Loading...
HomeMy WebLinkAbout20081516 Ver 1_401 Application_20081008 S?G? Southern Environmental Group, Inc. 5315 South College Road, Suite E Wilmington, North Carolina 28412 910.452.2711 (office) • 910.452.2899 (fax) Date: September 30, 2008 To: Ian McMillan Of: DWQ - 401 Permitting Attached you will find:* ? Proposal ? Sketch(es) ? JD Package ? Report(s) SMftjedM13701 Cflent Nerve: WRW+vm Surf CUy, U.C LMMX AKk Transmittal Letter p [N ? ? a? D 0 C T 2 2008 DENR - WATER QUALITY WEtt DS AND STOR"ATf=R BRANCH ? Permit ? Wetland Boundary Map ? Photo(s) ? Plans ?x Filing Fee ? Other Copies Dated Description 1 $240 Filing Fee 401 Review of Captiva Commons at Surf City, Pender County, NC These are being delivered: *If noted items are NOT attached, please contact our office. ? For your Review/Comment ? For your Records ? Returned for Correction(s) ? Corrected and Returned ? For your Signature ? As Requested 0 Other: By: ? Hand Delivery ? Fed-Ex ? UPS ?X Certified Mail ? Other Notes: Ian, The filing fee was not submitted with the packets mailed to your office 9/29/08. Please find enclosed the $240 filing fee for 401 Water Quality Certification Signature and (Typed) Name: D A. Lutheran Date: eptember 30, 2008 SEGO Southern Environmental Group, Inc. 5315 South College Road, Suite E Wilmington, North Carolina 28412 910.452.2711 (office) • 910.452.2899 (fax) Date: September 29, 2008 To: Mr. Ian McMillan Of: DWQ - Raleigh Attached you will find:* ? Proposal ? Sketch(es) ? JD Package ? Report(s) pg-1516 SE 1311 Project #: 06-137.01 Cunt Name: Howard Penton /Jeff Baran USAC OE Action IC*. UNCLASSIFIED Transmittal Letter Lr;-- R, (@' I R 0 W r ? 0 0 C T 1 2008 DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH ?X PCN ? Signed Wetland Map ? Photo(s) ? Plans ? Information Request ? Other Copies Dated Description 7 9/26/08 PCN for Captiva Commons and Harris Teeter at Surf City These are being delivered: *If noted items are NOT attached, please contact our office. X? For your Review/Comment ? For your Records ? Returned for Correction(s) ? Corrected and Returned ? For your Signature ? As Requested ? Other: By: [j Hand Delivery ? Fed-Ex UPS ? Regular Mail ? Fax Notes: an, N copy of this application has been submitted to Joanne Steenhuis, in the Wilmington regulatory office. )ana Signature and (Typed) Namq^ ll/ "a A. Lutheran Date: September 29, 2008 Soutkern Lnvironmcntal Grou P, Inc. 5315 South College }load, J' uite r - Wilmington, North Carolina 28412 910.452.271 1 - rax: 910.452.2899 ' o{fice@segi.us www.segi.us September 26, 2008 Hand Delivery Mr. Ronnie Smith Wilmington Regulatory Field Office US Army Corps of Engineers Post Office Box 1890 Wilmington, NC 28402-1890 CaGiTir ijed M,00-137,01 1 Ms. Joanne Steenhuis DWQ 401 Wetland Unit 127 Cardinal Drive Extension n L1 Wilmington, NC 28405 0 C T 1 2008 RE: Proposed Captiva Commons and Harris Teeter DENR . WATER GUi3?! i Surf City, Pender County , WnANDSMDSroRMWAJERBRmC11 AID#: UNCLASSIFED Dear Mr. Smith and Ms. Steenhuis: Southern Environmental Group, Inc. (SEGi) has been retained by Sound Development, LLC, and WRI-Hughes Surf City ("Applicants"), to seek Department of the Army authorization to permanently impact 0.49 acre and temporarily impact 0.17 acre of 404 jurisdictional wetlands. The fill is associated with the main the development of a multi-family residential complex and Harris Teeter shopping center. The project is located on the south side of NC 210, approximately %mile east of US 17 in Surf City, Pender County, North Carolina. The subject parcel encompasses 56.46 acres. Within the project limits, approximately 13.17 acres of 404 jurisdictional wetlands have been delineated and verified by the USACE. Upon an USACE site evaluation, it was determined that an area wetlands did not exhibit a significant nexus to a traditionally navigable water. This area encompasses 0.17 acre and has been classified as a wet flat. The majority of the jurisdictional wetlands are classified as pocosin, but there is an area of swamp forest found in the northeastern portion of the tract. Fifteen (15) permanent wetland impacts are proposed, totaling 0.49 acre. These impacts are associated with the construction of roadways, such as Alston Boulevard, the main collector roadway within the complex, building footprints, and parking lots. One (1) additional permanent impact is proposed, but is an isolated wetland complex. This impact is associated with the construction of a parking lot for the Harris Teeter and retail shops. Seventeen (17) temporary impacts, consisting of 0.47 acre (20,291 SF), are proposed and are associated with the installation of utilities and construction buffer. The following table outlines the anticipated impacts: SEGO Wetland Impact Site Number Type of Impact Type of Wetland Located within 100-year Floodplain Distance to Nearest Stream Area of Impact 1 Fill Pocosin No >1000 LF 0.21 1T Temporary Pocosin No >1000 LF (0.03) 2 Fill Pocosin No >1000 LF 0.09 2T Temporary Pocosin No >1000 LF (0.05) 3 Fill Pocosin No >1000 LF 0.02 3T Temporary Pocosin No >1000 LF (0.02) 4 Fill Pocosin No >1000 LF 0.05 4T Temporary Pocosin No >1000 LF (0.01) 5 Fill Pocosin No >1000 LF 0.004 5T Temporary Pocosin No >1000 LF (0.005) 6 Fill Pocosin No >1000 LF 0.003 6T Tem rary Pocosin No >1000 LF (0.009) 7 FBI/culvert Pocosin No >1000 LF 0.01 8 Fill Pocosin No >1000 LF 0.0009 8T Temporary Pocosin No >1000 LF (0.004) 9 Fill Pocosin No >1000 LF 0.005 9T