 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 200.05 cfs Storm frequency = 10 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 1,516,362 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 18 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 10 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 63 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 73.73 cfs Storm frequency = 10 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 294,291 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 19 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 10 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 64 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 77.29 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 229,307 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 20 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 10 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 65 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 21.52 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 78,997 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 21 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 10 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 66 of 275 Hydrograph Summary Report 22 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 259.79 1 759 1,974,688 ------ ------------ Existing Watershed #1 2 SCS Runoff 97.74 1 731 390,556 ------ ------------ Existing Watershed #2 3 SCS Runoff 101.48 1 724 302,848 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 28.70 2 728 105,355 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 25 Year Tuesday, 06 / 6 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 67 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 259.79 cfs Storm frequency = 25 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 1,974,688 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 6.35 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 23 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 25 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 68 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 97.74 cfs Storm frequency = 25 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 390,556 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 6.35 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 24 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 25 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 69 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 101.48 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 302,848 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 6.35 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 25 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 25 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 70 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 28.70 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 105,355 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 6.35 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 26 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 25 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 71 of 275 Hydrograph Summary Report 27 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 355.25 1 758 2,719,086 ------ ------------ Existing Watershed #1 2 SCS Runoff 136.41 1 731 548,654 ------ ------------ Existing Watershed #2 3 SCS Runoff 140.21 1 724 423,270 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 40.30 2 728 148,775 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 100 Year Tuesday, 06 / 6 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 72 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 355.25 cfs Storm frequency = 100 yrs Time to peak = 758 min Time interval = 1 min Hyd. volume = 2,719,086 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 28 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 400.00 400.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 100 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 73 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 136.41 cfs Storm frequency = 100 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 548,654 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 29 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 100 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 74 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 140.21 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 423,270 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 30 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 100 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 75 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 6 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 40.30 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 148,775 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 31 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 100 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 76 of 275 Novo Nordisk Clayton, NC Proposed Conditions Pre-Detention Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 77 of 275 Hydraflow Table of Contents Novo Nordisk Proposed1.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Proposed DA#1..................................................................... 4 TR-55 Tc Worksheet............................................................................................................ 5 Hydrograph No. 2, SCS Runoff, Proposed DA#2..................................................................... 6 TR-55 Tc Worksheet............................................................................................................ 7 Hydrograph No. 3, SCS Runoff, Proposed DA#3..................................................................... 8 TR-55 Tc Worksheet............................................................................................................ 9 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 10 TR-55 Tc Worksheet.......................................................................................................... 11 2 - Year Summary Report....................................................................................................................... 12 Hydrograph Reports................................................................................................................. 13 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 13 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 14 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 15 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 16 10 - Year Summary Report....................................................................................................................... 17 Hydrograph Reports................................................................................................................. 18 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 18 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 19 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 20 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 21 25 - Year Summary Report....................................................................................................................... 22 Hydrograph Reports................................................................................................................. 23 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 23 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 24 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 25 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 26 100 - Year Summary Report....................................................................................................................... 27 Hydrograph Reports................................................................................................................. 28 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 28 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 29 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 30 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 31 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 78 of 275 1234 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Project: Novo Nordisk Proposed1.gpw Tuesday, 06 / 20 / 2017 Hyd.Origin Description Legend 1 SCS Runoff Proposed DA#1 2 SCS Runoff Proposed DA#2 3 SCS Runoff Proposed DA#3 4 SCS Runoff Proposed DA#4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 79 of 275 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No. type hyd(s)Description (origin)1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 130.96 169.65 ------- ------- 280.58 349.13 ------- 461.97 Proposed DA#1 2 SCS Runoff ------ 32.19 44.94 ------- ------- 83.59 108.31 ------- 149.60 Proposed DA#2 3 SCS Runoff ------ 20.89 27.08 ------- ------- 44.79 55.71 ------- 73.67 Proposed DA#3 4 SCS Runoff ------ 6.117 8.885 ------- ------- 17.57 23.24 ------- 32.79 Proposed DA#4 Proj. file: Novo Nordisk Proposed1.gpw Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 80 of 275 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 130.96 1 752 875,345 ------ ------------ Proposed DA#1 2 SCS Runoff 32.19 1 740 167,219 ------ ------------ Proposed DA#2 3 SCS Runoff 20.89 1 721 53,277 ------ ------------ Proposed DA#3 4 SCS Runoff 6.117 1 727 20,803 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 1 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 81 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 130.96 cfs Storm frequency = 1 yrs Time to peak = 752 min Time interval = 1 min Hyd. volume = 875,345 cuft Drainage area = 128.460 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(31.290 x 98) + (39.620 x 92) + (57.520 x 85)] / 128.460 4 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) Proposed DA#1 Hyd. No. 1 -- 1 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 82 of 275 TR55 Tc Worksheet 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 1 Proposed DA#1 Description A B C Totals Sheet Flow Manning's n-value = 0.011 0.150 0.011 Flow length (ft) = 300.0 300.0 0.0 Two-year 24-hr precip. (in) = 4.10 4.10 0.00 Land slope (%) = 0.50 0.50 0.00 Travel Time (min) = 4.49 + 36.29 + 0.00 = 40.78 Shallow Concentrated Flow Flow length (ft) = 700.00 1000.00 0.00 Watercourse slope (%) = 0.50 0.50 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) =1.44 1.14 0.00 Travel Time (min) = 8.12 + 14.61 + 0.00 = 22.72 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................63.50 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 83 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 32.19 cfs Storm frequency = 1 yrs Time to peak = 740 min Time interval = 1 min Hyd. volume = 167,219 cuft Drainage area = 35.800 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(20.630 x 98) + (15.170 x 61)] / 35.800 6 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) Proposed DA#2 Hyd. No. 2 -- 1 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 84 of 275 TR55 Tc Worksheet 7 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 2 Proposed DA#2 Description A B C Totals Sheet Flow Manning's n-value = 0.130 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 35.03 + 0.00 + 0.00 = 35.03 Shallow Concentrated Flow Flow length (ft) = 726.