Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3170601_Stormwater Report_20170714
STORMWATER MANAGEMENT AND EROSION CONTROL DESIGN Moore Farm Subdivision Union County, North Carolina for Graham Enterprises of the Carolinas, LLC EN GSI NEE R I N G John Ross, P.E. EAGLE ENGINEERING, INC. 2013A Van Buren Ave. Indian Tra &,NC 28079 Q�pFESS16%;I. 10 1 n ? NOUS�� I PROJECT NO.: 5750 November 19, 2016 Revision Date Revised Per Comments 5/9/17 Revised Per Comments 5/22/17 Revised Per Comments 07/10/17 VICINITY MAP »:s Moore Farms Subdivision — Union County, NC 5750 May 5, 2017 Project Summary The proposed project is located on the east side of Waxhaw Indian Trail Road (S.R. 1008) 5950 L.F north of Potter Road (S.R. 1357) in Union County North Carolina. The residential subdivision project will included roadway improvements, stormwater management facilities, underground utilities, two amenity areas, a storm drainage system, sanitary sewer, water, and varies other utilities necessary to serve the project. The subdivision is planned as an age restrictive Active Adjust Community and consequently is designed so, with proposed walking trails, community gardens, and multiple amenity facilities. Two roads on the eastern side of the project, stubbed to the property line, will provide cross connection to the adjacent property currently under design development. Together this corridor is part of the Town of Indian Trail Comprehensive Transportation Plan and will connect Waxhaw Indian Trail Road to the planned Faith Church Road Extension. Not located within any incorporated town or city, Union County is the jurisdictional view agency for planning, zoning, stormwater, sanitary sewer and water. Water quality review will be reviewed and permitted through the NCDEQ state office. This project will include roadway improvements along Waxhaw Indian Trail Road and is subject to review and approval by NCDOT. The project's internal road system will be dedicated to NCDOT and consequently has been designed to their standards. With internal roadway dedication, NCDOT will also review all project construction documents and calculations. Located along Price Mill Creek, a proposed route of the Carolina Tread Trail, the project will provide dedicated easements and construct a portion of it along with the planned internal walking trails. The project drains to the floodplain of Davis Creek & Price Mill Creek and is not located within a protected watershed. A portion of the property is located within a special flood hazard areas as shown on FEMA Flood map, Community Panel No. 3710449700J, Effective Date October 16, 2008. Soils on the site consist of: • BaB - Badin channery silt loam, 2 to 8percent slopes • BaC - Badin channery silt loam, 8 to 15percent slopes • BdB2 - Badin channery silty clay loam, 2to 8 percent slopes,moderately eroded • BdC2 - Badin channery silty clay loam, 8to 15 percent slopes,moderately eroded • ChA - Chewacla silt loam, 0 to 2percent slopes, frequentlyflooded • GoC - Goldston very channery siltloam, 4 to 15 percent slopes • GsB - Goldston-Badin complex, 2 to 8percent slopes • ScA - Secrest-Cid complex, 0 to 3percent slopes • WyB - Wynott gravelly loam, 2 to 8percent slopes These soils are predominantly labeled as hydrologic soil group (HSG) "C & D". USDA NRCS soils map and supporting information can be found in the USDA Soils Resource Report Included in these calculations. TABLE OF CONTENTS LOCATION MAP PROJECT SUMMARY STORM DRAINAGE STORM DRAINAGE NARRATIVE STORM DRAINAGE AREA MAP (1 OF 8) STORM DRAINAGE AREA MAP (2 OF 8) STORM DRAINAGE AREA MAP (3 OF 8) STORM DRAINAGE AREA MAP (4 OF 8) STORM DRAINAGE AREA MAP (5 OF 8) STORM DRAINAGE AREA MAP (6 OF 8) STORM DRAINAGE AREA MAP (7 OF 8) STORM DRAINAGE AREA MAP (8 OF 8) STORM PIPE CALCULATIONS STORM PIPE CALCULATIONS STORM PIPE CALCULATIONS STORM PIPE CALCULATIONS STORM PIPE CALCULATIONS STORM PIPE CALCULATIONS STORM PIPE CALCULATIONS STORM SPREAD & SAG CALCULATIONS STORM SPREAD & SAG CALCULATIONS RIP RAP APRON GRAPH RIP RAP APRON GRAPH STORM FLARED END SECTION RIP RAP APRON CALCULATIONS STORM DROP INLET CALCULATIONS CMP CULVERT CALCULATIONS (DUAL 72" CMP) - STORM DRAINAGE AREA MAP -HYDROLOGY - TIME OF CONCENTRATION - PIPE SIZING CALCULATION RCP CULVERT CALCULATIONS (36" RCP) - STORM DRAINAGE AREA MAP -HYDROLOGY -TIME OF CONCENTRATION - PIPE SIZING CALCULATION EROSION CONTROL IV - EROSION CONTROL NARRATIVE -TEMPORARY SEDIMENT TRAP 1 CALCULATIONS - TEMPORARY SEDIMENT TRAP 2 CALCULATIONS -TEMPORARY SEDIMENT TRAP 3 CALCULATIONS - TEMPORARY SEDIMENT TRAP 4 CALCULATIONS - SKIMMER BASIN A & FAIRCLOTH SKIMMER SIZING AND CALCULATIONS - SKIMMER BASIN B & FAIRCLOTH SKIMMER SIZING AND CALCULATIONS - SKIMMER BASIN C & FAIRCLOTH SKIMMER SIZING AND CALCULATIONS - SKIMMER BASIN D & FAIRCLOTH SKIMMER SIZING AND CALCULATIONS - SKIMMER BASIN E & FAIRCLOTH SKIMMER SIZING AND CALCULATIONS - SKIMMER BASIN F & FAIRCLOTH SKIMMER SIZING AND CALCULATIONS - SKIMMER BASIN G & FAIRCLOTH SKIMMER SIZING AND CALCULATIONS - SKIMMER BASIN H & FAIRCLOTH SKIMMER SIZING AND CALCULATIONS - USDA SOIL REPORT -RIP-RAP APRON CALCULATIONS WATERQUALITY CALCULATIONS V WATER QUALITY /DETENTION NARRATIVE WET POND 1 - DRAINAGE MAP (1 OF 2) - DRAINAGE MAP (2 OF 2) -CALCULATIONS (1 OF 2) -CALCULATIONS (2 OF 2) - HYDROGOGRPAH RETURN REPORT RECAP - POND REPORT - HYDROGRAPH SUMMARY REPORT 100 YR STORM - CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND 2 WATER QUALITY VOLUME CALCULATIONS - DRAINAGE MAP (1 OF 2) - DRAINAGE MAP (2 OF 2) -CALCULATIONS (1 OF 2) -CALCULATIONS (2 OF 2) - HYDROGOGRPAH RETURN REPORT RECAP - POND REPORT - HYDROGRAPH SUMMARY REPORT 2, 25, 100 YR STORM - CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND 3 WATER QUALITY VOLUME CALCULATIONS - DRAINAGE MAP -CALCULATIONS (1 OF 2) -CALCULATIONS (2 OF 2) - HYDROGOGRPAH RETURN REPORT RECAP - POND REPORT - HYDROGRAPH SUMMARY REPORT 2, 25, & 100 YR STORM - CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND 4 WATER QUALITY VOLUME CALCULATIONS - DRAINAGE MAP -CALCULATIONS (1 OF 2) -CALCULATIONS (2 OF 2) - HYDROGOGRPAH RETURN REPORT RECAP - POND REPORT - HYDROGRAPH SUMMARY REPORT 100 YR STORM - CONCRETE ANCHOR BUOYANCY CALCULATIONS Moore Farms Subdivision — Union County, NC Stormwater Management Report Stormwater System Design Calculations 5750 May 9, 2017 STORM WATER NARRATIVE The proposed project involves the construction of a 269 -lot residential subdivision on +/-116- acres located at the east side of Waxhaw Indian Trail Road in Union County North Carolina. The residential subdivision project will included approximately 10,332 linear feet of internal roadway with sidewalks, relative utilities, and stormwater management infrastructure. The Stormwater Management Plan for Moore Farms will systematically treat the project's stormwater runoff via engineered storm water management facilities design to capture and treat virtually all the impervious runoff. The project stormwater discharges to floodplain of Davis Creek & Price Mill Creek. The proposed project site is not located within a protected watershed. The design discharge used in sizing the storm drainage system was determined by the rational method. The storm drainage system was design so that at no point in the system does the hydraulic grade line come out of the ground. Surface flow calculations where done using coefficients in the range of 0.50 -0.80 and modeled with built out conditions. Spread calculations have been provided to prove that during the 10yr storm event a navigable road travel width of 6.0 ft. is maintained in all spread conditions. In sag conditions, inlet capacity and storm drains have been designed for the 25 -year storm event and a navigable travel with of 9.0 feet is maintained. These criteria are consistent with NCDOT practices. Rear yard swale where designed to route water to drop inlet. Swale calculations for the rear yard swales where designed using the 10 -year storm event. The swales are evaluated using three vegetation characteristics or stages of vegetation: un -vegetated, practically vegetated, and fully vegetated. Ponding at yard inlets outside the roadway where designed to be less than one foot above the grate inlet. All low points outside the roadway are accompanied with an overflow who's elevation is less than one foot above the grate elevation. All pad elevations are set a minimum of one foot above any adjacent overflow. Runoff calculations were performed following the procedures outlined in the NDENR Stormwater BMP Manual and by the SCS method. All necessary documentation and information needed to review and verify that the design objective and standards have been met, are included. 6/26/2017 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 1-, Location name: Indian Trail, North Carolina, USA* Latitude: 35.0409*, Longitude: -80.6787° Elevation: 645.78 ft** ` source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Average recurrence interval (years) luration 100 1 1 2 5 10 25 50 100 200 500 1000 5.00 IF 5.90 IF 6.86 7.55 8.34 8.89 9.38 9.83 IF 10.3 IF 10.7 5 -min (4.61-5.42) 1 (5.44-6.43) 1 (6.30-7.46) 11 (6.92-8.20) 1 (7.62-9.04) 1 (8.08-9.62) 1 (8.50-10.2) (8.84-10.7) 1 (9.22-11.2) 1 (9.46-11.6) 10 -min 3.99 4.72 5.49 6.04 6.65 7.08 7.46 7.79 8.17 8.41 (3.68-4.34) (4.35-5.14) (5.05-5.98) (5.54-6.55) (6.07-7.20) (6.43-7.67) (6.74-8.08) (7.01-8.44) ( 7.29-8.87) ( 7.45-9.16) 3.33 3.96 4.63 5.09 5.62 5.98 6.28 6.55 6.86 7.04 15 -min (3.07-3.61) (3.65-4.31) (4.26-5.04) (4.67-5.53) (5.13-6.08) (5.43-6.47) (5.68-6.80) (5.90-7.10 (6.12-7.44) (6.23-7.66) 2.28 2.73 3.29 3.69 4.16 4.50 4.81 5.10 5.45 5.70 30 -min (2.10-2.48) (2.52-2.98) (3.02-3.58) (3.38-4.00) (3.80-4.51) (4.09-4.87) (4.35-5.21) (4.59-5.53) (4.87-5.92) (5.05-6.20) 1.42 1.72 2.11 2.40 2.77 3.05 3.31 3.58 3.91 4.16 60 -min (1,31-1.54) (1.58-1.87) (1.94-2.30) (2.20-2.61) (2.53 3.00) (2.77-3.30) 1 (3.00-3.59) 11 (3.22-3.88) (3.49-4.25) (3.68-4.53) 0.822 0.996 1.23 1.42 1.65 1.83 2.01 2.18 2.41 2.59 2 -hr 1(0.754-0.900)1(0.912-1.09) 1 (1.13-1.35) 11 (1.29-1.55) 1 (1.50-1.80) 1 (1.65-1.99) 1 (1.80-2.19) 1 (1.95-2.38) 1 (2.13-2.63) 1 (2.27-2.83) 3 -hr 0.582 0.703 0.877 1.01 1.19 1.34 1.48 1.63 1.83 2.00 1(0.533-0.640)1(0.643-0.773)1(0.801-0.963)11(0.921-1.11) 1 (1.08-1.31) 1 (1.20-1.46) 1 (1.33-1.61) 11 (1.45-1.78) 1 (1.61-2.00) 1 (1.73-2.18) 6 -hr 0.351 0.423 0.528 0.611 0.723 0.813 0.904 0.999 1.131.23 (0.322-0.385) (0.388-0.464) (0.484-0.579) (0.558-0.669) (0.656-0.789) (0.733-0.885) (0.809-0.984) (0.885-1.09) (0.987-1.23) ( 1.07-1.34) 12 -hr 0.206 0.249 0.312 0.363 0.433 0.490 0.548 0.610 0.697 0.767 (0.189-0.226) (0.229-0.274) (0.286-0.342) (0.331-0.397) (0.392-0.473) (0.440-0.533) (0.488-0.596) (0.537-0.663) (0.604-0.756) (0.655-0.833) 24 -hr 0.122 0.148 0.186 0.216 0.257 0.290 0.325 0.361 0.411 0.451 (0.113-0.132) (0.137-0.160) (0.171-0.201) (0.199-0.233) (0.236-0.278) (0.266-0.314) (0.297-0.352) (0.328-0.391) (0.371-0.446) (0.406-0.491) 2 -day 3 -day 4 -day 0.072 (0.067-0.078) 0.051 (0.047-0.055) 0.040 (0.037-0.043) 0.087 (0.080-0.094) 0.061 (0.057-0.066) 0.048 (0.045-0.052) 0.108 (0.100-0.117) 0.076 (0.070-0.082) 0.060 (0.055-0.064) 0.125 (0.116-0.136) 0.088 (0.081-0.095) 0.069 (0.064-0.074) 0.149 (0.137-0.161) 0.104 (0.096-0.112) 0.081 (0.075-0.088) 0.168 (0.154-0.181) 0.117 (0.107-0.126) 0.091 (0.084-0.099) 0.187 (0.171-0.203) 0.130 (0.119-0.141) 0.102 (0.093-0.110) 0.207 (0.189-0.225) 0.144 (0.131-0.156) 0.112 (0.103-0.122) 0.235 (0.213-0.256) 0.164 (0.148-0.178) 0.128 ( 0.116-0.138) 0.258 (0.232-0.281) 0.179 (0.162-0.195) 0.140 (0.126-0.152) 0.027 0.032 0.039 0.044 0.052 0.058 0.064 0.071 0.080 0.088 7 -day (0.025-0.029) (0.030-0.034) (0.036-0.042) (0.041-0.047) (0.048-0.056) (0.054-0.062) (0.060-0.069) (0.065-0.076) (0.074-0.086) (0.080-0.095) 0.021 0.025 0.031 0.035 0.040 0.045 0.049 0.054 0.060 0.065 10 -day (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.032-0.037) (0.037-0.043) (0.041-0.048) (0.045-0.052) (0.049-0.057) (0.055-0.064) (0.059-0.070) 0.014 0.017 0.020 0.022 0.026 0.028 0.031 0.033 0.037 0.040 20 -day (0.013-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.030) (0.029-0.033) (0.031-0.036) (0.034-0.040) (0.037-0.043) 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.025 0.028 0.029 30 -day (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) (0.027-0.031) 0.010 0.012 0.013 0.014 0.016 0.017 0.019 0.020 0.021 0.023 45 -day (0.009-0.010) (0.011-0.012) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.024) 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 60 -day (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) ' Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0409&Ion=-80.6787&data=intensity&units=english&series=pds 1/4 6/26/2017 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Indian Trail, North Carolina, USA*� Latitude: 35.0409*, Longitude: -80.6787° Elevation: 645.78 ft** ` source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)' Average recurrence interval (years) Duration 1 2 F 50 5 10 25 50 100 200 500 1000 =0.417 5-mi(0.384-0.452) F 3.05 0.492 0.572 0.629 0.695 0.741 0.782 0.819 0.861 0.890 (2.53 3.00) 3.30 (2.77-3.30) 3.66 (0.453-0.536) (0.525-0.622) (0.577-0.683) (0.635-0.753) (0.673-0.802)(0.708-0.847) 2 -hr (0.737-0.888) (0.768-0.935) (0.788-0.969) 0.665 11 0.787 11 0.915 11 lb 1.11 1.181.24 1.30 1.36 1.40 10 -min (0.614-0.723) (0.725-0.857) (0.841-0.996) (0.923-1.09 1.01-1.20 ( ) (1.07-1.28) ( 1.12-1.35) ( 1.17-1.41) ( 1.22-1.48) ( 1.24-1.53) 0.832 0.990 1.16 1.27 1.40 1.49 1.57 IF1.64 1.71 1.76 15 -min 1(0.768-0.903)1(0.912-1.08) 1 (1.06-1.26) 11 (1.17-1.38) 1 (1.28-1.52) 1 (1.36-1.62) 1 (1.42-1.70) 11 (1.47-1.78) 1 (1.53-1.86) 1 (1.56-1.92) 1.14 1.37 1.65 1.85 2.08 2.25 2.41 2.55 2.73 2.85 30 -min (1.05-1.24) 11 (1.26-1.49) 11 (1.51-1.79) 11 (1.69-2.00) 11 (1.90-2.25) 11 (2.05-2.44) 11 (2.18-2.61) 11 (2.29-2.76) 11 (2.43-2.96) 11 (2.52-3.10) 3 -hr 1.75 2.11 2.63 3.04 3.59 4.02 4.45 4.90 5.51 5.99 (1.60-1.92) (1.93-2.32) (2.41-2.89) (2.77-3.33) (3.25-3.92) (3.62-4.38) (3.98-4.85) (4.35-5.34) (4.83-6.01) (5.19-6.54) 6 -hr 2.10 2.53 3.16 3.66 4.33 4.87 5.42 5.98 6.77 IF 7.39 (1.93-2.31) (2.32-2.78) (2.90-3.47) (3.34-4.00) (3.93-4.72) (4.39-5.30) (4.85-5.89) (5.30-6.50) (5.91-7.35) (6.38-8.03) 12 -hr 2.48 3.00 3.76 4.37 5.22 5.90 6.61 7.358.39 9.24 (2.28-2.72) (2.76-3.30) (3.45-4.13) (3.99-4.79) (4.73 5.69) (5.30-6.43) (5.88-7.19) (6.47-7.99) ( 7.27-9.11) ( 7.90-10.0) 24 -hr 2.94 3.54 5.17 4.45 6.17 6.96 7.79 8.66 9.86 10.8 (2.72-3.18) (3.28-3.84) (4.12-4.82) (4.77-5.60) (5.67 6.67) (6.38-7.54) (7.12-8.44) (7.87-9.39) (8.91-10.7) (9.74-11.8) 2 -day 3.46 4.16 5.19 6.01 7.14 8.04 (3.20-3.74) 8.98 9.95 11.3 12.4 3 20-3.74) (3.86-4.52) 1 (4.81-5.63) 11 (5.55-6.51) (6.57 7.73) (7.37-8.71) (8.20-9.73) (9.05-10.8) (10.2-12.3) (11.1-13.5) 3.67 4.40 5.46 6.31 7.47 8.40 9.37 10.4 11.8 12.9 3 -da (3.40-3.96) 1 (4.09-4.76) 1 (5.06-5.91) 1 (5.83-6.82) (6.88 8.07) (7.72-9.09) (8.58-10.1) (9.46-11.2) (10.7-12.8) (11.6-14.0) 4 -day 3.87 4.64 5.73 6.60 7.80 8.77 9.76 10.8 12.2 13.4 (3.60-4.18) (4.32-5.01) (5.32-6.19) 11 (6.11-7.12) 1 (7.20-8.42) (8.07-9.47) 1 (8.95-10.5) 1 (9.86-11.7) (11.1-13.3) (12.1-14.5) 7 -day 4.48 5.34 6.51 7.45 8.74 -9-.77--]F10.8 11.9 13.5 14.7 (4.19-4.80) (5.00-5.73) (6.09-6.98) (6.95-7.98) (8.12-9.37) (9.06-10.5) ( 10.0-11.6) ( 11.0-12.8) ( 12.4-14.5) ( 13.4-15.9) 10 -day 5.13 6.11 7.35 8.33 9.65 10.7 11.8 12.8 14.3 15.5 (4.81-5.49) (5.72-6.53) (6.87-7.86) (7.78-8.90) (8.99-10.3) (9.94-11.4) ( 10.9-12.6) ( 11.9-13.8) ( 13.2-15.4) ( 14.2-16.7) 20 -day 6.87 8.10 9.57 10.7 F 13.5 14.8 16.1 17.8 19.1 (6.47-7.31) (7.63-8.62) (9.01-10.2) (10.1-11.4) (11.5 13.1) (12.7-14.4) (13.8-15.8) (14.9-17.1) (16.5-19.0) (17.7-20.5) 30 -day 8.42 9.90 11.5 12.8 14.4 15.307-day7 17.0 18.2 19.9 21.2 (7.96-8.92) (9.36-10.5) (10.9-12.2) ( 12.1-13.6) (13.6-15.3) (14.8-16.7) 11 (15.9-18.0) 11 (17.1-19.4) 11 (18.6-21.2) 11 (19.7-22.7) 1.42 1.72 2.11 2.40 F 3.05 3.31 3.58 3.91 4.16 60 -min (1.31-1.54) 1.65 1 (1.58-1.87) 1.99 1 (1.94-2.30) 2.477F 11 (2.20-2.61) 2.83 (2.53 3.00) 3.30 (2.77-3.30) 3.66 1 (3.00-3.59) 4.01 11 (3.22-3.88) 4.36 (3.49-4.25) (3.68-4.53) F 5.18 2 -hr (1.51-1.80) 1 (1.82-2.18) 1 (2.26-2.70) 11 (2.58-3.09) 1 (3.00-3.60) 1 (3.31-3.98) 1 (3.61-4.37) 1 (3.90-4.76) 27.4 1 (4.54-5.66) 3 -hr 1.75 2.11 2.63 3.04 3.59 4.02 4.45 4.90 5.51 5.99 (1.60-1.92) (1.93-2.32) (2.41-2.89) (2.77-3.33) (3.25-3.92) (3.62-4.38) (3.98-4.85) (4.35-5.34) (4.83-6.01) (5.19-6.54) 6 -hr 2.10 2.53 3.16 3.66 4.33 4.87 5.42 5.98 6.77 IF 7.39 (1.93-2.31) (2.32-2.78) (2.90-3.47) (3.34-4.00) (3.93-4.72) (4.39-5.30) (4.85-5.89) (5.30-6.50) (5.91-7.35) (6.38-8.03) 12 -hr 2.48 3.00 3.76 4.37 5.22 5.90 6.61 7.358.39 9.24 (2.28-2.72) (2.76-3.30) (3.45-4.13) (3.99-4.79) (4.73 5.69) (5.30-6.43) (5.88-7.19) (6.47-7.99) ( 7.27-9.11) ( 7.90-10.0) 24 -hr 2.94 3.54 5.17 4.45 6.17 6.96 7.79 8.66 9.86 10.8 (2.72-3.18) (3.28-3.84) (4.12-4.82) (4.77-5.60) (5.67 6.67) (6.38-7.54) (7.12-8.44) (7.87-9.39) (8.91-10.7) (9.74-11.8) 2 -day 3.46 4.16 5.19 6.01 7.14 8.04 (3.20-3.74) 8.98 9.95 11.3 12.4 3 20-3.74) (3.86-4.52) 1 (4.81-5.63) 11 (5.55-6.51) (6.57 7.73) (7.37-8.71) (8.20-9.73) (9.05-10.8) (10.2-12.3) (11.1-13.5) 3.67 4.40 5.46 6.31 7.47 8.40 9.37 10.4 11.8 12.9 3 -da (3.40-3.96) 1 (4.09-4.76) 1 (5.06-5.91) 1 (5.83-6.82) (6.88 8.07) (7.72-9.09) (8.58-10.1) (9.46-11.2) (10.7-12.8) (11.6-14.0) 4 -day 3.87 4.64 5.73 6.60 7.80 8.77 9.76 10.8 12.2 13.4 (3.60-4.18) (4.32-5.01) (5.32-6.19) 11 (6.11-7.12) 1 (7.20-8.42) (8.07-9.47) 1 (8.95-10.5) 1 (9.86-11.7) (11.1-13.3) (12.1-14.5) 7 -day 4.48 5.34 6.51 7.45 8.74 -9-.77--]F10.8 11.9 13.5 14.7 (4.19-4.80) (5.00-5.73) (6.09-6.98) (6.95-7.98) (8.12-9.37) (9.06-10.5) ( 10.0-11.6) ( 11.0-12.8) ( 12.4-14.5) ( 13.4-15.9) 10 -day 5.13 6.11 7.35 8.33 9.65 10.7 11.8 12.8 14.3 15.5 (4.81-5.49) (5.72-6.53) (6.87-7.86) (7.78-8.90) (8.99-10.3) (9.94-11.4) ( 10.9-12.6) ( 11.9-13.8) ( 13.2-15.4) ( 14.2-16.7) 20 -day 6.87 8.10 9.57 10.7 F 13.5 14.8 16.1 17.8 19.1 (6.47-7.31) (7.63-8.62) (9.01-10.2) (10.1-11.4) (11.5 13.1) (12.7-14.4) (13.8-15.8) (14.9-17.1) (16.5-19.0) (17.7-20.5) 30 -day 8.42 9.90 11.5 12.8 14.4 15.307-day7 17.0 18.2 19.9 21.2 (7.96-8.92) (9.36-10.5) (10.9-12.2) ( 12.1-13.6) (13.6-15.3) (14.8-16.7) 11 (15.9-18.0) 11 (17.1-19.4) 11 (18.6-21.2) 11 (19.7-22.7) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_pri ntpage.htm I?I at=35.0409&I on=-80.6787&data=depth&units=engl i sh&seri es=pds 1/4 10.6 12.4 14.2 15.6 17.4 18.7 20.1 21.4 23.1 24.3 45 -day (10.1-11.2) (11.8-13.0) (13.5-14.9) (14.8-16.4) (16.5 18.3) (17.7-19.7) (18.9-21.1) (20.1-22.5) (21.7-24.3) (22.8-25.7) 12.6 14.7 16.7 18.2 20.1 21.5 22.9 24.3 26.1 27.4 60 -day (12.1-13.2) (14.1-15.4) (15.9-17.4) (17.3-19.0) 1 (19.1-21.0) (20.5-22.6) (21.8-24.1) (23.0-25.5) (24.6-27.4) (25.8-28.9) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_pri ntpage.htm I?I at=35.0409&I on=-80.6787&data=depth&units=engl i sh&seri es=pds 1/4 I r_— I / ZIL - - COS I GRAPHIC SCALE 0 80' 160' ( IN FEET ) 1 inch = 8o ft. ENGINEERING 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 PHASE 1 STORMWATER DRAINAGE AREA MAP MAP 1 OF 2 r_— -w ------------------ OA U - - 24A -FES 0.26ac. \ / _ I 24B -ce -/ - — 0.650 ac, - 1 0.01ac. 0 \ � 2'D-CB 0Aac. ------� _ - 0.650- i � 21E -CB \ 0.18ac. 0.650 - - - _ _ - - - - - 0.26ac. 0.650 - U CO 0.65 -U - w � - - 12 -- - -- - 21C -CB -- _- \ 0.650 en l I' Cn —/_--- GRAPHIC SCALE 0 80' 160' ( IN FEET ) 1 inch = 8o ft. ENGINEERING 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 PHASE 1 STORMWATER DRAINAGE AREA MAP MAP 1 OF 2 Iz-_ II ly I III / I 36F -DI / 47A -HW \ \ \ 35E -DI 0.84ac. I / 10 650 - 1 650 0.650 0. 66ac. LLI A I T10 / / / - � \ V A - T11 _ I ✓ I A I I I I I / / / / A � �A A / I I I 1 ( - i , / / / T7 TS _ 0 I / � 1 I / / l � I •A � I/ l I I I I i / i / // // / / ' _ _ - 1- , ! / I 36E -CB I� I V 0.32ac.. l A \ 0650 IT26 1 I m _ _ \ T28l I, t I 11 I � / _,- � A � �--- ---- -- � _ l / i I II I III �• I r VI I -- /i, i l� � - - - - - - / \ - '/ I I ` v � , v v _ - , - - _ _ _ _ - - Co 11 IIII I II r �� � / / / 1'� .I _ A ! � 1111111 IIII �� �� '� '/ I/�,/ A I1 28C -HW i / l 1 A V I I 0.650 l 1 / / l l A - � A l \ v Q / v � � � ♦ I. 1 - � v � � A i / � i 'i i 29E -DI — — — — ' ' _V 3 2 204 1 - _ -� A - V� I I• 1 � � / 1 i �/� e O LV - - 111 I I I l l l l / / I I I / / I V , 1.31ac. , / , l •/ - - l �.� - /i / // / i - - = ' , CO I ✓ / � l�G R / 1 ' v UM I I / / / 38F -DCB \V / U 9 , I I I I I [] / - � /- W o.5sac. / / o I / \ 34A -DCB ' Cp / / I 21 0 M v 0.650 I I I 0.41ac. 1 1 �� / , p . U N qq�� / - 29C -DCB I 0.650 \ \ \ \ \ 1 \• \ I // , / / / / / I 0.89ac. m 7 0.41ac. O 10 - - - osso os5o M 0.650 I 29B -DI � _ U 348 -DCB I _ / — / / O I I 44A -CB A m- A v v / I 109 ' I ossa D 192- _ m y ov vv _ -.�- �I o 38G -DI I - - U � I 0.83ac. i / r a I I I I Y 1 \ \ \ I 1 \ 1 \ MM os5o I 1 4oE-ce � I I �`�'u- v A A A A V A I U 0.650 0.650 I , I\ M 0.64ac. � 0.650 0.13ac. m J 1 �`� � 1 I I /� 8 / � ' -,/ Il I N ��1 I I I� I I i •�' _ -_ V - A I // / 1 1 I I I IIV v 18 4 I i I l/ / l, 1 i/ I I ) I A I II III I I \ V v 1 // / / � v _ / / / I S I I v v / / / / / _ C/ � � M 5 V- _ - \ �` ossa 00 / U v 1 , o - ` - 1 �r / / I v _ 36K-Dce Y v I v Q m 1 11 m U a18 -DI '// 1 11 M I 0.63ac. W C\j� I 143 381 -DI 44F -DI _ V 162 - - I � _ _ v -- ' 44.- \ v _ _, I v �/ � � � 1 � l -, - z _ 160 m � � ;;_,', ,�, ,' __ /,' '•���'';//'// "- 42A -CB - - • / / I I I I / / i _ _ 0.650 - v 400 -CB 0.11 ac. Li l � U / 0.36ac. I I , �i i ' _ / / / �- 1 / / / / / // / / l// / l m X1,,1 148 m U � U 04 . 650 - - - - ' \ \ \ N r0 I \\ 0.29ac. / III ( // / I,I11Y � - \ 47 � - � V N I A 1 A A I 1 V I 33D -D I If E -71 I I - _- /I 1`24 / ENGINEERING 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 PHASE 2 s GRAPHIC SCALE STORMWATER I - I III 0 100' 200' �•' I I I �i / i�/ l � I I I I / i � _- I I Ill ( 1 IN FEET , DRAINAGE AREA MAP 1 inch = loo ft. MAP 20F2 Hydraflow Storm Sewers Extension for Autodesk® AutoCAD® Civil 3D® Plan 22D - DI 22AyB-CB 22C -CB 20 22A -JB 24A -FES 3 24��CBIS 23B -DI 19 142 11 2 24C- 1 P1E-CB CB 11� 'B9 10L1A1-CB 19G -DI Outfall 18 8 19F -CB 7 CRC -DC 19D-CTRB1-JB 20A2§&DC 5 27A -DI 3198 -JB 4 2M -DI Outfall 42 2L -CB 25A -FES 41 24 -CB 149-t&99 8 Outfall 9016 49A -C 82 B94B95 26B-,,, IIE-�1 17A -CB 923 25C -CB 26A -CB 2J-CB16F-Db0A1-CB �838718A-DI 17% -EB Outfall 39 47 50Q76 17B -CB 8A -DI 60 $!#CB 516 mrsni 37 2G -CB 36 14C -DI 1114IQ1DI 59 58 I -CB 2F6B 677A -DCB 15A 70 6A -DI 35 5E -DI 65 5D -DI 57 2E -CB 64 69H-D�B 56 34 63 5B -DI 1H -DI 14A -DCB 14B -DI 2 7 62 X2G- 5A-CB 1F -DI 78 1G -DI 55 13A -CB 13B -DI 4A -DI 33 11F -CB 75 11E -C§4 5a1D-CB 2C -CB 32 52 79 1 2B 31 1E-D�11c- 11B-CB 12A -CB 2A -CB 29 1C -JB 11A -CB 3A -DI 28 27 1B -DI Outfall Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Date: 7/7/2017 Storm Sewers v11.