Temporary Pocosin No >1000 LF (0.01) 10T Temporary Pocosin No >1000 LF (0.06) 11T Temporary Swam Forest No >1000 LF (0.06) 12 Fill Pocosin No >1000 LF 0.009 12T Temporary Pocosin No >1000 LF (0.02) 13T Temporary Pocosin No >1000 LF (0.04) 14T Temporary Pocosin No >1000 LF (0.02) 15T Temporary Pocosin No >1000 LF (0.01) 16 FBI/culvert Pocosin No >1000 LF 0.06 16T Temporary Pocosin No >1000 LF (0.07) 17 Fill Pocosin No >1000 LF 0.06 17T Temporary Pocosin No >1000 LF (0.02) 18 Fill Pocosin No >1000 LF 0.006 18T Temporary Pocosin No >1000 LF (0.008) 191 Isolated Wet Flat No >1000 LF 0.17 Total Proposed Permanent 404 Wetland Impacts 0.49 Total Proposed Temporary 404 Wetland Impacts (0.47) Total Isolated Wetland Impacts (0.17) SE-6i All temporary impacts, except for 10, 11, & 13 are being provided as a construction buffer during the installation of roads, retaining walls, the bridge to boat storage area and building footprints. Temporary Impact Areas 10, 11 & 13 are necessary for the installation of the sewer line. Once construction has been completed, these areas will be returned to their original grade and seeded with a native wetland seed mix. The proposed mitigation plan has been developed to offset permanent and temporal losses of 0.50 acre of non-riparian wetlands and their functions that may result due to the proposed construction of the residential community, shopping center complex and attendant features. Mitigation is being proposed in order to protect resources and water quality found in the immediate drainage area, the Cape Fear Drainage Basin. Based on site evaluation and discussions held with the Corps' field officer, permittee responsible mitigation is not an option on this site. Therefore, the Applicant intends to utilize a combination of compensatory mitigation components, which consist of avoidance and minimization practices, payment to the NCSU Hoffinan Forest Wetland Mitigation Bank (WMB) for 0.50 acre of mitigation credit, and the strict preservation of on-site, non-riparian wetlands. In addition, strict stormwater management and sediment and erosion control mechanisms will be in place prior to impacts to wetlands. Mitigation is offered at a 1:1 ratio, through the NCSU Hoffman Forest Wetland Mitigation Bank, in Onslow County, North Carolina, and the preservation of the remaining wetlands that are not located within an utility easement. In summary, the Applicants are requesting USACE and DWQ authorization to impact permanently impact 0.49 acre and temporarily impact 0.47 acre of 404 jurisdictional wetlands. The fill is necessary to construct roadway, buildings and parking areas for the proposed Captiva Commons residential community and Harris Teeter shopping center. For clarification and verification of the statements made above, please refer to the following documentation attached to this correspondence: Attachment 1. Pre-Construction Notification Attachment 2. Overall Impact Map and Cross Section Drawings (Sheets 1 - 9) Attachment 3. DOT Policy on Street and Driveway Access to North Carolina Attachment 4. Agreement to Purchase Between WRI-Hughes Surf City, LLC & Sound Development, LLC Attachment 5. Hoffinan Forest Wetland Mitigation Bank Acceptance Email Attachment 6. Vicinity Maps (2 scales) Attachment 7. Property Owner Tax Information Attachment 8. Aerial Photograph Attachment 9: Letter of Agency Please review the attached permit application and accompanying documentation for NWP 29 & 39 authorization. Should you have any questions, concerns, or comments, feel free to contact me at 910.452.2711. Thank you in advance for your assistance with this project. sr-6I Sincerely, Dana A. Lutheran Project Manager cc: Mr. Ian McMillan (401 Oversight/Express Review Permitting Unit) Enclosures: (9) Office Use Only: Version December 2006 08-15 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 29 & 39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information - (Co-Applicants) Name: 1) Mr. Jeff Baran - WRI- Hughes Surf City, LLC 2) Mr. Howard Penton - Sound Development. LLC Mailing Addresses: 1) 6409 Westgate Road D ? k '?, R 0W U Raleigh, North Carolina 27617 2) 6345 Shinnwood Drive 0 C T 1 2008 Wilmington, NC 28409 DENR -1iVATER QUALITY WETLANDS AND sTORMWATER BRANCH Telephone Number: 919.847.7309 and 910.452.1410 respectively Fax Number: 919.848.9854 and 910.452.7768 respectively E-mail Address: NA 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Dana A. Lutheran Company Affiliation: Southern Environmental Group, Inc (SEGi) Mailing Address: 5315 S. College Rd. Suite E Wilmington, North Carolina 28412 6 Page 1 of 15 Telephone Number: 910.452.2711 Fax Number: 910.452.2899 E-mail Address: dlutheranksegi.us III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Harris Teeter and Captiva Commons Q Surf City 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): 4225-17-1959-0000 4. Location: The proposed project is located on the south side of NC 210, approximately 0.25 mile east of US 17. County: Pender (#71) Nearest Town: Surf Ci Subdivision name (include phase/lot number): Harris Teeter & Captiva Commons Apartment Complex Directions to site (include road numbers, landmarks, etc.): Travel north out of Wilmington on US 17. Turn right (east) on NC 210 towards Surf Ci The project site is located anproximately 0.25 mile on the right (south). 