Loading...
HomeMy WebLinkAbout20170782 Ver 1_401 Application_20170627O�O� W ATF9QG Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification (PCN) Form A. Applicant Information 7 0 1 1. Processing 1 a. Type(s) of approval sought from the Corps: X Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes X No For the record only for Corps Permit: ❑ Yes X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No 2. Project Information 2a. Name of project: Pisgah Forest Base Camp, LLC 2b. County: Transylvania 2c. Nearest municipality / town: Pisgah Forest 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state N/A project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Pisgah Forest Basecamp, LLC 3b. Deed Book and Page No. 805/55 3c. Responsible Party (for LLC if applicable): Lee Warden affNam7iiiiiM 3d. Street address: 2112 Club Road 3e. City, state, zip: Charlotte, NC 28205 3f. Telephone no.: N/A 3g. Fax no.: N/A D p_ q 3h. Email address: N/A FFER PERMI�fTMG 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4b. Name: Derek Goddard 4c. Business name (if applicable): BREC, PA 4d. Street address: 126 Executive Drive 4e. City, state, zip: Wilkesboro, NC 28697 4f. Telephone no.: 336-844-4088 . 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 B. Project Information and Prior Project History B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): PID = 9507-45-1997-000 1 b. Site coordinates (in decimal degrees): Latitude: 35.275676 Longitude: - 82.672223 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 4.25 Acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to North Prong Glade Creek & UT's proposed project: 2b. Water Quality Classification of nearest receiving water: C; Tr 2c. River basin: French Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site is surrounded by residential and wooded properties 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1200 ft 3d. Explain the purpose of the proposed project: To access RV Camping Sites and a Cabin for a family compound 3e. Describe the overall project in detail, including the type of equipment to be used: All work will be conducted in the dry and from the banks. Utilizing a pump around - a tracked excavator will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ❑ Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes X No Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary Final of determination was made. 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Unknown Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Unknown 5. Project History 5a. Have permits or certifications been requested or obtained for Yes X No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes X No 6b. If yes, explain. Page 3 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T ❑ ❑ ❑ Yes ❑ Corps W1 P T ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) ❑ S1 X P T Culvert UT to North Glade X PER X Corps 2 60 Prong [:]INT X DWQ El S2 X P T Culvert UT to North Glade X PER X Corps 2 20 Prong E:1 INT X DWQ ElElNorth S3 P T Culvert Glade X PER X Corps 4 20 Prong F] INT X DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 100 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of Page 4 of 11 the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ F-1Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. El ❑ El ❑ Neuse Other: Project is in which protected basin? Catawba Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? ❑P❑T F-1 Yes B1 ❑ No ❑ F-1 Yes B2 PEI T ❑ No B3 DID ❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Because of the availability of septic approved drain fields the only available usable land must be access across jurisdictional waters. During the design care was taken to minimize the new jd impacts by aligning the driveway in such a way as to minimize new impacts as much as practically possible. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All work will be in the dry and from the top of the bank. Erosion Control for sensitive watersheds will be added to. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes X No Page 6 of 11 61b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) 6e. Multiplier Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 11 C. Stormwater Management and Diffuse Flow Plan (required by DWQ), continued E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ ElYes No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 8% 2b. Does this project require a Stormwater Management Plan? ❑ Yes X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ ❑ attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 11 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ ❑ environmental document pursuant to the requirements of the National or State Yes No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the ❑ State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Yes No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated ❑ Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, Yes No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ ® impacts? Yes No ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http://www.ncnhp.org - http://www.saw.usace.army.mil/WETLAND/esa - http://www.fws.gov/nc-es/es/es.html Page 9 of 11 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http://ocean.floridamarine.org/efh_coral/ims/viewer. htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? http://www.hpo.ncdcr.gov 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? http://www.ncfloodmaps.com Derek Goddard Applicant/Agent's Printed Name 06/01/2017 Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 11 r It ' PISGAH BASE CAMP LLC Prs lbs �TTL�S Hit, SITE H�VVEHWY � HENDERSONVILLE HWY -HWY � t00�� VICINITY MAP (NTS) NORTH CAROLINA COUNTY MAP (TRANSYLVANIA COUNTY) ENGINEER: BREC, PA C000 SHEET INDEX COVER SHEET 126 EXECUTIVE DRIVE - SUITE 220 C001 NOTES WILKESBORO, NC 28697 C200 GRADING PLAN C900 DETAILS LICENSE: C-3448 C901 DETAILS CITY/TOWN: PISGAH FOREST, NC n—YRIGHT 21715 RY RREf. PA All RIf TS RFSFRVFD THIS PI AN MAY NOT RE RFa ISFD SOLD IOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN SITE COORDINATES: LATITUDE = 35.276651 p N FEDERAL COPYRIGHT LAWS. PUNISHABLE BY FINES UP TO $100,000 LONGITUDE = -82.6716650 W PREPAREDFOR - PISGAH BASE 151 CHARLIE K PISGAH FOREE DATE: II— w w BEC Lu F- UJI J IL �y O o`e U xeeaHClnuixMClexEwoe�xTn� Q 126 EXECUTNE DRIVE -SUITE .20 Q WILKESBORO NC 26657 335.B/i1CB6 17170 ubec�¢ LV w C.i ui `OPS'F ESSip �'Z.cr— W SEAL = m 035736 H ' G'F'YGIrvEEP,: C,Z•: � ' STM C. CHV •�� cL 0610812017 7 COVER