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 65.093 0.01 0.31 0.65 0.01 0.20 5.0 7.5 6.8 1.37 12.88 3.96 18 1.51 641.00 641.98 641.33 642.42 641.00 646.90 24C 2 1 57.308 0.04 0.30 0.65 0.03 0.20 5.0 6.3 7.1 1.39 12.86 3.98 18 1.50 642.18 643.04 642.51 643.48 646.90 646.82 24B 3 2 56.000 0.26 0.26 0.65 0.17 0.17 5.0 5.0 7.5 1.28 31.16 5.02 18 8.80 643.24 648.17 643.48 648.59 646.82 649.96 24A 4 End 42.697 0.00 6.69 0.00 0.00 4.35 5.0 10.6 6.0 26.26 46.78 6.69 36 0.49 613.00 613.21 614.61 614.86 613.00 626.13 19B 5 4 98.741 0.00 5.81 0.00 0.00 3.78 5.0 10.3 6.1 23.07 28.89 6.54 30 0.50 613.71 614.20 615.40 615.89 626.13 624.18 19C 6 5 24.683 0.00 5.81 0.00 0.00 3.78 5.0 10.2 6.1 23.14 29.76 6.36 30 0.53 614.40 614.53 616.17 616.23 624.18 620.14 Pipe - (475) 7 6 72.034 0.31 4.95 0.65 0.20 3.22 5.0 10.0 6.2 19.84 29.56 6.84 24 1.71 615.23 616.46 617.22 618.06 620.14 621.68 19D 8 7 154.042 0.40 4.64 0.65 0.26 3.02 5.0 9.6 6.3 18.86 39.97 7.60 24 3.12 616.66 621.47 618.06 623.03 621.68 627.72 19E 9 8 30.360 0.18 4.24 0.65 0.12 2.76 5.0 9.5 6.3 17.29 33.35 7.22 24 2.17 621.67 622.33 623.03 623.83 627.72 627.72 21A 10 9 64.399 0.33 4.06 0.65 0.21 2.64 5.0 9.3 6.3 16.67 37.07 7.23 24 2.69 622.53 624.26 623.83 625.73 627.72 631.62 21 B 11 10 26.261 0.22 3.73 0.65 0.14 2.42 5.0 9.3 6.3 15.36 22.50 6.89 24 0.99 624.46 624.72 625.73 626.13 631.62 631.78 Pipe - (474) 12 11 50.476 0.33 1.22 0.65 0.21 0.79 5.0 6.6 7.0 5.57 23.46 4.96 18 4.99 625.22 627.74 626.13 628.65 631.78 633.34 21C 13 12 84.905 0.43 0.89 0.65 0.28 0.58 5.0 6.1 7.2 4.17 26.63 4.77 18 6.43 627.94 633.40 628.65 634.18 633.34 637.47 21 D 14 13 57.222 0.02 0.28 0.65 0.01 0.18 5.0 5.2 7.5 1.36 7.92 3.03 15 1.50 633.65 634.51 634.18 634.97 637.47 640.26 23A 15 14 12.913 0.26 0.26 0.65 0.17 0.17 5.0 5.0 7.5 1.28 7.83 3.18 15 1.47 634.51 634.70 634.97 635.15 640.26 638.01 23B 16 13 30.324 0.18 0.18 0.65 0.12 0.12 5.0 5.0 7.5 0.88 6.42 2.25 15 0.99 633.60 633.90 634.18 634.27 637.47 637.47 21 E 17 11 148.436 0.17 0.77 0.65 0.11 0.50 5.0 7.1 6.9 3.44 31.99 2.68 24 2.00 624.72 627.69 626.13 628.34 631.78 632.72 19F 18 17 120.235 0.60 0.60 0.65 0.39 0.39 5.0 5.0 7.5 2.94 22.60 4.35 24 1.00 627.89 629.09 628.38 629.69 632.72 633.60 19G 19 11 107.199 0.00 1.52 0.00 0.00 0.99 0.0 6.2 7.2 7.07 9.02 5.56 18 0.74 625.22 626.01 626.22 627.04 631.78 633.64 22A 20 19 176.906 0.51 1.52 0.65 0.33 0.99 5.0 5.5 7.4 7.29 8.50 5.40 18 0.66 625.96 627.12 627.04 628.18 633.64 630.57 22B 21 20 26.308 0.31 0.31 0.65 0.20 0.20 5.0 5.0 7.5 1.52 7.38 0.86 18 0.49 627.57 627.70 629.22 629.23 630.73 630.86 22C 22 20 14.852 0.70 0.70 0.65 0.46 0.46 5.0 5.0 7.5 3.43 16.13 2.02 18 2.36 627.57 627.92 629.22 629.22 630.57 631.57 Pipe - (473) Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v11.00 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 23 4 28.964 0.88 0.88 0.65 0.57 0.57 5.0 5.0 7.5 4.32 15.85 6.08 18 2.28 618.40 619.06 618.94 619.86 626.13 624.42 27A 24 6 39.713 0.04 0.86 0.65 0.03 0.56 5.0 5.5 7.4 4.13 10.41 3.40 18 0.98 615.73 616.12 617.22 616.90 620.14 619.70 20A 25 24 41.568 0.32 0.82 0.65 0.21 0.53 5.0 5.2 7.5 3.98 4.48 4.13 15 0.48 616.38 616.58 617.30 617.50 619.70 619.89 20B 26 25 29.120 0.50 0.50 0.65 0.33 0.33 5.0 5.0 7.5 2.45 4.63 2.24 15 0.51 616.78 616.93 617.89 617.92 619.89 620.03 20C 27 End 85.735 0.28 15.28 0.65 0.18 9.93 5.0 11.8 5.8 57.62 201.2 13.16 42 4.00 600.00 603.43 601.28 605.81 600.00 615.00 1B 28 27 119.974 0.00 15.00 0.00 0.00 9.75 0.0 11.4 5.9 57.23 201.2 8.68 42 4.00 603.63 608.43 605.81 610.80 615.00 619.51 1C 29 28 32.014 0.31 15.00 0.65 0.20 9.75 5.0 11.3 5.9 57.41 175.1 8.72 42 3.03 608.63 609.60 610.80 611.97 619.51 616.30 ID 30 29 62.536 0.14 8.58 0.65 0.09 5.58 5.0 11.1 5.9 33.10 100.5 7.15 36 2.27 610.10 611.52 611.97 613.39 616.30 616.72 2A 31 30 78.335 0.09 8.05 0.65 0.06 5.23 5.0 10.8 6.0 31.38 85.92 7.40 36 1.66 611.72 613.02 613.39 614.83 616.72 618.22 26 32 31 43.089 0.27 7.63 0.65 0.18 4.96 5.0 10.6 6.0 29.92 28.74 4.62 36 0.19 613.22 613.30 615.81 615.89 618.22 619.08 2C 33 32 149.586 0.20 7.36 0.65 0.13 4.78 5.0 10.0 6.2 29.49 96.63 5.73 36 2.10 613.50 616.64 616.05 618.40 619.08 622.79 2D 34 33 106.043 0.19 5.29 0.65 0.12 3.44 5.0 9.4 6.3 21.65 94.97 5.78 36 2.03 616.74 618.89 618.40 620.39 622.79 625.43 2E 35 34 96.501 0.25 5.10 0.65 0.16 3.32 5.0 9.0 6.4 21.17 37.11 6.68 30 0.82 618.87 619.66 620.39 621.22 625.43 627.83 2F 36 35 204.247 0.06 4.28 0.65 0.04 2.78 5.0 8.1 6.6 18.40 32.72 5.96 30 0.64 619.66 620.96 621.22 622.41 627.83 630.30 2G 37 36 151.799 0.28 4.22 0.65 0.18 2.74 5.0 7.5 6.8 18.62 29.02 6.26 30 0.50 621.16 621.92 622.62 623.38 630.30 627.22 2H 38 37 25.046 0.20 3.63 0.65 0.13 2.36 5.0 7.3 6.8 16.10 36.65 6.21 30 0.80 622.12 622.32 623.38 623.67 627.22 627.02 21 39 38 124.611 0.07 1.61 0.65 0.05 1.05 5.0 6.4 7.1 7.41 18.46 5.24 24 0.67 622.82 623.65 623.70 624.62 627.02 628.42 2J 40 39 90.912 0.08 1.54 0.65 0.05 1.00 5.0 6.1 7.2 7.20 11.01 6.08 18 1.10 624.15 625.15 625.03 626.19 628.42 629.77 2K 41 40 104.602 0.37 1.16 0.65 0.24 0.75 5.0 5.5 7.4 5.56 13.54 5.22 18 1.66 625.35 627.09 626.19 628.00 629.77 631.34 2L 42 41 98.913 0.79 0.79 0.65 0.51 0.51 5.0 5.0 7.5 3.88 9.14 5.31 15 2.00 627.34 629.32 628.00 630.12 631.34 632.81 2M 43 40 25.403 0.30 0.30 0.65 0.20 0.20 5.0 5.0 7.5 1.47 4.62 2.95 15 0.51 625.60 625.73 626.19 626.22 629.77 629.77 49A 44 38 26.330 0.75 1.82 0.65 0.49 1.18 5.0 7.0 6.9 8.19 15.89 5.08 24 0.49 622.82 622.95 623.84 623.97 627.02 627.02 9A Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v11.00 Storm Sewer Tabulation Page 3 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 45 44 118.865 0.45 1.07 0.65 0.29 0.70 5.0 6.3 7.1 4.96 8.56 4.89 18 0.66 623.45 624.24 624.27 625.10 627.02 627.60 9B 46 45 51.041 0.12 0.44 0.65 0.08 0.29 5.0 5.8 7.3 2.08 4.61 3.64 15 0.51 624.49 624.75 625.10 625.33 627.60 628.05 50A 47 46 61.973 0.32 0.32 0.65 0.21 0.21 5.0 5.0 7.5 1.57 4.57 3.38 15 0.50 624.95 625.26 625.46 625.77 628.05 629.14 Pipe - (476) 48 45 43.726 0.18 0.18 0.65 0.12 0.12 5.0 5.0 7.5 0.88 12.92 2.21 15 4.00 624.49 626.24 625.10 626.61 627.60 634.64 9C 49 29 78.641 0.07 3.95 0.65 0.05 2.57 5.0 10.4 6.1 15.63 20.24 6.82 24 0.80 611.10 611.73 612.42 613.15 616.30 616.85 11A 50 49 44.888 0.11 3.88 0.65 0.07 2.52 5.0 10.2 6.1 15.43 19.10 6.63 24 0.71 611.93 612.25 613.29 613.67 616.85 617.59 11B 51 50 43.213 0.07 3.77 0.65 0.05 2.45 5.0 10.1 6.2 15.07 21.49 6.91 24 0.90 612.45 612.84 613.68 614.24 617.59 618.32 11C 52 51 36.058 0.28 3.70 0.65 0.18 2.41 5.0 10.0 6.2 14.86 22.91 6.97 24 1.03 613.04 613.41 614.24 614.80 618.32 618.93 11D 53 52 26.293 0.05 3.15 0.65 0.03 2.05 5.0 9.9 6.2 12.69 16.51 5.80 24 0.53 613.61 613.75 614.93 615.06 618.93 618.93 11E 54 53 54.520 0.12 3.10 0.65 0.08 2.02 5.0 9.6 6.2 12.59 27.40 5.03 24 1.47 613.95 614.75 615.84 616.02 618.93 620.01 11F 55 54 71.173 0.17 2.98 0.65 0.11 1.94 5.0 9.4 6.3 12.23 27.47 6.50 24 1.48 614.95 616.00 616.02 617.26 620.01 621.35 11G 56 55 104.002 0.26 2.48 0.65 0.17 1.61 5.0 8.9 6.4 10.36 27.34 5.85 24 1.46 616.20 617.72 617.26 618.87 621.35 623.24 11H 57 56 136.587 0.37 1.41 0.65 0.24 0.92 5.0 6.4 7.1 6.50 8.52 6.84 15 1.74 618.47 620.85 619.29 621.88 623.24 625.69 111 58 57 124.321 0.36 0.59 0.65 0.23 0.38 5.0 5.5 7.4 2.83 9.66 3.74 15 2.24 621.05 623.83 621.88 624.50 625.69 627.69 11 J 59 58 28.485 0.23 0.23 0.65 0.15 0.15 5.0 5.0 7.5 1.13 21.68 2.89 15 11.27 624.03 627.24 624.50 627.66 627.69 633.00 11K 60 37 121.101 0.31 0.31 0.65 0.20 0.20 5.0 5.0 7.5 1.52 4.84 3.46 15 0.56 623.40 624.08 623.88 624.57 627.22 627.02 8A 61 35 120.250 0.30 0.30 0.65 0.20 0.20 5.0 5.0 7.5 1.47 9.14 4.43 15 2.00 622.42 624.83 622.76 625.31 627.83 629.29 6A 62 33 26.634 0.33 1.56 0.65 0.21 1.01 5.0 6.4 7.1 7.19 7.34 4.73 18 0.49 618.24 618.37 619.44 619.57 622.79 622.69 5A 63 62 133.382 0.20 1.23 0.65 0.13 0.80 5.0 5.8 7.3 5.83 7.72 4.48 18 0.54 618.57 619.29 619.75 620.23 622.69 622.94 5B 64 63 102.665 0.44 1.03 0.65 0.29 0.67 5.0 5.2 7.5 5.02 13.94 3.91 18 1.76 619.49 621.30 620.82 622.16 622.94 626.36 5E 65 64 22.362 0.59 0.59 0.65 0.38 0.38 5.0 5.0 7.5 2.90 14.45 4.31 15 5.01 621.50 622.62 622.16 623.30 626.36 631.00 5D 66 57 26.319 0.45 0.45 0.65 0.29 0.29 5.0 5.0 7.5 2.21 7.76 3.21 15 1.44 621.05 621.43 621.88 622.02 625.69 625.69 15A Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v11.00 Storm Sewer Tabulation Page 4 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 67 35 27.156 0.27 0.27 0.65 0.18 0.18 5.0 5.0 7.5 1.32 50.62 1.89 24 5.01 620.16 621.52 621.22 621.92 627.83 627.73 7A 68 56 26.333 0.22 0.81 0.65 0.14 0.53 5.0 8.7 6.5 3.40 9.75 5.85 15 2.28 618.47 619.07 618.98 619.81 623.24 623.24 14A 69 68 115.851 0.29 0.59 0.65 0.19 0.38 5.0 7.9 6.7 2.56 4.57 3.83 15 0.50 619.17 619.75 619.84 620.42 623.24 623.93 14B 70 69 205.866 0.30 0.30 0.65 0.20 0.20 5.0 5.0 7.5 1.47 8.83 2.30 15 1.87 619.47 623.32 620.76 623.80 623.93 627.76 14C 71 33 120.928 0.31 0.31 0.65 0.20 0.20 5.0 5.0 7.5 1.52 6.46 3.86 15 1.00 618.49 619.70 618.90 620.19 622.79 623.35 4A 72 55 26.326 0.18 0.33 0.65 0.12 0.21 5.0 8.2 6.6 1.41 5.63 3.58 15 0.76 616.95 617.15 617.38 617.62 621.35 621.35 13A 73 72 116.032 0.15 0.15 0.65 0.10 0.10 5.0 5.0 7.5 0.74 4.76 2.79 15 0.54 617.35 617.98 617.68 618.32 621.35 621.27 13B 74 29 34.827 0.51 2.16 0.65 0.33 1.40 5.0 7.2 6.9 9.63 66.86 3.44 36 1.01 610.10 610.45 611.97 611.43 616.30 616.15 1E 75 74 126.972 0.97 1.65 0.65 0.63 1.07 5.0 6.4 7.1 7.62 33.59 6.81 24 2.21 611.45 614.25 612.10 615.23 616.15 618.54 IF 76 75 41.004 0.30 0.68 0.65 0.20 0.44 5.0 6.0 7.2 3.19 16.80 5.32 18 2.56 614.75 615.80 615.23 616.48 618.54 619.50 1G 77 76 91.862 0.38 0.38 0.65 0.25 0.25 5.0 5.0 7.5 1.86 10.39 4.32 15 2.59 616.05 618.43 616.48 618.97 619.50 623.52 IH 78 31 121.245 0.33 0.33 0.65 0.21 0.21 5.0 5.0 7.5 1.62 6.45 3.93 15 1.00 614.77 615.98 615.20 616.48 618.22 619.10 3A 79 52 116.415 0.27 0.27 0.65 0.18 0.18 5.0 5.0 7.5 1.32 6.39 3.37 15 0.98 614.36 615.50 614.80 615.95 618.93 619.19 12A 80 30 26.340 0.39 0.39 0.65 0.25 0.25 5.0 5.0 7.5 1.91 4.54 3.54 15 0.49 613.27 613.40 613.84 613.97 616.72 616.65 81 End 18.332 0.00 3.49 0.00 0.00 2.27 5.0 9.6 6.3 14.21 39.53 8.90 24 3.05 613.00 613.56 613.83 614.92 613.00 623.46 16B 82 81 69.204 0.18 1.53 0.65 0.12 0.99 5.0 9.3 6.3 6.30 13.36 6.33 18 1.62 617.78 618.90 618.51 619.87 623.46 623.62 17A 83 82 96.406 0.32 1.35 0.65 0.21 0.88 5.0 9.0 6.4 5.62 9.64 5.87 15 2.23 619.00 621.15 619.87 622.11 623.62 626.14 17B 84 83 26.818 0.32 0.75 0.65 0.21 0.49 5.0 8.8 6.4 3.14 8.18 3.92 15 1.60 621.25 621.68 622.11 622.39 626.14 626.25 17C 85 84 120.219 0.37 0.43 0.65 0.24 0.28 5.0 7.6 6.7 1.89 9.12 3.41 15 2.00 621.78 624.18 622.39 624.73 626.25 628.00 17D 86 85 37.763 0.06 0.06 0.65 0.04 0.04 5.0 5.0 7.5 0.29 14.45 1.46 15 5.00 624.28 626.17 624.73 626.38 628.00 636.25 17E 87 83 120.710 0.28 0.28 0.65 0.18 0.18 5.0 5.0 7.5 1.37 4.55 2.38 15 0.50 621.25 621.85 622.11 622.32 626.14 625.70 18A 88 81 39.608 0.63 1.96 0.65 0.41 1.27 5.0 6.3 7.1 9.06 22.73 6.05 24 1.01 616.49 616.89 617.37 617.96 623.46 623.02 16C 89 88 27.030 0.63 1.33 0.65 0.41 0.86 5.0 6.2 7.2 6.18 10.49 5.68 18 1.00 617.39 617.66 618.22 618.62 623.02 623.02 16D Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v11.00 Storm Sewer Tabulation Page 5 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 90 89 118.661 0.39 0.70 0.65 0.25 0.46 5.0 5.5 7.4 3.36 6.38 4.56 15 0.98 617.91 619.07 618.62 619.81 623.02 624.17 16E 91 90 37.589 0.31 0.31 0.65 0.20 0.20 5.0 5.0 7.5 1.52 17.11 6.01 15 7.02 620.74 623.38 620.99 623.87 624.17 633.93 16F 92 End 61.095 0.23 2.49 0.65 0.15 1.62 5.0 6.0 7.2 12.98 16.89 9.14 18 2.59 615.00 616.58 615.99 617.93 615.00 622.45 25C 93 92 30.353 0.21 2.26 0.65 0.14 1.47 5.0 5.9 7.3 11.94 16.73 7.75 18 2.54 616.78 617.55 617.93 618.86 622.45 622.45 25B 94 93 109.550 0.08 1.00 0.65 0.05 0.65 5.0 5.2 7.5 4.86 7.44 3.52 18 0.50 617.55 618.10 618.86 619.06 622.45 624.56 26A 95 94 48.288 0.92 0.92 0.65 0.60 0.60 5.0 5.0 7.5 4.51 4.55 4.23 15 0.50 618.35 618.59 619.37 619.61 624.56 622.00 26B 96 93 63.989 1.05 1.05 0.65 0.68 0.68 5.0 5.0 7.5 6.43 26.06 4.92 18 6.16 617.75 621.69 618.86 622.67 622.45 626.69 25A Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v11.00 Inlet Report Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 24C -CB 0.03 0.00 0.03 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.050 2.00 0.060 0.020 0.013 0.04 0.65 0.09 0.17 1.0 Off 2 24B -CB 0.10 0.00 0.10 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,050 2.00 0.060 0.020 0.013 0.06 1.07 0.09 0.17 1.0 13 3 24A -FES 0.68 0.00 0.68 0.00 Hdwl 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 4 19B -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 5 19B1 -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 6 19C -DCB 0.00 0.03 0.03 0.00 Comb 6.0 6.00 0.00 6.00 2.00 0.029 2.00 0.060 0.020 0.013 0.04 0.72 0.09 0.17 1.0 24 7 19D -CB 0.81 0.04 0.82 0.03 Comb 6.0 3.00 0.00 3.00 2.00 0.029 2.00 0.060 0.020 0.013 0.15 3.70 0.13 0.83 1.0 8 19E -CB 1.04 0.00 1.00 0.04 Comb 6.0 3.00 0.00 3.00 2.00 0.050 2.00 0.060 0.020 0.013 0.15 3.50 0.13 0.83 1.0 9 21A1 -CB 0.47 0.09 0.56 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.050 2.00 0.060 0.020 0.013 0.12 2.00 0.09 0.17 1.0 26 10 21A2 -CB 0.86 0.00 0.78 0.07 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.17 4.60 0.16 1.33 1.0 11 21 B -CB 0.57 0.00 0.56 0.01 Comb 6.0 3.00 0.00 3.00 2.00 0,015 2.00 0.060 0.020 0.013 0.15 3.55 0.12 0.67 1.0 12 21 C -CB 0.86 0.00 0.85 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.050 2.00 0.060 0.020 0.013 0.14 3.05 0.10 0.33 1.0 13 21 D -CB 1.12 0.00 1.07 0.05 Comb 4.0 3.00 0.00 3.00 2.00 0.050 2.00 0.060 0.020 0.013 0.15 3.70 0.13 0.83 1.0 Off 14 23A -CB 0.05 0.00 0.05 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.020 2.00 0.060 0.020 0.013 0.06 0.98 0.09 0.17 1.0 13 15 23B -DI 0.68 0.00 0.68 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.08 9.97 0.08 9.97 0.0 Off 16 21 E -CB 0.47 0.00 0.47 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,050 2.00 0.060 0.020 0.013 0.11 1.88 0.09 0.17 1.0 17 19F -CB 0.44 0.00 0.44 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.019 2.00 0.060 0.020 0.013 0.13 2.60 0.09 0.17 1.0 18 19G -DI 1.56 0.00 1.56 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.14 15.92 0.14 15.92 0.0 Off 19 22A -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 20 22B -CB 1.33 0.00 1.33 0.00 Comb 6.0 3.00 6.00 3.00 2.00 Sag 2.00 0.060 0.020 0.013 0.22 6.95 0.30 6.95 1.0 Off 21 22C -CB 0.81 0.00 0.81 0.00 Comb 6.0 3.00 6.00 3.00 2.00 Sag 2.00 0.060 0.020 0.000 0.17 4.70 0.26 4.70 1.0 Off 22 22D - DI 1.82 0.00 1.82 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.15 17.43 0.15 17.43 0.0 Off 23 27A -DI 2.29 0.00 2.29 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 rag 2.00 0.020 0.020 0.013 0.18 19.97 0.18 19.97 0.0 Off Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Inlet Report Page 2 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 24 20A -CB 0.10 0.00 0.10 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,029 2.00 0.060 0.020 0.013 0.07 1.18 0.09 0.17 1.0 25 25 20B -DCB 0.83 0.00 0.83 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.013 0.15 3.60 0.24 3.60 1.0 Off 26 20C -DCB 1.30 0.00 1.30 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.013 0.18 5.20 0.27 5.20 1.0 Off 27 1 B -DI 0.73 0.00 0.73 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.08 10.37 0.08 10.37 0.0 Off 28 1C -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 29 1 D -DCB 0.81 0.00 0.81 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.013 0.15 3.50 0.23 3.50 1.0 Off 30 2A -CB 0.36 0.00 0.36 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.025 2.00 0.060 0.020 0.013 0.12 1.95 0.09 0.17 1.0 29 31 2B -CB 0.23 0.02 0.25 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.025 2.00 0.060 0.020 0.013 0.10 1.70 0.09 0.17 1.0 30 32 2C -CB 0.70 0.00 0.69 0.02 Comb 6.0 3.00 0.00 3.00 2.00 0.025 2.00 0.060 0.020 0.013 0.15 3.40 0.12 0.67 1.0 31 33 2D -CB 0.52 0.00 0.52 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,025 2.00 0.060 0.020 0.013 0.13 2.65 0.10 0.33 1.0 32 34 2E -CB 0.49 0.01 0.50 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,025 2.00 0.060 0.020 0.013 0.13 2.60 0.09 0.17 1.0 33 35 2F -CB 0.65 0.00 0.64 0.01 Comb 6.0 3.00 0.00 3.00 2.00 0.025 2.00 0.060 0.020 0.013 0.14 3.20 0.12 0.67 1.0 34 36 2G -CB 0.16 0.00 0.16 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.025 2.00 0.060 0.020 0.013 0.08 1.42 0.09 0.17 1.0 Off 37 2H -CB 0.73 0.00 0.71 0.02 Comb 6.0 3.00 0.00 3.00 2.00 0.024 2.00 0.060 0.020 0.013 0.15 3.55 0.12 0.67 1.0 38 38 21 -CB 0.52 0.02 0.54 0.00 Comb 6.0 3.00 6.00 3.00 2.00 Sag 2.00 0.060 0.020 0.013 0.15 3.40 0.23 3.40 1.0 Off 39 2J -CB 0.18 0.00 0.18 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,015 2.00 0.060 0.020 0.013 0.10 1.65 0.09 0.17 1.0 38 40 2K -CB 0.21 0.11 0.31 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.12 2.10 0.09 0.17 1.0 39 41 2L -CB 0.96 0.00 0.86 0.11 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.18 4.90 0.17 1.50 1.0 40 42 2M -DI 2.05 0.00 2.05 0.00 DrGrt 0.0 0.00 6.00 3.00 2,00 Sag 2.00 0.020 0.020 0.013 0.17 18.72 0.17 18.72 0.0 Off 43 49A -CB 0.78 0.00 0.73 0.05 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.17 4.35 0.15 1.17 1.0 44 44 9A -DCB 1.95 0.05 2.00 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.013 0.23 7.25 0.31 7.25 1.0 Off 45 9B -DI 1.17 0.25 1.42 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.13 15.06 0.13 15.06 0.0 Off 46 50A -CB 0.31 0.34 0.40 0.25 DrGrt 0.0 0.00 0.00 3.00 2.00 0.020 2.00 0.020 0.020 0.013 0.07 9.10 0.07 9.10 0.0 45 Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Inlet Report Page 3 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 47 50A1 -CB 0.83 0.00 0.49 0.34 DrGrt 0.0 0.00 0.00 3.00 2.00 0,020 2.00 0.020 0.020 0.013 0.08 10.10 0.08 10.10 0.0 46 48 9C -DI 0.47 0.00 0.47 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.06 8.23 0.06 8.23 0.0 Off 49 11A -CB 0.18 0.00 0.18 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.018 2.00 0.060 0.020 0.013 0.10 1.60 0.09 0.17 1.0 29 50 11 B -CB 0.29 0.00 0.29 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,018 2.00 0.060 0.020 0.013 0.11 1.90 0.09 0.17 1.0 9 51 11 C -CB 0.18 0.03 0.21 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.018 2.00 0.060 0.020 0.013 0.10 1.70 0.09 0.17 1.0 50 52 11 D -CB 0.73 0.00 0.70 0.03 Comb 6.0 3.00 0.00 3.00 2.00 0.018 2.00 0.060 0.020 0.013 0.16 3.95 0.13 0.83 1.0 51 53 11 E -CB 0.13 0.00 0.13 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.018 2.00 0.060 0.020 0.013 0.08 1.42 0.09 0.17 1.0 74 54 11 F -CB 0.31 0.00 0.31 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.018 2.00 0.060 0.020 0.013 0.12 1.95 0.09 0.17 1.0 53 55 11G -CB 0.44 0.03 0.47 0.00 Comb 6.0 3.00 0.00 3.00 2.00 .018 2.00 0.060 0.020 0.013 0.14 2.80 0.10 0.33 1.0 Off 56 11 H -DCB 0,68 0.09 0.74 0.03 Comb 6.0 6.00 0.00 6.00 2.00 .018 2.00 0.060 0.020 0.013 0.16 4.05 0.13 0.83 1.0 55 57 111 -CB 0.96 0.00 0.87 0.09 Comb 6.0 3.00 0.00 3.00 2.00 .018 2.00 0.060 0.020 0.013 0.17 4.65 0.16 1.33 1.0 56 58 11J -DI 0.94 0.00 0.52 0.41 DrGrt 0.0 0.00 0.00 3.00 2.00 .020 2.00 0.020 0.020 0.013 0.08 10.10 0.08 10.10 0.0 77 59 11 K -DI 0.60 0.00 0.38 0.21 DrGrt 0.0 0.00 0.00 3.00 2.00 .020 2.00 0.020 0.020 0.013 0.07 9.10 0.07 9.10 0.0 76 60 8A -DI 0.81 0.00 0.81 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.09 10.96 0.09 10.96 0.0 Off 61 6A -DI 0.78 0.00 0.78 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.09 10.77 0.09 10.77 0.0 Off 62 5A -CB 0.86 0.00 0.81 0.05 Comb 6.0 3.00 0.00 3.00 2.00 0,025 2.00 0.060 0.020 0.013 0.16 3.90 0.14 1.00 1.0 74 63 5B -DI 0.52 0.00 0.33 0.19 DrGrt 0.0 0.00 0.00 3.00 2.00 0.020 2.00 0.020 0.020 0.013 0.06 8.10 0.06 8.10 0.0 75 64 5E -DI 1.14 0.00 1.14 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.11 13.32 0.11 13.32 0.0 Off 65 5D -DI 1.53 0.00 1.53 0,00 DrGrt 0.0 0.00 6.00 3.00 2,00 Sag 2.00 0.020 0.020 0.013 0.14 15.76 0.14 1576 0.0 Off 66 15A -CB 1.17 0.00 1.02 0.15 Comb 6.0 3.00 0.00 3.00 2.00 0.018 2.00 0.060 0.020 0.013 0.18 5.20 0.17 1.50 1.0 68 67 7A -DCB 0.70 0.00 0.70 0.00 Comb 6.0 6.00 0.00 3.00 2.00 0.025 2.00 0.060 0.020 0.013 0.15 3.40 0.19 1.83 1.0 62 68 14A -DCB 0.57 0.15 0.71 0.02 Comb 6.0 6.00 0.00 6.00 2.00 0.018 2.00 0.060 0.020 0.013 0.16 3.90 0.13 0.83 1.0 72 69 14B -DI 0.75 0.30 0.60 0.46 DrGrt 0.0 0.00 0.00 3.00 2.00 0.020 2.00 0.020 0.020 0.013 0.09 11.10 0.09 11.10 0.0 73 Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 7[Ru7nDate: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Inlet Report Page 4 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 70 14C -DI 0.78 0.00 0.48 0.30 DrGrt 0.0 0.00 0.00 3.00 2.00 0,020 2.00 0.020 0.020 0.013 0.08 10.10 0.08 10.10 0.0 69 71 4A -DI 0.81 0.00 0.81 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.09 10.96 0.09 10.96 0.0 Off 72 13A -CB 0.47 0.02 0.49 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.018 2.00 0.060 0.020 0.013 0.14 2.90 0.11 0.50 1.0 52 73 13B -DI 0.39 0.46 0.85 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.09 11.29 0.09 11.29 0.0 Off 74 1 E -DCB 1.33 0.13 1.45 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.013 0.19 5.65 0.28 5.65 1.0 Off 75 1 F -DI 2.52 1.07 3.59 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.24 26.26 0.24 26.26 0.0 Off 76 1G -DI 0.78 0.89 0.79 0.88 DrGrt 0.0 0.00 0.00 3.00 2.00 0.020 2.00 0.020 0.020 0.013 0.10 12.10 0.10 12.10 0.0 75 77 1 H -DI 0.99 0.41 0.73 0.67 DrGrt 0.0 0.00 0.00 3.00 2.00 0.020 2.00 0.020 0.020 0.013 0.10 12.10 0.10 12.10 0.0 76 78 3A -DI 0.86 0.00 0.50 0.36 DrGrt 0.0 0.00 0.00 3.00 2.00 0.020 2.00 0.020 0.020 0.013 0.08 10.10 0.08 10.10 0.0 Off 79 12A -CB 0.70 0.00 0.42 0.28 DrGrt 0.0 0.00 0.00 3.00 2.00 0,020 2.00 0.020 0.020 0.013 0.07 9.10 0.07 9.10 0.0 Off 80 1.01 0.00 0.93 0.08 Comb 6.0 3.00 0.00 3.00 2.00 0,025 2.00 0.060 0.020 0.013 0.17 4.35 0.15 1.17 1.0 74 81 16B -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 82 17A -CB 0.47 0.03 0.50 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.029 2.00 0.060 0.020 0.013 0.13 2.40 0.09 0.17 1.0 Off 83 17B -CB 0.83 0.00 0.80 0.03 Comb 6.0 3.00 0.00 3.00 2.00 0.029 2.00 0.060 0.020 0.013 0.15 3.65 0.13 0.83 1.0 82 84 17C -CB 0.83 0.00 0.80 0.03 Comb 6.0 3.00 0.00 3.00 2.00 0.029 2.00 0.060 0.020 0.013 0.15 3.65 0.13 0.83 1.0 89 85 17D -DI 0.96 0.00 0.53 0.43 DrGrt 0.0 0.00 0.00 3.00 2.00 0,020 2.00 0.020 0.020 0.013 0.08 10.10 0.08 10.10 0.0 90 86 17E -DI 0.16 0.00 0.13 0.03 DrGrt 0.0 0.00 0.00 3.00 2.00 0.020 2.00 0.020 0.020 0.013 0.04 6.10 0.04 6.10 0.0 91 87 18A -DI 0.73 0.00 0.73 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.08 10.37 0.08 10.37 0.0 Off 88 16C -DCB 1.64 0.00 1.64 0.00 Comb 6.0 6.00 12.00 6.00 2,00 Sag 2.00 0.060 0.020 0.013 0.20 6.20 0.29 6.20 1.0 Off 89 16D -DCB 1.64 0.03 1.67 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.013 0.21 6.30 0.29 6.30 1.0 Off 90 16E -DI 1.01 0.43 1.44 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.13 15.22 0.13 15.22 0.0 Off 91 16F -DI 0.81 0.03 0.83 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.09 11.16 0.09 11.16 0.0 Off 92 25C -CB 0.60 0.00 0.59 0.01 Comb 6.0 3.00 0.00 3.00 2.00 0.019 2.00 0.060 0.020 0.013 0.15 3.35 0.12 0.67 1.0 Off Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Inlet Report Page 5 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 93 25B -CB 0.55 0.01 0.55 0.01 Comb 6.0 3.00 0.00 3.00 2.00 0,019 2.00 0.060 0.020 0.013 0.14 3.15 0.12 0.67 1.0 Off 94 26A -CB 0.21 0.00 0.20 0.01 Comb 6.0 3.00 0.00 3.00 2.00 0,019 2.00 0.020 0.020 0.013 0.07 3.30 0.11 1.50 1.0 93 95 26B -DI 2.39 0.00 2.39 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.19 20.51 0.19 20.51 0.0 Off 96 25A -FES 4.01* 0.00 4.01 0.00 Hdwl 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off Project File: 5750 PHASE 1 STORM.stm Number of lines: 96 Run Date: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Hydraflow Storm Sewers Extension for Autodesk® AutoCAD® Civil 3D® Plan 29E -DI UuttalI -MB-JB B 732C -DI 32E -CB 782F -CB 76 77 2D -CB 79 80 81 33A -DCB 32G -DI 33B -C@2 33C -DCB 31C3 -DI 31 C2 -C B 35D -DI 47B 35E -DI 36F -DI Outfall 45A -DI 21 utfall 16 38B -DI 46D -CB 33 40B -JB 17 38E -DCB 22 34 24 25 40C -JB 34A -DCB 1$ 19 38F -DCB 38D -DCB 38 - 3 35 40D -DCB E -CB 32 60 26 51A -CB 52A -DI 36 89 40E -C 38G -DI 1416E1 -CB 27 44A -CB 40F -Ce 58 38H -DI 44B-CB1 50 38 41) 44E -DI 44C -DI 52 40G-CB9 28 55 54 53 40HI-CB 38J -DCB 40 38K-DCE30 29 44F -DI 44D -DI 401 -CB 5(42A-CB381-DI 31 41 57 40J -CB 40N -CB 42 400-056 42B -DI 45 40K -CB 38L -HW 44 43 483A -CB 47 40M -CB 40L -CB 49 40P -DI 43B -DI 37C -DI 37B -DCB 37A -DCB 416E2 -DI 33D -DI Project File: 5750 PHASE 2 STORM.stm Number of lines: 90 Date: 7/7/2017 41 B -DI Storm Sewers v11.