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody) Decimal Degrees (6 digits minimum): 34.4510°N 77.6029°W 6. Property size (acres): +/- 54.46 acres 7. Nearest body of water (stream/river/sound/ocean/lake): Unnamed tributary to Virginia Creek 8. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 2 of 15 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The project site is currently undeveloped and forested with the exception of a Progress Energy transmission line easement located on the southern half of the property. Land use in the vicinity of the proposed project is a combination of retail commercial and single-familv residential. A large Lowe's Home Improvement store is located between the project site and US 17. The high ground on the subject property is covered with a canopy of red maple (Acer rubrum). loblolly pine (Pings taedal American holly (Ilex opaca). sweetbay (Magnolia i ftiniana). live oak (Ouercus virginiana) and laurel oak (Quercus laurifolia): an herbaceous laver of cinnamon fern (Pteridium aguilinum): and a vine layer of an unidentified grape species (Vitis spp) There was no evidence of hydrology within 24 inches of the surface. The underlain soil type. Leon (poorly drained), as mapped in the USDA Pender Coun Soil Survey 1990 is listed as a "H dric Soil of the United States." The 404 wetlands on this tract can be classified as pocosin These areas are covered with a canopy of red maple (A rubrum . redbay (Persea borbonia). and live oak (Q ft!yiana): a shrub laver of fetterbush (Lyonia lucida): and a vine laver of laurel leaf greenbrier (Smilax laurifolia) and an unidentified grape species (Vitus spp) Indicators of hydrology include drainage patterns in wetlands water stained leaves and a prevalence of species with an indicator status that was wetter than facultative Saturated soil was found at 24 inches below the surface The underlain soil type, Murville (poorly drained) as mapped in the USDA Pender County Soil Survey 1990). is listed as a "Hydric Soil of the United States." The isolated wetland can be described as an ephemeral wetland Water stained leaves and soils saturated to the surface were observed during a site visit on 25 April 2007 Vegetation in this area includes loblolly pine (P taeda), sweet gum (Liquidambar raci ua laurel leaf reenbrier S. lauri M and netted chainfern Woodwardia areolata). The underlain soil type as mapped in the soil survey is Leon 10. Describe the overall project in detail, including the type of equipment to be used: WRI-Hughes is planning to construct a Harris Teeter grocery store and retail shop, while Sound Development LLC intends to construct a multifamily, residential complex and retail shops. With this project, it is anticipated that discharge of fill material into approximately 0.49 acre of 404 jurisdictional wetlands and 017 acre of isolated wetlands will occur. In addition, 0.47 acre of temporary impacts are anticipated The fill is necessarv to implement infrastructure such as roads parking lots, and utility lines, while also providing a building pad for Buildings 1. 2,15, and 16 Heavy machinery, such as backhoes dump trucks graders and pavers will be utilized during Page 3 of 15 the construction of the project. Temporary impacts are associated with the installation of the sewer line, access roads throughout the development, and the bridge to boat storage area. 11. Explain the purpose of the proposed work: The purpose of this project is to construct a roadway (Alston Boulevard), which will grant access to the proposed multi-family complex and provide additional access to the proposed Harris Teeter. Fill is also required to provide stable building footprints for proposed residential dwellings, and parking for commercial and retail structures. The construction of a Harris Teeter grocery store will allow the residents of Hampstead a variety in their choice of where to purchase groceries. In addition, the project, as proposed, will provide additional commercial space and residential dwellings in a growing area. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. USACE AID: Unclassified. The site was delineated by SEGi Brad Shaver, with the Corps, verified the site on 13 December 2006 and Ronnie Smith also with the Corps visited the site to make an isolated wetlands call (date unknown). V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future permit requests are anticipated for this project VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) Page 4 of 15 should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Location Impact Description Area 1: Fill is associated with the construction of the entrance to Alston Blvd. Area 2: Fill is associated with the parking lot for the commercial tract, adjacent to NC Hwy 210. Area 3: Fill is associated with the construction of Alston Blvd. and building pad for storage facility. Area 4: Fill is associated with the construction of an access drive to the proposed storage facilities. Area 5: Fill is associated with the construction of an access drive to the proposed storage facilities. Area 6: Fill is associated with the building footprint for storage facilities. Area 7: Fill is associated with the installation of a culvert and access road, Sandbell Lane. The road will serve as ingress/egress to Buildings 1 & 2. Area 8: Fill is associated with the foundation of Building 1. Area 9: Fill is associated with the foundation of Building 1. Area 12: Fill is associated with the foundation of Building 2. Area 15: Fill is associated with the foundation of Building 3. Area 16: Fill is associated with the construction of Charter Street and parking area for Buildings 15 & 16. Area 17: Fill is associated with the foundation of Building 16. Area 18: Fill is associated with the EMS and sanitary truck turn-around. Area 19: Fill is necessary to provide required parking spaces for the shopping center *** H temporary impacts, except for 10, 11, & 13, are being provided as construction buffer during the installation of roads, retaining walls, bridge to boat storage area and building footprints. Temporary Impact Areas 10, 11 & 13, are necessary for the installation of the sewer line. Once construction has been completed, these areas will be returned to their original grade and seeded with a wetland seed mix. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Page 5 of 15 Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no) Distance to Nearest Stream (linear feet) Area of Impact (acre) 1 Fill Pocosin No >1000 LF 0.21 1T Temporary Pocosin No >1000 LF (0.03) 2 Fill Pocosin No >1000 LF 0.09 2T Temporary Pocosin No >1000 LF (0.05) 3 Fill Pocosin No >1000 LF 0.02 3T Temporary Pocosin No >1000 LF (0.02) 4 Fill Pocosin No >1000 LF 0.05 4T Temporary Pocosin No >1000 LF (0.01) 5 Fill Pocosin No >1000 LF 0.004 5T Temporary Pocosin No >1000 LF (0.005) 6 Fill Pocosin No >1000 LF 0.003 6T Temporary Pocosin No >1000 LF (0.009) 7 Fill/culvert Pocosin No >1000 LF 0.01 8 Fill Pocosin No >1000 LF 0.0009 8T Temporary Pocosin No >1000 LF (0.004) 9 Fill Pocosin No >1000 LF 0.005 9T Temporary Pocosin No >1000 LF (0.01) IOT Temporary Pocosin No >1000 LF (0.06) 11T Temporary Swamp Forest No >1000 LF (0.06) 12 Fill Pocosin No >1000 LF 0.009 12T Temporary Pocosin No >1000 LF (0.02) 13T Temporary Pocosin No >1000 LF (0.04) 14T Temporary Pocosin No >1000 LF (0.02) 15T Temporary Pocosin No >1000 LF (0.01) 16 Fill/culvert Pocosin No >1000 LF 0.06 16T Temporary Pocosin No >1000 LF (0.07) 17 Fill Pocosin No >1000 LF 0.06 17T Temporary Pocosin No >1000 LF (0.02) 18 Fill Pocosin No >1000 LF 0.006 18T Temporary Pocosin No >1000 LF (0.008) 191 Isolated Wet Flat No >1000 LF (0.17) Total Proposed Permanent 404 Wetland Impacts 0.497 [ Total Proposed Temporary 404 Wetland Impacts (0.47) c Total Isolated Wetland Impacts (047) H Page 6 of 15 3. List the total acreage (estimated) of all existing wetlands on the property: 13.17 acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Stream Perennial or Average Impact Area of Number Name Type of Impact Intermittent? Stream Width Length Impact indicate on ma Before Impact linear feet aces Total Stream Impact (by length and acreage) NA 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dred in flooding draina a bulkheads etc Open Water Impact Name Wat Type of Waterbody Area of Site Number le) (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on ma ocean, etc.) (acres) L Total Open Water Impact (acres) NA 6. List the cumulative impact to all Waters of the U.S. result in from the ro.ect: Stream Impact acres : N/A Wetland Impact (acres) 404/Isolated: 0.49 Open Water Impact acres : N/A Total Impact to Waters of the U.S. acres 0.49 Total Stream Impact (linear feet : N/A 7. Isolated Waters Do any isolated waters exist on the property? ® Yes ? No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. The site exhibits a isolated wet flat consisting of 7.300 SF (0.17 AC) The determination was made by Ronnie Smith and approved by Keith Harris in May of this year. In order to meet Pender County parking requirements the entire wetland feature will have to be filled. Page 7 of 15 8. Pond Creation - If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ® uplands O stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Excavation Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.):_ Stormwater requirement Current land use in the vicinity of the pond: wooded Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Surf City and the majority of eastern Pender County. in general, are fast growing areas The need for housing and shopping centers is in demand The nearest grocery stores to this site are both Food Lions, located at the intersection of NC 210 and NC 50, and in Hampstead, both approximately 6 miles away from the site As this area continues to grow, the new residents will look for greater convenience and variety in their shopping options According to NCDOT's "Policy On Street And Driveway Access to North Carolina Highways" for "...routes with safety, congestion or operational problems 1,000 feet or more may be required between the centerline of any left turn access points and any adjacent street and driveways". The minimum distance between centerlines of full-access drives that handle high traffic volumes is 600 feet The Applicant's attempted to obtain a variance from DOT policy but were unsuccessful Thus the location of the access road is based upon said guidelines. Impacts to wetlands were minimized by utilizing a bridge to access the boat storage area and the incorporation of retaining walls where possible, throughout the development VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 8 of 15 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/ or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if off-site), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. PROPOSED COMPENSATORY MITIGATION The proposed mitigation plan has been developed to offset permanent and temporal losses of 0.50 acre of non-riparian wetlands and their functions which may