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 8.42 + 0.00 + 0.00 = 8.42 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................43.50 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 85 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 20.89 cfs Storm frequency = 1 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 53,277 cuft Drainage area = 8.280 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.780 x 98) + (1.890 x 61) + (1.610 x 93)] / 8.280 8 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 21.00 21.00 Q (cfs) Time (min) Proposed DA#3 Hyd. No. 3 -- 1 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 86 of 275 TR55 Tc Worksheet 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 3 Proposed DA#3 Description A B C Totals Sheet Flow Manning's n-value = 0.013 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 5.55 + 0.00 + 0.00 = 5.55 Shallow Concentrated Flow Flow length (ft) = 500.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.14 0.00 0.00 Travel Time (min) = 7.30 + 0.00 + 0.00 = 7.30 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................12.90 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 87 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 6.117 cfs Storm frequency = 1 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 20,803 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 10 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (min) Proposed DA#4 Hyd. No. 4 -- 1 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 88 of 275 TR55 Tc Worksheet 11 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 4 Proposed DA#4 Description A B C Totals Sheet Flow Manning's n-value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 15.64 + 0.00 + 0.00 = 15.64 Shallow Concentrated Flow Flow length (ft) = 420.00 0.00 0.00 Watercourse slope (%) = 0.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 4.85 + 0.00 + 0.00 = 4.85 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................20.50 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 89 of 275 Hydrograph Summary Report 12 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 169.65 1 751 1,137,753 ------ ------------ Proposed DA#1 2 SCS Runoff 44.94 1 740 230,544 ------ ------------ Proposed DA#2 3 SCS Runoff 27.08 1 721 69,741 ------ ------------ Proposed DA#3 4 SCS Runoff 8.885 1 726 29,634 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 2 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 90 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 169.65 cfs Storm frequency = 2 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 1,137,753 cuft Drainage area = 128.460 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(31.290 x 98) + (39.620 x 92) + (57.520 x 85)] / 128.460 13 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (min) Proposed DA#1 Hyd. No. 1 -- 2 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 91 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 44.94 cfs Storm frequency = 2 yrs Time to peak = 740 min Time interval = 1 min Hyd. volume = 230,544 cuft Drainage area = 35.800 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(20.630 x 98) + (15.170 x 61)] / 35.800 14 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) Proposed DA#2 Hyd. No. 2 -- 2 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 92 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 27.08 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 69,741 cuft Drainage area = 8.280 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.780 x 98) + (1.890 x 61) + (1.610 x 93)] / 8.280 15 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) Proposed DA#3 Hyd. No. 3 -- 2 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 93 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 8.885 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 29,634 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 16 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) Proposed DA#4 Hyd. No. 4 -- 2 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 94 of 275 Hydrograph Summary Report 17 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 280.58 1 751 1,909,346 ------ ------------ Proposed DA#1 2 SCS Runoff 83.59 1 739 426,089 ------ ------------ Proposed DA#2 3 SCS Runoff 44.79 1 721 118,409 ------ ------------ Proposed DA#3 4 SCS Runoff 17.57 1 726 57,721 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 10 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 95 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 280.58 cfs Storm frequency = 10 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 1,909,346 cuft Drainage area = 128.460 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(31.290 x 98) + (39.620 x 92) + (57.520 x 85)] / 128.460 18 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (min) Proposed DA#1 Hyd. No. 1 -- 10 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 96 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 83.59 cfs Storm frequency = 10 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 426,089 cuft Drainage area = 35.800 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(20.630 x 98) + (15.170 x 61)] / 35.800 19 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (min) Proposed DA#2 Hyd. No. 2 -- 10 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 97 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 44.79 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 118,409 cuft Drainage area = 8.280 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.780 x 98) + (1.890 x 61) + (1.610 x 93)] / 8.280 20 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) Proposed DA#3 Hyd. No. 3 -- 10 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 98 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 17.57 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 57,721 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 21 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Proposed DA#4 Hyd. No. 4 -- 10 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 99 of 275 Hydrograph Summary Report 22 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 349.13 1 751 2,397,280 ------ ------------ Proposed DA#1 2 SCS Runoff 108.31 1 739 553,853 ------ ------------ Proposed DA#2 3 SCS Runoff 55.71 1 721 149,291 ------ ------------ Proposed DA#3 4 SCS Runoff 23.24 1 726 76,450 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 25 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 100 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 349.13 cfs Storm frequency = 25 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 2,397,280 cuft Drainage area = 128.460 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(31.290 x 98) + (39.620 x 92) + (57.520 x 85)] / 128.460 23 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (min) Proposed DA#1 Hyd. No. 1 -- 25 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 101 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 108.31 cfs Storm frequency = 25 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 553,853 cuft Drainage area = 35.800 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(20.630 x 98) + (15.170 x 61)] / 35.800 24 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Proposed DA#2 Hyd. No. 2 -- 25 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 102 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 55.71 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 149,291 cuft Drainage area = 8.280 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.780 x 98) + (1.890 x 61) + (1.610 x 93)] / 8.280 25 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) Proposed DA#3 Hyd. No. 3 -- 25 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 103 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 23.24 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 76,450 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 26 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) Proposed DA#4 Hyd. No. 4 -- 25 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 104 of 275 Hydrograph Summary Report 27 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 461.97 1 751 3,213,395 ------ ------------ Proposed DA#1 2 SCS Runoff 149.60 1 739 771,352 ------ ------------ Proposed DA#2 3 SCS Runoff 73.67 1 721 201,035 ------ ------------ Proposed DA#3 4 SCS Runoff 32.79 1 726 108,705 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 100 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 105 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 461.97 cfs Storm frequency = 100 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 3,213,395 cuft Drainage area = 128.460 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(31.290 x 98) + (39.620 x 92) + (57.520 x 85)] / 128.460 28 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 70.00 70.00 140.00 140.00 210.00 210.00 280.00 280.00 350.00 350.00 420.00 420.00 490.00 490.00 Q (cfs) Time (min) Proposed DA#1 Hyd. No. 1 -- 100 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 106 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 149.60 cfs Storm frequency = 100 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 771,352 cuft Drainage area = 35.800 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(20.630 x 98) + (15.170 x 61)] / 35.800 29 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (min) Proposed DA#2 Hyd. No. 2 -- 100 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 107 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 73.67 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 201,035 cuft Drainage area = 8.280 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.780 x 98) + (1.890 x 61) + (1.610 x 93)] / 8.280 30 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Proposed DA#3 Hyd. No. 3 -- 100 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 108 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 32.79 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 108,705 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 31 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) Proposed DA#4 Hyd. No. 4 -- 100 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 109 of 275 Novo Nordisk Clayton, NC Proposed Conditions Post-Detention Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 110 of 275 Hydraflow Table of Contents Novo Nordisk Proposed wbasins Rev 5ACM.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4......................................................... 4 TR-55 Tc Worksheet............................................................................................................ 5 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................... 6 TR-55 Tc Worksheet............................................................................................................ 7 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................... 8 TR-55 Tc Worksheet............................................................................................................ 9 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 10 TR-55 Tc Worksheet.......................................................................................................... 11 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 12 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 13 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 14 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 15 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 16 Pond Report - SWMB#3.................................................................................................... 17 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 18 Pond Report - SWMB#2.................................................................................................... 