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 1 End 82.382 0.83 6.26 0.65 0.54 4.07 5.0 9.9 6.2 25.16 28.93 6.64 30 0.50 609.00 609.41 610.80 611.21 609.00 617.17 29B 2 1 150.055 0.89 5.43 0.65 0.58 3.53 5.0 9.4 6.3 22.26 28.99 4.72 30 0.50 609.61 610.36 612.17 612.54 617.17 620.41 29C 3 2 30.417 0.48 4.54 0.65 0.31 2.95 5.0 9.3 6.3 18.70 28.80 4.24 30 0.49 610.56 610.71 612.73 612.76 620.41 620.41 29D 4 3 132.839 0.21 2.78 0.65 0.14 1.81 5.0 8.7 6.5 11.70 27.96 7.14 24 1.53 616.01 618.04 616.91 619.27 620.41 622.87 30B 5 4 101.116 0.24 2.57 0.65 0.16 1.67 5.0 8.2 6.6 11.01 47.02 6.22 24 4.32 618.24 622.61 619.27 623.80 622.87 627.27 30D 6 5 138.365 0.17 1.41 0.65 0.11 0.92 5.0 7.6 6.8 6.20 22.28 6.50 18 4.50 623.11 629.34 623.80 630.30 627.27 633.50 31A 7 6 53.674 0.31 1.24 0.65 0.20 0.81 5.0 7.4 6.8 5.49 15.06 6.56 15 5.44 629.59 632.51 630.30 633.46 633.50 636.65 31 B 8 7 26.339 0.44 0.93 0.65 0.29 0.60 5.0 7.3 6.8 4.14 6.78 5.11 15 1.10 632.71 633.00 633.46 633.82 636.65 636.65 31 C 9 5 124.319 0.45 0.67 0.65 0.29 0.44 5.0 6.6 7.0 3.07 14.38 3.96 18 1.87 623.11 625.44 623.80 626.11 627.27 629.15 30E 10 9 16.429 0.00 0.22 0.00 0.00 0.14 0.0 6.3 7.1 1.02 8.73 2.95 15 1.83 625.69 625.99 626.11 626.39 629.15 636.63 30F 11 5 30.323 0.25 0.25 0.65 0.16 0.16 5.0 5.0 7.5 1.23 4.54 3.15 15 0.49 623.36 623.51 623.80 623.95 627.27 627.27 30C 12 3 74.901 1.28 1.28 0.65 0.83 0.83 5.0 5.0 7.5 6.28 7.48 3.55 18 0.51 611.71 612.09 613.34 613.59 620.41 622.14 29E 13 10 66.770 0.22 0.22 0.65 0.14 0.14 5.0 5.0 7.5 1.08 14.42 5.00 15 4.99 631.05 634.38 631.28 634.79 636.63 642.83 14 End 131.199 0.12 1.91 0.65 0.08 1.24 5.0 8.4 6.5 8.13 16.60 7.59 18 2.50 624.00 627.28 624.74 628.38 624.00 632.49 Pipe - (480) 15 14 26.327 0.13 1.79 0.65 0.08 1.16 5.0 8.3 6.6 7.64 10.22 7.62 15 2.51 627.53 628.19 628.38 629.29 632.49 632.49 46C 16 15 89.665 0.07 1.28 0.65 0.05 0.83 5.0 8.0 6.6 5.53 12.94 5.69 15 4.01 628.39 631.99 629.29 632.94 632.49 636.38 46D 17 16 52.864 0.41 0.78 0.65 0.27 0.51 5.0 5.3 7.4 3.78 4.53 4.13 15 0.49 632.19 632.45 633.06 633.32 636.38 639.19 34A 18 17 26.325 0.37 0.37 0.65 0.24 0.24 5.0 5.0 7.5 1.82 4.71 1.95 15 0.53 632.65 632.79 633.61 633.62 639.19 639.19 34B 19 16 107.024 0.05 0.43 0.65 0.03 0.28 5.0 6.9 6.9 1.94 9.79 3.10 15 2.30 632.19 634.65 632.94 635.20 636.38 639.03 46E 20 15 50.511 0.38 0.38 0.65 0.25 0.25 5.0 5.0 7.5 1.86 15.63 6.11 15 5.86 629.39 632.35 629.68 632.89 632.49 640.50 45A 21 End 64.796 0.28 4.68 0.65 0.18 3.04 5.0 8.1 6.6 20.11 50.58 11.30 24 5.00 608.00 611.24 608.88 612.85 608.00 622.96 38B 22 21 120.932 0.10 4.40 0.65 0.07 2.86 5.0 7.8 6.7 19.17 26.90 8.26 24 1.41 616.69 618.40 617.94 619.97 622.96 624.07 38C 23 22 60.209 0.21 3.98 0.65 0.14 2.59 5.0 7.6 6.8 17.47 27.65 7.24 24 1.49 618.60 619.50 619.97 621.00 624.07 624.81 38D (1) Project File: 5750 PHASE 2 STORM.stm Number of lines: 90 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v11.00 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 24 23 107.311 0.52 3.77 0.65 0.34 2.45 5.0 7.3 6.8 16.78 27.44 7.24 24 1.47 619.70 621.28 621.00 622.76 624.81 626.16 38D 25 24 26.323 0.59 3.25 0.65 0.38 2.11 5.0 7.2 6.9 14.52 22.48 6.59 24 0.99 621.48 621.74 622.76 623.11 626.16 626.16 38E 26 25 127.535 0.57 2.66 0.65 0.37 1.73 5.0 6.6 7.0 12.17 17.57 5.96 24 0.60 621.94 622.71 623.16 623.96 626.16 626.68 38F 27 26 63.564 0.18 2.09 0.65 0.12 1.36 5.0 6.4 7.1 9.64 28.55 8.62 18 7.39 623.21 627.91 623.96 629.11 626.68 635.87 38G 28 27 122.935 0.12 1.91 0.65 0.08 1.24 5.0 6.0 7.2 8.97 10.42 6.38 18 0.98 628.11 629.32 629.18 630.48 635.87 635.73 38H 29 28 57.231 0.35 1.79 0.65 0.23 1.16 5.0 5.8 7.3 8.48 14.82 6.54 18 1.99 629.52 630.66 630.48 631.79 635.73 635.39 381 30 29 26.326 0.63 1.44 0.65 0.41 0.94 5.0 5.7 7.3 6.85 14.90 5.69 18 2.01 630.86 631.39 631.79 632.40 635.39 635.39 38J 31 30 130.839 0.81 0.81 0.65 0.53 0.53 5.0 5.0 7.5 3.97 6.49 4.91 15 1.01 631.64 632.96 632.40 633.77 635.39 0.00 38K 32 22 26.273 0.32 0.32 0.65 0.21 0.21 5.0 5.0 7.5 1.57 6.42 3.01 15 0.99 619.35 619.61 619.97 620.11 624.07 624.07 Pipe - (470) 33 End 63.373 0.00 8.93 0.00 0.00 5.80 0.0 10.9 6.0 34.71 47.39 7.31 36 0.50 608.00 608.32 609.91 610.23 608.00 621.87 40B 34 33 69.574 0.00 8.93 0.00 0.00 5.80 0.0 10.6 6.0 35.00 46.62 7.23 36 0.49 608.52 608.86 610.46 610.80 621.87 619.44 40C 35 34 103.151 1.31 8.93 0.65 0.85 5.80 5.0 10.3 6.1 35.41 47.35 7.21 36 0.50 609.06 609.58 611.05 611.52 619.44 614.78 40D 36 35 63.666 0.10 7.24 0.65 0.07 4.71 5.0 10.0 6.2 28.97 84.00 5.46 36 1.59 609.78 610.79 612.77 612.53 614.78 616.75 40E 37 36 62.490 0.24 7.14 0.65 0.16 4.64 5.0 9.8 6.2 28.83 54.68 7.32 36 0.67 610.99 611.41 612.54 613.15 616.75 617.73 40F 38 37 64.380 0.13 6.30 0.65 0.08 4.10 5.0 9.5 6.3 25.71 116.4 6.79 36 3.04 611.61 613.57 613.15 615.21 617.73 619.84 40G 39 38 27.072 0.16 3.39 0.65 0.10 2.20 5.0 9.4 6.3 13.88 15.67 5.63 24 0.48 614.57 614.70 616.03 616.16 619.84 619.84 40H 40 39 78.538 0.20 3.23 0.65 0.13 2.10 5.0 9.1 6.4 13.38 13.98 5.04 24 0.38 614.90 615.20 616.48 616.77 619.84 620.19 401 41 40 109.294 0.12 2.37 0.65 0.08 1.54 5.0 8.6 6.5 10.02 24.86 4.38 24 1.21 615.40 616.72 617.25 617.85 620.19 621.86 40J 42 41 77.908 0.13 2.25 0.65 0.08 1.46 5.0 8.1 6.6 9.66 26.51 6.32 24 1.37 616.97 618.04 617.85 619.15 621.86 623.08 40K 43 42 74.929 0.50 1.37 0.65 0.33 0.89 5.0 7.8 6.7 5.97 12.90 6.13 18 1.51 618.74 619.87 619.46 620.81 623.08 624.21 40L 44 43 66.514 0.11 0.87 0.65 0.07 0.57 5.0 7.4 6.8 3.84 14.08 5.10 15 4.75 620.12 623.28 620.81 624.07 624.21 628.18 40M 45 44 108.753 0.21 0.76 0.65 0.14 0.49 5.0 6.8 7.0 3.44 14.42 5.26 15 4.98 623.48 628.90 624.07 629.65 628.18 633.45 40N Project File: 5750 PHASE 2 STORM.stm Number of lines: 90 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v11.00 Storm Sewer Tabulation Page 3 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 46 45 26.000 0.20 0.55 0.65 0.13 0.36 5.0 6.6 7.0 2.51 9.39 4.44 15 2.12 629.10 629.65 629.65 630.28 633.45 633.45 400 47 46 136.429 0.35 0.35 0.65 0.23 0.23 5.0 5.0 7.5 1.72 3.99 3.13 15 0.38 629.85 630.37 630.42 630.94 633.45 633.49 40P 48 42 26.174 0.46 0.75 0.65 0.30 0.49 5.0 6.7 7.0 3.42 4.55 4.07 15 0.50 619.41 619.54 620.22 620.35 623.08 623.08 43A 49 48 115.527 0.29 0.29 0.65 0.19 0.19 5.0 5.0 7.5 1.42 4.54 2.62 15 0.49 619.74 620.31 620.48 620.78 623.08 623.42 43B 50 38 86.150 0.47 2.78 0.65 0.31 1.81 5.0 7.2 6.9 12.40 22.47 6.62 24 0.99 614.57 615.42 615.63 616.68 619.84 620.83 44A 51 50 26.347 0.37 2.31 0.65 0.24 1.50 5.0 7.1 6.9 10.36 34.13 5.24 24 2.28 615.42 616.02 616.68 617.17 620.83 620.83 44B 52 51 64.320 0.21 1.94 0.65 0.14 1.26 5.0 6.7 7.0 8.83 32.40 4.03 24 2.05 615.22 616.54 617.17 617.60 620.83 620.57 44C (1) 53 52 72.951 0.72 1.73 0.65 0.47 1.12 5.0 6.4 7.1 7.97 13.64 6.90 18 1.69 617.04 618.27 617.86 619.36 620.57 622.21 44C 54 53 118.570 0.72 1.01 0.65 0.47 0.66 5.0 5.9 7.2 4.75 5.40 4.97 15 0.70 618.63 619.46 619.54 620.37 622.21 623.09 44D 55 54 65.363 0.29 0.29 0.65 0.19 0.19 5.0 5.0 7.5 1.42 17.91 2.26 15 7.70 619.66 624.69 620.94 625.16 623.09 635.16 44E 56 40 26.326 0.36 0.66 0.65 0.23 0.43 5.0 6.6 7.0 3.02 7.66 1.71 18 0.53 615.20 615.34 617.25 617.27 620.19 620.19 42A 57 56 115.574 0.30 0.30 0.65 0.20 0.20 5.0 5.0 7.5 1.47 4.53 1.21 15 0.49 615.59 616.16 617.29 617.35 620.19 619.28 42B 58 37 27.124 0.33 0.60 0.65 0.21 0.39 5.0 7.0 6.9 2.70 4.64 2.20 15 0.52 611.78 611.92 613.15 613.17 617.73 617.73 13131 59 58 127.408 0.27 0.27 0.65 0.18 0.18 5.0 5.0 7.5 1.32 4.54 1.82 15 0.49 612.12 612.75 613.21 613.31 617.73 615.86 41 B 60 35 33.745 0.38 0.38 0.65 0.25 0.25 5.0 5.0 7.5 1.86 13.52 2.58 15 4.39 611.53 613.01 612.77 613.55 614.78 620.50 Pipe - (471) 61 End 27.320 0.00 3.62 0.00 0.00 2.35 0.0 7.7 6.7 15.84 35.96 6.49 30 0.77 611.11 611.32 612.27 612.66 611.11 621.53 36B 62 61 118.993 0.23 3.62 0.65 0.15 2.35 5.0 7.3 6.8 16.09 27.74 7.89 24 1.50 615.13 616.92 616.22 618.36 621.53 629.62 36C 63 62 104.643 0.33 3.39 0.65 0.21 2.20 5.0 6.9 6.9 15.29 27.70 6.95 24 1.50 617.12 618.69 618.36 620.10 629.62 628.93 36D 64 63 26.333 0.32 1.16 0.65 0.21 0.75 5.0 5.5 7.4 5.56 10.43 5.48 18 0.99 623.66 623.92 624.44 624.83 628.93 628.93 36E 65 64 108.188 0.84 0.84 0.65 0.55 0.55 5.0 5.0 7.5 4.12 6.45 5.20 15 1.00 624.17 625.25 624.90 626.07 628.93 629.40 36F 66 63 216.290 0.39 1.90 0.65 0.25 1.24 5.0 5.7 7.3 9.04 15.98 4.55 24 0.50 618.69 619.77 620.10 620.84 628.93 624.61 37A 67 66 26.326 0.38 1.51 0.65 0.25 0.98 5.0 5.6 7.4 7.22 7.38 4.76 18 0.49 620.27 620.40 621.47 621.60 624.61 624.61 37B Project File: 5750 PHASE 2 STORM.stm Number of lines: 90 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v11.00 Storm Sewer Tabulation Page 4 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 68 67 107.145 1.13 1.13 0.65 0.73 0.73 5.0 5.0 7.5 5.55 7.46 4.20 18 0.50 620.60 621.14 621.78 622.09 624.61 625.19 37C 69 End 62.800 0.59 2.24 0.65 0.38 1.46 5.0 7.1 6.9 10.03 25.04 6.50 24 1.23 621.00 621.77 621.88 622.90 628.00 627.01 35B 70 69 26.309 0.73 1.65 0.65 0.47 1.07 5.0 7.0 6.9 7.42 11.76 6.31 18 1.25 622.27 622.60 623.13 623.65 627.01 627.01 35C 71 70 122.187 0.26 0.92 0.65 0.17 0.60 5.0 6.2 7.2 4.28 7.42 4.31 18 0.50 622.80 623.41 623.65 624.21 627.01 626.93 35D 72 71 186.244 0.66 0.66 0.65 0.43 0.43 5.0 5.0 7.5 3.24 4.56 3.68 15 0.50 623.66 624.59 624.68 625.32 626.93 629.70 35E 73 End 121.698 12.42 12.42 0.65 8.07 8.07 40.9 40.9 3.1 71.83 95.59 12.81 36 2.05 621.00 623.50 622.94 626.18 628.00 627.00 47B 74 End 37.558 0.00 3.65 0.00 0.00 2.37 0.0 7.4 6.8 16.15 76.59 9.15 30 3.49 609.00 610.31 609.78 611.67 609.00 621.00 32B 75 74 26.506 0.55 3.65 0.65 0.36 2.37 5.0 7.3 6.8 16.24 76.82 6.63 30 3.51 610.51 611.44 611.67 612.80 621.00 620.56 32C 76 75 141.834 0.23 3.10 0.65 0.15 2.02 5.0 6.5 7.1 14.26 34.44 6.04 30 0.71 611.64 612.64 612.80 613.91 620.56 620.21 32D 77 76 109.157 0.30 1.28 0.65 0.20 0.83 5.0 6.1 7.2 5.98 15.05 8.65 15 5.43 613.89 619.82 614.44 620.81 620.21 625.37 Pipe - (465) 78 77 26.326 0.44 0.98 0.65 0.29 0.64 5.0 6.0 7.2 4.60 6.54 5.35 15 1.03 620.02 620.29 620.81 621.16 625.37 625.37 32F 79 78 125.941 0.54 0.54 0.65 0.35 0.35 5.0 5.0 7.5 2.65 6.46 4.03 15 1.00 620.49 621.75 621.16 622.40 625.37 624.96 32G 80 76 26.434 0.24 1.59 0.65 0.16 1.03 5.0 6.0 7.2 7.45 21.10 5.53 24 0.87 613.14 613.37 613.96 614.34 620.21 620.21 33A 81 80 35.957 0.08 1.35 0.65 0.05 0.88 5.0 5.9 7.3 6.37 9.27 5.45 18 0.78 613.87 614.15 614.78 615.13 620.21 618.99 33B 82 81 28.424 0.61 1.27 0.65 0.40 0.83 5.0 5.7 7.3 6.03 7.37 4.65 18 0.49 614.35 614.49 615.38 615.52 618.99 617.87 33C 83 82 116.683 0.66 0.66 0.65 0.43 0.43 5.0 5.0 7.5 3.24 7.91 3.52 15 1.50 614.74 616.49 615.97 617.21 617.87 619.90 33D 84 End 215.289 0.00 5.31 0.00 0.00 3.45 0.0 5.3 7.4 25.67 59.56 9.39 30 2.11 608.00 612.54 609.15 614.26 608.00 621.33 28B 85 84 105.836 5.31 5.31 0.65 3.45 3.45 5.0 5.0 7.5 26.06 66.23 7.73 30 2.61 612.74 615.50 614.26 617.24 621.33 619.96 28C 86 8 54.650 0.09 0.49 0.65 0.06 0.32 5.0 6.8 7.0 2.22 4.54 3.68 15 0.49 633.20 633.47 633.82 634.08 636.65 637.27 87 86 89.480 0.02 0.40 0.65 0.01 0.26 5.0 5.8 7.3 1.89 4.58 3.25 15 0.50 633.67 634.12 634.33 634.67 637.27 639.09 88 87 74.920 0.38 0.38 0.65 0.25 0.25 5.0 5.0 7.5 1.86 4.60 3.23 15 0.51 634.32 634.70 634.98 635.25 639.09 637.97 89 19 101.134 0.04 0.38 0.65 0.03 0.25 5.0 5.8 7.3 1.80 4.59 3.50 15 0.50 634.85 635.36 635.39 635.91 639.03 638.70 90 89 65.780 0.34 0.34 0.65 0.22 0.22 5.0 5.0 7.5 1.67 4.50 3.09 15 0.49 635.56 635.88 636.19 636.40 638.70 640.12 Project File: 5750 PHASE 2 STORM.stm Number of lines: 90 Run Date: 7/7/2017 NOTES: Intensity = 75.61 / (Inlet time + 12.50) ^ 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v11.00 Inlet Report Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 29B -DI 2.16 0.00 2.16 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.17 19.28 0.17 19.28 0.0 Off 2 29C -DCB 2.31 0.00 2.31 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.000 0.24 8.10 0.33 8.10 1.0 Off 3 29D -DCB 1.25 0.00 1.25 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.000 0.18 5.05 0.26 5.05 1.0 Off 4 30ACB 0.55 0.00 0.55 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,045 2.00 0.060 0.020 0.013 0.12 2.10 0.09 0.17 1.0 5 30B -CB 0.62 0.00 0.62 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.045 2.00 0.060 0.020 0.013 0.13 2.40 0.09 0.17 1.0 6 31A -CB 0.44 0.06 0.50 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.045 2.00 0.060 0.020 0.013 0.12 1.97 0.09 0.17 1.0 7 31 B -DCB 0.81 0.00 0.80 0.01 Comb 6.0 6.00 0.00 6.00 2.00 0.035 2.00 0.060 0.020 0.013 0.15 3.35 0.11 0.50 1.0 8 31 C -DCB 1.14 0.00 1.09 0.05 Comb 6.0 6.00 0.00 6.00 2.00.035 2.00 0.060 0.020 0.013 0.17 4.25 0.14 1.00 1.0 9 30C -DI 1.17 0.00 0.63 0.54 DrGrt 0.0 0.00 0.00 3.00 2.00 .020 2.00 0.020 0.020 0.013 0.09 11.10 0.09 11.10 0.0 Off 10 30C1 -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 ff 11 53A -CB 0.65 0.00 0.65 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.045 2.00 0.060 0.020 0.013 0.13 2.50 0.09 0.17 1.0 12 29E -DI 3.33 0.00 3.33 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.23 25.07 0.23 25.07 0.0 Off 13 0.57 0.00 0.57 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.07 9.13 0.07 9.13 0.0 Off 14 46B -CB 0.31 0.00 0.31 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.045 2.00 0.060 0.020 0.013 0.10 1.65 0.09 0.17 1.0 Off 15 46C -CB 0.34 0.00 0.34 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.045 2.00 0.060 0.020 0.013 0.10 1.70 0.09 0.17 1.0 Off 16 46D -CB 0.18 0.00 0.18 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,045 2.00 0.060 0.020 0.013 0.08 1.35 0.09 0.17 1.0 Off 17 34A -DCB 1.07 0.00 1.00 0.07 Comb 6.0 6.00 0.00 6.00 2.00 0.020 2.00 0.060 0.020 0.013 0.18 4.80 0.15 1.17 1.0 Off 18 34B -DCB 0.96 0.00 0.91 0.05 Comb 6.0 6.00 0.00 6.00 2.00 0.020 2.00 0.060 0.020 0.013 0.17 4.50 0.14 1.00 1.0 Off 19 46E -CB 0.13 0.00 0.13 0.00 Comb 6.0 3.00 0.00 3.00 2,00 0.019 2.00 0.060 0.020 0.013 0.08 1.40 0.09 0.17 1.0 25 20 45A -DI 0.99 0.00 0.99 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.10 12.26 0.10 12.26 0.0 Off 21 38B -DI 0.73 0.00 0.73 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.08 10.37 0.08 10.37 0.0 Off 22 38C -CB 0.26 0.02 0.28 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.013 2.00 0.060 0.020 0.013 0.12 2.00 0.09 0.17 1.0 50 23 38D -DCB 0.55 0.14 0.66 0.02 Comb 6.0 6.00 0.00 6.00 2.00 0.013 2.00 0.060 0.020 0.013 0.16 4.20 0.13 0.83 1.0 22 Project File: 5750 PHASE 2 STORM.stm Number of lines: 90 Run Date: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Inlet Report Page 2 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 24 38E -DCB 1.35 0.00 1.21 0.14 Comb 6.0 6.00 0.00 6.00 2.00 0.013 2.00 0.060 0.020 0.013 0.20 6.15 0.18 1.67 1.0 23 25 38F -DCB 1.53 0.00 1.35 0.18 Comb 6.0 6.00 0.00 6.00 2.00 0,013 2.00 0.060 0.020 0.013 0.21 6.55 0.19 1.83 1.0 32 26 38G -DI 1.48 0.00 0.70 0.78 DrGrt 0.0 0.00 0.00 3.00 2.00 0.032 2.00 0.020 0.020 0.013 0.09 11.10 0.09 11.10 0.0 Off 27 38H -DI 0.47 0.00 0.47 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.06 8.23 0.06 8.23 0.0 Off 28 381 -DI 0,31 0.00 0.31 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.011 2.00 0.060 0.020 0.013 0.13 2.45 0.09 0.17 1.0 27 29 38J -DCB 0.91 0.00 0.91 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.000 0.16 3.90 0.24 3.90 1.0 Off 30 38K -DCB 1.64 0.00 1.64 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.013 0.20 6.20 0.29 6.20 1.0 Off 31 38L -HW 2.11 0.00 2.11 0.00 Hdwl 0.0 0.00 0.00 0.00 0.00 Sag 2.00 0.020 0.020 0.013 0.00 0.00 0.00 0.00 0.0 Off 32 51A -CB 0.83 0.18 0.88 0.13 Comb 6.0 3.00 0.00 3.00 2.00 0.013 2.00 0.060 0.020 0.013 0.19 5.25 0.17 1.50 1.0 51 33 40B -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 34 40C -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 35 40D -DCB 3.41 0.11 3.52 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.000 0.30 11.00 0.38 11.00 1.0 Off 36 40E -CB 0.26 0.03 0.29 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.12 1.98 0.09 0.17 1.0 35 37 40F -CB 0.62 0.04 0.63 0.03 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.16 3.90 0.14 1.00 1.0 36 38 40G -CB 0.34 0.20 0.52 0.02 Comb 6.0 3.00 0.00 3.00 2.00 0.013 2.00 0.060 0.020 0.013 0.15 3.55 0.13 0.83 1.0 37 39 40H -CB 0.42 0.15 0.55 0.02 Comb 6.0 3.00 0.00 3.00 2.00 0,013 2.00 0.060 0.020 0.013 0.15 3.70 0.13 0.83 1.0 37 40 401 -CB 0.52 0.00 0.51 0.01 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.15 3.30 0.11 0.50 1.0 37 41 40J -CB 0.31 0.00 0.31 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.12 2.05 0.09 0.17 1.0 40 42 40K -CB 0.34 0.21 0.54 0.01 Comb 6.0 3.00 0.00 3.00 2,00 0.015 2.00 0.060 0.020 0.013 0.15 3.45 0.12 0.67 1.0 Off 43 40L -CB 1.30 0.00 1.09 0.21 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.20 5.80 0.19 1.83 1.0 42 44 40M -CB 0.29 0.00 0.29 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.049 2.00 0.060 0.020 0.013 0.09 1.57 0.09 0.17 1.0 43 45 40N -CB 0.55 0.00 0.55 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.049 2.00 0.060 0.020 0.013 0.12 2.00 0.09 0.17 46 400 -CB 0.52 0.00 0.52 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.049 2.00 0.060 0.020 0.013 0.12 1.97 0.09 0.17 Project File: 5750 PHASE 2 STORM.stm Number of lines: 90 Run Date: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Inlet Report Page 3 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 47 40P -DI 0.91 0.00 0.91 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.10 11.71 0.10 11.71 0.0 Off 48 43A -CB 1.20 0.00 1.02 0.17 Comb 6.0 3.00 0.00 3.00 2.00 0,015 2.00 0.060 0.020 0.013 0.19 5.55 0.18 1.67 1.0 56 49 43B -DI 0.75 0.00 0.44 0.32 DrGrt 0.0 0.00 0.00 3.00 2.00 0.020 2.00 0.020 0.020 0.013 0.07 9.10 0.07 9.10 0.0 57 50 44A -CB 1.22 0.00 1.02 0.20 Comb 6.0 3.00 0.00 3.00 2.00 0,013 2.00 0.060 0.020 0.013 0.20 5.80 0.19 1.83 1.0 38 51 44B -CB 0.96 0.13 0.94 0.15 Comb 6.0 3.00 0.00 3.00 2.00 0.013 2.00 0.060 0.020 0.013 0.19 5.50 0.18 1.67 1.0 39 52 44C -DI 0.55 0.00 0.55 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.07 8.91 0.07 8.91 0.0 Off 53 44D -DI 1.87 0.00 1.87 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.16 17.72 0.16 17.72 0.0 Off 54 44E -DI 1.87 0.00 1.87 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.16 17.72 0.16 17.72 0.0 Off 55 44F -DI 0.75 0.00 0.75 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.09 10.57 0.09 10.57 0.0 Off 56 42A -CB 0.94 0.17 0.97 0.14 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.19 5.35 0.18 1.67 1.0 58 57 42B -DI 0.78 0.32 1.10 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.11 13.01 0.11 13.01 0.0 Off 58 41A -CB 0.86 0.14 0.89 0.11 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.18 5.05 0.17 1.50 1.0 35 59 41 B -D1 0.70 0.00 0.70 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.08 10.17 0.08 10.17 0.0 Off 60 52A -DI 0.99 0.00 0.99 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.10 12.26 0.10 12.26 0.0 Off 61 36B -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 62 36C -D1 0.60 0.00 0.38 0.21 DrGrt 0.0 0.00 0.00 3.00 2.00 0,020 2.00 0.020 0.020 0.013 0.07 9.10 0.07 9.10 0.0 Off 63 36D -CB 0.86 0.00 0.80 0.06 Comb 6.0 3.00 0.00 3.00 2.00 0.020 2.00 0.060 0.020 0.013 0.16 4.20 0.15 1.17 1.0 66 64 36E -CB 0.83 0.00 0.79 0.05 Comb 6.0 3.00 0.00 3.00 2.00 0.020 2.00 0.060 0.020 0.013 0.16 4.15 0.14 1.00 1.0 67 65 36F -DI 2.18 0.00 0.88 1.31 DrGrt 0.0 0.00 0.00 3.00 2,00 0,080 2.00 0.020 0.020 0.013 0.09 11.10 0.09 11.10 0.0 68 66 37A -DCB 1.01 0.06 1.00 0.07 Comb 6.0 6.00 0.00 6.00 2.00 0.020 2.00 0.060 0.020 0.013 0.18 4.80 0.15 1.17 1.0 Off 67 37B -DCB 0.99 0.05 0.97 0.07 Comb 6.0 6.00 0.00 6.00 2.00 0.020 2.00 0.060 0.020 0.013 0.17 4.70 0.15 1.17 1.0 Off 68 37C -DI 2.94 1.31 2.94 1.31 Comb 6.0 3.00 0.00 3.00 2.00 0.055 2.00 0.060 0.020 0.013 0.23 7.50 0.24 4.00 1.0 Off 69 35B -DCB 1.53 0.00 1.53 0.00 Comb 6.0 6.00 12.00 6.00 2.00 rag 2.00 0.060 0.020 0.000 0.20 5.90 0.28 5.90 1.0 Off Project File: 5750 PHASE 2 STORM.stm -T Number of lines: 90 Run Date: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Inlet Report Page 4 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 70 35C -DCB 1,90 0.00 1.90 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.000 0.22 6.95 0.30 6.95 1.0 Off 71 35D -D1 0.68 0.95 1.63 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.14 16.33 0.14 16.33 0.0 Off 72 35E -DI 1.72 0.00 0.76 0.95 DrGrt 0.0 0.00 0.00 3.00 2.00 0.050 2.00 0.020 0.020 0.013 0.09 11.10 0.09 11.10 0.0 71 73 4713 -FES 79.29* 0.00 79.29 0.00 Hdwl 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 74 32B -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 75 32C -DI 1.43 0.00 1.43 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.13 15.13 0.13 15.13 0.0 Off 76 32D -CB 0.60 0.00 0.60 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.040 2.00 0.060 0.020 0.013 0.13 2.45 0.09 0.17 1.0 82 77 32E -CB 0.78 0.00 0.78 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.040 2.00 0.060 0.020 0.013 0.14 3.10 0.10 0.33 1.0 Off 78 32F -CB 1.14 0.00 1.07 0.07 Comb 6.0 3.00 0.00 3.00 2.00 0.040 2.00 0.060 0.020 0.013 0.16 4.05 0.14 1.00 1.0 Off 79 32G -DI 1.40 0.00 0.64 0.77 DrGrt 0.0 0.00 0.00 3.00 2.00 0,069 2.00 0.020 0.020 0.013 0.07 9.10 0.07 9.10 0.0 B3 80 33A -DCB 0.62 0.00 0.62 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,040 2.00 0.060 0.020 0.013 0.13 2.55 0.09 0.17 1.0 81 81 33B -CB 0.21 0.00 0.21 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0,040 2.00 0.060 0.020 0.013 0.09 1.45 0.09 0.17 1.0 82 82 33C -DCB 1.59 0.00 1.59 0.00 Comb 6.0 6.00 12.00 6.00 2.00 Sag 2.00 0.060 0.020 0.000 0.20 6.05 0.28 6.05 1.0 Off 83 33D -DI 1.72 0.77 2.48 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.19 20.98 0.19 20.98 0.0 Off 84 28B -JB 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 85 28C -HW 13.81 0.00 13.81 0.00 Hdwl 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 86 31C1 -CB 0.23 0.00 0.23 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.030 2.00 0.060 0.020 0.013 0.10 1.60 0.09 0.17 1.0 87 31C2 -CB 0.05 0.00 0.05 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.015 2.00 0.060 0.020 0.013 0.06 1.03 0.09 0.17 1.0 86 88 31C3 -DI 0.99 0.00 0.99 0.00 DrGrt 0.0 0.00 6.00 3.00 2,00 Sag 2.00 0.020 0.020 0.013 0.10 12.26 0.10 12.26 0.0 B7 89 416E1 -CB 0.10 0.00 0.10 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.019 2.00 0.060 0.020 0.013 0.08 1.28 0.09 0.17 1.0 30 90 416E2 -DI 0.88 0.00 0.88 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.10 11.53 0.10 11.53 0.0 89 File: 5750 PHASE 2 STORM.stm --7Project Number of lines: 90 Run Date: 7/7/2017 NOTES: Inlet N -Values = 0.016; Intensity = 4.00 / (Inlet time + 0.00) A 0.00; Return period = 3 Yrs. ; * Indicates Known Q added. All curb inlets are throat. Storm Sewers v11.00 Hydrology Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. CULVERT - LINE -72 (47B) - 100yr Hydrograph type = Rational Storm frequency (yrs) = 100 Drainage area (ac) = 12.420 Rainfall Inten (in/hr) = 4.082 OF Curve = 5750-NOAA.IDF Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 0 10 20 30 Runoff Hyd - Qp = 32.95 (cfs) Friday, Jul 7 2017 Peak discharge (cfs) = 32.95 Time interval (min) = 1 Runoff coeff. (C) = 0.65 Tc by User (min) = 41 Rec limb factor = 1.00 Hydrograph Volume = 81,068 (cuft); 1.861 (acft) Runoff Hydrograph 100 -yr frequency 40 50 60 70 80 90 v vv Time (min) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Friday, Jul 7 2017 CULVERT - LINE -72 (47B) Invert Elev Dn (ft) = 621.00 Calculations Pipe Length (ft) = 121.70 Qmin (cfs) = 32.95 Slope (%) = 2.05 Qmax (cfs) = 32.95 Invert Elev Up (ft) = 623.50 Tailwater Elev (ft) = Normal Rise (in) = 36.0 Shape = Circular Highlighted Span (in) = 36.0 Qtotal (cfs) = 32.95 No. Barrels = 1 Qpipe (cfs) = 32.95 n -Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 11.79 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.15 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 622.25 HGL Up (ft) = 625.36 Embankment Hw Elev (ft) = 626.34 Top Elevation (ft) = 627.55 Hw/D (ft) = 0.95 Top Width (ft) = 85.79 Flow Regime = Inlet Control Crest Width (ft) = 60.00 Eley (ft) &28.00 527.00 625 OD 525.00 524.00 523.OD 522.OD 521.00 520.00 CULVERT - LINE -72 (576) Hw Depth (ft) 4.50 3.50 2 50 1.50 0.50 -0.50 -1.50 -2.50 3.5D Cl 1cu C -rt HGL Embank Reach (ft) 3roject Name: Moore Farm Date: 7/6/201 i -ocation: Union County, North Carolina By: K.E.W )escription: 1A -FES - Riprap Discharge Apron 3o Runoff Discharge Information 4uttet 1 - Dq + La pipe I Q10 57.62 cfs diameter (Do) = i R0 0. 