result due to the proposed construction of the residential communi , shopping center complex and attendant features. Mitigation is being proposed in order to protect resources and water quality found in the immediate drainage area, the Cape Fear Drainage Basin Based on site evaluation and discussions held with the Corps' field officer, permittee responsible mitigation is not an option on this site Therefore the Applicant intends to utilize a combination of compensato mitigation components, which consist of payment to the NCSU Hoffman Forest Wetland Mitigation Bank (WMB) for 0.50 acre of mitigation credit and the strict preservation of on-site non-riparian wetlands In addition, strict stormwater management and sediment and erosion control mechanisms will be implemented prior to impacts to wetlands The mitigation plan should guarantee that the Corps' "no net loss of wetlands" policy is adhered to, as well as ensure that the temporal losses of function of the aquatic resources are minimized to the greatest extent possible Page 9 of 15 NCSU HOFFMAN FOREST WETLAND MITIGATION BANK Pursuant to the Army Corps of Engineer's new rules regarding Compensatory Mitigation for Losses of Aquatic Functions, baseline information regarding the impact sites, as well as the determination of credits, will be the only two of the twelve components of mitigation discussed with regard to Hoffman Forest WMB: BASELINE INFORMATION: These areas are covered with a canopy of red maple (A. rubrum), redbay (Persea borbonia), and live oak (Q. vir&iana), a shrub layer of fetterbush (Leonia lucida): and a vine laver of laurel leaf greenbrier (Smilax laurifolia) and an unidentified grape species (Vitus snn.). Indicators of hydrology include drainage patterns in wetlands, water stained leaves, and a prevalence of species with an indicator status that was wetter than facultative. Saturated soil was found at 24 inches below the surface. The underlain soil types, Murville (Mu) and Mandarin (Ma), as mapped in the USDA Pender County Soil Survey (1990). The Mu soil series is a very poorly drained soil and is listed in the 'INC Hydric Soils List", while Ma is only somewhat poorly drained and not listed in the publication. The isolated wetland can be described as an ephemeral wetland. Water stained leaves and soils saturated to the surface were observed during a site visit on 25 April 2007. Vegetation in this area includes loblolly Rine (P. taeda), sweet gum (Liguidambar styraciRua), laurel leaf greenbrier (S. laurifolia), and netted chainfern (Woodwardia areolata). The underlain soil type as mapped in the soil survey is Kureb (KuB) and is an excessively drained soil. Mammals that would utilize the area mapped at Ma for foraging habitat may include the raccoon, fox, rabbit, bobcat black bear, opossum, and birds. The Mu soil series provides fair or poor habitat for wildlife. However, the same species of wildlife found in areas mapped as Ma, with the addition of ducks, may utilize the area for foraging. DETERMINATION OF CREDITS: Mitigation is offered at a 1:1 ratio, for non-riparian wetland impacts (see Attachment 8). Acceptance has been granted from North Carolina State University Hoffman Forest Wetland Mitigation Bank. The ratio of 1:1 is based on communication between Ronnie Smith (USACE) and David Syster (SEGi). The proposed 1:1 ratio is sufficient to offset the impacts associated with the development and ensures the project is adhering to the Corps' "no net loss of wetlands" policy. PRESERVATION OF REMAINING ON-SITE WETLANDS AND FORESTED UPLAND BUFFER In accordance with the Corps' new Compensatory Mitigation rules, the twelve components of mitigation will be discussed, with regard to the proposed preservation area: Page 10 of 15 OBJECTIVES: Preservation is a mechanism utilized by the Corps which protects remaining on-site wetlands in perpetuity by using appropriate restrictions or covenants. These restrictions prohibit harmful activities that might otherwise jeopardize the purpose and function of remaining wetlands These restrictions include: no filling: no grading: no construction of walkways, roads, etc.: no activities which may alter on-site drainage patterns: and, no alteration of vegetation on the property. Preservation of this land will provide significant resource protection of Virginia Creek and the Cape Fear River Drainage Basin The preservation easement will be designed to ensure perpetual protection of the wetlands will be binding to the ro e SITE SELECTION: The eastern portion of Pender Coun is being developed quickly with residential subdivisions and commercial shopping centers, which increases the need to protect these wetlands The features to be protected, exhibit characteristics of high value wetlands (e.g., bottomland hardwood forest, pocosin, and swamp forest)BASELINE INFORMATION: As discussed previously, the wetland types found within the proposed preservation area consist of.