AMP JOB ROAD T NC Z O F- 0 REVISIONS: H— Cn Z O U O u- s1eeT sce 24-061 �0 RTE 051102017 J �_cT xuue[v 0530052017 � H wxe B.DAEMER O Z JCHURCH SCALE NTS H) Z V) K SHEET w C000 a NPDES CONSTRUCTION GENERAL PERMIT - NCG 010000 ENTIRE PERMIT CAN BE FOUND AT: httpJlporfalnedemargfddoeummtjibrarylp•k_BNYuui"5.7•sbeb5O 443f-9dd- WMM1337ac3gmupid-36364 SECTION 11.8. - STORM WATER POLLUTION PREVENTION REQUIREMENTS IN THE NC CONSTRUCTION GENERAL PERMIT IN ADDITION TO THE STORMWATER POLLUTION PREVENTION CONTROLS FOUND IN THE E&SC PLAN, THIS CONSTRUCTION GENERAL PERMIT CONTAINS ADDITIONAL CONDITIONS THAT MUST BE MET IN ORDER TO COMPLY WITH THE NPDES PROGRAM REQUIREMENTS. THEY ARE AS FOLLOWS: 1. CONSTRUCTION SITE POLLUTANTS PERMITTEE MUST MANAGE ACTIVITIES ON THE SITE SUCH THAT WATER QUALITY STANDARDS ARE NOT VIOLATED FROM SITE ACTIVITIES OR ALLOWED DISCHARGES. IN ADDITION TO STREAM POLLUTION FROM SEDIMENT DISCHARGE, OTHER ACTIVITIES ON CONSTRUCTION AND DEVELOPMENT SITES CAN RESULT IN POLLUTANTS REACHING THE STATE'S WATERS. EPA HAS PREPARED GUIDANCE DOCUMENTS THAT PROVIDE BEST MANAGEMENT PRACTICES THAT ADDRESS MANY ACTIVITIES. SEE HTTPJICILLUB.EPA.GOV/NPDEMTONNWATERAAENUOFIMMSANDEXCFM7ACTJ00=MJLL LDEASUREMAN MEASURE ID=4 THE FOLLOWING ACTIVITIES, AND OTHERS ON A SITE-SPECIFIC BASIS, REQUIRE OVERSIGHT THROUGHOUT THE CONSTRUCTION AND DEVELOPMENT PROCESS TO ASSURE THAT ALL WATER QUALITY STANDARDS ARE PROTECTED: a EQUIPMENT OPERATION AND MAINTENANCE - EQUIPMENT UTILIZED DURING THE CONSTRUCTION ACTIVITY ON A SITE MUST BE OPERATED AND MAINTAINED IN SUCH A MANNER AS TO PREVENT THE POTENTIAL OR ACTUAL POLLUTION OF THE SURFACE OR GROUND WATERS OFTHE STATE. FUELS, LUBRICANTS, COOLANTS, AND HYDRAULIC FLUIDS, OR ANY OTHER PETROLEUM PRODUCTS, SHALL NOT BE DISCHARGED ONTO THE GROUND OR INTO SURFACE WATERS, SPENT FLUIDS SHALL BE CLEANED UP AND DISPOSED OF IN A MANNER SO AS NOT TO ENTER THE WATERS, SURFACE OR GROUND, OFTHE STATE AND IN ACCORDANCE WITH APPUCABLE STATE AND FEDERAL REGULATIONS. b. MATERIAL HANDLING - HERBICIDE, PESTICIDE, AND FERTILIZER USAGE DURING THE CONSTRUCTION ACTIVITY SHALL BE CONSISTENT WITH THE FEDERAL INSECTICIDE, FUNGICIDE, AND RODENTICIDE ACT AND SHALL BE IN ACCORDANCE WITH LABEL RESTRICTIONS. C. BUILDING MATERIAL WASTE HANDLING 1) ALL WASTES COMPOSED OF BUILDING MATERIALS SHALL BE DISPOSED OF IN ACCORDANCE WITH NORTH CAROLINA GENERAL STATUTES, CHAPTER 130A, ARTICLE 9 - SOLID WASTE MANAGEMENT, AND RULES GOVERNING THE DISPOSAL OF SOLID WASTE (NORTH CAROLINA ADMINISTRATIVE CODE SECTION 15A NCAC 13B). II) LOCATE AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE. THIS LOCATION SHALL BE AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. III) DUMPING OF PAINT AND OTHER LIQUID BUILDING MATERIAL WASTES IN STORM DRAINS IS PROHIBITED. IV) UTTER AND SANITARY WASTE- THE PERMITTEE SHALL CONTROL THE MANAGEMENT AND DISPOSAL OF UTTER AND SANITARY WASTE FROM THE SITE. d. LOCATION OF STOCK PILES - LOCATE EARTHEN -MATERIAL STOCK PILE AREAS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. e. HANDLING OF CONCRETE 1) CONCRETE MATERIALS ONSITE, INCLUDING EXCESS CONCRETE, MUST BE CONTROLLED AND MANAGED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS OR BUFFERS. NO CONCRETE OR CEMENT SLURRY SHALL BE DISCHARGED FROM THE SITE. (NOTE THAT DISCHARGES FROM ONSITE CONCRETE PLANTS REQUIRE COVERAGE UNDER A SEPARATE NPDES PERMIT - NCG 140000.) 11) ANY HARDENED CONCRETE RESIDUE WILL BE DISPOSED OF, OR RECYCLED ON SITE, IN ACCORDANCE WITH LOCAL AND STATE SOLID WASTE REGULATIONS. 2. GROUND STABILIZATION a. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: I) ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND AU SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3: 1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. II) ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. b. CONDITIONS - IN MEETING THE STABILIZATION REQUIREMENTS ABOVE, THE FOLLOWING CONDITIONS OR EXEMPTIONS SHALL APPLY: 1) EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. 11) ALL SLOPES 50' IN LENGTH OR GREATER SHALL APPLY THE GROUND COVER WITHIN 7 DAYS EXCEPT WHEN THE SLOPE IS FLATTER THAN 4:1 SLOPES LESS THAN 50' SHALL APPLY GROUND COVER WITHIN 14 DAYS EXCEPT WHEN SLOPES ARE STEEPER THAN 3: 1, THE 7 DAY -REQUIREMENT APPLIES. III) ANY SLOPED AREA FLATTER THAN 4: 1 SHALL BE EXEMPT FROM THE 7 -DAY GROUND COVER REQUIREMENT. IV) SLOPES 10' OR LESS IN LENGTH SHALL BE EXEMPT FROM THE 7 -DAY GROUND COVER REQUIREMENT EXCEPT WHEN THE SLOPE IS STEEPER THAN 2: 1. V) ALTHOUGH STABILIZATION IS USUALLY SPECIFIED AS GROUND COVER, OTHER METHODS, SUCH AS CHEMICAL STABILIZATION, MAY BE ALLOWED ON A CASE-BY-CASE BASIS. VI) FOR PORTIONS OF PROJECTS WITHIN THE SEDIMENT CONTROL COMMISSION -DEFINED 'HIGH QUALITY WATER ZONE' (15A NCAC 04A. 0105) , STABILIZATION WITH GROUND COVER SHALL BE ACHIEVED AS SOON AS PRACTICABLE BUT IN ANY EVENT ON ALL AREAS OF THE SITE WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACT. VIII PORTIONS OF A SITE THAT ARE LOWER IN ELEVATION THAN ADJACENT DISCHARGE LOCATIONS AND ARE NOT EXPECTED TO DISCHARGE DURING CONSTRUCTION MAY BE EXEMPT FROM THE TEMPORARY GROUND COVER REQUIREMENTS IF IDENTIFIED ON THE APPROVED E&SC PLAN OR ADDED BY THE PERMITTING AUTHORITY. 3. SELF INSPECTION AND REPORTING REQUIREMENTS MINIMUM SELF INSPECTION -AND REPORTING REQUIREMENTS ARE AS FOLLOWS UNLESS OTHERWISE APPROVED IN WRITING BY THE DIVISION OF WATER QUALITY. a. A RAIN GAUGE SHALL BE MAINTAINED IN GOOD WORKING ORDER ON THE SITE UNLESS ANOTHER RAIN MONITORING DEVICE HAS BEEN APPROVED BY THE DIVISION OF WATER QUALITY. b. A WRITTEN RECORD OF THE DAILY RAINFALL AMOUNTS SHALL BE RETAINED AND ALL RECORDS SHALL BE MADE AVAILABLE TO DIVISION OF WATER QUALITY OR AUTHORIZED AGENT UPON REQUEST. IF NO DAILY RAIN GAUGE OBSERVATIONS ARE MADE DURING WEEKEND OR HOLIDAY PERIODS, AND NO INDIVIDUAL -DAY RAINFALL INFORMATION IS AVAILABLE, THE CUMULATIVE RAIN MEASUREMENT FOR THOSE UWATTENDED DAYS WILL DETERMINE IF A SITE INSPECTION IS NEEDED. (NOTE: IF NO RAINFALL OCCURRED, THE PERMITTEE MUST RECORD'ZERO'). c, EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTE<;L TO ENSURE THAT THEY ARE OPERATING CORRECTLY. INSPECTION RECORDS MUST BE MAINTAINED FOR EACH INSPECTION EVENT AND FOR EACH MEASURE. AT A MINIMUM, INSPECTION OF MEASURES MUST OCCUR AT THE FREQUENCY INDICATED BELOW: 1) ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED BY OR UNDER THE DIRECTION OF THE PERMITTEE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS, AND II) ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSPECTED BY OR UNDER THE DIRECTION OF THE PERMITTEE WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 0.50 INCHES OF RAIN PER 24 HOUR PERIOD. d. ONCE LAND DISTURBANCE HAS BEGUN ON THE SITE, STORM WATER RUNOFF DISCHARGE OUTFALLS SHALL BE INSPECTED BY OBSERVATION FOR EROSION, SEDIMENTATION AND OTHER STORM WATER DISCHARGE CHARACTERISTICS SUCH AS CLARITY, FLOATING SOLIDS, AND OIL SHEENS. INSPECTIONS OF THE OUTFALLS SHALL BE MADE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 0.50 INCHES OF RAIN PER 24 HOUR PERIOD. e. INSPECTIONS ARE ONLY REQUIRED TO BE MADE DURING NORMAL BUSINESS HOURS. WHEN ADVERSE WEATHER CONDITIONS WOULD CAUSE THE SAFETY OF THE INSPECTION PERSONNEL TO BE IN JEOPARDY, THE INSPECTION CAN BE DELAYED UNTIL IT IS DEEMED SAFE TO PERFORM THESE DUTIES. (TIMES WHEN INSPECTIONS WERE DELAYED BECAUSE OF SAFETY ISSUES SHOULD BE NOTED IN THE INSPECTION RECORD.) IF THE INSPECTION CANNOT BE DONE ON THAT DAY, IT MUST BE COMPLETED ON THE FOLLOWING BUSINESS DAY. I. TWENTY-FOUR HOUR REP01-11NG FOR VISIBLE SEDIMENT DEPQSITION 1) THE PERMITTEE SHALL REPORT TO THE DIVISION OF WATER QUALITY CENTRAL OFFICE OR THE APPROPRIATE REGIONAL OFFICE ANY VISIBLE SEDIMENT BEING DEPOSITED IN ANY STREAM OR WETLAND OR ANY NONCOMPLIANCE WHICH MAY ENDANGER HEALTH OR THE ENVIRONMENT. (SEE SECTION VIII OF THIS PERMIT FOR CONTACT INFORMATION.) ANY INFORMATION SHALL BE PROVIDED ORALLY OR ELECTRONICALLY WITHIN 24 HOURS FROM THE TIME THE PERMITTEE BECAME AWARE OF THE CIRCUMSTANCES. OCOPYRIGHT 2015 BY BREC, PA, ALL RIGHTS RESERVED. THIS PIAN MAY NOT BE RE -USED, SOLD, LOANED. OR GIVEN TO OTHERS. REPRODUCTION OR II) A WRITTEN SUBMISSION SHALL BE PROVIDED TO THE APPROPRIATE REGIONAL OFFICE OF THE DIVISION OF WATER QUALITY WITHIN 5 DAYS OF THE TIME THE PERMITTEE BECOMES AWARE OF THE CIRCUMSTANCES. THE WRITTEN SUBMISSION SHALL CONTAIN A DESCRIPTION OF THE SEDIMENT DEPOSITION AND ACTIONS TAKEN TO ADDRESS THE CAUSE OF THE DEPOSITION. THE DIVISION OF WATER QUALITY STAFF MAY WAIVE THE REQUIREMENT FOR A WRITTEN REPORT ON A CASE-BY-CASE BASIS. g. RECORDS OF INSPECTIONS MADE DURING THE PREVIOUS 30 DAYS SHALL REMAIN ON THE SITE AND AVAILABLE FOR AGENCY INSPECTORS AT ALL TIMES DURING NORMAL WORKING HOURS, UNLESS THE DIVISION OF WATER QUALITY PROVIDES A SITE-SPECIFIC EXEMPTION BASED ON UNIQUE SITE CONDITIONS THAT MAKE THIS REQUIREMENT NOT PRACTICAL. OLDER RECORDS MUST BE MAINTAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION AND MADE AVAILABLE UPON REQUEST THE RECORDS MUST PROVIDE THE DETAILS OF EACH INSPECTION INCLUDING OBSERVATIONS, AND ACTIONS TAKEN IN ACCORDANCE WITH THIS PERMIT. THE PERMITTEE SHALL RECORD THE REQUIRED RAINFALL AND MONITORING OBSERVATIONS ON THE INSPECTION RECORD FORM PROVIDED BY THE DNISION OR A SIMILAR INSPECTION FORM THAT IS INCLUSIVE OF ALL OF THE ELEMENTS CONTAINED IN THE DIVISION'S FORM USE OF ELECTRONICALLY -AVAILABLE RECORDS, IN DEU OF THE REQUIRED PAPER COPIES FOR INSPECTION WILL BE ALLOWED IF SHOWN TO PROVIDE EQUAL ACCESS AND UTILITY AS THE HARD -COPY RECORDS. h. INSPECTION RECORDS MUST INCLUDE, AT A MINIMUM, THE FOLLOWING: I) CONTROL MEASURE INSPECTIONS: INSPECTION RECORDS MUST INCLUDE AT A MINIMUM: 1) IDENTIFICATION OF THE MEASURES INSPECTED, 2) DATE AND TIME OF THE INSPECTION, 3) NAME OF THE PERSON PERFORMING THE INSPECTION, 4) INDICATION OF WHETHER THE MEASURES WERE OPERATING PROPERLY, 5) DESCRIPTION OF MAINTENANCE NEEDS FOR THE MEASURE, 6) CORRECTIVE ACTIONS TAKEN (7) DATE OF ACTIONS TAKEN, AS WELL AS THE DATE AND AMOUNTS OF RAINFALL RECEIVED. 11) STORM WATER DISCHARGE INSPECTIONS: INSPECTION RECORDS MUST INCLUDE AT A MINIMUM: I) IDENTIFICATION OF THE DISCHARGE OUTFALL INSPECTED, 2) DATE AND TIME OF THE INSPECTION, 3) NAME OF THE PERSON PERFORMING THE INSPECTION, 4) EVIDENCE OF INDICATORS OF STORM WATER POLLUTION SUCH AS OIL SHEEN, FLOATING OR SUSPENDED SOLIDS OR DISCOLORATION, 5) INDICATION OF VISIBLE SEDIMENT LEAVING THE SITE, 6) ACTIONS TAKEN TO CORRECTIPREVENT SEDIMENTATION AND 7) DATE OF ACTIONS TAKEN. III) VISIBLE SEDIMENTATION FOUND OUTSIDE THE SITE LIMITS: INSPECTION RECORDS MUST INCLUDE: 1) AN EXPLANATION AS TO THE ACTIONS TAKEN TO CONTROL FUTURE RELEASES, 2) ACTIONS TAKEN TO CLEAN UP OR STABILIZE THE SEDIMENT THAT HAS LEFT THE SITE LIMITS AND 3) THE DATE OF ACTIONS TAKEN. IV) VISIBLE SEDIMENTATION FOUND IN STREAMS OR WETLANDS: ALL INSPECTIONS SHOULD INCLUDE EVALUATION OF STREAMS OR WETLANDS ONSITE OR OFFSITE (WHERE ACCESSIBLE) TO DETERMINE IF VISIBLE SEDIMENTATION HAS OCCURRED. V) VISIBLE STREAM TURBIDITY - IF THE DISCHARGE FROM A SITE RESULTS IN AN INCREASE IN VISIBLE STREAM TURBIDITY, INSPECTION RECORDS MUST RECORD THAT EVIDENCE AND ACTIONS TAKEN TO REDUCE SEDIMENT CONTRIBUTIONS. SITES DISCHARGING TO STREAMS NAMED ON THE STATE'S 303(D) LIST AS IMPAIRED FOR SEDIMENT -RELATED CAUSES MAY BE REQUIRED TO PERFORM ADDITIONAL MONITORING, INSPECTIONS OR APPLICATION OF MORE -STRINGENT MANAGEMENT PRACTICES IF IT IS DETERMINED THAT THE ADDITIONAL REQUIREMENTS ARE NEEDED TO ASSURE COMPLIANCE WITH THE FEDERAL OR STATE IMPAIRED -WATERS CONDITIONS. IF A DISCHARGE COVERED BY THIS PERMIT ENTERS A STREAM SEGMENT THAT IS LISTED ON THE IMPAIRED STREAM LIST FOR SEDIMENT -RELATED CAUSES, AND A TOTAL MAXIMUM DAILY LOAD (TMDL) HAS BEEN PREPARED FOR THOSE POLLUTANTS, THE PERMITTEE MUST IMPLEMENT MEASURES TO ENSURE THAT THE DISCHARGE OF POLLUTANTS FROM THE SITE IS CONSISTENT WITH THE ASSUMPTIONS AND MEETS THE REQUIREMENTS OF THE APPROVED TMDL THE DIVISION OF WATER QUALITY 303(D) LIST CAN BE FOUND AT: HTTP:IM20. ENRSTATE NC. USRMDI/GENERA1303D.HTML 4. SEDIMENT BASINS SEDIMENT BASINS AND TRAPS SHALL MEET THE FOLLOWING REQUIREMENTS: a OUTLET STRUCTURES SHALL BE UTILIZED THAT WITHDRAW WATER FROM THE SURFACE. b. FOR BASINS OR TRAPS THAT HAVE A DRAINAGE AREA OF LESS THAN 1.0 ACRE, DRAW -DOWN DESIGNS SPECIFIED IN THE DIVISION OF LAND RESOURCES OR DELEGATED LOCAL PROGRAM REQUIREMENTS ARE ACCEPTABLE. C. CHEMICAL TREATMENT I) ALL TREATMENT CHEMICALS MUST BE STORED IN LEAK -PROOF CONTAINERS THAT ARE KEPT UNDER STORM -RESISTANT COVER OR SURROUNDED BY SECONDARY CONTAINMENT STRUCTURES DESIGNED TO PROTECT ADJACENT SURFACE WATERS. 