HomeMy WebLinkAbout20170784 Ver 1_401 Application_20170626City of Wilson P. U. Box 10 NORTH CAROLINA Wilson, North Carolina 27894-0010 Public Works D '�aREOU June 16, 2017JD -+40 & To Whom It May Concern: We are proposing a project in which we plan to improve both the stream and the buffer. The stream is currently experiencing erosion on its banks which has caused more sediment to slough off into the creek. There are also sediment bars that have formed due to past storms. In some spots of the stream there is a small Zone 1 buffer but most of the buffer is grass mowed to the creek banks prior to the Neuse Buffer Rules coming into effect. Unknown to the city, concrete pieces and other debris have been dumped into the stream in various places which have also contributed problems. The erosion has spread and customers have expressed their concern of possible property loss due to streambank erosion. With this proposed project we hope to remove the sediment bars as well as the other debris. We plan to re -slope the banks to a more natural slope to allow the creek to stabilize in areas where it has become incised. The banks and buffer will also be improved by adding vegetation and matting techniques. The City of Wilson is proposing a streambank stabilization project to improve the stream channel, enhance the buffer area, and also to address the erosion which is currently happening along the banks of the stream. Over time this section of stream has been affected from storm events but also from poor choices by the citizens in the area. It is our hope that by executing this project and providing education to homeowners in the vicinity who have contributed to the problem that we can hopefully stabilize this section and prevent it from being an issue in the future. I have attached an overhead map of the project area, pictures of the project area, along with the PCN for obtaining a 404/401. If there are any questions or any additional information needed to obtain approval for this project, please feel free to contact me. Sincerely, 404-'1' Noah Parsons Stormwater Compliance Specialist City of Wilson 252-296-3305 C: Jimmy Taylor, Engineering Services Manager P. O. BOX 10 * WILSON, NORTH CAROLINA 27894-0010 * TELEPHONE (252) 399-2435 OPERATIONS CENTER * 1800 HERRING AVENUE * FAX(252)399-2453 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 A. Pre -Construction Notification (PCN) Form Applicant Information 1 �s[ ., '4 96 2017 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit ❑Section 10 Permit 1 BU F R PERM TTg N 1b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1 e. No Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Toisnot Swamp Creek Streambank Stabilization 2b. County: Wilson 2c. Nearest municipality / town: Wilson 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): City of Wilson 3d. Street address: 1800 Herring Avenue 3e. City, state, zip: Wilson, NC, 27894 3f. Telephone no.: 252-296-3305 3g. Fax no.: 252-399-2453 3h. Email address: nparsons@wilsonnc.org Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Noah Parsons 5b. Business name (if applicable): City of Wilson Stormwater Division 5c. Street address: 1800 Herring Avenue 5d. City, state, zip: Wilson, NC 27894 5e. Telephone no.: 252-296-3305 5f. Fax no.. 252-399-2453 5g. Email address: nparsons@wilsonnc.org Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: 35.785805 Longitude: -77.927379 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Toisnot Swamp Creek proposed project: 2b. Water Quality Classification of nearest receiving water: WS -3, NSW 2c. River basin: map is available at Neuse hftp://h2o.enr.state.nc.us/admin/maps/ 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: A branch of Toisnot Swamp Creek runs through a residential neighborhood with grassed yards as well as some trees buffering this section. The stream has become incised, the banks are not well vegetated in areas, erosion is present and could pose a threat to property if not corrected. Property owners have put various fill material into the stream bed which will need removed. There are also sediment bars and steep, eroded slopes that need corrected. There are 4 stormwater pipes that discharge into this section as well. 