19 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 20 Pond Report - WAREHOUSE POND................................................................................ 21 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 22 Pond Report - SW PKLOT POND..................................................................................... 23 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 24 Pond Report - SE PKLOT POND...................................................................................... 25 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 26 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 27 TR-55 Tc Worksheet.......................................................................................................... 28 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 29 Pond Report - SWMB#1.................................................................................................... 30 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 31 2 - Year Summary Report....................................................................................................................... 32 Hydrograph Reports................................................................................................................. 33 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 33 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 34 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 35 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 36 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 37 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 38 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 39 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 40 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 41Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 111 of 275 Contents continued...Novo Nordisk Proposed wbasins Rev 5ACM.gpw Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 42 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 43 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 44 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 45 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 46 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 47 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 48 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 49 10 - Year Summary Report....................................................................................................................... 50 Hydrograph Reports................................................................................................................. 51 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 51 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 52 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 53 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 54 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 55 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 56 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 57 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 58 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 59 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 60 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 61 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 62 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 63 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 64 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 65 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 66 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 67 25 - Year Summary Report....................................................................................................................... 68 Hydrograph Reports................................................................................................................. 69 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 69 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 70 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 71 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 72 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 73 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 74 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 75 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 76 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 77 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 78 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 79 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 80 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 81 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 82 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 83 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 84 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 85 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 112 of 275 Contents continued...Novo Nordisk Proposed wbasins Rev 5ACM.gpw 100 - Year Summary Report....................................................................................................................... 86 Hydrograph Reports................................................................................................................. 87 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 87 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 88 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 89 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 90 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 91 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 92 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 93 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 94 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 95 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 96 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 97 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 98 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 99 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1....................................................... 100 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2........................................... 101 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2...................................................... 102 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3....................................................... 103 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 113 of 275 12345678 9 10 11 12 13 14 15 16 17 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Project: Novo Nordisk Proposed wbasins Rev 5ACM.gpw Tuesday, 06 / 20 / 2017 Hyd.Origin Description Legend 1 SCS Runoff Post Dev Analysis Pt#4 2 SCS Runoff DA#1 Sub Basin #1 3 SCS Runoff DA#1 Sub Basin #2 4 SCS Runoff DA#1 Sub Basin #3 5 SCS Runoff DA#1 Sub Basin #4 6 SCS Runoff DA #3 Sub Basin #1 7 SCS Runoff DA #3 Sub Basin #2 8 SCS Runoff DA #3 Sub Basin #3 9 Reservoir SWMB#3 10 Reservoir SWMB#2 11 Reservoir WAREHOUSE POND 12 Reservoir SW PKLOT POND 13 Reservoir SE PKLOT POND 14 Combine Post Dev Analysis Pt#1 15 SCS Runoff Proposed Drainage Area #2 16 Reservoir Post Dev Analysis Pt#2 17 Combine Post Dev Analysis Pt#3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 114 of 275 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No. type hyd(s)Description (origin)1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 6.117 8.885 ------- 13.58 17.57 23.24 27.86 32.79 Post Dev Analysis Pt#4 2 SCS Runoff ------ 44.64 58.50 ------- 80.57 98.57 123.47 143.47 164.57 DA#1 Sub Basin #1 3 SCS Runoff ------ 131.37 159.82 ------- 204.45 240.64 290.68 330.95 373.51 DA#1 Sub Basin #2 4 SCS Runoff ------ 47.60 57.94 ------- 74.15 87.29 105.46 120.08 135.53 DA#1 Sub Basin #3 5 SCS Runoff ------ 2.003 2.665 ------- 3.739 4.619 5.837 6.816 7.847 DA#1 Sub Basin #4 6 SCS Runoff ------ 9.602 11.89 ------- 15.46 18.34 22.32 25.51 28.88 DA #3 Sub Basin #1 7 SCS Runoff ------ 2.078 3.058 ------- 4.735 6.166 8.205 9.877 11.66 DA #3 Sub Basin #2 8 SCS Runoff ------ 9.320 11.53 ------- 14.99 17.78 21.63 24.71 27.97 DA #3 Sub Basin #3 9 Reservoir 3 0.294 0.429 ------- 0.626 1.131 1.457 1.664 3.368 SWMB#3 10 Reservoir 4 0.869 1.291 ------- 1.527 1.678 5.335 10.58 16.13 SWMB#2 11 Reservoir 5 0.000 0.000 ------- 0.000 0.000 0.000 0.000 0.000 WAREHOUSE POND 12 Reservoir 6 4.150 5.221 ------- 8.756 11.69 12.98 15.75 23.36 SW PKLOT POND 13 Reservoir 8 2.051 4.000 ------- 10.35 12.42 19.46 24.15 27.74 SE PKLOT POND 14 Combine 2, 9, 10, 11, 45.53 60.02 ------- 82.50 100.78 129.82 154.40 179.62 Post Dev Analysis Pt#1 15 SCS Runoff ------ 77.83 100.33 ------- 135.78 164.52 204.22 236.03 269.51 Proposed Drainage Area #2 16 Reservoir 15 1.146 4.324 ------- 10.02 13.19 17.01 19.87 22.15 Post Dev Analysis Pt#2 17 Combine 7, 12, 13, 8.143 12.08 ------- 23.22 30.14 39.69 45.83 57.14 Post Dev Analysis Pt#3 Proj. file: Novo Nordisk Proposed wbasins Rev 5ACM.gpw Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 115 of 275 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 6.117 1 727 20,803 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 44.64 1 791 506,016 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 131.37 1 719 340,592 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 47.60 1 721 144,093 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 2.003 1 717 3,802 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 9.602 1 722 27,376 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 2.078 1 728 7,378 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 9.320 1 721 25,107 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 0.294 1 1449 33,040 3 278.92 330,597 SWMB#3 10 Reservoir 0.869 1 1040 93,033 4 284.53 110,745 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 285.54 3,802 WAREHOUSE POND 12 Reservoir 4.150 1 732 26,766 6 290.44 12,075 SW PKLOT POND 13 Reservoir 2.051 1 734 23,515 8 290.72 11,604 SE PKLOT POND 14 Combine 45.53 1 791 632,089 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 77.83 1 725 244,751 ------ ------------ Proposed Drainage Area #2 16 Reservoir 1.146 1 1326 109,976 15 289.44 202,058 Post Dev Analysis Pt#2 17 Combine 8.143 1 730 57,659 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 5ACM.gpwReturn Period: 1 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 116 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 6.117 cfs Storm frequency = 1 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 20,803 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#4 Hyd. No. 1 -- 1 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 117 of 275 TR55 Tc Worksheet 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 1 Post Dev Analysis Pt#4 Description A B C Totals Sheet Flow Manning's n-value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 15.64 + 0.00 + 0.00 = 15.64 Shallow Concentrated Flow Flow length (ft) = 420.00 0.00 0.00 Watercourse slope (%) = 0.