5Dp Pipe Dia. = 42 in. l Apron Sizinge�gt �I f rn Length = 22 ft.Y 4 L.I s r , Width = 25.5 ft. fl � I . - L, 3Do @ Pipe = 10.5 ft. 20 -, y '- I � n IRiprapStone Sizing (d50) 2 �n d50 Size (Avg) = 0.7 ft. - _.: r of a m d50 Size (Max.)* 1.05 ft Min. Depth** = 1.25 ft. * equal to 1.5*d50 average stone size 5 10 20 s0 100 200 sot) ioao ** min. depth no less than 15" Discharge (Olsec) NOTES: 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet Project Name: Moore Farm Date: 7/6/2017 Location: Union County, North Carolina By: K.E.W. Description: 16A -FES - Riprap Discharge Apron 11.1 Runoff Discharge information . `f ` outlet I`W - Do + La pipe Q10 = 14.21 cfs diameter (Do) Pipe Dia. = 24 in. water 47.5D,, fio Aron Sizing Length = 13 ft. �� 1 l d rtf�fl` , 4 g � �_ I , � ' Width 15 f. 1 $ �a�jl3Do@Pipe 6 f. tl, 20 ll � : t ,y•;. z - 10 .. -- r v lRiprapStone Sizing (d50) _� _ •. • w � in d50 Size (Avg) = 0.7 ft. L as J V j d50 Size (Max.)* 1.05 ft. v 1 Min. Depth** = 1.25 ft. v u + - V = I * equal to 1.5*d50 average stone size 3 5 10 20 S0 tuo - 200 ` 500 III 1000 Dao ** min. depth no less than 15" Discharge (ft /sec) NOTES: 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet Project Name: Moore Farm Date: 7/6/2017 Location: Union County, North Carolina By: K.E.W. Description: 19A -FES - Riprap Discharge Apron Runoff Discharge information 3, outlet f`W - Do + La pipe i Q10 = 26.26 efs diameter {Ch} l� water Pipe Dia. = 36 in. - 0, So, Aaron Sizin Length = Width = 3Do @ Pipe = 20 ft. 23 ft. 9 ft _ Riprap Stone Sizing (d50) ....... d50 Size (Avg) = 0.6 ft. 4::: : d50 Size (Max.)* 0.9 ft. Min. Depth** = 1.25 ft. * equal to 1.5*d50 average stone size ** min. depth no less than 15" NOTES: 1 50 100 Discharge (Olsec) 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet M )roject Name: Moore Farm Date: 7/6/201' -ocation: Union County, North Carolina By: K.E.W )escription: 24D -FES - Riprap Discharge Apron 3, Runoff Discharge information Outlet W - Do + La Pipe diameter (Do) L. e Q10 = 1.37 cfs t _ 80 a • ,.water � I � Pipe Dia. = 18 in. 0, So, IJ ,4 pII r Aron Sizin e�gN f' rn Length = 9 ft. 4 { y Width = 10.5 ft. 3S - ,a ` a i L 3Do @Pipe = 4.5 ft. !, a Riprap Stone Sizing (d50) y 12 ' m d50 Size (Avg) = 0.4 ft. d50 Size (Max.)* 0.6 ft. Min. Depth** = 1.25 ft..' f 71 1 a * equal to 1.5*d50 average stone size 5 10 20 s0 100 �u 200 500 io0o ** min. depth no less than 15" Discharge (Olsec) NOTES: 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet 'roject Name: Moore Farm Date: 7/6/201 .ocation: Union County, North Carolina By: K.E.W )escription: 25D -FES - Riprap Discharge Apron Runoff Discharge Information Q10 = 12.98 cfs Pipe Dia. = 18 in. IApron Sizin Length = 8.5 ft. Width = 10 ft. 3Do @ Pipe = 4.5 ft. IRiprapStone Sizing (d50) d50 Size (Avg) = 0.7 ft. d50 Size (Max.)* 1.05 ft. Min. Depth** = 1.25 ft. * equal to 1.5*d50 average stone size ** min. depth no less than 15" NOTES: 1--F—.LiL 3 5 10 20 50 100 Discharge (Olsec) I 1 1 I i i J.II 200 500 1000 1.0 Riprap aprons to be sized for I0 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet Project Name: Moore Farm Date: 7/6/2017 Location: Union County, North Carolina By: K.E.W. Description: 28A -FES - Riprap Discharge Apron ** min. depth no less than 15" NOTES: i 80 I h I I .... ;. t- i - �'{• ' � i� ��•�" err ` ; :: l , r J F 4 50 100 Discharge (Olsec) �I�ff.ANw"s`m 3, Runoff Discharge information outlet W - Do + La PIPe Q10 = 25.67 cfs diameter (D7) Pipe Dia. = 30 in. _ O's ��lil�'��; lApron iili Sizin Vey" nll! �ti[i �_l� S n • . I: Length = 16 ft. Width = 18.5 ft. �� 111 ;I f 3Do @ Pipe = 7.5 ft. za - III{II N� 0AllifiNl lRiprapStone Sizing (d50) - l I : d50 Size (Avg) = 0.5 ft. 4 i I. d50 Size (Max.)* 0.75 ft. - f Min. Depth** = 1.25 ft.r J = to •a I 1 * equal to 1.5*d50 average stone size 5 to 20 ** min. depth no less than 15" NOTES: i 80 I h I I .... ;. t- i - �'{• ' � i� ��•�" err ` ; :: l , r J F 4 50 100 Discharge (Olsec) �I�ff.ANw"s`m 200 500 1000 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet ��lil�'��; iili nll! I Iplli d P.117'I II III{II N� 0AllifiNl I 200 500 1000 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet 3roject Name: Moore Farm Date: 7/6/201 i _ocation: Union County, North Carolina By: K.E.W )escription: 29A -FES - Riprap Discharge Apron 3o Runoff Discharge Information 4uttet 4t - Dq + La pipe Q10 = 25.16 cfs diameter {R7} ` � 80 a • ,.water � D.5Up � - � n ' Pipe Dia. = 30 in. �n II Aron Sizin e��` Length = 16 ft. fiY — `` �r s r�, r _ �.4 Ji 1 `I I r fr f Width = 18.5 ft. I I...1 3Do @ Pipe = 7.5 ft. za__: _::_ - y5 tig — __ :.... �_ - - �, U IRiprapStone Sizing (d50) � d50 Size (Avg) = 0.5 ft. - 0= d50 Size (Max.)* 0.75 ft. Min. Depth** = 1.25 ft. * equal to 1.5*d50 average stone size 5 10J 20 50 100 �u 200 500 loop ** min. depth no less than 15" Discharge (Olsec) NOTES: 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet Project Name: Moore Farm Date: 7/6/2017 Location: Union County, North Carolina By: K.E.W. Description: 32A -FES - Riprap Discharge Apron Runoff Discharge information 3, outlet f`W - Do + La pipe i d ter {Ch} Q10 = 16.15 cfs ame Pipe Dia. = 30 in. - water < 0.5up �o IApron Sizin Length = 16 ft. fin Width = 18.5 ft. 34 til ll l - s�.i 3Do @ Pipe = 7.5 ft. 2 l i Riprap Stone Sizing (d50) d50 Size (Avg) = 0.5 ft. I d50 Size (Max.)* 0.75 ft. i-- Min. Depth** = 1.25 ft.— * equal to 1.5*d50 average stone size S is ** min. depth no less than 15" NOTES: 50 100 Discharge (Olsec) 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet M )roject Name: Moore Farm Date: 7/6/201' -ocation: Union County, North Carolina By: K.E.W )escription: 35A -FES - Riprap Discharge Apron ** min. depth no less than 15" NOTES: I) 100 -- SDischarge (Olsec) .AT'7 W1 HIM I N� � ia1NIH. 200 500 loop 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet 3, Runoff Discharge information outlet - Do + La pipe f`W Q10 = 10.03 cfs diameter (D7) i Pipe Dia. = 24 in. water - 0, So, IApron t� Sizin Length = 13 ft. {4n+ Width = 15 ft. 3 3Do @ Pipe = 6 ft. 20 10 Riprap Stone Sizing (d50) d50 Size (Avg) = 0.4 ft. 4 i ` d50 Size (Max.)* 0.6 ft. i-..: G-- - Min. Depth** = 1.25 ft. v= - * equal to 1.5*d50 average stone size 5 10 20 ** min. depth no less than 15" NOTES: I) 100 -- SDischarge (Olsec) .AT'7 W1 HIM I N� � ia1NIH. 200 500 loop 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet )roject Name: Moore Farm Date: 7/6/201' _ovation: Union County, North Carolina By: K.E.W )escription: 36A -FES - Riprap Discharge Apron 3, Runoff Discharge information Outlet W - Do + La PIPe diameter (Do) L. e Q10 = 15.84 cfs t _ e:� a water 0, So, h Pipe Dia. tit = 30 in. f f — II Apron Sizing �L ��� Length = 16 ft. fiY � � Tr ^—''� 'r � 4 Ji l 4 J � Width = 18.5 ft. �� I' 3Do @ Pipe — 7.5 ft. 3 IRiprapStone Sizing (d50) 2 i—n d50 Size (Avg) = 0.5 ft. ;z l� a , d50 Size (Max.)* 0.75 ft. f ---I ,�v = — i o Min. Depth** = 1.25 ft. * equal to 1.5*d50 average stone size S 10 20 50 �100 200 500 ioao ** min. depth no less than 15" Discharge (Olsec) NOTES: 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet Project Name: Moore Farm Date: 7/6/2017 Location: Union County, North Carolina By: K.E.W. Description: 38A -FES - Riprap Discharge Apron 3, Runoff Discharge information Outlet W - Do + La PIPe diameter (Do) L. e Q10 = 20.11 cfs t _ 60 h ...water 4 >7..SDp , Pipe Dia. = 24 in. `` I � � I W$ fio IApron Sizin pec f ,I r - Length = 13 ft.fiY `-•� Tr - c 4 11.E I L r fr f Width = 15 ft. 34 1`- a 3Doe = 6 ft. �q �y =• @ Pipe zo =._ 3 IRiprapStone Sizing (d50) '• a 1. 12 d50 Size (Avg) = 0.45 ft. 4 i d50 Size .675 ft. (Max.)** } I I Min. Depth** = 1.25 ft. 4 _ to a aol– * equal to 1.5*d50 average stone size 5 10 2L 50 1010 �u 200 500 1000 ** min. depth no less than 15" Discharge (Olsec) NOTES: 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet Project Name: Moore Farm Date: 7/6/2017 Location: Union County, North Carolina By: K.E.W. Description: 40A -FES - Riprap Discharge Apron Runoff Discharge information r__ I OutletW - Do + La pipe I Q10 = 34.71 cfs " " _ Pipe Dia. = 36 in. 0. 5Up Aaron Sizin Length = 20 ft. Width = 23 ft. 3Do @ Pipe = 9 ft. Riprap Stone Sizing (d50) 10 d50 Size (Avg) = 0.6 ft. d50 Size (Max.)* 0.9 ft. Min. Depth** = 1.25 ft. * equal to 1.5*d50 average stone size ** min. depth no less than 15" NOTES: 3 S tV 4 rte. 50 100 Discharge (Olsec) i 80 _ hr, � i r 4 3 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet M )roject Name: Moore Farm Date: 7/6/201' _ovation: Union County, North Carolina By: K.E.W )escription: 46A -FES - Riprap Discharge Apron Runoff Discharge information Q10 = 5.31 cfs Pipe Dia. = 18 in. IApron Sizin Length = 9 ft. Width = 10.5 ft. 3Do @ Pipe = 4.5 ft. IRiprapStone Sizing (d50) d50 Size (Avg) = 0.35 ft. d50 Size (Max.)* 0.525 ft. Min. Depth** = 1.25 ft. * equal to 1.5*d50 average stone size ** min. depth no less than 15" NOTES: 3, Outlet W - Do + La PIPe diameter {Ch} � 80 ..... ... mai waterD.5Up n i o 3 S 10 20 0 100 200 500 1000 Discharge (Olsec) 1.0 Riprap aprons to be sized for 10 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet 'roject Name: Moore Farm Date: 7/6/201 .ocation: Union County, North Carolina By: K.E.W )escription: 47A -HW - Riprap Discharge Apron 3o Runoff Discharge Information 4uttet 4t - Dq + La pipe Q10 = 71.83 cfs diameter {[hp ` � 80 water 0, 5Dp Pipe Dia. = 36 in. i IApron Sizin Length = 20 ft. fiY T� L1 - d ° -- �, 4 r r Width = 23 ft. 3� 3Do (k Pipe = 9 ft.I a ` 3 Riprap Stone Sizing (d50) 1 y d50 Size (Avg) = 0.6 ft. - a a r� d50 Size (Max.)* 0.9 ft .-- G-- jv _ -7#1 Min. Depth** = 1.25 ft. * equal to 1.5*d50 average stone size 3 5 10 20 50 1010 � 200 I 500 1OGO ** min. depth no less than 15" Discharge (Olsec) NOTES: 1.0 Riprap aprons to be sized for I0 -year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet Moore Farms Subdivision — Union County, NC Stormwater Management Report Stormwater Design Calculations Dual 72 in. Culvert Crossing 5750 May 9, 2017 DUAL 72 IN. CUI i 724. 00 707.55 VERT I _ 663.83 0 651.18 A*' 164.31 AC. MAI, r r � a r TC: 60 MINS. j PROP. DUAL 72" CULVERT i PRE -DEV. DRAINAGE AREA TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS CULVERT CROSSING 100 -YR FREQUENCY Description A B C Totals Sheet Flow = 4.71 11.00 0.00 Manning's n -value = 0.400 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. ((in)) = 3.54 0.00 0.00 Land slope (%) = 5.48 0.00 0.00 Travel Time (min) = 32.85 + 0.00 + 0.00 = 32.85 Shallow Concentrated Flow Flow length (ft) = 1037.00 0.00 0.00 Watercourse slope (%) = 4.21 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 3.31 0.00 0.00 Travel Time (min) = 5.22 + 0.00 + 0.00 = 5.22 Channel Flow X sectional flow area ((sqft)) = 1.77 15.32 0.00 Wetted perimeter ((ft)) = 4.71 11.00 0.00 Channel slope (%) = 2.22 1.32 0.00 Manning's n -value = 0.030 0.070 0.015 Velocity (ft/s) = 3.84 3.05 0.00 Flow length (ft) = 570.0 3543.0 0.0 Travel Time (min) = 2.4732276.00 19.3399101-00 0 = 21.81 Total Travel Time, Tc.............................................................................. 60.00 min Hydrology Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. CULVERT CROSSING 100 -YR FREQUENCY Hydrograph type = SCS Storm frequency (yrs) = 100 Drainage area (ac) = 164.310 Basin Slope (%) = See Worksheet Tc method = TR55 Total precip. (in) = 7.79 Storm duration (hrs) = 24 Q (cfs) 480.00 420.00 0-111111A 300.00 240.00 180.00 120.00 Tuesday, Jun 27 2017 Peak discharge (cfs) = 449.46 Time interval (min) = 1 Curve number (CN) = 75 Hydraulic length (ft) = See Worksheet Time of conc. (min) = 60 Storm Distribution = Type II Shape factor = 484 Runoff Hydrograph 100 -yr frequency Hydrograph Volume = 2,894,306 (cuft); 66.444 (acft) Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 0.00 ' ' ' ' ' ' ' ' ' ' ' ' ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 Time (hrs) Runoff Hyd - Qp = 449.46 (cfs) � 4 .. . .. ✓N h -- mow/_/_ �',►,ih�MA�h%vivo;%a�di��;N��.AM MAI vrc���yv puiII / / 03 E STREAM CROSS- SECTION PLAN VIEW N. T. S. 1 Profile: 100 YR - 24 HR Flow Discharge = 449.46 cfs Computed Water Surface = 608.12 ft (PRE) Profile: 100 YR - 24 HR Flow Discharge = 449.46 cfs Computed Water Surface = 608.12 ft (POST) STREAM CROSS- SECTION 1 2 Profile: 100 YR - 24 HR Flow Discharge = 449.46 cfs Computed Water Surface = 608.84 ft (PRE) Profile: 100 YR - 24 HR Flow Discharge = 449.46 cfs Computed Water Surface = 612.52 ft (POST) STREAM CROSS- SECTION 2 3 Profile: 100 YR - 24 HR Flow Discharge = 449.46 cfs Computed Water Surface = 612.62 ft (PRE) Profile: 100 YR - 24 HR Flow Discharge = 449.46 cfs Computed Water Surface = 612.49 ft (POST) STREAM CROSS- SECTION 3 PROJECT DATA Project Title Project File 5750 DRAINAGE MAPS.PRJ Run Date and Time 07/08/17 08:56:31 PM Project in English units PLAN DATA Plan Summary Information: Number of: Cross Sections = 3 Multiple Openings = Culverts = 1 Bridges = 0 Computational information water surface calculation tolerance = 0.01 Critical depth calculation tolerance = 0.01 Maximum number of iterations = 20 Maximum difference tolerance = 0.3 Flow tolerance factor = 0.001 Computational Flow Regime: Subcritical Flow Encroachment Data: None FLOW DATA 0 Flow Data (cfs) River Reach Riv Sta 100 YR - 24 HR *River #1 *Reach #1 3 449.46 Boundary Conditions River Reach Profile Upstream Downstream Page 1 5750 DRAINAGE MAPS.RPT HEC -RAS Version 4.1.0 Jan 2010 U.S. Army Corps of Engineers Hydrologic Engineering Center 609 Second Street Davis, California X x xxxxxx xxxx xxxx xx xxxx X x x x x x x x x x X x x x x x x x x xxxxxxx xxxx x xxxx xxxx xxxxxx xxxx X x x x x x x x x X x x x x x x x x x X x xxxxxx xxxx x x x x xxxxx PROJECT DATA Project Title Project File 5750 DRAINAGE MAPS.PRJ Run Date and Time 07/08/17 08:56:31 PM Project in English units PLAN DATA Plan Summary Information: Number of: Cross Sections = 3 Multiple Openings = Culverts = 1 Bridges = 0 Computational information water surface calculation tolerance = 0.01 Critical depth calculation tolerance = 0.01 Maximum number of iterations = 20 Maximum difference tolerance = 0.3 Flow tolerance factor = 0.001 Computational Flow Regime: Subcritical Flow Encroachment Data: None FLOW DATA 0 Flow Data (cfs) River Reach Riv Sta 100 YR - 24 HR *River #1 *Reach #1 3 449.46 Boundary Conditions River Reach Profile Upstream Downstream Page 1 5750 DRAINAGE MAPS.RPT *River #1 *Reach #1 100 YR - 24 HR Normal S = 0.00432 CROSS SECTION RIVER: River #1 REACH: Reach #1 River Station: 3 INPUT Description: Station Elevation Data, num = 54 Sta. Elev. Sta. Elev. Sta. Elev. Sta. Elev. Sta. Elev. 0 626.43 .1 626.43 .2 626.42 .78 626.4 7.94 626.32 17.8 626.13 25.36 625.6 38.59 624.68 41.64 624.45 46.61 622.11 50.33 620.44 69.79 616.39 80.1 613.65 84.7 613.65 84.7 612.58 91.51 612.49 102.21 612.09 114.18 611.94 119.58 611.76 131.03 611.6 136.68 611.45 138.89 611.2 147.31 609.88 147.31 609.87 148.26 610.18 150.88 608.14 150.88 608.15 151.5 608.39 151.53 608.43 154.94 610.53 155.22 610.95 159.12 610.63 163.28 610.48 171.5 610.97 177.19 611.36 182.82 611.54 191.58 612.05 198.39 612.28 205.55 612.59 208.32 612.88 217.13 613.56 222.49 613.73 235.18 614.45 236.72 614.56 247.11 615.34 252.34 615.58 256.12 615.67 262.86 615.84 267.77 616.28 273.84 617.01 282 617.59 289.03 618.09 295.81 618.59 300.2 618.83 Manning's n values, num = 3 Sta. value Sta. value Sta. value 0 .05 84.7 .035 217.13 .05 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 84.7 217.13 350.13 375.85 338.3 0.1 0.3 CROSS SECTION OUTPUT Profile # 100 YR - 24 HR •• E.G. Elev (ft) 612.71 * Element Left OB Channel * Right OB ;; •• Vel Head (ft) 0.21 •• wt. n -Val 0.035 * •• W.S. Elev (ft) 612.49 * Reach Len. (ft) 350.13 375.85 * 338.30 :; • Crit W.S. (ft) •• Flow Area (sq ft) 121.29 •• • E.G. Slope (ft/ft) 0.007005 * Area (sq ft) 121.29 * •• Q Total (cfs) 449.46 * Flow (cfs) 449.46 * • Top width (ft) 112.02 •• Top width (ft) 112.02 •• •• Vel Total (ft/s) 3.71 * Avg. Vel. (ft/s) 3.71 * •• Max Ch1 Dpth (ft) 4.35 * Hydr. Depth (ft) 1.08 * •• Conv. Total (cfs) 5370.2 * Conv. (cfs) 5370.2 •• •• Length wtd. (ft) 375.42 * wetted Per. (ft) 113.88 * Page 2 5750 DRAINAGE MAPS.RPT •• Min Ch E1 (ft) 608.14 •• Shear (1b/sq ft) 0.47 •• Alpha 1.00 •• Stream Power (lb/ft s) 300.20 * 0.00 •• 0.00 •• • Frctn Lo55 (ft) 0.11 •• Cum volume (acre -ft) 0.05 * 2.48 •• 0.08 •• •• C & E Loss (ft) 0.06 •• Cum SA (acres) 0.05 * 1.19 •• 0.08 warning: The conveyance ratio (upstream conveyance) is less than 0.7 or greater additional cross sections. CROSS SECTION RIVER: River #1 REACH: Reach #1 River Station: 2 conveyance divided by downstream than 1.4. This may indicate the need for INPUT Description: Station Elevation Data, num = 52 Sta. Elev. Sta. Elev. Sta. Elev. Sta. Elev. Sta. Elev. 0 625.09 .1 625.09 8.07 624.91 14.04 624.89 33.1 623.85 35.5 623.72 36.54 623.36 44.39 620.26 52.82 617.63 63.17 615.1 73.31 612.38 74.66 611.91 77.98 611.15 81.46 610.22 82.45 610.05 99.33 609.12 111.85 608.69 122.69 608.46 139.36 607.37 143.15 607.24 144.53 606.98 144.6 607.12 145.28 606.92 145.62 606.63 149.84 604.58 150.09 604.58 150.23 604.58 150.94 604.64 151.3 604.67 151.4 605.26 153.87 606.72 154.91 606.95 154.94 607.02 154.97 606.98 155.84 607.15 160.43 607.68 180.68 609.3 186.56 610.82 188.54 611.38 199.18 613.07 202.5 613.72 210.23 614.69 224.31 616.29 231.64 616.91 239.27 617.84 252.29 619.11 263.46 619.96 275.74 620.77 286.47 620.95 293.38 620.93 300.1 620.8 300.2 620.8 Manning's n values, num = 3 Sta. value Sta. value Sta. value 0 .05 82.45 .035 180.68 .05 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 82.45 180.68 127.19 127 127.13 0.1 0.3 CROSS SECTION OUTPUT Profile # 100 YR - 24 HR •• E.G. Elev (ft) 612.54 •• Element Left OB •• Channel •• Right OB :; •• Vel Head (ft) 0.02 * wt. n -Val 0.050 •• 0.035 •• 0.050 ;, •• W.S. Elev (ft) 612.52 •• Reach Len. (ft) 127.19 * 127.00 •• 127.13 * •• Crit W.S. (ft) 608.84 * Flow Area (sq ft) 12.61 •• 421.66 * 21.43 ;, :; E.G. Slope (ft/ft) 0.000088 * Area (sq ft) 12.61 * 421.66 * 21.43 :; •• Q Total (cfs) 449.46 * Flow (cfs) 4.11 •• 437.92 * 7.44 •• •• Top width (ft) 122.97 •• Top width (ft) 9.68 •• 98.23 •• 15.06 Page 3 5750 DRAINAGE MAPS.RPT •• vel Total (ft/s) 0.99 * Avg. Vel. (ft/s) 0.33 * 1.04 * 0.35 •• •• Max Ch1 Dpth (ft) 7.94 * Hydr. Depth (ft) 1.30 * 4.29 * 1.42 •• • Conv. Total (cfs) 47913.9 * Conv. (cfs) 437.7 * 46683.5 * 792.8 :, •• Length wtd. (ft) 127.00 * wetted Per. (ft) 10.00 * 100.13 * 15.42 * •• Min Ch E1 (ft) 604.58 •• Shear (1b/sq ft) 0.01 * 0.02 * 0.01 •• • Alpha 1.08 * Stream Power (lb/ft s) 300.20 * 0.00 * 0.00 •• Frctn LOSS (ft) •• Cum volume (acre -ft) 0.14 •• •• C & E Loss (ft) * Cum SA (acres) 0.02 0.28 •• 0.02 CULVERT RIVER: River #1 REACH: Reach #1 River Station: 1.5 INPUT Description: Distance from upstream XS = 50 Deck/Roadway width = 28 weir Coefficient = 1 Bridge Deck/Roadway skew = upstream Deck/Roadway Coordinates, num = 2 Sta. Hi Cord Lo Cord Sta. Hi Cord Lo Cord 44.76 620.02 265.2 620.02 Downstream Deck/Roadway Coordinates, num = 2 Sta. Hi Cord Lo Cord Sta. Hi Cord Lo Cord 42.02 620.02 246.7 620.02 Elevation at which weir flow begins = 620.02 Maximum allowable submergence for weir flow = 0.95 submergence criteria : Broad Crested CROSS SECTION RIVER: River #1 REACH: Reach #1 River Station: 1 INPUT Description: Station Elevation Data, num = 52 Sta. Elev. Sta. Elev. Sta. Elev. Sta. Elev. Sta. Elev. 0 624.77 .1 624.77 11.6 624.76 22.47 624.41 25.91 624.18 31.37 623.34 41.05 620.52 42.63 619.97 43.99 619.55 58.39 614.61 59.8 614.14 65.52 612.63 69.82 611.1 77.56 609.41 79.85 608.97 80.8 608.92 84.54 607.99 84.89 607.92 85.16 607.91 96.58 607.42 108.67 607.18 113.71 607.1 121.53 606.91 132.07 606.58 134.1 605.3 135.28 604.51 136.49 604.31 139.12 604.04 140.23 604.25 142.52 604.45 143.84 605.31 146.59 606.89 157.57 606.91 168.91 606.45 170.04 606.43 171.63 606.52 181.87 607.94 187.08 609.23 198.48 611.64 206.8 613.29 Page 4 5750 DRAINAGE MAPS.RPT 225.36 616.63 230.53 617.59 244.04 619.69 246.65 620.1 247.11 620.19 247.66 620.24 265.83 622.06 278.45 623.43 283.37 623.8 297.74 624.61 300.2 624.71 300.3 624.71 manning's n values, num = 3 Sta. value Sta. value Sta. value 0 .05 85.16 .035 181.87 .05 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 85.16 181.87 0 0 0 0.1 0.3 CROSS SECTION OUTPUT Profile # 100 YR - 24 HR •• E.G. Elev (ft) Reach 608.29 nl •• Element *Reach Left OB * Channel Right OB 0.035° 0.05* *Reach #1 2 0.05* 0.035* 0.05* •• Vel Head (ft) #1 0.18 Culvert* •• wt. n -Val *Reach 0.050 * 0.035 0.050 :, 0.035* 0.05` Page 5 • W.S. E1ev (ft) 608.12 •• Reach Len. (ft) •• Crit W.S. (ft) 607.57 •• Flow Area (sq ft) 0.14 •• 132.11 •• 0.06 •• E.G. Slope (ft/ft) 0.004322 •• Area (sq ft) 0.14 * 132.11 •• 0.06 •• • Q Total (cfs) 449.46 •• Flow (cfs) 0.07 * 449.37 •• 0.02 •• Top width (ft) 98.54 •• Top width (ft) 1.12 * 96.71 •• 0.71 •• Vel Total (ft/s) 3.40 •• Avg. vel. (ft/s) 0.48 * 3.40 •• 0.38 •• •• Max Ch1 Dpth (ft) 4.08 •• Hydr. Depth (ft) 0.13 * 1.37 •• 0.09 •• •• Conv. Total (cfs) 6837.0 •• Conv. (cfs) 1.0 * 6835.6 •• 0.4 •• • Length wtd . (ft) •• wetted Per. (ft) 1.15 * 98.19 •• 0.73 •• •• Min Ch E1 (ft) 604.04 •• Shear (1b/sq ft) 0.03 * 0.36 •• 0.02 •• Alpha 1.00 •• Stream Power (lb/ft s) 300.30 •• 0.00 •• 0.00 •• • Frctn Loss (ft) •• Cum volume (acre -ft) •• C & E Loss (ft) •• Cum SA (acres) SUMMARY OF MANNING'S N VALUES River: River #1 Reach River Sta. nl n2 n3 *Reach #1 3 0.05* 0.035° 0.05* *Reach #1 2 0.05* 0.035* 0.05* *Reach #1 1.5 Culvert* *Reach #1 1 0.05* 0.035* 0.05` Page 5 5750 DRAINAGE MAPS.RPT SUMMARY OF REACH LENGTHS River: River #1 Reach * River Sta. * Left * channel* Right *Reach #1 3 * 350.13* 375.85* 338.3* *Reach #1 2 * 127.19* 127* 127.13* *Reach #1 1.5 * Culvert* *Reach #1 1 SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS River: River #1 Profile output - standard Table 1 Reach *River Sta. * Profile * Q Total *Min ch El *W.S. Elev *Crit W.S. *E.G. Elev *E.G. slope * Vel Chnl *Flow Area *Top width *Froude # Ch1 * (cfs) (ft) (ft) (ft) (ft) (ft/ft) * (ft/s) (sq ft) (ft) Reach #1 *3 *100 YR 449.46 608.14 612.49 612.71 0.007005 3.71 121.29 112.02 0.63 Reach #1 *2 *100 YR 449.46 604.58 612.52 608.84 612.54 0.000088 1.04 455.70 122.97 0.09 Reach #1 *1.5 *100 YR - Culvert Reach #1 *1 *100 YR - 449.46 604.04 608.12 607.57 608.29 0.004322 3.40 132.31 98.54 0.51 Profile output - standard Table 2 Reach * River Sta. * Profile * E.G. Elev * W.S. Elev * Vel Head Frctn Loss C & E Loss Q Left Q channel Q Right Top width (ft) * (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) Page 6 Reach River Sta. Contra* EXpan. *Reach #1 3 0.1* 0.3* *Reach #1 2 0.1* 0.3* *Reach #1 1.5 Culvert* *Reach #1 1 0.1* 0.3* Profile output - standard Table 1 Reach *River Sta. * Profile * Q Total *Min ch El *W.S. Elev *Crit W.S. *E.G. Elev *E.G. slope * Vel Chnl *Flow Area *Top width *Froude # Ch1 * (cfs) (ft) (ft) (ft) (ft) (ft/ft) * (ft/s) (sq ft) (ft) Reach #1 *3 *100 YR 449.46 608.14 612.49 612.71 0.007005 3.71 121.29 112.02 0.63 Reach #1 *2 *100 YR 449.46 604.58 612.52 608.84 612.54 0.000088 1.04 455.70 122.97 0.09 Reach #1 *1.5 *100 YR - Culvert Reach #1 *1 *100 YR - 449.46 604.04 608.12 607.57 608.29 0.004322 3.40 132.31 98.54 0.51 Profile output - standard Table 2 Reach * River Sta. * Profile * E.G. Elev * W.S. Elev * Vel Head Frctn Loss C & E Loss Q Left Q channel Q Right Top width (ft) * (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) Page 6 5750 DRAINAGE MAPS.RPT Reach #1 * 3 100 YR - •• 612.71 612.49 0.21 0.11 0.06 449.46 112.02 Reach #1 2 100 YR - 612.54 612.52 0.02 4.11 437.92 7.44 122.97 Reach #1 1.5 100 YR - culvert Reach #1 1 100 YR - 608.29 608.12 0.18 0.07 449.37 0.02 98.54 Report completed - 07/08/17 08:57:20 PM Page 7 Moore Farm Subdivision — Union County, NC Stormwater Management Report Stormwater Design Calculations 30 in. Culvert Crossing #2 5750 July 10, 2017 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 www.eagleonline.net ■ w E 400' 400" 40P 400' DA= 5.27 ACRES L 1 GRAPHIC SCALE 0 100, 200' IN FEET 1 inch = loo ft. BYPASS DRAINAGE AREA MAP 5A EA SHEET FLOW 300 LF@ 1.41 I I I I I I I 633 631 7 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 www.eagleonline.net PRE -DEV. TIME OF SHALLOW N CONCENTRATED 684 L F@ 2.79 63' -- CONCENTRATION 6 1 FLOW TO HW -28C GRAPHIC SCALE 0 60' 120' ( IN FEET ) 1 inch = 60' ft. Hydrology Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. CULVERT #2 - Moore Farm Parkway Hydrograph type = Rational Storm frequency (yrs) = 100 Drainage area (ac) = 5.270 Rainfall Inten (in/hr) = 4.035 OF Curve = NOAA IDF.IDF Q (cfs) 8.00 K 2.00 0.00 11 0 10 20 30 Runoff Hyd - Qp = 7.44 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff. (C) Tc by TR55 (min) Rec limb factor Runoff Hydrograph 100 -yr frequency 40 50 Monday, Jul 10 2017 = 7.443 = 1 = 0.35 = 42 = 1.00 Hydrograph Volume = 18,756 (cuft); 0.431 (acft) 70 N Q (cfs) 8.00 4.00 2.00 1 0.00 90 Time (min) TR55 Tc Worksheet Rational CULVERT #2 - Moore Farm Parkway Description A B C Sheet Flow = 0.00 0.00 0.00 Manning's n -value = 0.240 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. ((in)) = 3.54 0.00 0.00 Land slope (%) = 1.41 0.00 0.00 Travel Time (min) = 37.58 + 0.00 + 0.00 Shallow Concentrated Flow Flow length (ft) = 684.00 0.00 0.00 Watercourse slope (%) = 2.79 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 2.69 0.00 0.00 Travel Time (min) = 4.23 + 0.00 + 0.00 Channel Flow X sectional flow area ((sqft)) = 0.00 0.00 0.00 Wetted perimeter ((ft)) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0 + 0 + 0 TotalTravel Time, Tc.............................................................................. Hydraflow Express by Intelisolve Totals 37.58 �, wicl 0.00 42.00 min Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. CULVERT # 2 - Moore Farm Parkway Invert Elev Dn (ft) Pipe Length (ft) Slope (%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n -Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Eley (ft) 621.00 620.OD 61900 613.00 617.00 616.00 615.00 61400 613.00 612.DD 611.00 = 612.74 = 105.84 = 2.61 = 615.50 = 30.0 = Circular = 30.0 = 1 = 0.012 = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 620.92 = 60.00 = 0.00 CULVERT # 2 - Moore Farm Parkway Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Monday, Jul 10 2017 = 7.44 = 7.44 = (dc+D)/2 = 7.44 = 7.44 = 0.00 = 2.09 = 4.64 = 614.44 = 616.41 = 616.73 = 0.49 = Inlet Control Hw Depth (ft) 5.50 4.50 3 5D 2.50 1.50 0.50 -0.50 -154 -2.54 -3.54 -43D 150 Reach (ft) 0 10 20 30 40 50 60 70 30 so 700 110 120 130 140 Cl 1cu C I -t HGL Embank Moore Farms Subdivision — Union County, NC Stormwater Management Report 5750 May 9, 2017 Erosion Control Calculations Skimmer Basin Design, Temporary Sediment Basin Design, Faircloth Skimmer Sizing (Including: Orifice Drawdown Calculations) 1.0 Introduction 1.1 Project Scope of Work The project is located in an unincorporated area of Union County, North Carolina on the west side of Waxhaw Indian Trail Road and approximately 2.25 miles south of the intersection with Old Monroe Road. The proposed development will include construction of 269 residential lots, a clubhouse, amenity areas, associated parking, landscaping, stormwater management facilities and associated infrastructure. Site development will include site grading, storm drainage system, sanitary sewer extension and water extension throughout the proposed site. Tax Parcel/s: M7-120-012, N7-120-012, M7-120-013, N7-120-013 M7-120-014, N7-120-014, 07-138-003A Total Site Acreage: 116.11 Acres Total Disturbed area approximately: 75 Acres Project Address: 3401 WAXHAW INDIAN TRAIL ROAD Project Location: 35° 0'36."N, -80°67'98"W Jurisdiction: UNION COUNTY Total Lots: 269 Existing Conditions: Vacant 1.2 Project Contacts Project Owner Name: Graham Enterprises of the Carolinas, LLC. Address: Post Office Box 78926 Charlotte, NC 28271 Owner Representative: Mel Graham Email: mel@qrahamenterprises.org Phone: 704-552-5338 Developer: Graham Enterprises of the Carolinas, LLC Address: Post Office Box 78926 Charlotte, NC 28271 ESC Plan Preparer: Contact: Email: Eagle Engineering, Inc. John H. Ross, P.E. jross@eagleonline.net Phone: 704-882-4222 License No: NC -14959 2.0 Site Assessment/Description 2.1 Topography/ Discharge Points The site is accessed along Waxhaw Indian Trail Road. In general the site drains south, away from Waxhaw Indian Trail Road towards an un -named tributary of Davis Mill Creek that splits the front portion of the property. creek that runs along the properties south east corner. This being the primary outfall. A large null in the southwest corner splits the grade near the upper part of the property creating a small outfall to the west. The slope ranges from 5 — 8% on average. 2.2 Site Soils Within the project lines the major soils include the following: • BaB - Badin channery silt loam, 2 to 8percent slopes • BaC - Badin channery silt loam, 8 to 15percent slopes • BdB2 - Badin channery silty clay loam, 2to 8 percent slopes,moderately eroded • BdC2 - Badin channery silty clay loam, 8to 15 percent slopes,moderately eroded • ChA - Chewacla silt loam, 0 to 2percent slopes, frequentlyflooded • GoC - Goldston very channery siltloam, 4 to 15 percent slopes • GsB - Goldston-Badin complex, 2 to 8percent slopes • ScA - Secrest-Cid complex, 0 to 3percent slopes • WyB - Wynott gravelly loam, 2 to 8percent slopes 2.3 Surface Waters and Receiving Water Receiving waters from this project include Davis Mill Creek, an un -named tributary of Davis Mill Creek and Price Mill Creek. These drainage patterns being classified as class 3, tributaries to Twelve Mile Creek and outfalls to the Catawba River. (FIRM Panel 4496, Map Number 3710449700J effective date 10/16/2008). Surface Water Classifications: • Stream Index: 11-138-2-2-1 • Stream Name: Davis Mine Creek • Classification: C • River Basin: Catawba 2.4 Critical Areas Reference 707 General Permit SAW -2016-01541 (Moore Farms Development) for the following permitted activities. - Riparian Buffer: Land Development activities onsite include three buffer impacts 1. Prop. 8" S.S crossing (temporary) 2. Dual 72" CMP culvert with Headwalls (permanent) 3. Removal of existing 18" CMP culvert (temporary) - Wetlands: Land Development activities onsite include disturbance of delineated wetlands. 1. Total proposed wetlands impact: 0.041 acres (1,805 s.f.) 2.5 Adjacent/Off-Site Areas Land disturbing active associated with this development will be limited to onsite. 3.0 Sediment & Erosion Control 3.1 Design Objective The objective of the erosion control plan is to establish specific guidelines by design for controlling soil erosion and sedimentation during and after site clearing. Moreover, this plan specifies the control measures and sequencing that will be employed to provide a practical and workable means of minimizing detrimental impacts to soils and water resource as a result of the construction actives. All measures are designed in accordance with North Carolina DEQ Erosion Control Manual revised January 2017. 3.2 Characteristics of Earth Disturbance Activity: The project is roughly 116 acres with 49% being left as open space. The overall topo is rolling with three receiving waters (Price Creek, Davids Mill Creek, and an unnamed tributary of Davids Mill Creek). Installation of the erosion control measures will be Phased. The front portion of the property being +/- 39.5 acres (west side of un -named tributary) will be considered Phase 1. After the precon, this area's erosion control measures will be installed, stabilized and inspected. As clearing & grading begins in Phase 1, installation of erosion control measure for phase two will begin denoted by the installation of a temporary creek crossing. A grade break in Phase 2 (east side of tributary) splits the rear portion of the property between two outfalls. Depending on weather conditions at the time of construction, and if an effort to ensure containment of erosion control measures, the Contractor may op to split Phase 2 into two phases. Should there be three phases, the second portion of the erosion control measure would be installed, stabilized and inspected prior to installation of the remaining erosion control measure. Total Project Area: 116.11 acres Total Impervious Area: 31.97 acres Proposed Disturbance: 75 acres 3.3 Best Management Practices: Temporary and permanent BMP's will be mitigated to control erosion and sediment throughout the project area. Post construction storm water runoff will be control as well with the proper BMP implementations. The temporary BMP are discuss further more within this report. 3.4 Temporary Best Management Practices: Temporary control measures or BMP's that will be included are a stabilized construction entrance, a temporary creek crossing temporary culvert with rip-rap along the stream channel to minimize the increase of stream flow velocity, silt fences, a small sediment trap will be constructed to control runoff of any sediment throughout the drainage area/ project area. 3.5 Plan Drawings: The Erosion and Sediment control plan and supporting details for the project are provided in the construction plans for The Moore Farm Subdivision. 3.6 Supporting Calculations: Supporting calculations are provided with in the E&S plan which includes the Project Design report. EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 E G G TEMPORARY N NGE RLN SEDI M ENT TRAP -1 Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/25/2017 2013A Van Buren Ave. Designation TS -1 Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 1.96 Acres 85,378 Square Feet Total Disturbed Area 1.83 Acres 79,715 Square Feet C 0.35 Tc 5 Minutes 110 7.03 Inches per Hour Q10 4.82 CFS Required Volume 6,588 Cubic Feet Contour Area Volume Net Volume Required Surface Area 2,098 Square Feet 617.5 1,242 0 0 618 1,465 677 677 Provided Volume�-M Cubic Feet OK 619 1,985 1,725 2,402 Provided Surface Area Square Feet OK 620 2,578 2,282 4,683 6211 3,2441 2,9111 7,594 Length 50 Feet Minimum Spillway Design Width 25 Feet Q10 4.82 CFS L/W Ratio 2.00 OK H 1 Feet C 3 Spillway Elevation620 Surface Area at Spillway 2,578 L 1.61 Feet EC Phase 1 - Skimmer Basin 1 - Emergency Spillway Spillway Length 5 Feet Head over Spillway 1 Feet Weir Coefficient 3 Max Flow 15 CFS OK EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 EN GINGERING TEMPORARY SEDIMENT TRAP -2 Project MOORE FARMS Client Graham Enterprises Project# 5750 Date 5/25/2017 2013A Van Buren Ave. Designation TS -2 Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 3.81 Acres 165,964 Square Feet Total Disturbed Area 1.56 Acres 67,954 Square Feet C 0.35 T, 5 Minutes 110 7.03 Inches per Hour Q10 9.37 CFS Required Volume 5,616 Cubic Feet Contour Area Volume Net Volume Required Surface Area L:::4,078 Square Feet 608 1,779 0 0 609 2,355 2,067 2,067 Provided Volume 12,228 Cubic Feet OK 610 3,003 2,679 4,746 Provided Surface Area 4,515 Square Feet OK 611 3,723 3,363 8,109 612 4,5151 4,1191 12,228 Length 70 Feet Minimum Spillway Design Width 35 Feet Q10 9.37 CFS L/W Ratio 2.00 OK H 1 Feet C 3 Spillway Elevation611 Surface Area at Spillway 3,723 L 3.12 Feet EC Phase 1- Skimmer Basin 1- Emergency Spillway Spillway Length 5 Feet Head over Spillway 1 Feet Weir Coefficient 3 Max Flow 15 CFS EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN A EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation A Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 10.03 Acres 436,907 Square Feet Total Disturbed Area 9.06 Acres 394,654 Square Feet C 0.35 Tc 5 Minutes 110 7.03 Inches per Hour Contour Area Volume Net Volume Q10 24.68 CFS 0 0 613 4,160 0 0 Required Volume 32,616 Cubic Feet 614 5,101 4,631 4,631 Required Surface Area I 10,735 Square Feet 615 6,134 5,618 10,248 616 7,244 6,689 16,937 Provided Volume 44,201 Cubic Feet OK 617 8,430 7,837 24,774 Provided Surface Area 11,035 Square Feet OK 618 9,694 9,062 33,836 619 11,035 10,365 44,201 Length 70 Feet Minimum Spillway Design Width 30 Feet Q10 24.68 CFS L/W Ratio 2.33 OK H 2 Feet C 3.367 Spillway Elevation 618 *Provides 1 Foot Freeboard Surface Area at Spillway 9,694 L 2.59 Feet Top of Berm Elevation 620 EC Phase 1 - Skimmer Basin 1 - Emergency Spillway Spillway Length Feet OK Days to Drain Days 5 3 2 4 Head over Spillway Feet Skimmer Size Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 1.7 Inches Max Flow CFS I OK Orifice Diamter Inches 47.6 3.4 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation B Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 6.28 Acres 273,557 Square Feet Total Disturbed Area 4.38 Acres 190,793 Square Feet C 0.35 Tc 5 Minutes 110 7.03 Inches per Hour Q10 15.45 CFS Required Volume 15,768 Cubic Feet Contour Area Volume Net Volume Required Surface Area I 6,722 Square Feet 615 4,210 0 0 616 5,069 4,640 4,640 Provided Volume 16,674 Cubic Feet OK 617 5,999 5,534 10,174 Provided Surface Area I 7,002 Square Feet OK 618 7,002 6,501 16,674 619 8,076 7,539 24,213 Length 90 Feet Minimum Spillway Design Width 45 Feet Q10 15.45 CFS L/W Ratio 2.00 OK H 1 Feet C 3 Spillway Elevation 618 Surface Area at Spillway 1 7,0021 L 5.15 Feet EC Phase 1- Skimmer Basin 1 - Emergency Spillway Spillway Length 7 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 2.5 Inches Weir Coefficient 3 Orifice Radius 1.1 Inches Max Flow 21 CFS OK Orifice Diamter 2.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN C EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation C Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 6.52 Acres 284,011 Square Feet Total Disturbed Area 6.02 Acres 262,231 Square Feet C 0.35 Tc 5 Minutes Contour 7192 Volume Net Volume 110 7.03 Inches per Hour 609 8,292 0 0 Q10 16.04 CFS 610 9,482 8,887 8,887 611 10,742 10,112 18,999 Required Volume 21,672 Cubic Feet 612 12,074 11,408 30,407 Required Surface Area I 6,978 Square Feet 613 13,478 12,776 43,183 614 14,954 13,478 56,661 Provided Volume 71,615 Cubic Feet OK 615 16,502 14,954 71,615 Provided Surface Area I 16,502 Square Feet OK Length 120 Feet Minimum Spillway Design Width 60 Feet Q10 16.04 CFS L/W Ratio 2.00 OK H 1 Feet C 3 Spillway Elevation 614 Surface Area at Spillway 1 14,9541 L 5.35 Feet EC Phase 1- Skimmer Basin 1 - Emergency Spillway Spillway Length 10 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 5 Inches Weir Coefficient 3 Orifice Radius 2.2 Inches Max Flow 30 CFS OK Orifice Diamter 4.4 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN D EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation D Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 9.40 Acres 409,464 Square Feet Total Disturbed Area 8.08 Acres 351,965 Square Feet C 0.35 Tc 5 Minutes Contour Area Volume Net Volume 110 7.03 Inches per Hour 595.5 7,659 0 0 Q10 23.13 CFS 600 16,523 54,410 54,410 600.5 23,712 10,059 64,468 Required Volume 29,088 Cubic Feet 601 24,987 12,175 76,643 Required Surface Area I 10,061 Square Feet 601.25 21,591 5,822 82,465 603.5 28,034 55,828 138,293 Provided Volume 82,465 Cubic Feet I OK 1 604.51 29,254 Provided Surface Area I 21,591 Square Feet OK Length 240 Feet Minimum Spillway Design Width 60 Feet Q10 23.13 CFS L/W Ratio 4.00 OK H 1 Feet C 3 Spillway Elevation 603.5 Surface Area at Spillway 1 28,0341 L 7.71 Feet EC Phase 1- Skimmer Basin 1 - Emergency Spillway Spillway Length 15 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 5 Inches Weir Coefficient 3 Orifice Radius 2.3 Inches Max Flow 45 CFS OK Orifice Diamter 4.7 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN E EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation E Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 5.60 Acres 243,936 Square Feet Total Disturbed Area 5.60 Acres 243,936 Square Feet C 0.50 Tc 5 Minutes 110 7.03 Inches per Hour Q10 19.68 CFS Required Volume 20,160 Cubic Feet Contour Area Volume Net Volume Required Surface Area I 8,563 Square Feet 607 5,712 0 0 608 6,729 6,221 6,221 Provided Volume 31,378 Cubic Feet OK 609 7,802 7,266 13,486 Provided Surface Area I 9,525 Square Feet OK 610 8,931 8,367 21,853 611 10,119 9,525 31,378 Length 122 Feet Minimum Spillway Design Width 47 Feet Q10 19.68 CFS L/W Ratio 2.60 OK H 1 Feet C 3 Spillway Elevation 611 Surface Area at Spillway 1 10,1191 L 6.56 Feet EC Phase 1- Skimmer Basin 1 - Emergency Spillway Spillway Length 7 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 4 Inches Weir Coefficient 3 Orifice Radius 1.4 Inches Max Flow 21 CFS OK Orifice Diamter 2.9 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN F EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation F Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 6.03 Acres 262,667 Square Feet Total Disturbed Area 4.73 Acres 206,039 Square Feet C 0.50 Tc 5 Minutes 110 7.03 Inches per Hour Q10 21.20 CFS Required Volume 17,028 Cubic Feet Contour Area Volume Net Volume Required Surface Area I 9,220 Square Feet 609 4,965 0 0 610 6,380 5,673 5,673 Provided Volume 21,492 Cubic Feet OK 611 7,895 7,138 12,810 Provided Surface Area 9,468 Square Feet OK 612 9,468 8,682 21,492 613 11,098 10,283 31,775 Length 160 Feet Minimum Spillway Design Width 50 Feet Q10 21.20 CFS L/W Ratio 3.20 OK H 1 Feet C 3 Spillway Elevation 613 Surface Area at Spillway 1 11,0981 L 7.07 Feet EC Phase 1- Skimmer Basin 1 - Emergency Spillway Spillway Length 8 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient 3 Orifice Radius 1.2 Inches Max Flow 24 CFS OK Orifice Diamter 2.4 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN G EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation G Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 3.87 Acres 168,577 Square Feet Total Disturbed Area 3.87 Acres 168,577 Square Feet C 0.50 Tc 5 Minutes 110 7.03 Inches per Hour Q10 13.60 CFS Required Volume 13,932 Cubic Feet Contour Area Volume Net Volume Required Surface Area I 5,917 Square Feet 604 3,580 0 0 605 4,355 3,968 3,968 Provided Volume 14,368 Cubic Feet OK 606 5,186 4,771 8,738 Provided Surface Area I 6,074 Square Feet OK 607 6,074 5,630 14,368 608 7,018 6,546 20,914 Length 94 Feet Minimum Spillway Design Width 40 Feet Q10 13.60 CFS L/W Ratio 2.35 OK H 1 Feet C 3 Spillway Elevation 607 Surface Area at Spillway 1 6,0741 L 4.53 Feet EC Phase 1- Skimmer Basin 1 - Emergency Spillway Spillway Length 5 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 2.5 Inches Weir Coefficient 3 Orifice Radius 1.0 Inches Max Flow 15 CFS OK Orifice Diamter 2.0 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN H EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation H Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 6.27 Acres 273,121 Square Feet Total Disturbed Area 6.27 Acres 273,121 Square Feet C 0.50 Tc 5 Minutes 110 7.03 Inches per Hour Q10 22.04 CFS Required Volume 22,572 Cubic Feet Contour Area Volume Net Volume Required Surface Area I 9,587 Square Feet 620 6,371 0 0 621 7,420 6,896 6,896 Provided Volume 23,976 Cubic Feet OK 622 8,526 7,973 14,869 Provided Surface Area 9,688 Square Feet OK 623 9,688 9,107 23,976 624 10,907 10,298 34,273 Length 126 Feet Minimum Spillway Design Width 51 Feet Q10 22.04 CFS L/W Ratio 2.47 OK H 1 Feet C 3 Spillway Elevation 623 Surface Area at Spillway 1 9,6881 L 7.35 Feet EC Phase 1- Skimmer Basin 1 - Emergency Spillway Spillway Length 8 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient 3 Orifice Radius 1.3 Inches Max Flow 24 CFS OK Orifice Diamter 2.5 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN A EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation A - Phase 2 Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 10.87 Acres 473,497 Square Feet Total Disturbed Area 10.87 Acres 473,497 Square Feet C 0.35 Tc 5 Minutes 110 7.03 Inches per Hour Contour Area Volume Net Volume Q10 26.75 CFS 0 0 613 4,160 0 0 Required Volume 39,132 Cubic Feet 614 5,101 4,631 4,631 Required Surface Area I 11,634 Square Feet 615 6,134 5,618 10,248 616 7,244 6,689 16,937 Provided Volume 56,131 Cubic Feet OK 617 8,430 7,837 24,774 Provided Surface Area I 12,601 Square Feet OK 618 9,694 9,062 33,836 620 12,601 22,295 56,131 Length 150 Feet Minimum Spillway Design Width 45 Feet Q10 26.75 CFS L/W Ratio 3.33 OK H 5 Feet C 3.367 Spillway Elevation620 Surface Area at Spillway 12,601 L 0.71 Feet Top of Berm Elevation 625 EC Phase 2 - Skimmer Basin A - Emergency Spillway Spillway Length Feet OK Days to Drain Days 5 3 5 4 Head over Spillway Feet Skimmer Size Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 1.9 Inches Max Flow CFS OK Orifice Diamter Inches 188.2 3.9 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN I EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 'a' SKIMMER BASIN EIV IVEERLIVG Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation I -Phase 2 Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 38.65 Acres 1,683,594 Square Feet Total Disturbed Area 26.29 Acres 1,145,192 Square Feet C 0.35 Tc 5 Minutes 110 7.03 Inches per Hour Q10 95.10 CFS Contour Area Volume Net Volume 608.5 4,280 0 0 Required Volume 94,644 Cubic Feet 609 6,447 2,682 2,682 Required Surface Area I 41,368 Square Feet 613.5 14,070 46,163 48,845 614 42,041 14,028 62,873 Provided Volume 264,751 Cubic Feet OK 618 58,898 201,878 264,751 Provided Surface Area 58,898 Square Feet OK 619 63,113 61,006 325,756 Length 400 Feet Minimum Spillway Design Width 70 Feet Q10 95.10 CFS L/W Ratio 5.71 OK H 1 C 3 Spillway Elevation 618 i Surface Area at Spillway 1 58,8981 L 31.70 Feet EC Phase 2 - Skimmer Basin A - Emergency Spillway Spillway Length 35 Feet Days to Drain 3.5 Days Head over Spillway 1 Feet Skimmer Size 8 Inches Weir Coefficient 3 Orifice Radius 3.9 Inches Max Flow 105 CFS OK Orifice Diamter 7.8 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN C EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation C -Phase 2 Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 10.84 Acres 472,190 Square Feet Total Disturbed Area 10.84 Acres 472,190 Square Feet C 0.35 Tc 5 Minutes Contour 7192 Volume Net Volume 110 7.03 Inches per Hour 609 8,292 0 0 Q10 26.67 CFS 610 9,482 8,887 8,887 611 10,742 10,112 18,999 Required Volume 39,024 Cubic Feet 612 12,074 11,408 30,407 Required Surface Area I 11,602 Square Feet 613 13,478 12,776 43,183 614 14,954 13,478 56,661 Provided Volume 71,615 Cubic Feet OK 615 16,502 14,954 71,615 Provided Surface Area I 16,502 Square Feet OK Length 150 Feet Minimum Spillway Design Width 75 Feet Q10 26.67 CFS L/W Ratio 2.00 OK H 5 Feet C 3 Spillway Elevation 614 Surface Area at Spillway 1 14,9541 L 0.80 Feet EC Phase 2 - Skimmer Basin A - Emergency Spillway Spillway Length 10 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 5 Inches Weir Coefficient 3 Orifice Radius 2.2 Inches Max Flow 30 CFS OK Orifice Diamter 4.4 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 BASIN D EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINGERLNG SKIMMER BASIN Project MOORE FARMS Client Graham Enterprises Project # 5750 Date 5/26/2017 2013A Van Buren Ave. Designation D - Phase 2 Designer JAB Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 17.05 Acres 742,698 Square Feet Total Disturbed Area 17.05 Acres 742,698 Square Feet C 0.35 Tc 5 Minutes Contour Area Volume Net Volume 110 7.03 Inches per Hour 595.5 7,659 0 0 Q10 41.95 CFS 600 16,523 54,410 54,410 600.5 23,712 10,059 64,468 Required Volume 61,380 Cubic Feet 601 24,987 12,175 76,643 Required Surface Area I 18,249 Square Feet 601.25 21,591 5,822 82,465 603.5 28,034 55,828 138,293 Provided Volume 138,293 Cubic Feet I OK 1 604.51 29,254 Provided Surface Area I 28,034 Square Feet OK Length 240 Feet Minimum Spillway Design Width 60 Feet Q10 41.95 CFS L/W Ratio 4.00 OK H 1 Feet C 3 Spillway Elevation 603.5 Surface Area at Spillway 1 28,0341 L 13.98 Feet EC Phase 2 - Skimmer Basin A - Emergency Spillway Spillway Length 15 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 8 Inches Weir Coefficient 3 Orifice Radius 3.0 Inches Max Flow 45 CFS OK Orifice Diamter 6.