11) ALL TREATMENT CHEMICALS MUST BE USED IN ACCORDANCE WITH DOSING SPECIFICATIONS AND APPLICATION RATES PROVIDED BY THE MANUFACTURER, SUPPLIER AND AS SPECIFIED BY THE DIVISION OF WATER QUALITY. III) THE PERMITTEE MUST ONLY USE CHEMICALS THAT HAVE BEEN APPROVED BY THE NC DIVISION OF WATER QUALITY AND POSTED ON THEIR *NORTH CAROLINA DIVISION OF WATER QUAUTY APPROVED PAMS/FLOCCULANTS LIST' FOUND ON THEIR WEB SITE AT: HTTP:IIPORTAL NCDENR.ORGLWEBNJGMS/SU. IV) THE PERMITTEE MUST ROUTE STORM WATER TREATED WITH POLYMERS, FLOCCULANTS, OR OTHER TREATMENT CHEMICALS THROUGH SEDIMENT TRAPPING, FILTERING, AND/OR SETTLING DEVICES($) TO ENSURE ADEQUATE REMOVAL OF SEDIMENT FLOCCULENT PRIOR TO DISCHARGE TO SURFACE WATERS. d. DISCHARGE REQUIREMENT - DISCHARGES MUST MEET THE STATUTORY REQUIREMENTS OF THE SEDIMENT POLLUTION CONTROL ACT AND UTILIZE THE PROVISIONS OF SECTION 6.74 OF THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL TO ASSURE THAT BUFFERS AND VEGETATED AREAS WILL BE USED TO REDUCE THE POTENTIAL FOR VISIBLE SILTATION OUTSIDE OF THE 25% BUFFER ZONE NEAREST THE LAND DISTURBING ACTMTY. 5. DISCHARGES TO SPECIAL OR THREATENED WATERS a DISTURBED AREAS WITHIN ONE MILE OF AND DRAINING TO WATERS WHERE FEDERALLY -LISTED THREATENED OR ENDANGERED AQUATIC SPECIES ARE PRESEN(SHALL BE LIMITED AT ANY TIME TO A MAXIMUM TOTAL AREA WITHIN THE BOUNDARIES OF THE TRACT OF20 ACRES. THESE PROJECTS SHALL ALSO USE CONTROL MEASURES THAT ARE DESIGNED, INSTALLED AND MAINTAINED IN ACCORDANCE WITH CRITERIA SET FORTH IN L5A NCAC 048 .0124 - DESIGN STANDARDS IN SENSITIVE WATERSHEDS. THE DIVISION OF WATER QUALITY MAY REQUIRE ADDITIONAUALTERNATIVE PROTECTION MEASURES OR REQUIRE COVERAGE UNDER AN INDIVIDUAL CONSTRUCTION NPDES STORMWATER PERMIT. OTHER MANAGEMENT PRACTICES MAY BE ACCEPTABLE IF THESE DESIGNS ARE SHOWN BY THE APPLICANT, TO THE SATISFACTION OF THE DIRECTOR TO PROVIDE EQUIVALENT PROTECTION. b. CONSTRUCTION ACTIVITIES IN HIGH QUALITY WATERS ZONES REQUIRE QUICKER GROUND STABILIZATION PROVISIONS AS SPECIFIED IN SECTION II.B.2.8. OF THE PERMIT. Major Elements of DWQ Construction General Permit lkb dwumrnt cpnsirs m< m.ja stamina dme,eeatly-rtvivd NaN Grplm• Dniebn d 0.'alw pualkl (Dl1'Q) CW,m,eton C-0 P- CWW) wifl, -,h..i. pl.«d m mm< PIP- mN diS'w ben IN, p,ji pwwk(axpimtiunW Au t2. 3011). S - 1h. aa,m.n' Ike Mlcu' eeaw onnsm daaik dww dungt Me amvplme Pama abpvld M u.M b e•urc NII impkmrnWiW Sea:nap://�n�lai n<denro„lweb/wq/ws/su/const, IT) Cw.nd SUNluadr• SN Art. Desch tion Subiluanr T®e Frame SnNaaaaM In. Fr.-Eue Pmvetr ml a. ml:ms ]d+y Nene ,watts, rad u. M Aq samftnr • wa - • Owen Im1p1Ww a Gcrm drvrma• kaldee W W. arm (HQ0.') 76,ya N. Zpnw IM an sspnamrt,Ic.rnh in wtx1M NCGD1000D pe,mt.G5. 113ASsl txe inn rtWn "accurate and �emple�mtM M. el my knnwed3e. Fina.nc.3lty =esponade Parte I Pwmeee or Agent! JeaNrse 1rdW..n lo' w • .kben 3; "wpm 3:1 ]Gaya I.r.1 n I.M1n inti m sew, 0up 2:1, Sfl•Ar-Daws Sbbaiaarbn Thnal nna E.c ion. Parim•bar diw., awr•s Ia aPw,e mnw<a Swea 3:1 or IA daysinn 7- fm `ops .emN. 0 fwl edea w NrrR« in m,Pn All dhcr ace 1 14 Day, I Nona, aPcW IN, WisnassausI and HQW Zorn• \arc lacgn lm wm•Icpc. sant, plan 4:1 lldaya Pmm-+., a,d N lore b...de�w n.,bwrtmw�au-gwnr. rnWmwn w�mr«.ptia,w ii.w.di<.N<•(s<wm,n arxna Ten mala cnaNa n 1ne Fnni1 fr.x tle Rn•_nwme etl• mpm, w m apps w� rml,mxm wen -mJdc nnw a gram Ile NC law •Mrvka,el<mlgmme SemroosA.A.,paa. plass lord auGl,m•n»,nu131 by,. e«dw da wr �A mxaaer rad 5tnsdu' wark w,m a pvmndrbay E,ix erAe..n n..r, rd I:PA.a.eaped pen.A nn. w,..i,. _ .a ra�,aa <pa. wa,m li •�dmrw Ma•A ]dw+ 3) Hulgap W'aen 11r1aNr No ryin p-liyud wasxsina mwetmn true Dra<arm w,r«anruew.<W.w<M,.w wb<r aau 41«sled 50' Som almn Brun --P ww. no m,wn,N<amma aauabk. • I;aMm <nd ei«kpike mm1 be incaeJ 50' Irom dm�m a�J eiuem.lmlw. nn rwa�maNe dv,r.ds-w mailank Cmu<e mueua4 mrt R wnbpllm --d -1 with ndau wecrs w.bm. m N ff n. 3) Dbd.ree.b FWenlly-IIem s, Rcquraonu m tl1c saint a in rm.iw. pmlil • Ile P:md1 alive•ren«nal tom deWl U IN Uinaer d DWp darnmnn w, -M BA�a provide palmi CONSENT OF MEC P A IS PRO IRITFD AND M A M(Y ATION OF FFCFRAL COPYRIMT BY FINES UP TO $100.000 PER D®A.RMmNdq Forty Ree n801113 11ngc I W : NPRCT AND AONITORING RECORDS FOR ACTIVITIES UNDER STORMNATER GENERAL PERNIT NC00100op AND SELF -INSPECTION RECORDS FOR LAND MTURRING ACTIVITIES PER O.S. 113A2 .1 h.,- Name Labe Qualrcy w Lord P ramp M aaMdMy R•sPoamN Pa .FRP I PMmIW P couny INSPECTOR lalwsloIT," IM•m) e FRPIPamxwe M Aq samftnr • wa - .-_ T ainf 11 Data RT 18 Cu r ratw d P,o'ect a Ran Am111- Phased Grading Day; Date Daily Rainfall Raqrw s))epl X u, cfor cMck d,•apli-N. Mxlal "Way.«Weekends. rcno an IrWlhnonapsnmNs•xownwsMmen iN11- YAth a `sen" Geaep aw flmm,q d ensevp pales cove M Lpmplsbpn d arY Mw.e d fl�ad,rp d a Was T Im1p1Ww a Gcrm drvrma• kaldee W �,nlNeeondall se,aealu,d.N a-dy cwnn TN F Sal (Opti ... 1) P.,mawt oropna <wer.,,N<�.<1 b,emar •maanr Sun lOplbnaN RT 1C: 9 natur of In IM an sspnamrt,Ic.rnh in wtx1M NCGD1000D pe,mt.G5. 113ASsl txe inn rtWn "accurate and �emple�mtM M. el my knnwed3e. Fina.nc.3lty =esponade Parte I Pwmeee or Agent! JeaNrse Jate GROUND STASILDATION nswgrtAms Sfl•Ar-Daws Sbbaiaarbn Thnal nna E.c ion. Parim•bar diw., awr•s and sb as 7Da Non. HlahQual Wabr N Zwrs I N - Sao Stsaw than 31 70. IT.lo are 1P or la. In W and an na r Sran 2:1.14 d ap Mlowad w NrrR« 1. D. 7 da for sb ;eater than W in laraM Are1Mr araa Wtfh ab 1 14 Day, I Nona, aPcW IN, WisnassausI and HQW Zorn• DEW.R Kfoniranug Fwm ResOBDI 2113 ht. 2 d: PART2A: EROSION AND SEDIMENTATION CONTROL MEASURES: Aleasua must b• Insp- M I•at ONCE PER 7 CALENDAR DAYS AND WMNW St HOURS OF A RAINFALL EVENT GREATER THAN 0.6 INCH PER L HOUR PERIOD. Erosion and Sedimentation Control Measures Inspected apaWon Describe Actions Needed naso " Daw �< eco�a actions sndma be cenormed aaoon Ca^sNd zc:Opaen", A"y IXmw • ssibl•end bet on m•next storm •vd oewpnm ,.,In, nM» MnMenanNa•Gd>`�F�-"A=^i ' a P ,71t6111�.'r �eYielar fium ft1 fIll B•0?-C�0 •haws r ,arts w ra ,m n pr.dlee Mmwn on a copy d the aW,m,d stuns, and sedmenuhon c0dr01 plan LiM C-,,-, 0 Measures suer as Sednerd Beans eM R,mp Aeon SOO, mart be 1N,W W at NM ONCE PER 7 CALENDAR DAYS AND WITHIN b HOURS OF A RAINFALL EVENT GitFATHt iMAN 0.6 INCH PER 24 HOUR PERIOD. Storirlwahr Discha a Outfalls Inspected "'pectin" Report Visible Sedimenbtion Io sine... or artLand. m Dau Mmer:anm m5bam ✓.bk Any -b-., Dae Land Q,,IHy within 24 Hours OW1 1n Sees rw, T -r, ldpr .b.•q fl -n, nnp'. apwml nr<.nrprp/webllrlpiwsionconuas IDw wed.rae o� raw" baba• aow.d wa•a Describe Actions Needed t D�u+de Ste D -l-, SD07 bpdacpns (YIIJJ Conaemw aalona.Muld n wnorm,M as coon as ppwmN and ❑m1.n lea ;Ylrn T N bent M r•sprdad arta, a Ii Ph.s• d GWIn Awr Wlr•Lantl D61VW2a Has fiesn Time Limit kr NG-Cw., CwleleYd or T. -I, --dGama Cwm saxd.dm Nspaotr, Describe Actions Needed OMa 7 plana R.