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 4.85 + 0.00 + 0.00 = 4.85 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................20.50 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 118 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 44.64 cfs Storm frequency = 1 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 506,016 cuft Drainage area = 77.540 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.580 x 93)] / 77.540 6 0 3 6 9 12 15 18 21 24 27 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) DA#1 Sub Basin #1 Hyd. No. 2 -- 1 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 119 of 275 TR55 Tc Worksheet 7 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 2 DA#1 Sub Basin #1 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.40 0.00 0.00 Travel Time (min) = 94.13 + 0.00 + 0.00 = 94.13 Shallow Concentrated Flow Flow length (ft) = 2200.00 0.00 0.00 Watercourse slope (%) = 0.40 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.02 0.00 0.00 Travel Time (min) = 35.93 + 0.00 + 0.00 = 35.93 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................130.10 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 120 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 131.37 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 340,592 cuft Drainage area = 35.290 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 8 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) DA#1 Sub Basin #2 Hyd. No. 3 -- 1 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 121 of 275 TR55 Tc Worksheet 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 3 DA#1 Sub Basin #2 Description A B C Totals Sheet Flow Manning's n-value = 0.011 0.011 0.011 Flow length (ft) = 30.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 0.77 + 0.00 + 0.00 = 0.77 Shallow Concentrated Flow Flow length (ft) = 800.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 9.28 + 0.00 + 0.00 = 9.28 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................10.00 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 122 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 47.60 cfs Storm frequency = 1 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 144,093 cuft Drainage area = 14.930 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) DA#1 Sub Basin #3 Hyd. No. 4 -- 1 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 123 of 275 TR55 Tc Worksheet 11 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 4 DA#1 Sub Basin #3 Description A B C Totals Sheet Flow Manning's n-value = 0.011 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 0.00 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 1200.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 13.91 + 0.00 + 0.00 = 13.91 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................13.90 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 124 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 2.003 cfs Storm frequency = 1 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 3,802 cuft Drainage area = 0.700 ac Curve number = 85 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 4.30 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 12 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) DA#1 Sub Basin #4 Hyd. No. 5 -- 1 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 125 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 9.602 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 1 min Hyd. volume = 27,376 cuft Drainage area = 3.220 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.70 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 13 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) DA #3 Sub Basin #1 Hyd. No. 6 -- 1 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 126 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 2.078 cfs Storm frequency = 1 yrs Time to peak = 12.13 hrs Time interval = 1 min Hyd. volume = 7,378 cuft Drainage area = 2.060 ac Curve number = 77 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 23.10 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 14 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) DA #3 Sub Basin #2 Hyd. No. 7 -- 1 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 127 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 9.320 cfs Storm frequency = 1 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 25,107 cuft Drainage area = 3.000 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.60 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 15 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) DA #3 Sub Basin #3 Hyd. No. 8 -- 1 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 128 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 0.294 cfs Storm frequency = 1 yrs Time to peak = 24.15 hrs Time interval = 1 min Hyd. volume = 33,040 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 278.92 ft Reservoir name = SWMB#3 Max. Storage = 330,597 cuft Storage Indication method used. 16 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) SWMB#3 Hyd. No. 9 -- 1 Year Hyd No. 9 Hyd No. 3 Total storage used = 330,597 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 129 of 275 Pond Report 17 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Pond No. 1 - SWMB#3 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 277.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 277.00 163,211 0 0 1.00 278.00 168,596 165,880 165,880 2.00 279.00 191,101 179,713 345,593 3.00 280.00 196,511 193,780 539,373 4.00 281.00 201,979 199,219 738,592 5.00 282.00 207,421 204,674 943,265 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 48.00 6.00 6.00 0.00 Span (in)= 48.00 40.00 6.00 0.00 No. Barrels = 1 310 Invert El. (ft)= 277.90 280.00 277.90 0.00 Length (ft)= 55.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 20.00 0.00 0.00 0.00 Crest El. (ft)= 281.50 0.00 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 277.90 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Stage (ft) 0.00 277.00 1.00 278.00 2.00 279.00 3.00 280.00 4.00 281.00 5.00 282.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 130 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 0.869 cfs Storm frequency = 1 yrs Time to peak = 17.33 hrs Time interval = 1 min Hyd. volume = 93,033 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 284.53 ft Reservoir name = SWMB#2 Max. Storage = 110,745 cuft Storage Indication method used. 18 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) SWMB#2 Hyd. No. 10 -- 1 Year Hyd No. 10 Hyd No. 4 Total storage used = 110,745 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 131 of 275 Pond Report 19 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Pond No. 2 - SWMB#2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 282.90 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 282.90 58,212 0 0 0.10 283.00 58,544 5,838 5,838 1.10 284.00 72,968 65,617 71,454 2.10 285.00 76,528 74,733 146,187 3.10 286.00 80,165 78,331 224,519 4.10 287.00 83,884 82,009 306,527 5.10 288.00 87,682 85,767 392,294 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 48.00 6.00 6.00 0.00 Span (in)= 48.00 36.00 6.00 0.00 No. Barrels = 1 310 Invert El. (ft)= 282.00 284.50 282.90 0.00 Length (ft)= 50.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 20.00 0.00 0.00 0.00 Crest El. (ft)= 286.50 0.00 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 Stage (ft) 0.00 282.90 1.00 283.90 2.00 284.90 3.00 285.90 4.00 286.90 5.00 287.90 6.00 288.90 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 132 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 285.54 ft Reservoir name = WAREHOUSE POND Max. Storage = 3,802 cuft Storage Indication method used. 20 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) WAREHOUSE POND Hyd. No. 11 -- 1 Year Hyd No. 11 Hyd No. 5 Total storage used = 3,802 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 133 of 275 Pond Report 21 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Pond No. 7 - WAREHOUSE POND Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 285.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 285.00 4,562 0 0 1.00 286.00 9,947 7,081 7,081 2.00 287.00 10,623 10,282 17,363 3.00 288.00 11,276 10,947 28,310 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 0.00 0.00 0.00 0.00 Span (in)= 0.00 0.00 0.00 0.00 No. Barrels = 0 000 Invert El. (ft)= 0.00 0.00 0.00 0.00 Length (ft)= 0.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a NoNoNo Crest Len (ft)= 145.00 0.00 0.00 0.00 Crest El. (ft)= 287.00 0.00 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = Broad --- --- --- Multi-Stage = No No No No Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 Stage (ft) 0.00 285.00 1.00 286.00 2.00 287.00 3.00 288.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 134 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 4.150 cfs Storm frequency = 1 yrs Time to peak = 12.20 hrs Time interval = 1 min Hyd. volume = 26,766 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 290.44 ft Reservoir name = SW PKLOT POND Max. Storage = 12,075 cuft Storage Indication method used. 22 0 3 6 9 12 15 18 21 24 27 30 33 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) SW PKLOT POND Hyd. No. 12 -- 1 Year Hyd No. 12 Hyd No. 6 Total storage used = 12,075 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 135 of 275 Pond Report 23 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Pond No. 5 - SW PKLOT POND Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 288.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 288.00 2,714 0 0 1.00 289.00 4,781 3,699 3,699 2.00 290.00 5,919 5,339 9,038 3.00 291.00 7,823 6,848 15,886 4.00 292.00 13,063 10,331 26,217 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 18.00 6.00 12.00 0.00 Span (in)= 18.00 6.00 12.00 0.00 No. Barrels = 1 210 Invert El. (ft)= 288.00 288.00 289.50 0.00 Length (ft)= 50.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 19.65 100.00 0.00 0.00 Crest El. (ft)= 291.00 291.75 0.00 0.00 Weir Coeff.= 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Stage (ft) 0.00 288.00 1.00 289.00 2.00 290.00 3.00 291.00 4.00 292.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 136 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 2.051 cfs Storm frequency = 1 yrs Time to peak = 12.23 hrs Time interval = 1 min Hyd. volume = 23,515 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 290.72 ft Reservoir name = SE PKLOT POND Max. Storage = 11,604 cuft Storage Indication method used. 24 0 3 6 9 12 15 18 21 24 27 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) SE PKLOT POND Hyd. No. 13 -- 1 Year Hyd No. 13 Hyd No. 8 Total storage used = 11,604 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 137 of 275 Pond Report 25 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Pond No. 6 - SE PKLOT POND Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 288.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 288.00 2,712 0 0 1.00 289.00 3,658 3,173 3,173 2.00 290.00 4,975 4,299 7,472 3.00 291.00 6,504 5,722 13,194 4.00 292.00 8,261 7,364 20,558 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 18.00 6.00 12.00 0.00 Span (in)= 18.00 6.00 12.00 0.00 No. Barrels = 1 210 Invert El. (ft)= 288.00 288.50 298.50 0.00 Length (ft)= 50.00 0.00 0.00 0.00 Slope (%)= 0.01 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 19.65 100.00 0.00 0.00 Crest El. (ft)= 291.00 291.50 0.00 0.00 Weir Coeff.= 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 Stage (ft) 0.00 288.00 1.00 289.00 2.00 290.00 3.00 291.00 4.00 292.