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 USDA United States Department of Agriculture N RCS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Union County, North Carolina Moore Farms June 23, 2016 Custom Soil Resource Report Soil Map 3 528600 528700 528800 528900 529000 529100 529200 529300 529400 529500 529600 529700 529800 529900 35° Z 26" N 35° Z 26" N m d B2F • • po qO^ IAI M O W • • Q h M ScA BaB o n g W CN M M o _g • r F M • o li 0 m 52 25 F M 1 O n i 0 Q M B • S O 35° V 55" N 35° V 55" N 528600 528700 528800 528900 529000 529100 529200 529300 529400 529500 529600 529700 529800 529900 3 3 v Map Scale: 1:6,590 if printed on A lardscope (11" x 8.5") sheet. Meters $ N 0 50 100 200 300 Feet 0 300 600 1200 1800 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons 0 Soil Map Unit Lines 0 Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip 0o Sodic Spot Custom Soil Resource Report MAP INFORMATION This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 15, Sep 10, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 11, 2011—Feb 13, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. ( Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause Other misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting +� Special Line Features soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. Transportation t++ Rails Source of Map: Natural Resources Conservation Service r ,.+ Interstate Highways Web Soil Survey URL: http://websoilsurvey.nres.usda.gov Coordinate System: Web Mercator (EPSG:3857) US Routes Major Roads Maps from the Web Soil Survey are based on the Web Mercator Local Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Background Albers equal-area conic projection, should be used if more accurate W Aerial Photography calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 15, Sep 10, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 11, 2011—Feb 13, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting Custom Soil Resource Report Map Unit Legend Union County, North Carolina (NC179) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaB Badin channery silt loam, 2 to 8 24.6 21.6% percent slopes BaC Badin channery silt loam, 8 to 15 5.3 4.6% percent slopes BdB2 Badin channery silty clay loam, 2 35.2 30.9% to 8 percent slopes, moderately eroded BdC2 Badin channery silty clay loam, 8 26.4 23.1% to 15 percent slopes, moderately eroded ChA Chewacla silt loam, 0 to 2 12.8 11.2% percent slopes, frequently flooded GoC Goldston very channery silt 2.1 1.9% loam, 4 to 15 percent slopes GsB Goldston-Badin complex, 2 to 8 0.1 0.1% percent slopes ScA Secrest-Cid complex, 0 to 3 4.4 3.8% percent slopes W Water 3.1 2.7% WyB Wynott gravelly loam, 2 to 8 0.0 0.0% percent slopes Totals for Area of Interest 114.2 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called 10 Custom Soil Resource Report noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha - Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. 11 Custom Soil Resource Report Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Union County, North Carolina BaB—Badin channery silt loam, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 2t80y Elevation: 300 to 1,100 feet Mean annual precipitation: 43 to 49 inches Mean annual air temperature: 59 to 63 degrees F Frost -free period: 215 to 245 days Farmland classification: Farmland of statewide importance Map Unit Composition Badin and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Badin Setting Landform: I nterfluves Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Interfluve Down-slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from metasedimentary rock and/or metavolcanics Typical profile A - 0 to 6 inches: channery silt loam Bt - 6 to 35 inches: silty clay Cr- 35 to 43 inches: bedrock R - 43 to 53 inches: bedrock Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 24 to 40 inches to paralithic bedrock; 40 to 59 inches to Iithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 6.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Minor Components Goldston Percent of map unit: 5 percent 13 Custom Soil Resource Report Landform: I nterfluves Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Convex Tatum Percent of map unit: 5 percent Landform: Interfluves Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Interfluve Down-slope shape: Linear Across -slope shape: Convex BaC—Badin channery silt loam, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3wOg Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Badin and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Badin Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap - 0 to 6 inches: channery silt loam Bt - 6 to 35 inches: silty clay Cr - 35 to 43 inches: weathered bedrock R - 43 to 80 inches: unweathered bedrock Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Natural drainage class: Well drained Runoff class: Medium 14 Custom Soil Resource Report Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 6.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C BdB2—Badin channery silty clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mx85 Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Badin, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Badin, Moderately Eroded Setting Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap - 0 to 6 inches: silty clay loam Bt - 6 to 20 inches: silty clay BC - 20 to 28 inches: channery silty clay loam Cr - 28 to 42 inches: weathered bedrock R - 42 to 80 inches: unweathered bedrock Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) 15 Custom Soil Resource Report Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C BdC2—Badin channery silty clay loam, 8 to 15 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mx86 Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Badin, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Badin, Moderately Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope, shoulder Landform position (three-dimensional): Side slope Down-slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap - 0 to 6 inches: silty clay loam Bt - 6 to 20 inches: silty clay BC - 20 to 28 inches: channery silty clay loam Cr - 28 to 42 inches: weathered bedrock R - 42 to 80 inches: unweathered bedrock Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None 16 Custom Soil Resource Report Frequency of ponding: None Available water storage in profile: Low (about 4.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C ChA—Chewacla silt loam, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 3wOp Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Map Unit Composition Chewacla and similar soils: 87 percent Minor components: 13 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Chewacla Setting Landform: Flood plains Down-slope shape: Concave Across -slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile A - 0 to 4 inches: silt loam Bw1 - 4 to 26 inches: silty clay loam Bw2 - 26 to 38 inches: loam Bw3 - 38 to 60 inches: clay loam C - 60 to 80 inches: loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat poorly drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 6 to 24 inches Frequency of flooding: Frequent Frequency of ponding: None Available water storage in profile: High (about 11.5 inches) Interpretive groups Land capability classification (irrigated): None specified 17 Custom Soil Resource Report Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Minor Components Congaree Percent of map unit: 8 percent Landform: Flood plains Down-slope shape: Linear Across -slope shape: Linear Wehadkee, undrained Percent of map unit: 5 percent Landform: Depressions on flood plains Down-slope shape: Concave Across -slope shape: Linear GoC—Goldston very channery silt loam, 4 to 15 percent slopes Map Unit Setting National map unit symbol: 3wOz Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Goldston and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Goldston Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile A - 0 to 1 inches: very channery silt loam E - 1 to 7 inches: very channery silt loam Bw - 7 to 16 inches: very channery silt loam Cr - 16 to 36 inches: weathered bedrock R - 36 to 80 inches: unweathered bedrock Properties and qualities Slope: 4 to 15 percent in Custom Soil Resource Report Depth to restrictive feature: 10 to 20 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 1.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: D GsB—Goldston-Badin complex, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 3wl 1 Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Goldston and similar soils: 45 percent Badin and similar soils: 40 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Goldston Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile A - 0 to 5 inches: very channery silt loam Bw - 5 to 16 inches: very channery silt loam Cr - 16 to 27 inches: weathered bedrock R - 27 to 80 inches: unweathered bedrock Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 10 to 20 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock Natural drainage class: Well drained 19 Custom Soil Resource Report Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 1.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: D Description of Badin Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile A - 0 to 7 inches: channery silt loam Bt - 7 to 28 inches: silty clay Cr - 28 to 41 inches: weathered bedrock R - 41 to 80 inches: unweathered bedrock Properties and qualities Slope: 4 to 8 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C ScA—Secrest-Cid complex, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 3wl b 20 Very low to high (0.00 Custom Soil Resource Report Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Secrest and similar soils: 65 percent Cid and similar soils: 20 percent Minor components: 2 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Secrest Setting Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from argillite and/or residuum weathered from metavolcanics Typical profile Ap - 0 to 8 inches: silt loam BA - 8 to 11 inches: silt loam Bt - 11 to 43 inches: silty clay loam BCt - 43 to 54 inches: silty clay Cr - 54 to 62 inches: weathered bedrock R - 62 to 80 inches: unweathered bedrock Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: 40 to 60 inches to paralithic bedrock; 60 to 80 inches to Iithic bedrock Natural drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately high (0.00 to 0.20 in/hr) Depth to water table: About 12 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 8.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w Hydrologic Soil Group: C Description of Cid Setting Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Linear 21 Custom Soil Resource Report Parent material: Residuum weathered from argillite and/or residuum weathered from metavolcanics Typical profile Ap - 0 to 9 inches: channery silt loam Bt - 9 to 22 inches: silty clay loam BC - 22 to 27 inches: channery silty clay Cr - 27 to 32 inches: weathered bedrock R - 32 to 80 inches: unweathered bedrock Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: 20 to 40 inches to lithic bedrock; 20 to 40 inches to paralithic bedrock Natural drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately high (0.00 to 0.20 in/hr) Depth to water table: About 12 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w Hydrologic Soil Group: D Minor Components Wehadkee, undrained Percent of map unit: 2 percent Landform: Depressions on flood plains Down-slope shape: Concave Across -slope shape: Linear W—Water Map Unit Composition Water: 100 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Water Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8w 22 Custom Soil Resource Report WyB—Wynott gravelly loam, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 2mdlm Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Wynott and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Wynott Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap - 0 to 8 inches: gravelly loam Bt - 8 to 23 inches: clay BC - 23 to 30 inches: gravelly clay Cr - 30 to 80 inches: weathered bedrock Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to Iithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately high (0.00 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: D 23 NCDENR Stormwater BMP Manual Chanter Revised 06-16-09 The type of ground cover at a given site greatly affects the volume of runoff. Undisturbed natural areas, such as woods and brush, have high infiltration potentials whereas impervious surfaces, such as parking lots and roofs, will not infiltrate runoff at all. The ground surface can vary extensively, particularly in urban areas, and Table 3-5 lists appropriate curve numbers for most urban land use types according to hydrologic soil group. Land use maps, site plans, and field reconnaissance are all effective methods for determining the ground cover. Table 3-5 Runoff curve numbers in urban areas for the SCS method (SCS, 1986) 77 Cover Description 91 Curve Numbers for Pasture (< 50% ground cover or heavily grazed) 68 79 Hydrologic Soil Group 89 Fully developed urban areas A B C D Open Space (lawns, parks, golf courses, etc.) Pasture (>75% ground cover or lightly grazed) 39 61 Poor condition (< 50% grass cover) 68 79 86 89 Fair condition (50% to 75% grass cover) 49 69 79 84 Good condition (> 75% grass cover) 39 61 74 80 Impervious areas: 48 67 77 Paved parking lots, roofs, driveways, etc. 98 98 98 98 Streets and roads: 77 Brush (>75% ground cover) 30 Paved; curbs and storm sewers 98 98 98 98 Paved; open ditches 83 89 98 98 Gravel 76 85 89 91 Dirt 72 82 85 88 Developing urban areas Newly graded areas 77 86 91 94 Pasture (< 50% ground cover or heavily grazed) 68 79 86 89 Pasture (50% to 75% ground cover or not heavily grazed) 49 69 79 84 Pasture (>75% ground cover or lightly grazed) 39 61 74 80 Meadow - continuous grass, protected from grazing and 30 58 71 78 generally mowed for hay Brush (< 50% ground cover) 48 67 77 83 Brush (50% to 75% ground cover) 35 56 70 77 Brush (>75% ground cover) 30 48 65 73 Woods (Forest litter, small trees, and brush destroyed by 45 66 77 83 heavy grazing or regular burning) Woods (Woods are grazed but not burned, and some forest 36 60 73 79 litter covers the soil) Woods (Woods are protected from grazing, and litter and 30 55 70 77 brush adequately cover the soil) Most drainage areas include a combination of land uses. The SCS Curve Number Model should be applied separately: once for areas where impervious cover is directly connected to surface water via a swale or pipe and a second time for the remainder of the site. The runoff volumes computed from each of these computations should be added to determine the runoff volume for the entire site. For the portion of the site that is NOT directly connected impervious surface, a composite curve number can be determined to apply in the SCS Curve Number Model. The composite curve number must be area -weighted based on the distribution of land uses at the site. Runoff from impervious areas that is allowed to flow over pervious Stormwater Management and Calculations 3-9 July 2007 Moore Farms Subdivision — Union County, NC Stormwater Management Report Wet Pond Model 5750 May 9, 2017 Moore Farm Subdivision — Union County, NC 5750 Stormwater Management Report JULY 7, 2017 DETENTION NARRATIVE The proposed development is located on the east side of Waxhaw Indian Trail road in Union County North Carolina. Per Union Counties Unified Development Operating Manual Article 5 (Residential Districts) Section 5.040/38b Other Relevant Regulations, subsection 6. Stormwater Management; "Post -Development Stormwater discharges rates at the property boundary may not exceed the pre -development rate of the 2 and 25 year storm evets. This regulation does not apply id discharging directly into a FEMA Regulated Floodplain. " The proposed development's stormwater runoff from basins 1 & 4 discharge to the FEMA Regulated Floodplain in Davis & Price Mill Creek. Consequently, this project's stormwater management facilities has been designed to address only water quality and to pass the 100 -yr storm event without over -topping. Moore Farms Subdivision — Union County, NC Stormwater Management Report Wet Pond 1 5750 May 9, 2017 DA - AC GRAPHIC SCALE 0 100' 200' 2013A Van Buren Ave. Indian Trail, NC 28079 AREA (704) 882-4222 ( IN FEET ) www.eagleonline.net 1 inch = loo ft. MAP 1A E WET BASIN - 1 DRAINAGE E GRAPHIC SCALE 0 100' 200' ( IN FEET ) 1 inch = loo ft. WET BASIN - 1 DRAINAGE AREA MAP 18 BASIN #1 Wet Detention Pond E N GI N E E RL N G PROJECT: MOORE FARM SUBDIVISION CLIENT: Graham Enterprises PROJ. #: 5750 DATE: 2013 Van Buren Avenue PHASE: Wet Basin #1 DESIGN BY: JWG Indian Trail, NC 28079 Wet Detention Pond - NC BMP Manual Calculate Water Quality Volume Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) = 742,567 Ft Impervious Area = 296,607 Ft Impervious Fraction (IA) = 0.40 40% Rv = 0.05+0.9(IA) = 0.41 Runoff Coefficient Water Quality Volume Required (WQV) = 25,340 ft3 Where: WQV = 3630 * RD * Rv * A Rainfall Depth (RD) = 1.0 in. Runoff Coefficient (Rv) = 0.41 unitless Watershed Area (A) = 17.05 ac. WQV Elev. = 601.25 WQV provided = ft3 OK Permanent Pool Average Deptl day = Vpp/App Volume at Bottom of Shelf= Area at Bottom of Shelf = Area at bottom of pond = Depth to bottom of shelf = Volume of perm. Pool= Percent Impervious Cover = SA/DA Ratio = Surface Area Req'd (SA) _ Surface Area Provided = Average Length = Average Width = Length to Width Ratio = 17.05 ac 6.81 ac Length, Width (Area), Depth, Geometry I (da„) = 3.1 35,856 Vpp (ft3) 11,686 App (ft) 6,872 Abot_pond (ftz) 3.00 Depth (ft) WQV Volume Calculation Main Pool Volume Calculation Contour Area Volume Net Vol 600 16,909 0 0 600.5 23,712 10,155 10,155 601 24,987 12,175 22,330 601.25 21,591 5,822 28,152 604.5 29,254 82,623 110,775 Length, Width (Area), Depth, Geometry I (da„) = 3.1 35,856 Vpp (ft3) 11,686 App (ft) 6,872 Abot_pond (ftz) 3.00 Depth (ft) ft 3.0 ft. (rounded down) Main Pool Volume Calculation Contour Area Volume Net Vol 595.5 6242 0 0 599.5 11686 35,856 35,856 600 13466 6,288 42,144 35,856 40 % 1.51 11,198 ft ft2 200 ft 60 ft 3.3 :1 SA/DA Ration for Perm. Pool Sizing % Imp. Cover Perm. Pool Avg Depth (ft) 3.0 3.5 4.0 30 1.17 1.06 0.94 40 1.51 1.38 1.24 50 1.79 1.65 1.51 Values from Table: Region: Efficiency: 1 Piedmont 85 % EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 1 Orifice diameter = Orifice inv. Elev. = Orifice Equation: 2 -day Avg Discharge (Q2av) = 5 -day Avg Discharge (Q5,J = Average Discharge (Q) = Discharge Coefficient (CD) _ X -sect area of orifice (A) _ Accel. due to gravity (g) _ Avg. driving head (Ho) = Forebay Vol. Required: Approx. Area Required Vol. Provided: Area Provided: BASIN #1 WQV Outlet Device 2.5 in. 6UU.UU Q = CD A (2g(HO/3))0.5 0.1466 cfs (max.) 0.0587 cfs (min.) cfs (provided) 0.60 0.0341 ft 32.2 ft/sect 0.3819 ft Ho = Driving Head (ft), measured from the centroid of the orifice area to the water surface Note: Use Ho/3 to compute drawdown to reflect the fact that head is decreasing as drawdown occurs Forebay Design 5,378 ft3 (15% main pool) 1,537 ft 10,067 ft OK 3,057 ft OK Forebay Volume Calculation Contour Area Volume Net Vol 595.5 1417 0 0 600 3057 10,067 10,067 Landscape Requirements 6' Littoral shelf shall be Planted with materials consistent with antcipated hydrology (Ref. Sheet C-3.9 BMP 1 Plan & Profile) On the tops of berms and on the exteior slopes of containment berms, maintain turf grass in access areas; Centipede grass is recommended. *Do not use love grass for slope stablization (References)* North Carolina DEQ BMP Manual Charter Revised 069-17-2009 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 1 Hydraflow Table of Contents Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 BASIN 1 - JWG .gpw Friday, 07 / 7 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 100 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, BASIN 1................................................................................ 4 OFReport.................................................................................................................... 5 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2016 by Autodesk, Inc. v1 1 Legend Hvd. Origin Description 1 SCS Runoff BASIN 1 2 Reservoir ROUTED Project: BASIN 1 - JWG .gpw Friday, 07 / 7 / 2017 Hydrograph Return Period Recap Hyd flow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 2 SCS Runoff Reservoir ------ 1 ---- ---- --- ------- ------- ------- ------- ------- --- ------- --- ---- ------- ------- ------- ------- 160.59 98.77 BASIN 1 ROUTED Proj. file: BASIN 1 - JWG .gpw Friday, 07 / 7 / 2017 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 160.59 2 716 341,979 ------ ------ ------ BASIN 1 2 Reservoir 98.77 2 722 340,468 1 603.80 87,475 ROUTED BASIN 1 - JWG .gpw Return Period: 100 Year Friday, 07 / 7 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 Time to peak BASIN 1 Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 17.050 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.79 in Storm duration = 24 hrs " Composite (Area/CN) = [(6.810 x 98) + (10.240 x 74)] / 17.050 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 4 Friday, 07 / 7 / 2017 Peak discharge = 160.59 cfs Time to peak = 716 min Hyd. volume = 341,979 cuft Curve number = 84* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 BASIN 1 Hyd. No. 1 -- 100 Year 60.00 40.00 20.00 0.00 0 120 Hyd No. 1 240 360 480 600 720 840 960 1080 120 TimE Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 (min) Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 63.8568 12.6000 0.8882 -------- 2 68.8345 12.3000 0.8618 -------- 3 0.0000 0.0000 0.0000 -- - - 5 76.1199 12.8000 0.8363 -------- 10 75.6056 12.5000 0.8054 ------- 25 65.5456 11.1000 0.7420 -------- 50 58.8220 10.1000 0.6963 3 100 53.6961 9.2000 0.6576 -------- File name: NOAA IDF.IDF Intensity = B / (Tc + D)^E G� Friday, 07 / 7 / 2017 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.00 4.00 3.35 2.89 2.55 2.28 2.07 1.89 1.74 1.62 1.51 1.42 2 5.90 4.74 3.98 3.44 3.04 2.73 2.48 2.27 2.10 1.96 1.83 1.72 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.85 5.57 4.72 4.11 3.65 3.29 3.00 2.76 2.56 2.39 2.24 2.11 10 7.54 6.16 5.24 4.58 4.08 3.69 3.37 3.11 2.89 2.70 2.54 2.40 25 8.34 6.82 5.83 5.12 4.58 4.16 3.82 3.54 3.30 3.10 2.92 2.77 50 8.88 7.28 6.24 5.49 4.94 4.50 4.15 3.85 3.61 3.40 3.21 3.05 100 9.38 7.69 6.61 5.84 5.26 4.81 4.44 4.14 3.89 3.67 3.48 3.31 Tc = time in minutes. Values may exceed 60. recip. file name: X:\Land Projects R2\5750 - Landtec - Moore Farms\Calculations\Stormwater\PONDS - JLR\NOAA. c Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24-hour 2.94 3.54 0.00 4.45 5.17 6.17 6.96 7.79 SCS 6 -Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E A G L E ENGINEERING 4f 2013-A liar Buren Avenue Indian Trail. NC 28479 (7G4)882-4222 Riser Buoyancy Calculations - Wet Detention Pond #1 Project Name: MOORE FARMS SUBDIVISION Project No.: 5750 Riser Width: 60 in Riser Thickness: 6 in Barrel Size: 36 in Top of Basin: 604.5 ft. Bottom of Basin 595 ft. Riser Weir: 601.75 ft. Spillway Height from top of Basin: 1 ft. 1 ft. Spillway Height 603.5 ft. Spillway Elev. 601.75 ft. Riser Weir 60 in. RISER 6.75 ft. i 595 ft. Bottom of Basin Unit wt. of H201 62.4 ft3 Volume of Riserl 237.5 ft3 Wt. of H2O displaced in riser) 14,8201lbs Unit Wt. of concrete (pcf) 150 lbs/ft3 Volume of concrete in riser 45.125 ft3 Wt. of concrete riser 6,769 lbs Total Buoyancy Force to displace 21,589 lbs Concrete Base Required to Stabilize Riser: Concrete Pad Thinckness 24 in. Concrete Pad Width/length 9 ft Volume of concrete pad 162.00 ft3 Wt. of H2O displaced = 10,109 lbs Wt. of concrete pad 24300 lbs Factor of Safety: 11.1256 1OK Factor of safety should be greater than 1.10 Ballast Pad 604.5 ft. Top of Basin 8.5f. 36 in. RCP Wt. of H2O displaced in riser + Wt. of concrete riser / 60 in. RISER Ballast Pad —� 24 in. 9 ft.