•h•n E-1 Gas, Cpneaea YM Major Elements of DWQ Construction General Permit- Continued 4) is p - 'arcw«kly b:p dm-dnmsn. • Sarc,unyeu6<@iwpccCwxaM tl.S'r�n cvmt • Irpectl"n m Wy rcgdrd dating `mnnld M1winwe bmm' • lmwceun npwa axe, h •vwl,Ne W+ie maing M.dnne mors ,m1w. a aeemnis< oenyom i. xcd RecwM munl6e kry1 fnr 1 _ un aM •. ailebie smn regwc( • F.lev"nicalN-nvuM1l<rtc,rd. mayhvunanlue0 ends cmnin cwx3dmu. 5) bnpkne.w-.rNew Pn C'mdi1I... • Rn3ca. P<f llowa me pmuio I.i u-I�ticd<WJinu [p,�l<tc appli..nau,cccivcd pram to AuBw 3. 2011 <w bnw :pn r.e of m. geuin. • Appliun nerd N. a_. 3.2011 mud wrgly wim n.. p<nrdt Wandw.. 6) ('as.""..bErwknd SetlimenNlr"e ('unvol t•kn•• Dwienan W W m<M,ro wbm de ] am laa.1 ewn"d •uNlvadan rcqumeeNs plena �IDDES p<wdl apph' Dwigna.r w Ne Plain wbea mina mu ..14, wim rte ewfe.-wilMnwal mw.,emam dent NPDFt pclnui as lorem. 71 BedldMe la•an Hrdxng No wane liywd wast' in m<awsia,m true • ncdi:a:A,wae fns drnnndan cwaw<eW a,W mM n bcaied 60- from ss,m trairo and unama ,vJ<v mahk Wt-manv'e.a avag,Nc. • F.armm-matrnal.«Lplw l«md10'mm�awn drnn ww• a, maan,ank dlemar,.<e eu1.N<. • male m,ut hcmMollm lu amid.mNct w-i1M1 aun'au wat<n. ae0atle. n l,Nien. el s<dlmew Hare ' www bmn e,ab .wra<e uuw.,N.rgc er,'e kw ibr 1 sn< • Ua my DWpaPpwcd Ro-sWau. . Lo-senrb.pdy ih r,ddm Nene crYe,ma.Gmml � nmm e.m(y as .kw Ur P•• -e >.kLadmmwva�a •vN� u. u. lemrn M�xlvebrf�widab•wd npmnreeply. U«uncal pnP+rm by dM llsiva d WNa Qe61r iu BREC W J a- 3 Oti 2 0 0 126 EXECUTIVE DRIVE - SUITE 220 NILKESKRO, W 2M7 336.841.40M nnp1&- Uuna(ry 'A C" SEAL - 036738 i OINE.P-e 0608017 `• epSC�P„��''• �ppPOR'rF.. _ NC8EL53'G3118; � %LO•'' •'KAP: ''•.;�Y CAR.•` PREPARED FOR. PISGAH BASE I 151 CHARLIE K PISGAH FORE! DATE: NOTES ;AMP 406 ROAD T NC Z O H- O REVISIONS: C0 C7 Z O U Of CD sx 0 MXdfi' LIJ C0 ATE . w10r2017 J LLJ nxo.Em xLMem 0570052m7 � L B.DAENER appRoaa ar Z J.CHURCH ' SCALE NTS (H) c M - 7C -000y PERMANENT STREAM CROSSING (CULVER C900 ROAD SURFACE SEEDING MIXTURE SUB -GRADE SURFACE ?i�CIES RATE (LBIACRE) TAMP BACKFILL MATERIAL TALL FESCUE 1DO MN OF IT AT REGULAR INTERVALS MORE THAN ONCE PER YEAR RESEED, FERTILIZE, AND MULCH DAMAGED AREAS KOREAN LESPEDEZA 70 IMMEDIATELY. REDTOP 5 CULVERT BASE AND SIDEWALL FILL SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT MATERIAL SHOULD BE SEEDING NOTE THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE COMPACTED, FINER SOIL PARTICLES D 2. WHERE APPEARANCE IS A CONSIDERATION, OMIT SERCIA LESPEDEZA AND 20%BURIED LEVEL OF CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE NATURAL STREAMED PLANTED. THIS INCLUDES ROCKS, BOTTLES, URGE ROOTS AND OLD TREE TRUNKS. ROCK FREE CULVERT SE) +� - VARIES EXISTING GROUND (GRAVEL OR SGL) (SEE NOTES) GENERAL NOTES: 1. STREAM WORK AND LAND DISTURBANCE WITHIN THE 25' WIDE BUFFER ZONE ARE PROHIBITED DURING THE BROWN AND BROOK TROUT SPAWNING SEASON OF OCT. 15 THROUGH APRIL 15. 2. TO THE MAX EXTENT PRACTICABLE, CULVERT 48'D OR LARGER SHOULD BE BURIED A FOOT INTO THE STREAMED. CULVERTS LESS THAN 48'D SHOULD BE BURIED TO A DEPTH EQUAL TO OR GREATER THAN 20% THEIR SIZE TO ALLOW FOR AQUATIC LIFE PASSAGE 3. STRINGENT EROSION CONTROL MEASURES SHOULD BE INSTALLED AND MAINTAINED WHERE SOL IS DISTURBED. THESE CONTROLS SHOULD BE MAINTAINED UNTIL FULL PROJECT COMPLETION. 4. IF ANY CONCRETE WILL BE USED, WORK MUST BE ACCOMPLISHED SO THAT WE CONCRETE DOES NOT CONTACT STREAM WATER 5. WHEN POSSIBLE HEAVY EQUIPMENT SHOULD BE OPERATED FROM THE BANK RATHER THAN IN THE STREAM CHANNEL 6. TEMPORARY OF HERBACEOUS VEGETATION SHOULD BE ESTABLISHED ON ALL BARE SOL WITHIN 15 DAYS OF GROUND DISTURBING ACTIVITIES IN THE 25 TROUT BUFFER TO PROVIDE LONGTERM EROSION CONTROL. IT IS ENCOURAGED TO USE NATURAL FIBER MATING INSTEAD OF PLASTIC MATTING THAT CAN ENTRAP SMALLANIMALS. 7. PLEASE SEE PUMP AROUND DETAIL AS REQUIRED. 2 SILT FENCE C900 STEEL POST IH� I WIRE FENCING I e' MAX -(FILTER FABRIC WARE FENCING I I i575TONE WOVEN FILTER FABRIC 30' MIN ,&- LL 6� FLOW F 8' MIN GENERALNOTES. d'MIN I. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THEREQUIREMENTS IN ASTM D 5461, WHICH IS SHOWN IN PART IN TABLE B.M. 2. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTIDN LIFE AT A TEMPERATURE RANGE OF 0 TO 120- F. 3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 135 LBHNFAR FT MINIMUM STEEL WITH A MINIMUM LENGTH OF 5 FEET MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 4. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GWGEAND AMAXIMUM MESH SPACING CF 61NCHES 5. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETICRLTER FABRICS. S ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE (HICHHER FENCES MAY IMPOUND VOLUMES a WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE) 7. CONSTRUCT THE FILTER FIBRO FROM A CONTINUOUS ROLL CDT TO TIE LENGTH OF THE BARRIER TO AVOID JOIRM WHEN JOINTS ARE NECESSARY. SECURELY FASTEN THE FILTER CLOTH ONLY ATA SUPPORT ROSTWTTH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. B SUPPORT STANDARD STRENGTH FILTER FABRIC BY N1RE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT. THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST, WIRE OR PIASTIG ➢P TIES SHOULC HAVE MINIMUM 50 PWND TENSILE STRENGTH 9. WHEN A WIRE MESH SUPPORT FENCE IS USES, SPACE POSTS A MAXIMUM OF 9 FEET APART SUPPORTPOSTSSHOULDBEDNV NSECURELYINTOTHE GR OUNDAMINIMUMOF241NCHES. 10 EXIRASTRENGTHFILTERFABRIC ITHSFEET RDSTSPACINGDOES NOT FEQUIREMRE MESH SUPPORT FENCE, SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO FORM WIRE CR PIPSTC2IP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 11. EXCAVATE A TRENCH APFROAMATRY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED UNE OF POSTS AND UPSLOPE FROM THE BARRIER IZ PULE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 5 SACXFILL THE TRENCH WITH SOL PLACED OVER THE FILTER FABRIC AND COMPACT THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE 14. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE NOTES. 