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 138 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 45.53 cfs Storm frequency = 1 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 632,089 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 77.540 ac 26 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#1 Hyd. No. 14 -- 1 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 139 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 77.83 cfs Storm frequency = 1 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 244,751 cuft Drainage area = 35.800 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 35.800 27 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) Proposed Drainage Area #2 Hyd. No. 15 -- 1 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 140 of 275 TR55 Tc Worksheet 28 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 15 Proposed Drainage Area #2 Description A B C Totals Sheet Flow Manning's n-value = 0.011 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 4.86 + 0.00 + 0.00 = 4.86 Shallow Concentrated Flow Flow length (ft) = 1136.00 0.00 0.00 Watercourse slope (%) = 0.40 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =1.29 0.00 0.00 Travel Time (min) = 14.73 + 0.00 + 0.00 = 14.73 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..............................................................................19.60 min Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 141 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 1.146 cfs Storm frequency = 1 yrs Time to peak = 22.10 hrs Time interval = 1 min Hyd. volume = 109,976 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 289.44 ft Reservoir name = SWMB#1 Max. Storage = 202,058 cuft Storage Indication method used. 29 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#2 Hyd. No. 16 -- 1 Year Hyd No. 16 Hyd No. 15 Total storage used = 202,058 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 142 of 275 Pond Report 30 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Pond No. 3 - SWMB#1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 287.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 287.00 74,697 0 0 1.00 288.00 81,003 77,821 77,821 2.00 289.00 87,433 84,189 162,010 3.00 290.00 93,988 90,682 252,692 4.00 291.00 100,635 97,283 349,975 5.00 292.00 107,406 103,992 453,966 6.00 293.00 114,290 110,819 564,785 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 24.00 8.00 6.00 Inactive Span (in)= 24.00 39.00 6.00 0.00 No. Barrels = 1 320 Invert El. (ft)= 287.41 289.41 287.41 0.00 Length (ft)= 255.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 20.00 0.00 0.00 0.00 Crest El. (ft)= 291.50 0.00 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Stage (ft) 0.00 287.00 1.00 288.00 2.00 289.00 3.00 290.00 4.00 291.00 5.00 292.00 6.00 293.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 143 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 8.143 cfs Storm frequency = 1 yrs Time to peak = 12.17 hrs Time interval = 1 min Hyd. volume = 57,659 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.060 ac 31 0 3 6 9 12 15 18 21 24 27 30 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#3 Hyd. No. 17 -- 1 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 144 of 275 Hydrograph Summary Report 32 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 8.885 1 726 29,634 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 58.50 1 791 662,395 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 159.82 1 719 418,443 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 57.94 1 721 177,029 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 2.665 1 717 5,124 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 11.89 1 722 34,354 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 3.058 1 728 10,601 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 11.53 1 721 31,506 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 0.429 1 1448 50,019 3 279.29 402,600 SWMB#3 10 Reservoir 1.291 1 957 118,975 4 284.80 131,244 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 285.72 5,124 WAREHOUSE POND 12 Reservoir 5.221 1 732 33,719 6 290.79 14,456 SW PKLOT POND 13 Reservoir 4.000 1 731 29,915 8 291.09 13,823 SE PKLOT POND 14 Combine 60.02 1 791 831,388 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 100.33 1 725 318,122 ------ ------------ Proposed Drainage Area #2 16 Reservoir 4.324 1 855 180,807 15 289.66 221,432 Post Dev Analysis Pt#2 17 Combine 12.08 1 731 74,236 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 5ACM.gpwReturn Period: 2 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 145 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 8.885 cfs Storm frequency = 2 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 29,634 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 33 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#4 Hyd. No. 1 -- 2 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 146 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 58.50 cfs Storm frequency = 2 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 662,395 cuft Drainage area = 77.540 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.580 x 93)] / 77.540 34 0 3 6 9 12 15 18 21 24 27 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) DA#1 Sub Basin #1 Hyd. No. 2 -- 2 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 147 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 159.82 cfs Storm frequency = 2 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 418,443 cuft Drainage area = 35.290 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 35 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) DA#1 Sub Basin #2 Hyd. No. 3 -- 2 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 148 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 57.94 cfs Storm frequency = 2 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 177,029 cuft Drainage area = 14.930 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 36 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) DA#1 Sub Basin #3 Hyd. No. 4 -- 2 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 149 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 2.665 cfs Storm frequency = 2 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 5,124 cuft Drainage area = 0.700 ac Curve number = 85 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 4.30 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 37 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) DA#1 Sub Basin #4 Hyd. No. 5 -- 2 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 150 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 11.89 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 1 min Hyd. volume = 34,354 cuft Drainage area = 3.220 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.70 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 38 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) DA #3 Sub Basin #1 Hyd. No. 6 -- 2 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 151 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 3.058 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 1 min Hyd. volume = 10,601 cuft Drainage area = 2.060 ac Curve number = 77 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 23.10 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 39 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) DA #3 Sub Basin #2 Hyd. No. 7 -- 2 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 152 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 11.53 cfs Storm frequency = 2 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 31,506 cuft Drainage area = 3.000 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.60 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 40 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) DA #3 Sub Basin #3 Hyd. No. 8 -- 2 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 153 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 0.429 cfs Storm frequency = 2 yrs Time to peak = 24.13 hrs Time interval = 1 min Hyd. volume = 50,019 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 279.29 ft Reservoir name = SWMB#3 Max. Storage = 402,600 cuft Storage Indication method used. 41 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) SWMB#3 Hyd. No. 9 -- 2 Year Hyd No. 9 Hyd No. 3 Total storage used = 402,600 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 154 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 1.291 cfs Storm frequency = 2 yrs Time to peak = 15.95 hrs Time interval = 1 min Hyd. volume = 118,975 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 284.80 ft Reservoir name = SWMB#2 Max. Storage = 131,244 cuft Storage Indication method used. 42 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) SWMB#2 Hyd. No. 10 -- 2 Year Hyd No. 10 Hyd No. 4 Total storage used = 131,244 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 155 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 285.72 ft Reservoir name = WAREHOUSE POND Max. Storage = 5,124 cuft Storage Indication method used. 43 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) WAREHOUSE POND Hyd. No. 11 -- 2 Year Hyd No. 11 Hyd No. 5 Total storage used = 5,124 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 156 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 5.221 cfs Storm frequency = 2 yrs Time to peak = 12.20 hrs Time interval = 1 min Hyd. volume = 33,719 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 290.79 ft Reservoir name = SW PKLOT POND Max. Storage = 14,456 cuft Storage Indication method used. 44 0 3 6 9 12 15 18 21 24 27 30 33 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) SW PKLOT POND Hyd. No. 12 -- 2 Year Hyd No. 12 Hyd No. 6 Total storage used = 14,456 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 157 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 4.000 cfs Storm frequency = 2 yrs Time to peak = 12.18 hrs Time interval = 1 min Hyd. volume = 29,915 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.09 ft Reservoir name = SE PKLOT POND Max. Storage = 13,823 cuft Storage Indication method used. 45 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) SE PKLOT POND Hyd. No. 13 -- 2 Year Hyd No. 13 Hyd No. 8 Total storage used = 13,823 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 158 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 60.02 cfs Storm frequency = 2 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 831,388 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 77.540 ac 46 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#1 Hyd. No. 14 -- 2 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 159 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 100.33 cfs Storm frequency = 2 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 318,122 cuft Drainage area = 35.800 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 35.800 47 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) Proposed Drainage Area #2 Hyd. No. 15 -- 2 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 160 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 4.324 cfs Storm frequency = 2 yrs Time to peak = 14.25 hrs Time interval = 1 min Hyd. volume = 180,807 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 289.66 ft Reservoir name = SWMB#1 Max. Storage = 221,432 cuft Storage Indication method used. 48 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#2 Hyd. No. 16 -- 2 Year Hyd No. 16 Hyd No. 15 Total storage used = 221,432 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 161 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 12.08 cfs Storm frequency = 2 yrs Time to peak = 12.18 hrs Time interval = 1 min Hyd. volume = 74,236 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.060 ac 49 0 3 6 9 12 15 18 21 24 27 30 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#3 Hyd. No. 17 -- 2 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 162 of 275 Hydrograph Summary Report 50 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 17.57 1 726 57,721 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 98.57 1 791 1,124,643 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 