HomeMy WebLinkAbout20170571 Ver 1_Buffer and/or Stream Determination_20170707Water Resources
Environmental Quality
July 7, 2017
Henry Grady
2169 NC HWY 55 East
Mount Olive, North Carolina 28365
Subject: On -Site Stream Origin Determination
Subject Property/ Project Name: Grady property
Address/Location: 2169 NC HWY 55 East; Havelock, North Carolina.
Stream(s) Evaluated: 2
Determination Date: June 7, 2017
Staff: Chris Pullinger, Robert Tankard
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
17-0571
WAYNE County
Determination Type:
Buffer:
Stream:
F-1 Neuse (15A NCAC 0213.0233)
Z Intermittent/Perennial Determination
F-1 Tar -Pamlico (15A NCAC 02B.0259)
F_� Catawba (15A NCAC 02B.0243)
Jordan (15A NCAC 02B .0267) (governmental
and/or interjurisclictional projects)
F_� Randleman (15A NCAC 02B.0250)
F Goose Creek (15A NCAC 02B.0605-.0608)
Stream E/I/P* Not Subject Subject Start@ Stop@ Soil LISGS
Survey Topo
17-0571 A P Not in Neuse 17-0571 A Begin 17-0571 A End X X
17-0571 B P Not in Neuse 17-0571 B Begin 17-0571 B End X X
*E111P = EphemeroOntermittentlPerennial
The Division of Water Resources has determined that the streams listed above and included on the attached map
have been located on the most recent published NRCS Soil Survey of Wayne County, North Carolina and/or the
most recent copy of the USGS Topographic map at a 1:24,000 scale and evaluated for applicability to the Neuse
Riparian Buffer Rule. Each stream that is checked "Not Subject" has been determined to not be at least
intermittent or not present on the property. Streams that are checked "Subject" have been located on the
property and possess characteristics that qualify them to be at least intermittent streams. There may be other
streams or features located on the property that do not appear on the maps referenced above but may be
considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act.
This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties
that dispute a determination made by the DWIR may request a determination by the Director. An appeal
request must be made within sixty (60) calendar days of date of this letter to the Director in writing.
-775>�Nothing Compares
State of North Carolina � Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889
252-946-6481
If sending via US Postal Service:
c/o Karen Higgins
D WR — 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC27699-1617
If sending via delivery service (UPS, FedEx, etc.):
clo Karen Higgins
D WR — 401 & Buffer Permitting Unit
512 N. Salisbury Street
Raleigh, NC27604
This determination is final and binding as detailed above, unless an appeal is requested within sixty (60) days.
This determination only addresses the applicability to the buffer rules and does not approve any activity
within the buffers. The project may require a Section 404/401 Permit for the proposed activity. Any
inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of
Engineers Raleigh Regulatory Field Office at (919)-554-4884.
If you have questions regarding this determination, please feel free to contact Chris Pullinger at (252) 948-3922.
Sincerely,
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
cc: WaRO DWR File Copy
LASERFICHE
Samantha Dailey, USACE Raleigh Reg. Field Office, (via e-mail: Samantha.J.Dailey@usace.army.mil)
2017-0571
I fl- A r+
I cl y pi u1ju y
-sac-
ILI
nftnd Z
r li
2
P-
ED 2017 Guagle
EME207
il R7-
fAl
t
irk.- Z-,
RM A 1 1,
350
-T
Of I
"Mm
ManapmatCommiwkxs
DMSiOn Of WaW Rwom
Fbr. Badn BW;:
7— - 2%(.�
ftvWA*d by TZ , ' �
�ku, I -
North Cardins Enykmmentd
Management Commission
Division of Water Resources
For tvc B"n Buflw
7
fwawed by,
Q -A V -,Ys
Ke
PL.
Xe