� — 9 ft. Ballast Pad Dimensions: 9 ft. X 9 ft. X 24 in. EEI Project No. 5750 Detention Structure Anchor Moore Farm Subdivision — Union County, NC Stormwater Management Report Wet Pond 2 5750 JULY 7, 2017 N E U 1UU LUU 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 ( IN FEET ) www.eagleonline.net 1 inch = loo ft. 1y1\L�ri ■ ■ ■ ■ ■ ■ ■ -2 i MEMO ■ DA 10.87 0 CRES 106 ■ 107 108 10! ■ 061 60 59 ■ 58 57 55 54 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 www.eagleonline.net GRAPHIC SCALE 0 100, 200' IN FEET 1 inch = loo ft. 22 WET BASIN -2 DRAINAGE FMAIMMAI E I 63 N �o rn Q) 6 1 rn M M V c 648 650- 0 3� 'SHEET FL O W 300 L F@ 2.94 • 626 II • N I cNo �o i' v 612 Rig 6( rn � i \ i' n 1 N � N 6, �19 611 —615- U 615- SHALLOW �� -615 61 I • ^ CONCENTRATEDE , 620- : O 288 LF /o 4.91 ♦ 11 N(31 Co P ♦ 6 M C-0 pp � � 1 p� alo A 6� 641Q0 �� rn co o 0 � o <co co � i - co i rn 1� o w'. 06 624 6 rn 639 ; ; tom Tern 6�'s A N p cr 6g3 6�o s �' rnp `r 6_ 6' Np ��9 7-1- A ra3��g�� 62 26 s3 624 6 6' rn rn o -62 rn ' Oy- ��� 0) CHANNEL FLOW N Co ��1v240 LF 1.01° ���� \ N c3)6� ppS co N M(b o U%8 6 o 619 N M ry rn A � MCO v �, 01 ^ co l a o C\1 1 M 1 ti3 M 6, CO d M CO N co 1 h 'o � 636 ��� Co rn w ^ cv, m 0 BASIN 2 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 www.eagleonline.net PRE -DEV. TIME OF CONCENTRATION GRAPHIC SCALE 0 60' 120' ( IN FEET ) 1 inch = 60' ft. i Ott FUTURE FUTURE AMENITY ♦ ' I 1 ®® znl GRAPHIC SCALE 0 100' 200' 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 ( IN FEET ) www.eagleonline.net 1 inch = loo ft. MAP 3 E L 5 mm" SUB -1 0. 16 AC SHEET FLOW S`13- 300 L F@ 1.41 % 0, 621 633 N) 632 631 1? ---6301 632 WI 628 6N ry&, 62e o CP (b 644 " ------1:23 3 ACb 641 623 o 621 `O 620 ;7# ♦ SHALLOW 621 r,�g ----- - r2f 'A C 6 SUB I 7.85 AC CONCENTRATED 624 615 - --- ---- 623co613 i rn 684 LF@ 2.79% 612 Op ,o 644 rn Lo "'BASIN 3 6Q N) Cl) CID 616 05 (b 13'23 \""CHANNEL FLOW 609610---- 0&2 -254 LF@ 3.01% 61 6,o6 - ------ - O 616 C) v ) to LOCO to G) Co rn rn 615 1b 3 9 N E E R PRE—DEV BASIN 3 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 www.eagleonline.net GRAPHIC SCALE 0 0' TIME OF 200' 40I CONCENTRATION IN FEET 1 inch = 200 ft. BASIN #2 Wet Detention Pond E N GI N E E RL N G PROJECT: MOORE FARM SUBDIVISION CLIENT: Graham Enterprises PROJ. #: 5750 DATE: 2013 Van Buren Avenue PHASE: Wet Basin #2 DESIGN BY: JWG Indian Trail, NC 28079 Wet Detention Pond - NC BMP Manual Calculate Water Quality Volume Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) = 473,497 Ft Impervious Area = 220,040 Ft Impervious Fraction (IA) = 0.46 46 % Rv = 0.05+0.9(IA) = 0.47 Runoff Coefficient Water Quality Volume Required (WQV) = 18,476 ft3 Where: WQV = 3630 * RD * Rv * A Rainfall Depth (RD) = 1.0 in. Runoff Coefficient (Rv) = 0.47 unitless Watershed Area (A) = 10.87 ac. WQV Elev. = 621.50 WQV provided = ft3 OK Permanent Pool Average Deptl day = Vpp/App Volume at Bottom of Shelf= Area at Bottom of Shelf = Area at bottom of pond = Depth to bottom of shelf = Volume of perm. Pool= Percent Impervious Cover = SA/DA Ratio = Surface Area Req'd (SA) _ Surface Area Provided = Average Length = Average Width = Length to Width Ratio = 10.87 ac 5.05 ac Length, Width (Area), Depth, Geometry I (da„) = 4.5 25,906 Vpp (ft3) 5,805 App (ft) 2,166 Abot_pond (ftz) 6.50 Depth (ft) WQV Volume Calculation Main Pool Volume Calculation Contour Area Volume Net Vol 620 12,601 0 0 620.5 14,012 6,653 6,653 621 14,739 7,188 13,841 621.5 15,487 7,557 21,398 622 16,235 7,931 29,328 623 17,789 17,012 46,340 Length, Width (Area), Depth, Geometry I (da„) = 4.5 25,906 Vpp (ft3) 5,805 App (ft) 2,166 Abot_pond (ftz) 6.50 Depth (ft) ft 4.0 ft. (rounded down) Main Pool Volume Calculation Contour Area Volume Net Vol 613 2166 0 0 619.5 5805 25,906 25,906 620 6741 3,137 29,042 25,906 46 % 1.41 6,699 ft ft2 200 ft 60 ft 3.3 :1 SA/DA Ration for Perm. Pool Sizing % Imp. Cover Perm. Pool Avg Depth (ft) 3.0 3.5 4.0 30 1.17 1.06 0.94 40 1.51 1.38 1.24 50 1.79 1.65 1.51 Values from Table: Region: Efficiency: 1 Piedmont 85 % EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 2 Orifice diameter = Orifice inv. Elev. = Orifice Equation: 2 -day Avg Discharge (Q2av) = 5 -day Avg Discharge (Q5,J = Average Discharge (Q) = Discharge Coefficient (CD) _ X -sect area of orifice (A) _ Accel. due to gravity (g) _ Avg. driving head (Ho) = Forebay Vol. Required: Approx. Area Required Vol. Provided: Area Provided: BASIN #2 WQV Outlet Device 2 in. 619.50 Q = CD A (2g(HO/3))0.5 0.1069 cfs (max.) 0.0428 cfs (min.) cfs (provided) 0.60 0.0218 ft 32.2 ft/sect 0.6389 ft Ho = Driving Head (ft), measured from the centroid of the orifice area to the water surface Note: Use Ho/3 to compute drawdown to reflect the fact that head is decreasing as drawdown occurs Forebay Design 3,886 ft3 (15% main pool) 1,110 ft 22,663 ft OK 5,545 ft2 OK Forebay Volume Calculation Contour Area Volume Net Vol 613 930 0 0 620 5545 22,663 22,663 Landscape Requirements 6' Littoral shelf shall be Planted with materials consistent with antcipated hydrology (Ref. Sheet C-3.9 BMP 1 Plan & Profile) On the tops of berms and on the exteior slopes of containment berms, maintain turf grass in access areas; Centipede grass is recommended. *Do not use love grass for slope stablization (References)* North Carolina DEQ BMP Manual Charter Revised 069-17-2009 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 2 Hydraflow Table of Contents BASIN 2&3 COMBINED - JWG.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 2 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, PRE DEV DA........................................................................ 4 Hydrograph No. 3, SCS Runoff, POST DA BASIN 2............................................................... 5 Hydrograph No. 4, SCS Runoff, POST BY PASS.................................................................... 6 Hydrograph No. 5, SCS Runoff, POST DA BASIN 3............................................................... 7 Hydrograph No. 6, Reservoir, BASIN 2 ROUTING.................................................................. 8 PondReport - BASIN 2........................................................................................................ 9 Hydrograph No. 7, Reservoir, BASIN 3 ROUTING................................................................ 10 PondReport - BASIN 3...................................................................................................... 11 Hydrograph No. 8, Combine, COMBINED BASINS............................................................... 12 Hydrograph No. 10, Combine, POST COMBINED................................................................ 13 25 - Year SummaryReport....................................................................................................................... 14 HydrographReports................................................................................................................. 15 Hydrograph No. 1, SCS Runoff, PRE DEV DA...................................................................... 15 Hydrograph No. 3, SCS Runoff, POST DA BASIN 2............................................................. 16 Hydrograph No. 4, SCS Runoff, POST BY PASS.................................................................. 17 Hydrograph No. 5, SCS Runoff, POST DA BASIN 3............................................................. 18 Hydrograph No. 6, Reservoir, BASIN 2 ROUTING................................................................ 19 Hydrograph No. 7, Reservoir, BASIN 3 ROUTING................................................................ 20 Hydrograph No. 8, Combine, COMBINED BASINS............................................................... 21 Hydrograph No. 10, Combine, POST COMBINED................................................................ 22 100 - Year SummaryReport....................................................................................................................... 23 HydrographReports................................................................................................................. 24 Hydrograph No. 1, SCS Runoff, PRE DEV DA...................................................................... 24 Hydrograph No. 3, SCS Runoff, POST DA BASIN 2............................................................. 25 Hydrograph No. 4, SCS Runoff, POST BY PASS.................................................................. 26 Hydrograph No. 5, SCS Runoff, POST DA BASIN 3............................................................. 27 Hydrograph No. 6, Reservoir, BASIN 2 ROUTING................................................................ 28 Hydrograph No. 7, Reservoir, BASIN 3 ROUTING................................................................ 29 Hydrograph No. 8, Combine, COMBINED BASINS............................................................... 30 Hydrograph No. 10, Combine, POST COMBINED................................................................ 31 OFReport.................................................................................................................. 32 Watershed Model Schematic 1 Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2016 by Autodesk, Inc. v11 8 Legend 10 Hvd• Origin Description 1 SCS Runoff PRE DEV DA 3 SCS Runoff POST DA BASIN 2 4 SCS Runoff POST BY PASS 5 SCS Runoff POST DA BASIN 3 6 Reservoir BASIN 2 ROUTING 7 Reservoir BASIN 3 ROUTING 8 Combine COMBINED BASINS 10 Combine POST COMBINED Project: BASIN 2 & 3 COMBINED - JWG.gpw Friday, 07 / 7 / 2017 Hydrograph Return Period Recap Hyd flow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 SCS Runoff ------ ------ 124.71 ------- ------- ------- 338.74 ------- 481.24 PRE DEV DA 3 SCS Runoff ------ ------ 37.30 ------- ------- ------ 78.45 ------- 103.79 POST DA BASIN 2 4 SCS Runoff ------ ------- 110.96 ------- ------- ------- 301.39 ------- 428.19 POST BY PASS 5 SCS Runoff ------ ------- 37.20 ------- ------- ------- 78.24 ------- 103.51 POST DA BASIN 3 6 Reservoir 3 -- 12.13 ------- ------- ------- 66.67 ------- 89.68 BASIN 2 ROUTING 7 Reservoir 5 --- - 2.117 ----- ------- ------- 39.62 ------- 74.61 BASIN 3 ROUTING 8 Combine 6,7 ------- 12.27 ------- ------- ------- 103.67 ------- 164.15 COMBINED BASINS 10 Combine 4, 8, ------- 116.34 --- --__ _______ _____ 316.30 ------- 446.47 POST COMBINED Proj. file: BASIN 2 & 3 COMBINED - JWG.gpw Friday, 07 / 7 / 2017 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 124.71 2 756 950,845 ------ ------ ------ PRE DEV DA 3 SCS Runoff 37.30 2 716 75,880 ------ ------ ------ POST DA BASIN 2 4 SCS Runoff 110.96 2 756 846,018 ------ ------ ------ POST BY PASS 5 SCS Runoff 37.20 2 716 75,671 ------ ------ ------ POST DA BASIN 3 6 Reservoir 12.13 2 724 72,030 3 622.37 35,493 BASIN 2 ROUTING 7 Reservoir 2.117 2 772 62,928 5 615.55 44,623 BASIN 3 ROUTING 8 Combine 12.27 2 724 134,958 6,7 ------ ------ COMBINED BASINS 10 Combine 116.34 2 756 980,975 4, 8, ------ ------ POST COMBINED BASIN 2 & 3 COMBINED - JWG.gpw Return Period: 2 Year Friday, 07 / 7 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 PRE DEV DA Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 196.920 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.54 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE DEV DA Hyd. No. 1 -- 2 Year 4 Friday, 07 / 7 / 2017 = 124.71 cfs = 756 min = 950,845 cuft = 75 = 0 ft = 71.00 min = Type II = 484 1 11 ���M 1 120 240 Q (cfs) 140.00 120.00 100.00 40.00 20.00 11111111fiva"A 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 POST DA BASIN 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 10.870 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.54 in Distribution Storm duration = 24 hrs Shape factor " Composite (Area/CN) _ [(5.050 x 98) + (5.820 x 74)] / 10.870 POST DA BASIN 2 Q (cfs) Hyd. No. 3 -- 2 Year Friday, 07 / 7 / 2017 = 37.30 cfs = 716 min = 75,880 cuft = 85* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0 120 Hyd No. 240 360 480 3 600 720 840 960 1080 0.00 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 4 POST BY PASS Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 175.210 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.54 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 1 11 20.00 0.00 ' ---l- 0 120 240 Hyd No. 4 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST BY PASS Hyd. No. 4 -- 2 Year 1 Friday, 07 / 7 / 2017 = 110.96 cfs = 756 min = 846,018 cuft = 75 = 0 ft = 71.00 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 I i i J I I I I I I I \J 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 POST DA BASIN 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 10.840 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.54 in Distribution Storm duration = 24 hrs Shape factor " Composite (Area/CN) _ [(4.980 x 98) + (5.860 x 74)] / 10.840 POST DA BASIN 3 Q (cfs) Hyd. No. 5 -- 2 Year Friday, 07 / 7 / 2017 = 37.20 cfs = 716 min = 75,671 cuft = 85* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0 120 Hyd No. 240 360 480 5 600 720 840 960 1080 0.00 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 6 BASIN 2 ROUTING Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 3 - POST DA BASIN 2 Reservoir name = BASIN 2 Storage Indication method used. Q (cfs) 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage BASIN 2 ROUTING Hyd. No. 6 -- 2 Year Friday, 07 / 7 / 2017 = 12.13 cfs = 724 min = 72,030 cuft = 622.37 ft = 35,493 cuft 0.00 ' ' 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Hyd No. 6 Hyd No. 3 ]17111] Total storage used = 35,493 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 2640 Time (min) Pond Report s Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Pond No. 1 - BASIN 2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 620.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 620.00 12,269 0 0 0.50 620.50 14,012 6,565 6,565 1.00 621.00 14,739 7,186 13,751 2.00 622.00 16,235 15,479 29,230 3.00 623.00 17,789 17,004 46,235 4.00 624.00 19,397 18,585 64,820 5.00 625.00 21,063 20,222 85,042 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 2.00 0.00 0.00 Crest Len (ft) = 16.00 15.00 Inactive 0.00 Span (in) = 36.00 2.00 0.00 0.00 Crest EI. (ft) = 622.00 624.00 622.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EI. (ft) = 613.00 620.00 0.00 0.00 Weir Type = 1 Ciplti Rect --- Length (ft) = 30.00 0.00 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 0.50 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 ' 0.0 20.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) 40.0 60.0 Stage / Discharge 80.0 100.0 120.0 140.0 Elev (ft) 625.00 624.00 623.00 622.00 621.00 `- 620.00 160.0 Discharge (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 7 BASIN 3 ROUTING Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 5 - POST DA BASIN 3 Reservoir name = BASIN 3 Storage Indication method used. Q (cfs) 40.00 30.00 20.00 10.00 0.00 ' 0 600 Hyd No. 7 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage BASIN 3 ROUTING Hyd. No. 7 -- 2 Year 10 Friday, 07 / 7 / 2017 = 2.117 cfs = 772 min = 62,928 cuft = 615.55 ft = 44,623 cuft 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 5 ]11111] Total storage used = 44,623 cuft Q (cfs) 40.00 30.00 20.00 10.00 1 0.00 6000 Time (min) Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Pond No. 2 - BASIN 3 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 613.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 613.50 15,723 0 0 0.50 614.00 17,313 8,255 8,255 7.50 621.50 30,262 164,401 172,656 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 36.00 2.00 0.00 0.00 Span (in) = 36.00 2.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert EI. (ft) = 608.50 613.50 0.00 0.00 Length (ft) = 62.00 0.00 0.00 0.00 Slope (%) = 0.80 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 8.00 6.00 4.00 2.00 0.00 1 0.0 11 Friday, 07 / 7 / 2017 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 20.00 6.00 0.00 Crest EI. (ft) = 616.50 620.00 615.50 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 Ciplti Rect --- Multi-Stage = Yes No Yes No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 20.0 40.0 60.0 Total Q Stage / Discharge Elev (ft) 621.50 619.50 617.50 615.50 ' ' ' 613.50 80.0 100.0 120.0 140.0 160.0 180.0 200.0 220.0 240.0 Discharge (cfs) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Hyd. No. 8 COMBINED BASINS Hydrograph type = Combine Peak discharge = 12.27 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 134,958 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 0.000 ac Q (cfs) 14.00 12.00 10.00 RIM 4.00 2.00 0.00 1 409C 0 600 Hyd No. 8 COMBINED BASINS Hyd. No. 8 -- 2 Year Q (cfs) 14.00 12.00 10.00 • 11 4.00 2.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 10 POST COMBINED Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 2 min Inflow hyds. = 4, 8 Q (cfs) 120.00 100.00 1 11 20.00 raffliNTRIN Peak discharge Time to peak Hyd. volume Contrib. drain. area POST COMBINED Hyd. No. 10 -- 2 Year 13 Friday, 07 / 7 / 2017 = 116.34 cfs = 756 min = 980,975 cuft = 175.210 ac Q (cfs) 120.00 100.00 40.00 20.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 Hyd No. 4 Hyd No. 8 14 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 338.74 2 756 2,449,964 ------ ------ ------ PRE DEV DA 3 SCS Runoff 78.45 2 716 165,099 ------ ------ ------ POST DA BASIN 2 4 SCS Runoff 301.39 2 756 2,179,860 ------ ------ ------ POST BY PASS 5 SCS Runoff 78.24 2 716 164,643 ------ ------ ------ POST DA BASIN 3 6 Reservoir 66.67 2 720 161,218 3 623.18 49,181 BASIN 2 ROUTING 7 Reservoir 39.62 2 722 151,811 5 616.82 74,360 BASIN 3 ROUTING 8 Combine 103.67 2 720 313,029 6,7 ------ ------ COMBINED BASINS 10 Combine 316.30 2 756 2,492,888 4, 8, ------ ------ POST COMBINED BASIN 2 & 3 COMBINED - JWG.gpw Return Period: 25 Year Friday, 07 / 7 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 PRE DEV DA Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 196.920 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.17 in Storm duration = 24 hrs Q (cfs) 350.00 250.00 a1111111A 150.00 100.00 50.00 0.00 ' ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE DEV DA Hyd. No. 1 -- 25 Year 15 Friday, 07 / 7 / 2017 = 338.74 cfs = 756 min = 2,449,964 cuft = 75 = 0 ft = 71.00 min = Type II = 484 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 I i I I I I I I 1 y 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Time to peak POST DA BASIN 2 Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 10.870 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.17 in Storm duration = 24 hrs " Composite (Area/CN) = [(5.050 x 98) + (5.820 x 74)] / 10.870 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 16 Friday, 07 / 7 / 2017 Peak discharge = 78.45 cfs Time to peak = 716 min Hyd. volume = 165,099 cuft Curve number = 85* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 POST DA BASIN 2 Hyd. No. 3 -- 25 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ` ' ' . ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 4 Time to peak POST BY PASS Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 175.210 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.17 in Storm duration = 24 hrs Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 17 Friday, 07 / 7 / 2017 Peak discharge = 301.39 cfs Time to peak = 756 min Hyd. volume = 2,179,860 cuft Curve number = 75 Hydraulic length = 0 ft Time of conc. (Tc) = 71.00 min Distribution = Type II Shape factor = 484 POST BY PASS Hyd. No. 4 -- 25 Year Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' ' ' ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 Time to peak POST DA BASIN 3 Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 10.840 ac Basin Slope = 0.0% Tc method = User Total precip. = 6.17 in Storm duration = 24 hrs " Composite (Area/CN) = [(4.980 x 98) + (5.860 x 74)] / 10.840 Q (cfs) 80.00 70.00 .1 11 50.00 40.00 30.00 20.00 10.00 18 Friday, 07 / 7 / 2017 Peak discharge = 78.24 cfs Time to peak = 716 min Hyd. volume = 164,643 cuft Curve number = 85* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 POST DA BASIN 3 Hyd. No. 5 -- 25 Year Q (cfs) 80.00 70.00 •1 11 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 5 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Hyd. No. 6 BASIN 2 ROUTING Hydrograph type = Reservoir Peak discharge = 66.67 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 161,218 cuft Inflow hyd. No. = 3 - POST DA BASIN 2 Max. Elevation = 623.18 ft Reservoir name = BASIN 2 Max. Storage = 49,181 cuft Storage Indication method used Q (cfs 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 3 1111111 Total storage used = 49,181 Cuft 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Hyd. No. 7 BASIN 3 ROUTING Hydrograph type = Reservoir Peak discharge = 39.62 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 151,811 cuft Inflow hyd. No. = 5 - POST DA BASIN 3 Max. Elevation = 616.82 ft Reservoir name = BASIN 3 Max. Storage = 74,360 cuft Storage Indication method used Q (cfs 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 5 ]11111] Total storage used = 74,360 Cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 8 COMBINED BASINS Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 2 min Inflow hyds. = 6, 7 Q (cfs) 120.00 100.00 1 11 20.00 0.00 ' 0 120 240 Hyd No. 8 Peak discharge Time to peak Hyd. volume Contrib. drain. area COMBINED BASINS Hyd. No. 8 -- 25 Year 21 Friday, 07 / 7 / 2017 = 103.67 cfs = 720 min = 313,029 cuft = 0.000 ac Q (cfs) 120.00 100.00 40.00 20.00 I I I NJ 1----7-I- 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 10 POST COMBINED Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 2 min Inflow hyds. = 4, 8 Q (cfs 350.00 250.00 150.00 100.00 50.00 Peak discharge Time to peak Hyd. volume Contrib. drain. area Friday, 07 / 7 / 2017 = 316.30 cfs = 756 min = 2,492,888 cuft = 175.210 ac Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 A 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 Hyd No. 8 23 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 481.24 2 756 3,468,723 ------ ------ ------ PRE DEV DA 3 SCS Runoff 103.79 2 716 222,351 ------ ------ ------ POST DA BASIN 2 4 SCS Runoff 428.19 2 756 3,086,306 ------ ------ ------ POST BY PASS 5 SCS Runoff 103.51 2 716 221,737 ------ ------ ------ POST DA BASIN 3 6 Reservoir 89.68 2 718 218,458 3 623.45 54,034 BASIN 2 ROUTING 7 Reservoir 74.61 2 720 208,869 5 617.31 85,717 BASIN 3 ROUTING 8 Combine 164.15 2 720 427,327 6,7 ------ ------ COMBINED BASINS 10 Combine 446.47 2 754 3,513,634 4, 8, ------ ------ POST COMBINED BASIN 2 & 3 COMBINED - JWG.gpw Return Period: 100 Year Friday, 07 / 7 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 PRE DEV DA Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 196.920 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.79 in Storm duration = 24 hrs Q (cfs) 490.00 420.00 350.00 08101111A 210.00 140.00 70.00 0.00 ' ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE DEV DA Hyd. No. 1 -- 100 Year 24 Friday, 07 / 7 / 2017 = 481.24 cfs = 756 min = 3,468,723 cuft = 75 = 0 ft = 71.00 min = Type II = 484 Q (cfs) 490.00 420.00 350.00 210.00 140.00 70.00 _ 1 1 1 1 1 1 1 1 \ 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Time to peak POST DA BASIN 2 Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 10.870 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.79 in Storm duration = 24 hrs " Composite (Area/CN) _ [(5.050 x 98) + (5.820 x 74)] / 10.870 Q (cfs) 120.00 100.00 :1 11 •1 11 1 11 20.00 25 Friday, 07 / 7 / 2017 Peak discharge = 103.79 cfs Time to peak = 716 min Hyd. volume = 222,351 cuft Curve number = 85* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 POST DA BASIN 2 Hyd. No. 3 -- 100 Year Q (cfs) 120.00 100.00 :1 11 .1 11 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 4 POST BY PASS Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 175.210 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.79 in Storm duration = 24 hrs Q (cfs) 480.00 420.00 0-91111A 300.00 240.00 180.