1. INSPECT SEDIMENT FENCE AT LEAST ONCE A WEE( AND AFTER EACH RAINFALL MAKE ANY REWIRED REPARS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE TEAR, DECOMPOSE OR BECOME INEFFECTIVE REPLACE IT PROMPRY, 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO RESUCE PRESSURE ON THE FENCE TAIKE CARE TO AMD UNDERMINING THE FENCE DURING CLEANOUT. A REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STASMUM STONE OUTLET E&SC TEMPORARY SEEDING SCHEDULE • DO NOT USE WITHIN 25 RIPARIAN BUFFER SEE RIPARIAN SEEDING SCHEDULE FOR BUFFER SEEDING SPECS LATE WINTER 8 EARLY SPRING (FEB 15#UY 15) SPECIES RATE (LB/ACRE) RYE GRAIN 120 AND KOREAN LESPEDEZA 50 SOIL PREPARATION' SUMMER (MAY 15 -AUGUST 15) SOIL TEST SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE RATE(LBIACR SPECIES E) THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE NEEDED AMOUNTS OF FERTIUZER AND/UR LIME GERMAN MILLET 40 OR CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE TALL FESCUE 50 PUNTED. THIS INCLUDES ROCKS, BOTTLES, LARGE ROOTS AND OLD TREE TRUNKS IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE T FOR FALL (AUGUST 15 DECEMBER 1ST REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. SPECIES RATE(LWACRE) THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, RYE GRAIN 120 ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRINGTOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS: A SgLAMENDMENTS SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. FOLLOW RECOMMENDATIONS OF SOIL TEST OR APPLY 2000 LWACRE GROUND DEEP TILLAGE: ROTOTILUNG LOOSENS COMPACTED SGL AND IMPROVES THE AGRICULTURAL LIMESTONE AND 75D UNACRE 10.10.10 FERTILIZER INCREASE FERTILIZER 1111 AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED RATE 701000 LBIACRE IN THE FALL TILLER WILL ADEQUATELY TILL THE SGL TAKE CARE NOT TO DESTROY THE MULCH EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SGL APPLY 4000.5000 UVACRE GRAIN STRAW OR EQUIVALENT COVER OR ANOTHER SUITABLE TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE. TREES CAN ALSO BE MULCHING MATERIAL ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SUFFOCATED BY DEEPLY COVERING THE ROOTS MATH SOIL IF ADDITIONAL SOIL IS ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A NECESSARY AT A TREE BASE, CONSTRUCT ATREE WELL' MULCH ANCHORING TOOL MAINTENANCE REPLACE THE TOPSOIL: ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE REFERTIUZE IF GROWTH IN NOT FULLY ADEQUATE. RESEED, FERTLIZER, AND MULCH TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTRE AREA ALLOW FOR AT LEAST IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TOPDRESS WTH 50 LB/ACRE OF a TO 8 INCHES OF DEPTH AFTER THE SGL HAS SETTLED. THIS MEANS PLACING NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE ABOUT a TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE IMPROVE THE SGL BY 15, OVERSEED NTH 50 LBIACRE KOREAN LESPEDEZA IN LATE FEBRUARY OR EARLY ADDING ORGANIC MATTER THIS IMPROVES WATER RETENTION IN SANDY SOILS MARCH. AND DRAINAGE IN CLAY SOILS AND REDUCES FERTILIZER LEACHING. •11 STRFAMBANK � SANDBAGS WATERSURFACE — _- — -OVATION — VABOVE — ' BASEFl.OW (Z MIN.) \.\n\\♦ SECTION BS' SANDBAGS E&SC PERMANENT SEEDING SCHEDULE • DO NOT USE WITHIN 25 RIPARIAN BUFFER SEE RIPARIAN SEEDING SCHEDULE FOR BUFFER SEEDING SPECS SEEDING MIXTURE FLOW ?i�CIES RATE (LBIACRE) MAINTENANCE TALL FESCUE 1DO REFERTILIZE TIE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MOW NO SERICEA LESPEDEZA 20 MORE THAN ONCE PER YEAR RESEED, FERTILIZE, AND MULCH DAMAGED AREAS KOREAN LESPEDEZA 70 IMMEDIATELY. REDTOP 5 SOIL PREPARATION: KENTUCKY BLUEGRASS 5 SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE SEEDING NOTE THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE I. AFTER AUGUST 15. USE UNSCARIFIED SERICEA LESPEDEZA SEED, NEEDED AMOUNTS OF FERTIUZER AND/OR UNE. 2. WHERE APPEARANCE IS A CONSIDERATION, OMIT SERCIA LESPEDEZA AND INCREASE KOREAN LESPEDEZA TO 40 LBIACRE. CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE NURSE PUNTS PLANTED. THIS INCLUDES ROCKS, BOTTLES, URGE ROOTS AND OLD TREE TRUNKS. BETWEEN MAY 1 AND AUGUST 15 ADD 10 UVACRE GERMAN MILLET OR 15 LB/ACRE TALL IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE IT FOR FESCUS, PRIOR TO MAY 1 OR AFTER AUGUST 15, ADD 40 LBIACRE RYE GRAIN. IT MAY BE REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED, BENEFICIAL TO PLANT THE GLASSES IN LATE SUMMER AND OVERSEED THE LESPEDEZA DOWNSTREAM POOL IN MARCH. TME SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, SEEDING DATES BEST POSSIBLE ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRING -TOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS; A FLOW DIRECTION SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. BELOW 2500 FT: AUG 15 -SEP 1 JULY 25SEP 15 MAR 1 -APR 1 MAR 1 -MAY 10 DEEP TILLAGE: ROTOTILUNG LOOSENS COMPACTED SOL AND IMPROVES THE II II II II SPEED AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED ABOVE 2500 FT: JULY 25 -AUG 15 JULY 15 -AUG 30 TILLER WILL ADEQUATELY TILL THE SOL TAKE CARE NOT TO DESTROY THE MAR 20 -APR 20 MAR 54AAY 15 EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SOL COMPLETE SEEDING EARLIER IN THE FALL AND START LATER IN THE SPRING ON NORTH TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE TREES CAN ALSO BE AND EAST FACING SLOPES. SUFFOCATED BY DEEPLY COVERING THE ROOTS NTH SOL IF ADDITIONAL SOIL IS NECESSARY ATA TREE BASE, CONSTRUCT A TREE WELL' SOILAMENDMENTS APPLY UME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4000 LBIACRE REPLACE THE TOPSOIL ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE GROUND AGRICULTURAL LIMESTONE AND 100D UNACRE 5.10-10 FERTILIZER TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTIRE AREA. ALLOW FOR AT LEAST MULCH 6 TO 8 INCHES OF DEPTH AFTER THE SOL HAS SETTLED. THIS MEANS PLACING APPLY 40005000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE ABOUT 8 TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE. IMPROVE THE SOIL BY MULCHING MATERIAL ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING. ADDING ORGANIC MATTER THIS IMPROVES WATER RETENTION IN SANDY SOLS NETTING IS THE PREFERRED ANCHORING METHOD ON STEEPSLOPES. AND DRAINAGE IN CLAY SOLS AND REDUCES FERTILIZER LEACHING. B EC 126 EXECUTIVE DRIVE -SUITE 220 MBLKES80RO, NO 2B@t7 338.04A40B8 hep'14x PRELIMINARY WBELSNC-3448- PUMP AROUND STREAM BANK 2015 BY BREC, PA., ALL RIGHTS RESERVED. THIS PUN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC. PA IS PROHIBITED AND IS A UPSTREAM POOL V ` ) SUMP HOLE OR POOL (12- MIN. DEPTH, Z MIN. DIAMETER) CI PREPARED FOR PISGAH BASE ( 151 CHARLIE K PISGAH FORE: DATE )ETAILS AMP 1013 ROAD T NC Z _O H O REVISIONS: ::D H Z O U O LL SHEET s¢e .1 Cn AT� Q 05/102011 J RO£CTNWBER: W 0530052017 B.DAEMER O Z APPROVI��; J.CHURCH ISM 'W— NTS (H) Z M ISHEET, LJi1 C900 FLOW DISSIPATION DEVICE � ( ) CHANNEL BED/WORK AREA STEEL FENCE POST � 2'MAX_ ---- SILTFENCE A Ns7 STONE Jtr 7'b' NEIN. _..... _. DOWNSTREAM POOL FLOW DIRECTION 3 MAX 1 E"MIN. SEDIMENT CONTROL STONE II II II II STRUCTURAL STONE e II II II FRONT VIEW II SECTION MEW 11 It PUMP GENERAL NOTES: B 1. STRUCTURAL STONE SHALL BE (CUSS B) STONE FOR EROSION CONTROL PURPOSES. PUMPED EFFLUENT 2. SEDIMENT CONTROL STONE SHALL BE 05 OR 457 STONE. DEWATERING DEVICE SEE DETAIL PROVIDED , PUN 2015 BY BREC, PA., ALL RIGHTS RESERVED. THIS PUN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC. PA IS PROHIBITED AND IS A UPSTREAM POOL V ` ) SUMP HOLE OR POOL (12- MIN. DEPTH, Z MIN. DIAMETER) CI PREPARED FOR PISGAH BASE ( 151 CHARLIE K PISGAH FORE: DATE )ETAILS AMP 1013 ROAD T NC Z _O H O REVISIONS: ::D H Z O U O LL SHEET s¢e .1 Cn AT� Q 05/102011 J RO£CTNWBER: W 0530052017 B.DAEMER O Z APPROVI��; J.CHURCH ISM 'W— NTS (H) Z M ISHEET, LJi1 C900 1 C901 NATURALGRWND STEP 1- SITE PREPARATION FIGURE PREPARE SITE TO DESIGN PROFILE AND GRADE REMOVE DEBRIS. ROCKS, HEIGHT FROM ROAD SHOULDER CLODS, ETC- GROUND SURFACE SHOULD BE SMOOTH PRIOR TO 1 3' INSTALLATION TO ENSURE BLANKET REMAINS IN CONTACT WITH SLOPE. 