- hardwood forest; swamp forest: and pocosin Each performs its own function (e.g., erosion control, flood storage, pollutant removal and providing habitat)DETERMINATION OF CREDITS: The ratio of preservation is limited by the remaining wetlands within the project boundaries omitting those areas where utility line easements are proposed MITIGATION WORK PLAN: The boundaries of the preservation area were determined by contracting a surveyor to obtain the metes and bounds of the proposed wetland preservation areas As the Applicant is offering preservation, not restoration enhancement or creation the remaining information reauested in this section is not applicable to the mitigation offer proposed for this project. MAINTENANCE PLAN: A maintenance plan is not required for preservation, as the model declaration of restrictions to be recorded in the Pender County Register of Deeds will ensure the wetlands remain in their natural condition. PERFORMANCE STANDARDS; The performance standards have been included in the model declaration of restrictions. Adherence to the restrictions, covenants and conditions within the model declaration of restrictions will ensure the compensatory mitigation area is achieving its objectives. Page 11 of 15 MONITORING REQUIREMENTS: Visual inspection of the preservation area will be sufficient to determine if the components of the model declaration of restrictions are being adhered to. The model declarations allow for the "Corps, its employees and agents and its successors and assigns, ftol have the right with reasonable notice, to enter the Propelu a reasonable times for the purpose of inspecting the Property to determine whether the Declarant, Declarant's representatives, or assigns are complying with the terms, conditions and restrictions of this Conservation Declaration". Thus, the Corps has the right to enter the property and perform a compliance inspection of the preservation area. LONG-TERM MANAGEMENT PLAN: The recordation of the model declarations of restrictions will serve as the long-term management plan. According to the model declarations, "This Declaration is intended to ensure continued compliance with the mitigation conditions of authorizations issued by the United States of America, US Army Corps of Engineers, Wilmington District and therefore may be enforced by the United States of America. This covenant is to run with the land and shall be binding on all parties and persons claiming under the Declarant." ADAPTIVE MANAGEMENT PLAN: An adaptive management plan should not be necessary for the proposed preservation area. The Applicant anticipates the preservation area will succeed, as the methods of protection put into place, namely, recordation of the model declaration of restrictions, will ensure perpetual preservation of the remaining on-site wetlands. If the District Engineer determines that a deficiency has arisen in the preservation area, then steps will be taken to remediate the situation, either restoration of the resource or payment to the NC EEP in an amount sufficient to off-set the deficient preservation area. Remediation, on behalf of the Applicant, will occur only in the event that man-made activities, that take place within the property boundaries, cause the decline in function of the systems being preserved. FINANCIAL ASSURANCES: Financial assurances should not be necessary for the proposed preservation area. The preservation mechanism recorded with the Pender County Register of Deeds, should provide a high level of confidence that the mitigation area will be preserved in perpetuity. In summary, in order to offset the 0.50 acre of impacts to 404 jurisdictional wetlands associated with the development, the Applicant is proposing to make payment to the NCSU Hoffman Forest Wetland Mitigation Bank for 0.50 acre of non-riparian mitigation credit and the preservation of all remaining non-riparian wetlands Those wetlands not placed into preservation are associated with the sewer and power line utility easements Page 12 of 15 Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): N/A. Amount of buffer mitigation requested (square feet): N/A. Amount of Riparian wetland mitigation requested (acres): N/A. Amount of Non-riparian wetland mitigation requested (acres): N/A. Amount of Coastal wetland mitigation requested (acres): N/A. 1. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? IX. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify)? Yes ? No ® If you answered "yes", provide the following information: Page 13 of 15 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet Mitigation 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. X. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level The site is located within '/ mile of SA waters (Virginia Creek) and will adhere to all current stormwater requirements. At this time, the Applicants are in the process of obtaining State stormwater management approval. XI. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The development will utilize municipal sewer facilities. II. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 14 of 15 XII. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: This is an single and complete project and is not associated with any other development. The completion of the residential community and shopping center will not result in development outside the proposed project area and would have minimal impact on downstream water quality, as implementation of approved on-site sedimentation and erosion control and stormwater treatment mechanisms should ensure the project remains in compliance with surface water and wetland standards. XIII. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). i? I - Z(o - Ofd- Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 15 of 15 cry y9,? Z (D C) Q ? H ? m N Q CJ W 11 z ? ; V W ?pY CL: o o N ?OD n O o LLJ -' G ((nn w L N C Jzi LU \56 ?? Z p? U m?? Q z ti? ?hWb'?a? H U Q W Z NNu'Q (!1 J P ?k z Z u C; a4 y ao?hj s? --j O Q Q O Syr oo FF- U Z? ??Lu °J Z DHSS ?? N DR. D U b Q cd aG ? O con D U 0 uZ ? ? V1 d- Ln t\ b taw w w Q OC OC ?