240.64 1 719 640,873 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 87.29 1 721 271,132 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 4.619 1 716 9,124 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 18.34 1 721 54,438 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 6.166 1 727 20,936 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 17.78 1 721 49,926 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 1.131 1 1446 116,590 3 280.31 600,530 SWMB#3 10 Reservoir 1.678 1 1011 180,796 4 285.75 204,626 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 286.20 9,124 WAREHOUSE POND 12 Reservoir 11.69 1 729 53,755 6 291.30 18,990 SW PKLOT POND 13 Reservoir 12.42 1 726 48,335 8 291.44 16,414 SE PKLOT POND 14 Combine 100.78 1 791 1,422,030 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 164.52 1 724 533,864 ------ ------------ Proposed Drainage Area #2 16 Reservoir 13.19 1 780 395,197 15 290.83 333,777 Post Dev Analysis Pt#2 17 Combine 30.14 1 728 123,026 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 5ACM.gpwReturn Period: 10 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 163 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 17.57 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 57,721 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 51 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#4 Hyd. No. 1 -- 10 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 164 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 98.57 cfs Storm frequency = 10 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 1,124,643 cuft Drainage area = 77.540 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.580 x 93)] / 77.540 52 0 3 6 9 12 15 18 21 24 27 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 Q (cfs) Time (hrs) DA#1 Sub Basin #1 Hyd. No. 2 -- 10 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 165 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 240.64 cfs Storm frequency = 10 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 640,873 cuft Drainage area = 35.290 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 53 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (hrs) DA#1 Sub Basin #2 Hyd. No. 3 -- 10 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 166 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 87.29 cfs Storm frequency = 10 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 271,132 cuft Drainage area = 14.930 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 54 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) DA#1 Sub Basin #3 Hyd. No. 4 -- 10 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 167 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 4.619 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 1 min Hyd. volume = 9,124 cuft Drainage area = 0.700 ac Curve number = 85 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 4.30 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 55 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (hrs) DA#1 Sub Basin #4 Hyd. No. 5 -- 10 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 168 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 18.34 cfs Storm frequency = 10 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 54,438 cuft Drainage area = 3.220 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.70 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 56 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 21.00 21.00 Q (cfs) Time (hrs) DA #3 Sub Basin #1 Hyd. No. 6 -- 10 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 169 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 6.166 cfs Storm frequency = 10 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 20,936 cuft Drainage area = 2.060 ac Curve number = 77 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 23.10 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 57 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) DA #3 Sub Basin #2 Hyd. No. 7 -- 10 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 170 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 17.78 cfs Storm frequency = 10 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 49,926 cuft Drainage area = 3.000 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.60 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 58 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) DA #3 Sub Basin #3 Hyd. No. 8 -- 10 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 171 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 1.131 cfs Storm frequency = 10 yrs Time to peak = 24.10 hrs Time interval = 1 min Hyd. volume = 116,590 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 280.31 ft Reservoir name = SWMB#3 Max. Storage = 600,530 cuft Storage Indication method used. 59 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (hrs) SWMB#3 Hyd. No. 9 -- 10 Year Hyd No. 9 Hyd No. 3 Total storage used = 600,530 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 172 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 1.678 cfs Storm frequency = 10 yrs Time to peak = 16.85 hrs Time interval = 1 min Hyd. volume = 180,796 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 285.75 ft Reservoir name = SWMB#2 Max. Storage = 204,626 cuft Storage Indication method used. 60 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) SWMB#2 Hyd. No. 10 -- 10 Year Hyd No. 10 Hyd No. 4 Total storage used = 204,626 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 173 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 286.20 ft Reservoir name = WAREHOUSE POND Max. Storage = 9,124 cuft Storage Indication method used. 61 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (hrs) WAREHOUSE POND Hyd. No. 11 -- 10 Year Hyd No. 11 Hyd No. 5 Total storage used = 9,124 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 174 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 11.69 cfs Storm frequency = 10 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 53,755 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.30 ft Reservoir name = SW PKLOT POND Max. Storage = 18,990 cuft Storage Indication method used. 62 0 3 6 9 12 15 18 21 24 27 30 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 21.00 21.00 Q (cfs) Time (hrs) SW PKLOT POND Hyd. No. 12 -- 10 Year Hyd No. 12 Hyd No. 6 Total storage used = 18,990 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 175 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 12.42 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 48,335 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.44 ft Reservoir name = SE PKLOT POND Max. Storage = 16,414 cuft Storage Indication method used. 63 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) SE PKLOT POND Hyd. No. 13 -- 10 Year Hyd No. 13 Hyd No. 8 Total storage used = 16,414 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 176 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 100.78 cfs Storm frequency = 10 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 1,422,030 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 77.540 ac 64 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#1 Hyd. No. 14 -- 10 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 177 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 164.52 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 533,864 cuft Drainage area = 35.800 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 35.800 65 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (hrs) Proposed Drainage Area #2 Hyd. No. 15 -- 10 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 178 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 13.19 cfs Storm frequency = 10 yrs Time to peak = 13.00 hrs Time interval = 1 min Hyd. volume = 395,197 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 290.83 ft Reservoir name = SWMB#1 Max. Storage = 333,777 cuft Storage Indication method used. 66 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#2 Hyd. No. 16 -- 10 Year Hyd No. 16 Hyd No. 15 Total storage used = 333,777 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 179 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 30.14 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 1 min Hyd. volume = 123,026 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.060 ac 67 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#3 Hyd. No. 17 -- 10 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 180 of 275 Hydrograph Summary Report 68 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 23.24 1 726 76,450 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 123.47 1 791 1,417,952 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 290.68 1 719 779,060 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 105.46 1 721 329,594 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 5.837 1 716 11,702 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 22.32 1 721 66,970 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 8.205 1 727 27,866 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 21.63 1 721 61,420 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 1.457 1 1446 169,662 3 280.91 721,356 SWMB#3 10 Reservoir 5.335 1 801 228,860 4 286.07 230,286 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 286.45 11,702 WAREHOUSE POND 12 Reservoir 12.98 1 730 66,282 6 291.56 21,675 SW PKLOT POND 13 Reservoir 19.46 1 724 59,828 8 291.58 17,451 SE PKLOT POND 14 Combine 129.82 1 791 1,816,474 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 204.22 1 724 670,293 ------ ------------ Proposed Drainage Area #2 16 Reservoir 17.01 1 775 530,759 15 291.67 419,373 Post Dev Analysis Pt#2 17 Combine 39.69 1 724 153,976 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 5ACM.gpwReturn Period: 25 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 181 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 23.24 cfs Storm frequency = 25 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 76,450 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 69 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#4 Hyd. No. 1 -- 25 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 182 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 123.47 cfs Storm frequency = 25 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 1,417,952 cuft Drainage area = 77.540 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.580 x 93)] / 77.540 70 0 3 6 9 12 15 18 21 24 27 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) DA#1 Sub Basin #1 Hyd. No. 2 -- 25 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 183 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 290.68 cfs Storm frequency = 25 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 779,060 cuft Drainage area = 35.290 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 71 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (hrs) DA#1 Sub Basin #2 Hyd. No. 3 -- 25 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 184 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 105.46 cfs Storm frequency = 25 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 329,594 cuft Drainage area = 14.930 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 72 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) DA#1 Sub Basin #3 Hyd. No. 4 -- 25 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 185 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 5.837 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 1 min Hyd. volume = 11,702 cuft Drainage area = 0.700 ac Curve number = 85 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 