7 _ r P STEP 2 -SEEDING SEEDING OF SITE SHOULD BE CONDUCTED TO DESIGN REQUIREMENTS OR TO FOLLOW LOCAL OR STATE SEEDING REQUIREMENTS AS NECESSARY. STEP 3- STAPLE SELECTION AT A MINIMUM, B' LONG BY I- CROWN. I I GAUGE STAPLES ARE TO BE USED TO SECURE THE BLANKET TO THE GROUND SURFACE INSTALLATION IN ROCKY, SANDY OR OTHER LOOSE SOIL MAY REWIRE LONGER STAPLES. STEP 4 -EXCAVATE ANCHOR TRENCH AND SECURE BLANKET EXCAVATE A TRENCH ALONG THE TOP OF THE CHANNEL SIDE SLOPES AND THE UPSTREAM TERMINAL END OF THE CHANNEL TO SECURE THE EDGES OF THE BLANKET. THE TRENCH SHOULD RUN ALONG THE LENGTH AND WIDTH OF THE INSTALLATION, BE S' WADE AND S DEEP. STAPLE BLANKET ALONG BOTTOM OF TRENCH, FILL PATH COMPACTED SOIL, OVERLAP BLANKET TOWARDS TOE OF SLOPE AND SECURE WITH ROW OF STAPLES (SHOWN IN FIRES RES A, H, E AND F). STEP 5 -SECURE BODY OF BLANKET ROLL BLANKET DOWN SLOPE FROM ANCHOR TRENCH. STAPLE BODY OF BLANKET FOLLOWING THE PATTERN SHOWN IN FIGURE D AND I. LEAVE END OF BLANKET UNSTAPLED TO ALLOW FOR OVERLAP SHOWN IN FIGURE B. PLACE DOWNSTREAM BLANKET UNDERNEATH UPSTREAM BLANKET TO FORM SHINGLE PATTERN. STAPLE SEAM AS SHOWN IN FIGURE E. SECURE DOWNSTREAM BLANKET WITH STAPLING PATTERN SHOWN IN FIGURE D AND I. STAPLING PATTERN SHOWN IN FIGURE D AND 1 REFLECTS MINIMUM STAPLES TO BE USED. MORE STAPLES MAY BE REWIRED TO ENSURE BLANKET IS SUFFICIENTLY SECURED TO RESIST MOWERS AND FOOT TRAFFIC AND TO ENSURE BLANKET IS IN CONTACT WITH SOIL SURFACE OVER THE ENTIRE AREA OF BLANKET. FURTHER, CRITICAL POINTS REQUIRE ADDITIONAL STAPLES. CRITICAL POINTS ARE IDENTIFIED IN FIGURE G AND J. STEP 6 CONTINUE ALONG SLOPE- COMPLETE INSTALLATION OVERLAP ADJACENT BLANKETS AS SHOWN IN FIGURE C AND REPEAT STEP 5. SECURE TOE OF SLOPE USING STAPLING PATTERN SHOWN IN FIGURE E. SECURE EDGES OF INSTALLATION BY STAPLING AT 1.0' INTERVALS ALONG THE TERMINAL EDGE. MAINTENANCE NOTES: 1. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (12 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY. 2. GOOD CONTACT WIT THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP. 3. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. FIGURE T) FIGURE F- PROFILE VIEW ROLLED EROSION CONTROL MATTING INSTALLATION C901 TEMPORARY SEDIMENT TRAP FIGURE F FIGURE E ^ FIGURE 81 FIGURE C L C FIGURE E - / .. BLANKET3 TEMPORARY SEDIMENT ^\ FIGURE / TRAP DESIGN CRITERIA CROSS SECTION I_ g \ DRAINAGE 1234N OF NCDOT#5 r MN AREA <5AO OR M57 WASHED STONE --_— / - - (ACRES) _ 1.5'MN FIGURE F MIN. LENGTH 3500 FTI/ACRE ^ BLAH(ET 2 - TO WIDTH 2:1 ti 5• ^ ^ ^ ^ �^ GROUND RATIO ' BLANKETI MAX SURFACE MIN. ^/ ^ VOLUME 3600 %REWIRED FT/A sr 1.5 Fl RE 81 SURFACE MIN - ^ ^ FIGURE FIGURED PREA 435 FT1/q0 ^ •• - •• REWIRED IFT12s) PLAN VIEWFILTER FABRIC BLANKETS BLANKET DESIGNED SETTLED 21' OVERFILLS'FOR GROUND - TOPMI IN /SETTLEMENT SURFACE • FIGURE I 'SLOPE INSTALLATION -APPROXIMATELY 200 STAPLES PER ROLL (VOR 4' S MAX FILL MIN E BELOW SETTLED 'BED INSTALLATION -APPROXIMATELY 300 STAPLES PER ROLL M WIDTH) REQUIRED -WIDE BLANKET SHOWN --- OR 4'WIDTFq REWIRED -MADE BLANKET SHOWN FIGUREE ---r— ENAyS- TOP OF DAM FIGURE A - BED INSTALLATION ,• 4 FIGURE H - SLOPE INSTALLATION -- 7703.5 — 1— — 50 NATURAL GROUND GENERAL NOTES: FILTER FABRIC � II ----I{ 2' rx- 7.11- 2' .w. 7 Y r- 2' PLEASE REFER TO NCESCPDM SEC ON 3' 15' 06.BO FOR ADDITIONAL DESIGN MIN FLO`N ,\W BLANK'T2/ x x x I,x.-.2•rx 1, SPECIFICATIONS REGARDING TEMPORARY 1.S 8• SEDIMENT TRAPS. x x x BLANKETS 1' �- 1' +� 1' •�• 1' 'N• 1' +► 1' -► 1' -► 1' / x x x z x SURFACE x x x 3 STANDARD PIPE OUTLET MINIMUM SURFACE FIGURE B - PROFILE VIEW x x x x AF —�C901 TAI LWATER FLOW 3 x GENERAL NOTES: F THE RiPRAP BLANKETI BLANKET2 X -DENOTES STAPLE 1, Ld=1.5 MES THE A=THE LENGTH MAXIMUM STONE EDTA FIGURE E- PLAN 2 NOT ESS THAN QMNCHES). STONE DAMETER BUT LOCATION D BE FIGURE D - PLAN VIEW- BED INSTALLATION VIEW A A 3. A TALLEDIANTWEEN FILTER FABRIC AND SIL INSTALLED BETWEEN THE RIPRAP AND SOIL _ FOUNDATION. GROUND %PE MAINTENANCE NOTES: SURFACE B• 4• 3XDoDo W=Do*LA INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AN _ AFTER SIGNIFICANT (12 INCH OR GREATER) RAINFAL 2' 1' .x- 2' -x- 71,.? •r Y EVENTS TO SEE IF ANY EROSION AROUND OR BELO FIGURE C CROSS SECTION THE RPRAP HAS TAKEN PLACE, OR IF STONES HA VIEW x x x x.-2*— 1• CRITICALPOINT BEEN DISO DGED.PREVEI MEDIATFURTHER Y MAKE.ALL NEED CRITICAL POINT ' CREST aF CREST OF x x x x x x / L PLANVIEW M SLOPE SLOPE TERMINAL END x x x z GROUND \ GROUND SURFACE - SURFACE I I OF SLD\ x z x x x x x x I x FIGURE J CRITICAL POINT-- FIGURE G- CRITICAL x x x x SECURING - SLOPE INSTALLATION e POINTS - BED INSTALLATION FIGURE I - PLAN VIEW SLOPE INSTALLATION SECTION'A-A' FILTER FABRIC 4 ROCK PIPE INLET PROTECTION Fc 9-01 C901 \ 1. GENERAL NOTES REPERTO NCESCPDM SECTION #6.55 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING ROCK PIPE INLET PROTECTION. \ RIPRAP MAINTENANCE NOTES jF'LOW- 1.M INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND NATURAL GROUND AFTER SIGNIFICANT (IQ INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE \ SEDIAENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACUMJLATED TO ONE-HALF THE DESIGN 700 GRAM COIR FIBER MATTING DEPTH OF TH TRAP. PUCE THE SEDIMENT THAT IS REMOVED IN FROM TOE OF CHANNEL THE DESIGNATED DISPOSAL AREA AND REPLACE THE T05 FT. BEYOND BANKFULL CONTAMINATED PART OF THE GRAVEL FACING. CLASS B RIPRAP PIPE INVERT, 3S 2. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED PIPE MAX 3. AFTERALLTHE�SEDIMEMEMUST BE-PRODUCINGP AREAS NAVE BEEN FLOW PERMANENTLY STABILIZED REMOVE THE STRUCTURE AND ALL THE LINSTABLE TH THE AREA O BUEND WITH ADJOINING AREAS AND PROVIDE PERMANENT TGROUND COVER.T� WASHED STONE CLASS B RIPRAP I 0 PO YRIGHT -PY RRPC P A Al I Rx91TS RFRFRUFn TF#A PI AN MAY -RF RFAIBFD SOLD. LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS RAN TYPICAL MATTING LOCATION DETAIL 700 GRAM COIR FIBER MATTING TUONG I", ZWOOD STAKES \V\ w/7 GALVANIZED ROOFING NAIL AT THE TOP TO HOLD MATTING 700 GRAM COIR FIBER MATTING SECTION A -A FROM TOE OF CHANNEL TO 2 FT. BEYOND BANKFULL NOTES'. 