/ ?/ ? Q Q Q Q U U ?-+ Q Q Q Q cL as v.) 4-4 w a. w w Q J _ D W w w w Lu cC3 0 CL/ a? w N w U -? U-J I-'- >O Q Z f V/ CLI o Q W w LL1 W OC t n a_ IL (L n 0 Z 2 X a lu cn C) o ? N Q CV m -jco z N ¢ ?ao? N O 0z ?n w- N m It n u I`- m (ii > p> O? z?w o? =Oj ?Q ?z=o13 ?m (!? Q a.: m n- w a° ?o a ?- ------------------------I I? I IW I IM I I i I , I a.s • I• . 4l r Tom`, ,• I • • ' -? • , ' -- •?...- U U m E E 3 ? r 441 SR- a ?o° N ^? II V! U I? ?I F+y V1? ?l 1 ' Y 1 n Mel n!/• I • •g • • • • I ' • ? • •' 1 ? ?/tea~? ®g S a YW ° II -.al I r OP ? 1 E 1 1 I G) LL- .O w? ti) 1 y? 1 O V k 1 LZI I i -I--? '----------- \ 6 , v-rw \ 0° ? I J ? ? a ? 1 , I •, v rr '... - -- -- - -- _ i - -- - --- LU - -------------+ cis 0 z I s rO V r.--r V O u? w ?o S1Z N ?'' W w F U? J We ?RZ ^N UZZ o? 00 ?oz ? -m 0 U dtL- uU m Q U u O -- :z O . J U z ` ' J tt? t!? W . fi W Q W Q Q w w . LL LL: LL- U: LL: U? LL IL LL U? U? L U.- LL: con con ? ? (6(6(666 Li0'6NL6 L6 ?(6 ??n '( '? ?_ Q Q NmN-t?N L L(1tt) tn Nt1'CDmv o r-, r-, ' CO coNNV) l?co om-6)IT NL) u) m Q? N a- C4 C4 T T Z w V / ? ?..U N o Q L L u_ LL u- U- U L ?- LL... N LLJ N O CD z ui Ti (6 U? U) (6 6 L6 (6 con omCOG) oommomo uN A Q Nmm- co t?coNU? 01 cQLo --un N CO d t9N -+ ? oL ? 06 m N N i ? .{ J U ? to c-? Q 2 w a 0 N tJ U ? J w0 J N H jto z; Nell V Q Q ?_ U p= gZ do 7j z r- P g 0 O pa cha U d 01 b t'ZSb'0 I 6 'Nd 6 0 9 iutiono uljoN - ?unoo xopuod - ?1o jjnS jo u?oZ Q9«'zsb'O' ''WJ £Ob93 ON 'NOIJNIWIIM 111 '111 - 3AII IIINd910 SO 15 l??NS 2UISSOJ) f4j) jJnS IV SUOWWo Vnl dv 13NnoG # Oll 1N3WdOl3n30 ON(105 log = „ 1 ' ]WO'S 1N`d?llddd El O'E-V=9AJ 01#P s / At zt, \ 0. y '?'S ZL6 '=I'S OZ I 'TG Lee '-4'S 06 I S \ \? lOddWl 'dW31 10`ddWl 'W?!?d 'MG JOddWI `? '? / \ \ / A SO N VIE M / 0 9 99LL ZSb'O 16 Xdd vuijo??D pox - ?unoo Japuad - f4t0 JMS jo unnoZ 0 1 bi'Z5b'O16 'Wd £Ob9Z ?)N 'NOIDNIWIIM N I OZ '2.S - DANO SDONYMO SO 19 # OII 1N3WdOla/9?30 ONf10S 2UISSOJO o jJnS It SUOtUtUOD VAIjdvD s QN I6G log • • :1NV3IIcIJV J'S irEtr 'J'S SLL =I' G `r trB' 1 m tr l ^? 1 x ?' S 966 0 s< I z!' ?, a 10 1 ?'S £B£ Z I m SOQ'z 01 1 ?>f 'XG SQtr VG 91 z 6 I 'A'S SL I '=I'S 6£ 8 \ 0 '=I'S ££S L ioddWl 'dW3i TOWN 'W?13d TUG J.:)ddWl 1 J ? ? ? ?y l l t7 I A 4t O o / I ?J I Q At Z? A / 1 / A At A At At At A 1 At A 4k A 0 N d' II L U- I O N d' _ II w O fo/ ,? ag ?# ay /? m \ v u \ \ \ O \ \ Q,3 \ ,rO \ O II LL- k?r o? \ nS \ 'oo, \ o \ o \ II \ ?n o m 1 LL. ad `7 \ \ I Cf) ?m \ JI ? V ?11? ? Cl V ?? I 0 L9 m oll U- U- - - A II LL =.o uJ Q Lu C's o w o ? C ?w C4--4 0 Con U ? con U 4 Q ?LL: Num w cei lu W Z Q LL: LL U? D c L = N omo ? s q? ?0 N In C1' lD N LLI U ? N N O O N O T v n ? _ ? Z In lD I? CO N C, Q Q Q o ? 'Q: Q V' OQ U p a- ?o ?m Q U55 wI Z, g;. 0 g M.0 -_-_- 6a NVI1 :1M -4O Lim ey F - , lc Q U G) - O z LL- O ---+++? ? Q w c ' u ?O U Z ? V con o? o •? o c?3 s W Y s n / otu n a Q c? ?o 0Z N tiF F U ?wO ELI f? ? ? Cl N CD OW Z ?t N N apW 4p o U p0 z 62 o$ ? a- m ? O Q U_ ) O § 0 Q Z g ci w 4 U z o . .a ur) T) ti (ID z rV Q ?- Con O Ui ? 3 v O C rl Q V U' z U,J, z W I Q a LO o cr- ' LL LU IL m w Q Q o o -m Oq p ?I ? D NU? N 0 Z ` / + -?' m 2 o O .. b CD O ME Q U U7 W I O o U ` ?N 0 C? L U 0 O tL D - D- o U IINn -4o 'i?dg 0 m 0 oQ 0 0= D r N N 41 41 L rr?^ o V O c -0 o z I = ? p ?C9 ? U ro z Q p N C _ C S} G ¢ ww +? F ( U' Z O 0 c?'n J o LU wQ De cn U cn O W 2 v v Op z - x fLJ m O C? D.- N z> Z p ? v O? U p? Z _ J Qx Q ° w ? o- A ffa-ch n lees f 5 Policy On Street And Driveway Access to North Carolina Highways On most State maintained routes, the minimum distance between the centerlines of full-movement driveways into developments that generate high traffic volumes should be at least 600 feet. However, on routes with safety, congestion, or operational problems, 1,000 feet or more may be required between the centerline of any left turn access points and any adjacent street and driveways. The minimum distance between drives does not apply to service drives not used by the general public. Driveways for fire stations should be designed to accommodate maneuvering of fire trucks within the driveway stem in order to avoid conflict with traffic. Because of the size of fire trucks, station buildings that are within 100 feet from the edge of pavement will be allowed up to 15 feet of driveway width per bay up to a maximum of 75 feet total driveway width. For station buildings more than 100 feet from the edge of pavement, a driveway width of up to 12 feet-6 inches per bay is allowable up to a maximum of 50 feet of total driveway width. The PERMIT for this type of service will be reviewed and approved by the Division Engineer or their designee. The Division Engineer may deviate from the above standards on a case-by-case basis using sound engineering judgement. D. Driveway Profile Generally, all driveways shall have a grade that slopes away from the highway surface at a rate equal to the slope of the shoulder, but not less than 1/4 inch per foot nor greater than one inch per foot in a normal crown typical section. The slope shall continue for a distance equal to the prevailing shoulder width or longer so as not to cause a hump or a depression in the shoulder area. Beyond the shoulder, the grade of commercial driveways within the right-of-way should not exceed +/- ten percent. The slopes of drives shall be compatible with provisions for drainage of the designed