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 810 LF 3d. Explain the purpose of the proposed project: The goal of this project is to re-establish vegetation on the slopes as well as create a more appropriate grade on the slope in order to provide stability to the streambank. This work will be performed in order to prevent future erosion in this area as well as correct the existing conditions. By removing the various fill debris that is clogging up multiple areas of the creek as well as removing the sediment bars that have accumulated we also will be restoring positive flow to this stream section and improving capacity. 3e. Describe the overall project in detail, including the type of equipment to be used: This project is focused at rebuilding the streambank, and stream system. Its purpose is to improve positive flow in the channel by removing bricks, asphalt, accumulated sediment, and other debris that is hindering the flow of water as well as decreasing the capacity. We plan to use a mini excavator and hand tools to complete these tasks. This same equipment will be used to re -slope the bank allowing us to improve our success rate of establishing vegetation on the slopes. We will be using a combination of matting, live stakes, and hydroseeding. Page 3 of 11 PCN Form —Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ❑ Yes ® No ❑ Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P F-1 T Stream/buffer Toisnot Swamp ® PER ® Corps 5-7 810 maintenance. Creek El INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 810 3i. Comments: Page 5 of 11 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P❑T 02 ❑P❑T 03 ❑P 04 ❑P 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ❑ Tar -Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 ❑ P ®T Improve Toisnot Swamp Creek ® Nos 16200 B2 ❑P❑T ❑Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 16200 6i. Comments: The buffer is mainly grassed yards with eroding banks. The buffer will only be impacted temporarily in order to improve the condition of the stream and buffer. Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you will have to fill out this entire form — please contact the State for more information. ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: The project is only to assist the stabilization of the stream and ❑ Yes ® No buffer. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Maintenance only. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No —71 Page 9 of 11 PCN Form – Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter.) Comments: Project has been submitted to the State Clearing House 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Noah Parsons / 0612 3/7 Applicant/Agent's Printed Name m. Applican Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 Ile r„ o t. ni..''i_ �P t k q ' i- ��,� �A �� �•� �'��✓� ��' `'-� ..fie,° �e�.i."a �.:.. - �'t'„►.``�r"- -rV.�. ': `>�' i, - .. ;ter// ! F ,~ + t1 �- xr �✓J �g` mR _. ° � �� •�- .•�� a.� �' -4 ;. • La: , r - � g Y / y ; r ,y f ��tri, ' w,yr�lr; � � ;. z. _� - ,� � i�r� �. '� _ : ► �-res �.,: � ; �. �- i. .• �: e t . 4 - r �s .. ,. 5. ,�. 1 fY f, i A• � i"t � �_ __. I` � �- a �! � n ' r � _ h���ry�'� f +��,s�� - �`'j1{� 3' yr �� � � o y - _� .. - a• � _ `ao --^r.. - - . _ ,� :�y�iA. _�L _ �' �� "t f _ ( .. � y.. t: � �, ,Ix .. '� � � � ' `'Aye '.�` � � . �.- <� , r� � 4 wa \ ._'... Legend N City Streams FEAT_DESC, COMMENT USGS Blue Line Stream —•••' USGS I merrnittent Stream I'TT USGS Ditch or Canal - NRCS Blue Line Stream —•••• NRCS Intermittent Stream Locally Added Drainage Neuse Buffer Soils DSL—NAME ® ExA AaA ® AyA AyB Bb ® Co - DpA ® ExA FuB GcA GoA GpA Gr ® GtB2 GtC2 Gu MaA Mae NAB2 NaB 0 NaB2 NnB NnC NoA NOB NuB Qu ® Re ® Rb Ro Sa - StA The Time ® To Tt 0 Ud Ur VAA ® VaA ® VaB WAS WaB Wee WeC Wh Wk 0 w SrG FpRGFSOR 041" J VO Foisn 'C`N\CK�tJ ARES 50 25 0 50 Feet tion soils Cy�AA Cy OSP RO R g Legend SS Mains <allothervalues, OWNER, SUBTYPE --, City, Gravity Main —10, City, Force Main City, Treated Main Private, Gravity Main 10- Private, Force Main SW Enclosed Pipe - <all other values> OWNER --10. City Private --` State City Streams FEAT_DESC,COMMENT USGS Blue Line Stream — — USGS Intermittent Strean 177= USGS Ditch or Canal — NRCS Blue Line Stream — — NRCS Intermittent Strean 0-6 Locally Added Drainage Parcels — Easements Neuse Buffer SW Outfall Points *' <all other values> OWNER City Private State SW Open Ditches — <all other values, OWNER �••� City �••� Private �••• State 50 25 0 50 Feet