1. USE WOOD STAKES YxYx18• MOT METAL) FOR MATTING INSTALLED IN PUMP AROUND OR IN THE WET. 2. USE OF METAL STAPLES IS ACCEPTABLE WHEN CONSTRUCTING IN THE DRY AND VEGETATION IS ESTABLISHED PRIOR TO DIVERTING WATER I 70D GRAM COIR FIBER MATTING SHALL BE PLACED ALONG 700 GRAM COIR MATTING THE OUTSIDE OF ALL BENDS AND ALONG BOTH SIDES OF THE CHANNEL IN TANGENT AREAS ,CROSS SECTION 4. STRAW AND SEED SHALL BE PLACED UNDER THE 700 GRAM COIR FIBER MATTING TO AID SEED GERMINATION. OF FFIIFRAI OFFENSE. ROCK CONSTRUCTED RIFFLE - SECTION B4T MATTING STAKING NEW T LONG V x Y WOOD STAKES W/ 7 GALVANIZED ROOFING NAIL AT THE TOP TO HOLD MATTING B C 128 EXECUTNE DRNE-SLATE 220 WILKESBOR0, NC 25587 33KBM.4CM KIIP/Nrx[a PRELIMINARY M,.' FEC: P.q��'•.,. 40pPOR;T� . ' NCBELM-3448: •,CAROW;A�P . DETAILS PREPARED FOR: PISGAH BASE CAMP 151 CHIARLIE KNOB ROAD PISGAH FOREST NC DATE I REVISIONS: ltdu sxeErs�. 24W'' Con 05/102017 J AOT xux�JX no 053005201 ( - —1- B.DAEMER Q APPAOVB)#r Z J.CHURCH SCALE: Q NTS )H) z M SHEET'. LJ C901 a NATURALGRWND FILTER BERM NC RIPRAP HEADWALL, 7' MIN DOT7150R A57 HEIGHT FROM ROAD SHOULDER WASHED STONE 1 3' \ 7 _ r P WASHED STONE CLASS B RIPRAP I 0 PO YRIGHT -PY RRPC P A Al I Rx91TS RFRFRUFn TF#A PI AN MAY -RF RFAIBFD SOLD. LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS RAN TYPICAL MATTING LOCATION DETAIL 700 GRAM COIR FIBER MATTING TUONG I", ZWOOD STAKES \V\ w/7 GALVANIZED ROOFING NAIL AT THE TOP TO HOLD MATTING 700 GRAM COIR FIBER MATTING SECTION A -A FROM TOE OF CHANNEL TO 2 FT. BEYOND BANKFULL NOTES'. 1. USE WOOD STAKES YxYx18• MOT METAL) FOR MATTING INSTALLED IN PUMP AROUND OR IN THE WET. 2. USE OF METAL STAPLES IS ACCEPTABLE WHEN CONSTRUCTING IN THE DRY AND VEGETATION IS ESTABLISHED PRIOR TO DIVERTING WATER I 70D GRAM COIR FIBER MATTING SHALL BE PLACED ALONG 700 GRAM COIR MATTING THE OUTSIDE OF ALL BENDS AND ALONG BOTH SIDES OF THE CHANNEL IN TANGENT AREAS ,CROSS SECTION 4. STRAW AND SEED SHALL BE PLACED UNDER THE 700 GRAM COIR FIBER MATTING TO AID SEED GERMINATION. OF FFIIFRAI OFFENSE. ROCK CONSTRUCTED RIFFLE - SECTION B4T MATTING STAKING NEW T LONG V x Y WOOD STAKES W/ 7 GALVANIZED ROOFING NAIL AT THE TOP TO HOLD MATTING B C 128 EXECUTNE DRNE-SLATE 220 WILKESBOR0, NC 25587 33KBM.4CM KIIP/Nrx[a PRELIMINARY M,.' FEC: P.q��'•.,. 40pPOR;T� . ' NCBELM-3448: •,CAROW;A�P . DETAILS PREPARED FOR: PISGAH BASE CAMP 151 CHIARLIE KNOB ROAD PISGAH FOREST NC DATE I REVISIONS: ltdu sxeErs�. 24W'' Con 05/102017 J AOT xux�JX no 053005201 ( - —1- B.DAEMER Q APPAOVB)#r Z J.CHURCH SCALE: Q NTS )H) z M SHEET'. LJ C901 a BREC 116 EXECUTWE DRNE- $UTET1[ NVESBORO, NC 2W 336.BN.IOB6 lb— PRELIMINARY �NCBELSMG3418; U J J n Q U w U) Q m Q C� cn a_ RIAL PLAN AMP JOB ROAD TNC REVISIONS: sn 0 24*.W �� 05=0171J OW MWNB H v.vnucs p vm er Z J.CHURCH SCALE: 7' = 50. (H) Z SHEET: w 0200 a AGENT AUTHORIZATION FORM Property Legal Description PIN: 9507-45-1997-000 Tract #3 Address: 151 Charlies Knob Road Pisgah Forest NC Property Owner: Pisgah Forest Basecamp LLC The undersigned, registered property owners of the above noted property, do hereby authorize Derek Goddard of BREC. PA (Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and all standard and special conditions attached. Property Owner Street Addr (if different than property above): Box 25 "]1ZCj -J Wilk ro NC 28697 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature- Print and Sign Date: Sliver vresveY f'f Creek Gap NafMeDerry wuor� / o�'� ,\��, aroC Knob t 4DY Mifw Mfn T" p l e ,oe+ George t '� Om Mtn LlrxlsRy Rlantyte 0 Little Riflge Little r ;,��`f`• ( Mifkory Rrob .0 Mtn I f M M en a'p- Ml" p eV2 ror .. >• a I" Fne Mfn / 5 (— n 0 Bollard Gap Johnson / CMHM MM ..,."• j "4} Know Faddeeslafk Dr• Mfn PISGAH FORE, n' e' ABASE CAMP, LLC ,+ N Slope RidYe faldlm E— MM Gap 0 Gap Rnoll . x Nan K 1•iv a Shadows o 3- r t � _ ,y� 5 En LoeYe \ 4-`\ v r w t I , � lam• �� t _ n \` - I m j 0 z. aa White Oe4 ... -- .n n `--_-_- 5•,5fll'R5''41 42 M5 '48 '50 151—f Produced try the Una" Stater Golio6kal Sul," SCALE 1:2400D RaAO QASSFiCkTiON e :wrm Ao:n:�D%°ma feel DMoesr tsPe�xeY,a ^o wane c«e.,i.sm.malw. rncsur h°%rD««e 1 a6 • Yag.ttas 1 z (/ M.u« '---- — 1.«R.ireMT t«., �..e------_. ,000dr«t.xYe: xas"e.,a.,. fea..nte synema�+.4 -Thrµ IDm - nFttls aim �R m•n n v MtYs ,«nraoa.mar «,w mem. onu��«.m,,.�a, en... ,Doff 0 ,wo law t0°D �fFt,� t0°o eoao loom earn R � O�ra.e6s+ '" •`• � 'neia`mw.mM`ns.°Tla.fR"`n'a"tDrs m" M« oe'^�r f11x10UR hTfRvu .e rFFi 't+'6^ GaY M[n laYfven Xmre unr « xur mle R«m ..... .....tea..«. zms zais ui�^+ xonTx ucaux vFRTuto..�w.a,sm z z zun.«r. xannxn _ nnn IMue forts tafrke upeates. M,1 1016 1 SYNaoe , . Anep 0.a" � xemee............................................................i "'. t0,a �y iMa map wu Rreeaeo to ranam MN Ne a 5 s xoi« M« 0_ Iyergra.........................x%.' xy.—t.. aatme[. lDa �onNGeowenal rmp..n ai Top°hoeun Lorene. colt. !Rm«n Caewrs............... ...Nal« flevation Data%[. 1 AmeueaufYe arrabtee MN YM, aoeur,46ah «rsbn D.Y.,e lae..re PISGAH FOREST, NC o«,d.n«............R,aa• r«r«r; .« m..,m,a te.len -1D.e r.„..,.o„m+rc a , R 1 uemm�Ystaw nountain wsnw we,was Immtay ,en - m,. '% .orDwlw w.DRnxwu 2016 35° 1639"N 35° 1628'N �j 347600 347%0 347721 347780 347840 3479M 3 Map Scale: 1:2,570 Y printed on A landsmpe (11" x 8.5") sheet Meters N 0 35 70 140 210 Feet 0 100 200 400 60D Map projection: Web Mercator Caner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey :iiiiii0 Conservation Service National Cooperative Soil Survey 3 Soil Map—Transylvania County, North Carolina 3 (PISGAH FOREST BASE CAMP, LLC - SOIL MAP) 347960 34M 34M 35° 1639"N 35° 1628"N 348140 3 b 6/1/2017 Page 1 of 3 4 J Soil Map—Transylvania County, North Carolina Map Unit Legend PISGAH FOREST BASE CAMP, LLC - SOIL MAP Transylvania County, North Carolina (NC175) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI FfE Brasstown-Junaluska complex, 18.0 15 to 30 percent slopes 58.5 TaF Junaluska-Tsali complex, 30 to 50 percent slopes 3.2 10.4% Tn Toxaway loam, 0 to 2 percent slopes, frequently flooded 9.6 31.1% Totals for Area of Interest 30.9 100.0% USD .% Natural Resources Web Soil Survey 6/1/2017 �� Conservation Service National Cooperative Soil Survey Page 3 of 3 �J}.EAn tt♦ n t , lig L � ew 4 7w -a