4.30 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 73 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) DA#1 Sub Basin #4 Hyd. No. 5 -- 25 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 186 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 22.32 cfs Storm frequency = 25 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 66,970 cuft Drainage area = 3.220 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.70 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 74 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) DA #3 Sub Basin #1 Hyd. No. 6 -- 25 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 187 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 8.205 cfs Storm frequency = 25 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 27,866 cuft Drainage area = 2.060 ac Curve number = 77 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 23.10 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 75 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) DA #3 Sub Basin #2 Hyd. No. 7 -- 25 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 188 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 21.63 cfs Storm frequency = 25 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 61,420 cuft Drainage area = 3.000 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.60 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 76 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) DA #3 Sub Basin #3 Hyd. No. 8 -- 25 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 189 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 1.457 cfs Storm frequency = 25 yrs Time to peak = 24.10 hrs Time interval = 1 min Hyd. volume = 169,662 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 280.91 ft Reservoir name = SWMB#3 Max. Storage = 721,356 cuft Storage Indication method used. 77 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (hrs) SWMB#3 Hyd. No. 9 -- 25 Year Hyd No. 9 Hyd No. 3 Total storage used = 721,356 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 190 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 5.335 cfs Storm frequency = 25 yrs Time to peak = 13.35 hrs Time interval = 1 min Hyd. volume = 228,860 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 286.07 ft Reservoir name = SWMB#2 Max. Storage = 230,286 cuft Storage Indication method used. 78 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) SWMB#2 Hyd. No. 10 -- 25 Year Hyd No. 10 Hyd No. 4 Total storage used = 230,286 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 191 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 25 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 286.45 ft Reservoir name = WAREHOUSE POND Max. Storage = 11,702 cuft Storage Indication method used. 79 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) WAREHOUSE POND Hyd. No. 11 -- 25 Year Hyd No. 11 Hyd No. 5 Total storage used = 11,702 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 192 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 12.98 cfs Storm frequency = 25 yrs Time to peak = 12.17 hrs Time interval = 1 min Hyd. volume = 66,282 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.56 ft Reservoir name = SW PKLOT POND Max. Storage = 21,675 cuft Storage Indication method used. 80 0 3 6 9 12 15 18 21 24 27 30 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) SW PKLOT POND Hyd. No. 12 -- 25 Year Hyd No. 12 Hyd No. 6 Total storage used = 21,675 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 193 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 19.46 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 59,828 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.58 ft Reservoir name = SE PKLOT POND Max. Storage = 17,451 cuft Storage Indication method used. 81 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) SE PKLOT POND Hyd. No. 13 -- 25 Year Hyd No. 13 Hyd No. 8 Total storage used = 17,451 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 194 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 129.82 cfs Storm frequency = 25 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 1,816,474 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 77.540 ac 82 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#1 Hyd. No. 14 -- 25 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 195 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 204.22 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 670,293 cuft Drainage area = 35.800 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 35.800 83 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) Proposed Drainage Area #2 Hyd. No. 15 -- 25 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 196 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 17.01 cfs Storm frequency = 25 yrs Time to peak = 12.92 hrs Time interval = 1 min Hyd. volume = 530,759 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 291.67 ft Reservoir name = SWMB#1 Max. Storage = 419,373 cuft Storage Indication method used. 84 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#2 Hyd. No. 16 -- 25 Year Hyd No. 16 Hyd No. 15 Total storage used = 419,373 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 197 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 39.69 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 153,976 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.060 ac 85 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#3 Hyd. No. 17 -- 25 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 198 of 275 Hydrograph Summary Report 86 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 32.79 1 726 108,705 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 164.57 1 790 1,909,412 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 373.51 1 719 1,008,186 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 135.53 1 721 426,529 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 7.847 1 716 16,058 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 28.88 1 721 87,792 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 11.66 1 727 39,837 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 27.97 1 721 80,516 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 3.368 1 1366 85,385 3 281.92 926,873 SWMB#3 10 Reservoir 16.13 1 749 323,034 4 286.52 267,442 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 286.87 16,058 WAREHOUSE POND 12 Reservoir 23.36 1 726 87,101 6 291.86 24,700 SW PKLOT POND 13 Reservoir 27.74 1 721 78,924 8 291.64 17,918 SE PKLOT POND 14 Combine 179.62 1 790 2,317,831 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 269.51 1 724 898,483 ------ ------------ Proposed Drainage Area #2 16 Reservoir 22.15 1 775 756,590 15 293.00 564,713 Post Dev Analysis Pt#2 17 Combine 57.14 1 725 205,861 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 5ACM.gpwReturn Period: 100 Year Tuesday, 06 / 20 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 199 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 32.79 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 108,705 cuft Drainage area = 5.400 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 87 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#4 Hyd. No. 1 -- 100 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 200 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 164.57 cfs Storm frequency = 100 yrs Time to peak = 13.17 hrs Time interval = 1 min Hyd. volume = 1,909,412 cuft Drainage area = 77.540 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.580 x 93)] / 77.540 88 0 3 6 9 12 15 18 21 24 27 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (hrs) DA#1 Sub Basin #1 Hyd. No. 2 -- 100 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 201 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 373.51 cfs Storm frequency = 100 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 1,008,186 cuft Drainage area = 35.290 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 89 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 400.00 400.00 Q (cfs) Time (hrs) DA#1 Sub Basin #2 Hyd. No. 3 -- 100 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 202 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 135.53 cfs Storm frequency = 100 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 426,529 cuft Drainage area = 14.930 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 90 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) DA#1 Sub Basin #3 Hyd. No. 4 -- 100 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 203 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 7.847 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 1 min Hyd. volume = 16,058 cuft Drainage area = 0.700 ac Curve number = 85 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 4.30 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 91 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (hrs) DA#1 Sub Basin #4 Hyd. No. 5 -- 100 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 204 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 28.88 cfs Storm frequency = 100 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 87,792 cuft Drainage area = 3.220 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.70 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 92 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (hrs) DA #3 Sub Basin #1 Hyd. No. 6 -- 100 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 205 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 11.66 cfs Storm frequency = 100 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 39,837 cuft Drainage area = 2.060 ac Curve number = 77 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 23.10 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 93 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) DA #3 Sub Basin #2 Hyd. No. 7 -- 100 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 206 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 27.97 cfs Storm frequency = 100 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 80,516 cuft Drainage area = 3.000 ac Curve number = 95 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.60 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 94 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) DA #3 Sub Basin #3 Hyd. No. 8 -- 100 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 207 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 3.368 cfs Storm frequency = 100 yrs Time to peak = 22.77 hrs Time interval = 1 min Hyd. volume = 85,385 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 281.92 ft Reservoir name = SWMB#3 Max. Storage = 926,873 cuft Storage Indication method used. 95 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 400.00 400.00 Q (cfs) Time (hrs) SWMB#3 Hyd. No. 9 -- 100 Year Hyd No. 9 Hyd No. 3 Total storage used = 926,873 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 208 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 16.13 cfs Storm frequency = 100 yrs Time to peak = 12.48 hrs Time interval = 1 min Hyd. volume = 323,034 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 286.52 ft Reservoir name = SWMB#2 Max. Storage = 267,442 cuft Storage Indication method used. 96 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) SWMB#2 Hyd. No. 10 -- 100 Year Hyd No. 10 Hyd No. 4 Total storage used = 267,442 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 209 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 286.87 ft Reservoir name = WAREHOUSE POND Max. Storage = 16,058 cuft Storage Indication method used. 97 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (hrs) WAREHOUSE