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST BY PASS Hyd. No. 4 -- 100 Year 26 Friday, 07 / 7 / 2017 = 428.19 cfs = 756 min = 3,086,306 cuft = 75 = 0 ft = 71.00 min = Type II = 484 Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 •1 11 0.00 ' — ' ' ' ' ' ' ' ' -"*— 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 Time to peak POST DA BASIN 3 Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 10.840 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.79 in Storm duration = 24 hrs " Composite (Area/CN) _ [(4.980 x 98) + (5.860 x 74)] / 10.840 Q (cfs) 120.00 100.00 :1 11 •1 11 1 11 20.00 27 Friday, 07 / 7 / 2017 Peak discharge = 103.51 cfs Time to peak = 716 min Hyd. volume = 221,737 cuft Curve number = 85* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 POST DA BASIN 3 Hyd. No. 5 -- 100 Year Q (cfs) 120.00 100.00 :1 11 .1 11 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 6 BASIN 2 ROUTING Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 3 - POST DA BASIN 2 Reservoir name = BASIN 2 Storage Indication method used. Q (cfs) 120.00 100.00 :1 11 •1 11 1 11 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage BASIN 2 ROUTING Hyd. No. 6 -- 100 Year 0.00 0 120 240 Hyd No. 6 Friday, 07 / 7 / 2017 = 89.68 cfs = 718 min = 218,458 cuft = 623.45 ft = 54,034 cuft Q (cfs) 120.00 100.00 :1 11 .1 11 40.00 20.00 WATITS11 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 3 1111111 Total storage used = 54,034 Cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 7 BASIN 3 ROUTING Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 5 - POST DA BASIN 3 Reservoir name = BASIN 3 Storage Indication method used. Q (cfs 120.00 100.00 :1 11 •1 11 1 11 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Friday, 07 / 7 / 2017 = 74.61 cfs = 720 min = 208,869 cuft = 617.31 ft = 85,717 cuft 0.00 24 100.00 :1 11 .1 11 40.00 20.00 r.T.T.7 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 ]11111] Total storage used = 85,717 Cuft 30 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Hyd. No. 8 COMBINED BASINS Hydrograph type = Combine Peak discharge = 164.15 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 427,327 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 0.000 ac Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 COMBINED BASINS Hyd. No. 8 -- 100 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 6 Hyd No. 7 31 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Hyd. No. 10 POST COMBINED Hydrograph type = Combine Peak discharge = 446.47 cfs Storm frequency = 100 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 3,513,634 cuft Inflow hyds. = 4, 8 Contrib. drain. area = 175.210 ac Q (cfs) 480.00 420.00 U1,91111A 300.00 240.00 180.00 120.00 POST COMBINED Hyd. No. 10 -- 100 Year Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 0.00 ' — I ff ' Tom' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 Hyd No. 4 Hyd No. 8 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 63.8568 12.6000 0.8882 -------- 2 68.8345 12.3000 0.8618 -------- 3 0.0000 0.0000 0.0000 -- - - 5 76.1199 12.8000 0.8363 -------- 10 75.6056 12.5000 0.8054 ------- 25 65.5456 11.1000 0.7420 -------- 50 58.8220 10.1000 0.6963 3 100 53.6961 9.2000 0.6576 -------- File name: NOAA IDF.IDF Intensity = B / (Tc + D)^E 32 Friday, 07 / 7 / 2017 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.00 4.00 3.35 2.89 2.55 2.28 2.07 1.89 1.74 1.62 1.51 1.42 2 5.90 4.74 3.98 3.44 3.04 2.73 2.48 2.27 2.10 1.96 1.83 1.72 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.85 5.57 4.72 4.11 3.65 3.29 3.00 2.76 2.56 2.39 2.24 2.11 10 7.54 6.16 5.24 4.58 4.08 3.69 3.37 3.11 2.89 2.70 2.54 2.40 25 8.34 6.82 5.83 5.12 4.58 4.16 3.82 3.54 3.30 3.10 2.92 2.77 50 8.88 7.28 6.24 5.49 4.94 4.50 4.15 3.85 3.61 3.40 3.21 3.05 100 9.38 7.69 6.61 5.84 5.26 4.81 4.44 4.14 3.89 3.67 3.48 3.31 Tc = time in minutes. Values may exceed 60. recip. file name: X:\Land Projects R2\5750 - Landtec - Moore Farms\Calculations\Stormwater\PONDS - JLR\NOAA. c Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24-hour 2.94 3.54 0.00 4.45 5.17 6.17 6.96 7.79 SCS 6 -Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E A G L E ENGINEERING 4f 2013-A liar Buren Avenue Indian Trail. NC 28479 (7G4)882-4222 Riser Buoyancy Calculations - Wet Detention Pond #2 Project Name: MOORE FARMS SUBDIVISION Project No.: 5750 Riser Width: 60 in Riser Thickness: 6 in Barrel Size: 36 in Top of Basin: 625 ft. Bottom of Basin 613 ft. Riser Weir: 622 ft. Spillway Height from top of Basin: 1 ft. 613 ft. Unit wt. of H201 62.4 ft3 Volume of Riserl 300 ft3 Wt. of H2O displaced in riser) 18,7201lbs 1 ft. Spillway Height 624 ft. Spillway Elev. 622 ft. Riser Weir 60 in. RISER 9 ft. I )m of Basin Unit Wt. of concrete (pcf) 150 lbs/ft3 Volume of concrete in riser 57 ft3 Wt. of concrete riser 8,550 lbs Total Buoyancy Force to displace 27,270 lbs Concrete Base Required to Stabilize Riser: Concrete Pad Thinckness 24 in. Concrete Pad Width/length 10 ft Volume of concrete pad 200.00 ft3 Wt. of H2O displaced = 12,480 lbs Wt. of concrete pad 30,000 lbs Factor of Safety: 11.1001 OK Factor of safety should be greater than 1.10 Ballast Pad 625 ft. Top of Basin 36 in. RCP Wt. of H2O displaced in riser + Wt. of concrete riser / 60 in. RISER Ballast Pad —� 24 in. loft — 10 ft. Ballast Pad Dimensions: 10 ft. X 10 ft. X 24 in. EEI Project No. 5750 Detention Structure Anchor Moore Farm Subdivision — Union County, NC Stormwater Management Report Wet Pond 3 5750 JULY 7, 2017 = n A Wet Detention Pond E N GI N E E RL N G PROJECT: MOORE FARM SUBDIVISION CLIENT: Graham Enterprises M�l PROJ. #: 5750 DATE: 2013 Van Buren Avenue PHASE: Wet Basin #3 DESIGN BY: JWG Indian Trail, NC 28079 Wet Detention Pond - NC BMP Manual Calculate Water Quality Volume Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) = 472,288 Ft Impervious Area = 217,118 Ft Impervious Fraction (IA) = 0.46 46 % Rv = 0.05+0.9(IA) = 0.46 Runoff Coefficient Water Quality Volume Required (WQV) = 18,252 ft3 Where: WQV = 3630 * RD * Rv * A Rainfall Depth (RD) = 1.0 in. Runoff Coefficient (Rv) = 0.46 unitless Watershed Area (A) = 10.84 ac. WQV Elev. = 614.75 WQV provided I ft3 OK Permanent Pool Average Deptl day = Vpp/App Volume at Bottom of Shelf= Area at Bottom of Shelf = Area at bottom of pond = Depth to bottom of shelf = Volume of perm. Pool= Percent Impervious Cover = SA/DA Ratio = Surface Area Req'd (SA) _ Surface Area Provided = Average Length = Average Width = Length to Width Ratio = 10.84 ac 4.98 ac Length, Width (Area), Depth, Geometry I (da„) = 3.5 26,568 Vpp (ft3) 7,528 App (ft) 4,280 Abot_pond (ft 2) 5.00 Depth (ft) WQV Volume Calculation Main Pool Volume Calculation Contour Area Volume Net Vol 613.5 15,723 0 0 614 17,313 8,259 8,259 614.75 18,555 13,451 21,710 615 18,970 4,691 26,400 621 30,262 147,696 174,096 Length, Width (Area), Depth, Geometry I (da„) = 3.5 26,568 Vpp (ft3) 7,528 App (ft) 4,280 Abot_pond (ft 2) 5.00 Depth (ft) ft 3.5 ft. (rounded down) Main Pool Volume Calculation Contour Area Volume Net Vol 608.5 4280 0 0 613 7528 26,568 26,568 613.5 8647 4,044 30,612 26,568 46 % 1.54 7,270 ft ft2 200 ft 60 ft 3.3 :1 SA/DA Ration for Perm. Pool Sizing % Imp. Cover Perm. Pool Avg Depth (ft) 3.0 3.5 4.0 30 1.17 1.06 0.94 40 1.51 1.38 1.24 50 1.79 1.65 1.51 Values from Table: Region: Efficiency: 1 Piedmont 85 % EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 3 Orifice diameter = Orifice inv. Elev. = Orifice Equation: 2 -day Avg Discharge (Q2av) = 5 -day Avg Discharge (Q5,J = Average Discharge (Q) = Discharge Coefficient (CD) _ X -sect area of orifice (A) _ Accel. due to gravity (g) _ Avg. driving head (Ho) = Forebay Vol. Required: Approx. Area Required Vol. Provided: Area Provided: 1551AX1I10E:�C? WQV Outlet Device 2 in. 61:3.50 Q = CD A (2g(HO/3))0.5 0.1056 cfs (max.) 0.0422 cfs (min.) cfs (provided) 0.60 0.0218 ft 32.2 ft/sect 0.3889 ft Ho = Driving Head (ft), measured from the centroid of the orifice area to the water surface Note: Use Ho/3 to compute drawdown to reflect the fact that head is decreasing as drawdown occurs Forebay Design 3,985 ft3 (15% main pool) 1,139 ft 17,267 ft OK 5,423 ft OK Landscape Requirements 6' Littoral shelf shall be Planted with materials consistent with antcipated hydrology (Ref. Sheet C-3.9 BMP 1 Plan & Profile) On the tops of berms and on the exteior slopes of containment berms, maintain turf grass in access areas; Centipede grass is recommended. *Do not use love grass for slope stablization (References)* North Carolina DEQ BMP Manual Charter Revised 069-17-2009 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 3 Forebay Volume Calculation Contour Area Volume Net Vol 609 2167 0 0 610 2863 2,515 2,515 611 3638 3,251 5,766 612 4492 4,065 9,831 613.5 5423 7,436 17,267 Landscape Requirements 6' Littoral shelf shall be Planted with materials consistent with antcipated hydrology (Ref. Sheet C-3.9 BMP 1 Plan & Profile) On the tops of berms and on the exteior slopes of containment berms, maintain turf grass in access areas; Centipede grass is recommended. *Do not use love grass for slope stablization (References)* North Carolina DEQ BMP Manual Charter Revised 069-17-2009 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 3 E A G L E ENGINEERING 4f 2013-A liar Buren Avenue Indian Trail. NC 28479 (7G4)882-4222 Riser Buoyancy Calculations - Wet Detention Pond #3 Project Name: MOORE FARMS SUBDIVISION Project No.: 5750 Riser Width: 60 in Riser Thickness: 6 in Barrel Size: 36 in Top of Basin: 621 ft. Bottom of Basin 608.5 ft. Riser Weir: 616.5 ft. Spillway Height from top of Basin: 1 ft. 608.5 ft. Unit wt. of H201 62.4 ft3 Volume of Riserl 312.5 ft3 Wt. of H2O displaced in riser) 19,5001lbs 1 ft. Spillway Height 620 ft. Spillway Elev. 616.5 ft. Riser Weir 60 in. RISER 8 ft. I ttom of Basin Unit Wt. of concrete (pcf) 150 lbs/ft3 Volume of concrete in riser 59.375 ft3 Wt. of concrete riser 8,906 lbs Total Buoyancy Force to displace 28,406 lbs Concrete Base Required to Stabilize Riser: Concrete Pad Thinckness 24 in. Concrete Pad Width/length 10.5 ft Volume of concrete pad 220.50 ft3 Wt. of H2O displaced = 13,759 lbs Wt. of concrete pad 33075 lbs Factor of Safety: 11.1644 1OK Factor of safety should be greater than 1.10 Ballast Pad 621 ft. Top of Basin 36 in. RCP Wt. of H2O displaced in riser + Wt. of concrete riser / 60 in. RISER Ballast Pad f— 24 in. 10.5 ft 10.5 ft. Ballast Pad Dimensions: 10.5 ft. X 10.5 ft. X 24 in. EEI Project No. 5750 Detention Structure Anchor Moore Farms Subdivision — Union County, NC Stormwater Management Report Wet Pond 4 5750 May 9, 2017 I \�� I I I 1 \\ \\ \\ \5 T \� T4 T \ \ ' T1 T48 t MATCHLINE GRAPHIC SCALE 0 100' 200' ( IN FEET ) 1 inch = loo ft. T2 T26 T27 T2 T \ \N WET BASIN - 4 DRAINAGE AREA E 11rA''� ' Jo - TOTAL DA= 1 38.65 _ 1 / ACRES (12.36 OFFSITE+ �� �•. 26.29 ONSITE) / \ T10 T7 T8 T9 � T12 T13 T14 T _ � I I ( 1 \\ \ \\ \ TS- / T4 - /1I T - Tl T4 T40 T39 T� T47 ✓ ' \ \ T48 � IMMEMEMEMEMEMEMEME MATCHLINE WET BASIN - 4 GRAPHIC SCALE DRAINAGE 100, 200'AREA ( IN FEET ) 1 inch = l°° ft. MAP 4D BASIN #4 Wet Detention Pond E N GI N E E RL N G PROJECT: MOORE FARM SUBDIVISION CLIENT: Graham Enterprises PROD. #: 5750 DATE: 7/7/2017 2013 Van Buren Avenue PHASE: Wet Basin #4 DESIGN BY: JLR Indian Trail, NC 28079 Wet Detention Pond - NC BMP Manual Calculate Water Quality Volume Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) = 1,683,594 Ft Impervious Area = 523,542 Ft Impervious Fraction (IA) = 0.31 Rv = 0.05+0.9(IA) = Water Quality Volume Required (WQV) _ Where: WQV = 3630 * RD * Rv * A Rainfall Depth (RD) = 1.0 Runoff Coefficient (Rv) = 0.33 Watershed Area (A) = 38.65 31% Runoff Coefficient 46,281 ft in. unitless ac. WQV Elev. = 615.02 WQV provided I ft3 OK 38.65 ac 12.02 ac Length, Width (Area), Depth, Geometry Permanent Pool Average Depth (da) = 4.6 ft C 4.5 ft. (rounded down) day = Vpp/App Volume at Perm Pool = WQV Volume Calculation 135,450 Contour Area Volume Net Vol 614 42,071 0 0 615.02 48,855 46,372 46,372 616 52,335 49,583 95,955 617 55,871 54,103 150,058 618 59,464 57,668 207,726 619 63,113 61,289 269,014 Length, Width (Area), Depth, Geometry Permanent Pool Average Depth (da) = 4.6 ft C 4.5 ft. (rounded down) day = Vpp/App Volume at Perm Pool = 31 % 135,450 ft Area at bottom shelf = 15,492 ft 29,602 Aperm_pool (ft) Area at bottom of pond = 15,549 Abot_pond (ft 2) Depth to bottom of shelf = 6.00 Depth (ft) -based on assumed bottom, add .5' to design pond Volume of perm. Pool= 135,450 bottom to provide add'I sediment storage Percent Impervious Cover = 31 % SA/DA Ratio = 0.92 Surface Area Req'd (SA) = 15,492 ft Surface Area Provided = ft2 Average Length = 340 ft Average Width = 90 ft SA/DA Ration for Perm. Pool Sizing % Imp. Cover Perm. Pool Avg Depth (ft) 4.0 4.5 5.0 30 0.94 0.89 0.84 40 1.24 1.17 1.09 50 1.51 1.41 1.31 Length to Width Ratio = 3.8 :1 Values from Table: 1 Region: Piedmont Efficiency: 85 % EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 4 Orifice diameter = Orifice inv. Elev. = Orifice Equation: 2 -day Avg Discharge Aa„) = 5 -day Avg Discharge (Q5,J = Average Discharge (Q) = Discharge Coefficient (CD) _ X -sect area of orifice (A) _ Accel. due to gravity (g) _ Avg. driving head (Ho) = Forebay Vol. Required: Approx. Area Required Vol. Provided: Area Provided: WQV Outlet Device 3 in. 614.UU Q = CD A (2g(Ho/3))0.5 0.2678 cfs (max.) 0.1071 cfs (min.) cfs (provided) 0.60 0.0491 ft 32.2 ft/sect 0.2983 ft Ho = Driving Head (ft), measured from the centroid of the orifice area to the water surface Note: Use Ho/3 to compute drawdown to reflect the fact that head is decreasing as drawdown occurs Forebay Design 20,318 ft (15% main pool) 5,805 ft 41,073 ft OK 11,030 ft OK Forebay Volume Calculation Contour Area Volume Net Vol 608 2661 0 0 614 11030 41,073 41,073 Landscape Requirements 6' Littoral shelf shall be Planted with materials consistent with antcipated hydrology (Ref. Sheet C-3.12 BMP 4 Plan & Profile) On the tops of berms and on the exteior slopes of containment berms, maintain turf grass in access areas; Centipede grass is recommended. *Do not use love grass for slope stablization (References)* North Carolina DEQ BMP Manual Charter Revised 069-17-2009 EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 WetDetention - 4 H yd raf I ow T le -o l;onttentwore Farms\Calculations\Stormwater\PONDS - JLR\BASIN 4 - JLR - 2017-07-07.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 100 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, OFFSITE DRAINAGE........................................................... 4 TR -55 Tc Worksheet............................................................................................................ 5 Hydrograph No. 2, SCS Runoff, POST DEVELOPED - ONSITE ............................................. 6 Hydrograph No. 3, Combine, COMBINED............................................................................... 7 Hydrograph No. 4, Reservoir, POST........................................................................................ 8 PondReport - BASIN 4........................................................................................................ 9 OFReport.................................................................................................................. 10 Watershed Model Schematic 1 Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2016 by Autodesk, Inc. v11 7.gp, 1 2 CD 3 11 vs Legend Hvd. Origin Description 1 SCS Runoff OFFSITE DRAINAGE 2 SCS Runoff POST DEVELOPED - ONSITE 3 Combine COMBINED 4 Reservoir POST Project: X:\Land Projects R2\5750 - Landtec - Moore Farms\Calculations\Stormwater\P N1F8G1 ), F0TAP3R917JLR - 2017-07- 7.gp, Hydrograph Return Period Recap Hyd flow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 SCS Runoff ------ ------ ------ ------- ------- ------ ------- ------- 37.55 OFFSITE DRAINAGE 2 SCS Runoff ------ ______ _______ _______ --- ___ ____ _____ ______ 251.03 POST DEVELOPED - ONSITE 3 Combine 1,2 ------ ------- ------- ------- ------ ------- ------- 264.50 COMBINED 4 Reservoir 3 ------- ------- ------- ------- ------- ------- ------- 103.40 POST Proj. file: X:\Land Projects R2\5750 - Landtec - Moore Farms\Calculations\Stor \kei�T074D-S/-2JLR\BASIN 4 - JLR - 2017-07- D7 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 37.55 2 740 194,074 ------ ------ ------ OFFSITE DRAINAGE 2 SCS Runoff 251.03 2 716 537,774 ------ ------ ------ POST DEVELOPED - ONSITE 3 Combine 264.50 2 716 731,848 1,2 ------ ------ COMBINED 4 Reservoir 103.40 2 724 721,976 3 618.21 219,764 POST XALand Projects R2\5750 - Landtec - Moore FRe#tgtCRedbdiol-OO eanwater\P IRB&y, DRWYA5gNl,7- JLR - 2017-07-07.gpw Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 OFFSITE DRAINAGE Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 12.360 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 7.79 in Storm duration = 24 hrs Q (cfs) 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor OFFSITE DRAINAGE Hyd. No. 1 -- 100 Year 0.00 0 120 240 360 480 600 720 840 Hyd No. 1 4 Friday, 07 / 7 / 2017 = 37.55 cfs = 740 min = 194,074 cuft = 70 = 0 ft = 40.90 min = Type II = 484 Q (cfs) 40.00 30.00 20.00 10.00 ' 0.00 960 1080 1200 1320 1440 1560 Time (min) TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 OFFSITE DRAINAGE Description A B C Totals Sheet Flow Manning's n -value = 0.400 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.12 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 36.30 + 0.00 + 0.00 = 36.30 Shallow Concentrated Flow Flow length (ft) = 628.00 0.00 0.00 Watercourse slope (%) = 2.30 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.45 0.00 0.00 Travel Time (min) = 4.28 + 0.00 + 0.00 = 4.28 Channel Flow X sectional flow area (sqft) = 7.07 0.00 0.00 Wetted perimeter (ft) = 9.42 0.00 0.00 Channel slope (%) = 0.52 0.00 0.00 Manning's n -value = 0.013 0.015 0.015 Velocity (ft/s) =6.82 0.00 0.00 Flow length (ft) ({0})118.0 0.0 0.0 Travel Time (min) = 0.29 + 0.00 + 0.00 = 0.29 Total Travel Time, Tc.............................................................................. 40.90 min 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Hyd. No. 2 POST DEVELOPED - ONSITE Hydrograph type = SCS Runoff Peak discharge = 251.03 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 537,774 cuft Drainage area = 26.290 ac Curve number = 85* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) _ [(12.020 x 98) + (14.270 x 74)] / 26.290 Q (cfs) 280.00 240.00 r11 Me 160.00 120.00 40.00 POST DEVELOPED - ONSITE Hyd. No. 2 -- 100 Year Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 COMBINED Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 1, 2 Q (cfs) 280.00 240.00 r11 ee 160.00 120.00 F-111101 40.00 Peak discharge Time to peak Hyd. volume Contrib. drain. area COMBINED Hyd. No. 3 -- 100 Year 0.00 0 120 240 Hyd No. 3 7 Friday, 07 / 7 / 2017 = 264.50 cfs = 716 min = 731,848 cuft = 38.650 ac Q (cfs) 280.00 240.00 200.00 160.00 120.00 :1 10 40.00 WITiTil 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 4 POST Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 3 - COMBINED Reservoir name = BASIN 4 Storage Indication method used. Q (CfS11 280.00 240.00 O 11 11 160.00 120.00 F-111101 40.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Friday, 07 / 7 / 2017 = 103.40 cfs = 724 min = 721,976 cuft = 618.21 ft = 219,764 cuft Q (cfs) 280.00 240.00 200.00 160.00 120.00 9011 11 40.00 rn•� 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 1111111 Total storage used = 219,764 cuft Pond Report s Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 07 / 7 / 2017 Pond No. 1 - BASIN 4 Weir Structures Pond Data [A] Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 614.00 ft Stage / Storage Table [A] [B] [C] Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 614.00 42,071 0 0 1.00 615.00 48,855 45,463 45,463 2.00 616.00 52,335 50,595 96,058 3.00 617.00 55,871 54,103 150,161 4.00 618.00 59,464 57,668 207,829 5.00 619.00 63,113 61,289 269,117 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 3.00 0.00 0.00 Crest Len (ft) = 16.00 20.00 9.00 0.00 Span (in) = 36.00 3.00 0.00 0.00 Crest EI. (ft) = 618.00 618.00 615.02 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EI. (ft) = 608.00 614.00 0.00 0.00 Weir Type = 1 Ciplti Rect --- Length (ft) = 93.00 0.00 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 1.00 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 ' ' 0.020.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 40.0 60.0 80.0 Elev (ft) 619.00 618.00 617.00 616.00 615.00 614.00 100.0 120.0 140.0 160.0 180.0 Discharge (cfs) Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 63.8568 12.6000 0.8882 -------- 2 68.8345 12.3000 0.8618 -------- 3 0.0000 0.0000 0.0000 -- - - 5 76.1199 12.8000 0.8363 -------- 10 75.6056 12.5000 0.8054 ------- 25 65.5456 11.1000 0.7420 -------- 50 58.8220 10.1000 0.6963 3 100 53.6961 9.2000 0.6576 -------- File name: NOAA IDF.IDF Intensity = B / (Tc + D)^E 10 Friday, 07 / 7 / 2017 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.00 4.00 3.35 2.89 2.55 2.28 2.07 1.89 1.74 1.62 1.51 1.42 2 5.90 4.74 3.98 3.44 3.04 2.73 2.48 2.27 2.10 1.96 1.83 1.72 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.85 5.57 4.72 4.11 3.65 3.29 3.00 2.76 2.56 2.39 2.24 2.11 10 7.54 6.16 5.24 4.58 4.08 3.69 3.37 3.11 2.89 2.70 2.54 2.40 25 8.34 6.82 5.83 5.12 4.58 4.16 3.82 3.54 3.30 3.10 2.92 2.77 50 8.88 7.28 6.24 5.49 4.94 4.50 4.15 3.85 3.61 3.40 3.21 3.05 100 9.38 7.69 6.61 5.84 5.26 4.81 4.44 4.14 3.89 3.67 3.48 3.31 Tc = time in minutes. Values may exceed 60. recip. file name: X:\Land Projects R2\5750 - Landtec - Moore Farms\Calculations\Stormwater\PONDS - JLR\NOAA. c Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24-hour 2.94 3.54 0.00 4.45 5.17 6.17 6.96 7.79 SCS 6 -Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E A G L E ENGINEERING 4f 2013-A liar Buren Avenue Indian Trail. NC 28479 (7G4)882-4222 Riser Buoyancy Calculations - Wet Detention Pond #4 Project Name: MOORE FARMS SUBDIVISION Project No.: 5750 Riser Width: 60 in Riser Thickness: 6 in Barrel Size: 36 in Top of Basin: 619 ft. Bottom of Basin 608 ft. Riser Weir: 618 ft. Spillway Height from top of Basin: 1 ft. 1 ft. Spillway Height 618 ft. Spillway Elev. 618 ft. Riser Weir 60 in. RISER 10 ft. I 608 ft. Bottom of Basin Unit wt. of H201 62.4 ft3 Volume of Riserl 275 ft3 Wt. of H2O displaced in riser) 17,1601lbs Unit Wt. of concrete (pcf) 150 lbs/ft3 Volume of concrete in riser 52.25 ft3 Wt. of concrete riser 7,838 lbs Total Buoyancy Force to displace 24,998 lbs Concrete Base Required to Stabilize Riser: Concrete Pad Thinckness 24 in. Concrete Pad Width/length 10 ft Volume of concrete pad 200.00 ft3 Wt. of H2O displaced = 12,480 lbs Wt. of concrete pad 30000 lbs Factor of Safety: 11.20011OK Factor of safety should be greater than 1.10 Ballast Pad 619 ft. Top of Basin 36 in. RCP 10f. Wt. of H2O displaced in riser + Wt. of concrete riser / 60 in. RISER Ballast Pad —� 24 in. 10 ft� — 10 ft. Ballast Pad Dimensions: 10 ft. X 10 ft. X 24 in. EEI Project No. 5750 Detention Structure Anchor