POND Hyd. No. 11 -- 100 Year Hyd No. 11 Hyd No. 5 Total storage used = 16,058 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 210 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 23.36 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 87,101 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.86 ft Reservoir name = SW PKLOT POND Max. Storage = 24,700 cuft Storage Indication method used. 98 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (hrs) SW PKLOT POND Hyd. No. 12 -- 100 Year Hyd No. 12 Hyd No. 6 Total storage used = 24,700 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 211 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 27.74 cfs Storm frequency = 100 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 78,924 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.64 ft Reservoir name = SE PKLOT POND Max. Storage = 17,918 cuft Storage Indication method used. 99 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) SE PKLOT POND Hyd. No. 13 -- 100 Year Hyd No. 13 Hyd No. 8 Total storage used = 17,918 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 212 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 179.62 cfs Storm frequency = 100 yrs Time to peak = 13.17 hrs Time interval = 1 min Hyd. volume = 2,317,831 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 77.540 ac 100 0 3 6 9 12 15 18 21 24 27 30 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#1 Hyd. No. 14 -- 100 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 213 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 269.51 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 898,483 cuft Drainage area = 35.800 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 35.800 101 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (hrs) Proposed Drainage Area #2 Hyd. No. 15 -- 100 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 214 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 22.15 cfs Storm frequency = 100 yrs Time to peak = 12.92 hrs Time interval = 1 min Hyd. volume = 756,590 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 293.00 ft Reservoir name = SWMB#1 Max. Storage = 564,713 cuft Storage Indication method used. 102 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#2 Hyd. No. 16 -- 100 Year Hyd No. 16 Hyd No. 15 Total storage used = 564,713 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 215 of 275 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 06 / 20 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 57.14 cfs Storm frequency = 100 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 205,861 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.060 ac 103 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) Post Dev Analysis Pt#3 Hyd. No. 17 -- 100 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 216 of 275 Novo Nordisk Clayton, NC Appendix II Nitrogen Calculations Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 217 of 275 Ph a s e  1 T e m p o r a r y P h a s e  2 To t a l                  (s q   ft ) T o t a l  (a c r e ) % Us e T N  (l b s / y r ) Bu i l d i n g s 3 7 0 4 4 6 . 7 4 37 0 4 4 6 . 7 4 8 . 5 0 4 . 8 7 % 180.29 Pa r k i n g 2 5 8 1 4 0 . 0 6 2 5 8 1 4 0 . 0 6 5 . 9 3 3 . 4 0 % 1 2 5 . 6 3 Pa v e m e n t 4 1 4 2 2 7 . 9 3 4 1 4 2 2 7 . 9 3 9 . 5 1 5 . 4 5 % 2 0 1 . 6 0 Si d e w a l k s 4 1 9 2 6 . 0 0 4 1 9 2 6 . 0 0 0 . 9 6 0 . 5 5 % 2 0 . 4 0 Eq u i p m e n t 2 9 6 4 . 0 0 2 9 6 4 . 0 0 0 . 0 7 0 . 0 4 % 1 . 4 4 Gr a v e l 1 5 5 6 7 0 . 8 9 1 5 5 6 7 0 . 8 9 3 . 5 7 2 . 0 5 % 7 5 . 7 6 We t  Po n d s 5 1 1 6 1 1 . 0 9 51 1 6 1 1 . 0 9 1 1 . 7 4 6 . 7 3 % 7.05 We t l a n d s 2 1 2 6 0 0 5 . 5 7 21 2 6 0 0 5 . 5 7 4 8 . 8 1 2 7 . 9 7 % 29.28 OP E N 37 1 9 8 7 7 . 8 2 8 5 . 4 0 4 8 . 9 4 % 102.48 To t a l 76 0 0 8 7 0 . 0 9 1 7 4 . 4 9 743.94 25 %  Re d e c t i o n  fo r  We t  Po n d s 557.95 an n u a l  po u n d s  of  ni t r o g e n  pe r  ac r e   3.20 Si t e  Bu i l d  Ou t No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 218 of 275 Novo Nordisk Clayton, NC Appendix III Pipe and Swale Calculations Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 219 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 220 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 221 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 222 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 223 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 224 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 225 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 226 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 227 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 228 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 229 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 230 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 231 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 232 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 233 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 234 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 235 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 236 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 237 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 238 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 239 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 240 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 241 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 242 of 275 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 243 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 244 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 245 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 246 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 247 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 248 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 249 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 250 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 251 of 275 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 252 of 275 Novo Nordisk Clayton, NC Appendix IV Silt Fence Calculations Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 253 of 275 N o v o N o r d i s k D A P I - U S D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 2 5 4 o f 2 7 5 N o v o N o r d i s k D A P I - U S D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 2 5 5 o f 2 7 5 N o v o N o r d i s k D A P I - U S D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 2 5 6 o f 2 7 5 N o v o N o r d i s k D A P I - U S D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 2 5 7 o f 2 7 5 N o v o N o r d i s k D A P I - U S D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 2 5 8 o f 2 7 5 N o v o N o r d i s k D A P I - U S D A P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 1 9 - J u n - 1 7 P a g e 2 5 9 o f 2 7 5 Appendix D Inspection Log and Reports Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 260 of 275 SWPPP Inspection Log Name of Construction Site Location of Construction Site Date of Inspection Inspector Name Does Inspection Report require maintenance of installed BMPs? Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 261 of 275 SWPPP Inspection Log (Continued) Date of Inspection Inspector Name Does Inspection Report require maintenance of installed BMPs? Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 262 of 275 Appendix E Rainfall Log and Reports Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 263 of 275 3 1 SW P P P R a i n f a l l R e c o r d s ( J a n u a r y - J u n e ) Ye a r : Ja n u a r y Ra i n f a l l Fe b r u a r y Ra i n f a l l Ma r c h Ra i n f a l l Ap r i l Ra i n f a l l Ma y Ra i n f a l l June Rainfall 1 1 1 1 1 1 2 2 2 2 2 2 3 3 3 3 3 3 4 4 4 4 4 4 5 5 5 5 5 5 6 6 6 6 6 6 7 7 7 7 7 7 8 8 8 8 8 8 9 9 9 9 9 9 10 10 10 10 10 10 11 11 11 11 11 11 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 19 19 19 19 19 19 20 20 20 20 20 20 21 21 21 21 21 21 22 22 22 22 22 22 23 23 23 23 23 23 24 24 24 24 24 24 25 25 25 25 25 25 26 26 26 26 26 26 27 27 27 27 27 27 28 28 28 28 28 28 29 29 29 29 29 29 30 30 30 30 30 31 31 31 SW P P P R a i n f a l l R e c o r ds ( J u l y - D e c e m b e r ) Ye a r : Ju l y Ra i n f a l l Au g u s t Ra i n f a l l Se p t e m b e r Ra i n f a l l Oc t o b e r Ra i n f a l l No v e m b e r Ra i n f a l l December Rainfall No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 264 of 275 3 2 1 1 1 1 1 1 2 2 2 2 2 2 3 3 3 3 3 3 4 4 4 4 4 4 5 5 5 5 5 5 6 6 6 6 6 6 7 7 7 7 7 7 8 8 8 8 8 8 9 9 9 9 9 9 10 10 10 10 10 10 11 11 11 11 11 11 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 19 19 19 19 19 19 20 20 20 20 20 20 21 21 21 21 21 21 22 22 22 22 22 22 23 23 23 23 23 23 24 24 24 24 24 24 25 25 25 25 25 25 26 26 26 26 26 26 27 27 27 27 27 27 28 28 28 28 28 28 29 29 29 29 29 29 30 30 30 30 30 30 31 31 31 31 No v o No r d i s k DA P I - U S DA P I - U S - I N F R - P L A N - X X 0 1 0 - 0 1 - 0 0 4 19 - J u n - 1 7 Page 265 of 275 Appendix F Additional Site Logs and Records SWPPP Pre-Construction Conference Attendance Log Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 266 of 275 Date & Time Description/Outline and Name of the Presenter of SWPPP and Site Requirements Name Company Signature SWPPP Pre-Construction Conference Attendance Log (Continued) Name Company Signature Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 267 of 275 SWPPP Contractor & Sub-Contractor Log Name of Construction Site Location of Construction Site Company/Individual Name Work Responsibilities 1.) Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 268 of 275 Start Date: Completion Date: 2.) Start Date: Completion Date: 3.) Start Date: Completion Date: 4.) Start Date: Completion Date: 5.) Start Date: Completion Date: 6.) Start Date: Completion Date: 7.) Start Date: Completion Date: 8.) Start Date: Completion Date: 9.) Start Date: Completion Date: 10.) Start Date: Completion Date: SWPPP Contractor & Sub-Contractor Log (Continued) 11.) Start Date: Completion Date: 12.) Start Date: Completion Date: 13.) Start Date: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 269 of 275 Completion Date: 14.) Start Date: Completion Date: 15.) Start Date: Completion Date: 16.) Start Date: Completion Date: 17.) Start Date: Completion Date: 18.) Start Date: Completion Date: 19.) Start Date: Completion Date: 20.) Start Date: Completion Date: 21.) Start Date: Completion Date: SWPPP Modification Log Name of Construction Site Location of Construction Site Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 270 of 275 Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: SWPPP Modification Log (Continued) Name of Construction Site Location of Construction Site Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 271 of 275 Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: SWPPP Soil Stabilization Log Name of Construction Site Location of Construction Site Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 272 of 275 Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: SWPPP Soil Stabilization Log (Continued) Name of Construction Site Location of Construction Site Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 273 of 275 Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 274 of 275 Appendix G Construction General Permit A copy of the NPDES General Permit for Stormwater Discharges from Construction Activities can be found at the following address: http://portal.ncdenr.org/web/lr/stormwater Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-01-004 19-Jun-17 Page 275 of 275