cross-section. Where special circumstances require driveway grades in excess of these requirements, the NCDOT may approve deviation on a case-by-case basis. Where a sidewalk is located close to the curb line and the driveway opening is to be provided across a depression or curb cut, the sidewalk should be constructed to conform to the driveway profile. Either one or both edges of the sidewalk may be depressed across the driveway provided the resulting sidewalk cross slope does not exceed 1 /2 inch per foot. In some cases, it may be necessary to discontinue the sidewalk across the driveway and to construct a curb along each driveway edge. In such instances, the curb cuts and curb ramps must be constructed in conformance with the latest edition of the NCDOT "Guidelines for Curb Cuts and Curb Ramps for Disabled Persons." Page 42 July 2003 fa?fachmer? i- ? AGREEMENT TO PURCHASE REAL ESTATE THIS AGREEMENT is made, entered into, and effective as of September I t- , 2007, by and between WRI-HUGHES SURE CITY, LLC ("Seller"), and SOUND DEVELOPMENT, LLC ("Buyer").. RECITALS Seller is the owner of that certain parcel of real property in Pender County on Highway 210, portions of which are more particularly shown and defined on attached Exhibit A (the identified portions in Exhibit A are hereinafter referred to as the :Property"). Buyer desires to purchase the Property from Seller, and Seller desires to sell the Property to Buyer, under the terms and conditions of this Agreement. NOW, THEREFORE, for and in consideration of the mutual promises and covenants contained herein, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: 1. Purchase and Sale of Property. Buyer hereby agrees to purchase the Property from Seller, and Seller hereby agrees to sell, transfer, and convey the Property to Buyer, under the terms and conditions of this Agreement. 2. Purchase Price, Payment. The purchase price for the Property payable by Buyer to Seller shall be One Million Seven Hundred Thousand Dollars ($1,700,000.00). The Purchase Price, plus or minus prorations, shall be paid in cash at closing by certified check or wire transfer. The earnest money described in paragraph 3, below, plus all additional earnest money paid by the Buyer hereunder is collectively referred to as the "Deposit." The Deposit is fully refundable during the first one hundred eighty (180) days of the Inspection Period (defined below), and is thereafter nonrefundable except in the event of a default by Seller hereunder or termination of this Agreement by the Buyer for failure to satisfy one of the conditions precedent set forth in paragraph 6 hereof. If the purchase and sale of the Property occurs, the Deposit (including any amounts added to the Deposit to extend the Inspection Period as described below) will be credited to the Purchase Price payable at Closing. If after the expiration of the first one hundred eighty (180) days of the Inspection Period, the purchase and sale of the Property hereunder does not occur for any reason other than a default by Seller or failure to satisfy the conditions precedent set forth in Paragraph 6 hereof, the Deposit shall be retained by Seller as liquidated damages. 3. Inspection Period. Buyer shall have the period commencing on the Effective Date of this Agreement, as defined below, and continuing for a period of one hundred eighty (180) days, in which to conduct, at Buyer's expense, such inspections, surveys, tests, and examinations of the Property as Buyer deems appropriate, including, t-,it'd 668229VOT6:O1 :WOaJ 80:Oi Boa2-9o-ont ?1taCh;V)641) ? S Date: Wed, 24 Sep 2008 12:11:31 -0700 (PDT) From: "Dana Lutheran" <dlutheran@segi.us> Subject: Re: Fwd: Hofmann Forest Wetland Mitigation Bank To: glenn_catts@ncsu.edu Dear Glenn, That is great news! Yes, we would like to reserve 1.1 credits of the Hofmann Forest Wetland Mitigation Bank. At this time, we are in the process of applying for the necessary USACE and DWQ authorizations, for the two projects. Typically, the fee for mitigation is not paid until the permits have been issued. With that said, SEGi does anticipate obtaining the permits for the two projects simultaneously. Therefore, payments will be made separately (one for 0.50 credit at $21,500 and the second for 0.60 credit at $28,500). I think it's great that NCSU has provided this resource as an alternative to the NC EEP In-Lieu Fee Program. Thank you so much for your assistance and your quick response. I look forward to working with you on future projects. Sincerely, Dana A. Lutheran Glenn Catts <glenn catts ncsu.edu> wrote: Dear Dana Lutheran, Thank you for your interest in Hofmann Forest Wetland Mitigation Bank credits. We currently have more than enough credits available to cover your stated needs. If I understand your request correctly, you are in the market to purchase 1.1 credits (0.6 plus 0.5 credits). Our credits are priced at the going EEP in-lieu fee price for coastal, non-riparian impacts at $43,000/credit. We would require payment of $47,300.00 to obtain the 1.1 credits you need. If you were to purchase a larger number of credits (say 25 or more) the per credit fee would be negotiable, but for such a small number of credits our price is firm. Let me know if you are interested in a purchase. Thanks, Glenn P. Catts Hoffman Forest Liaison College of Natural Resources at North Carolina State University 2023 Biltmore Hall, PO Box 8002 Raleigh, NC 27695-8002 Phone: (919) 513-3973 E-mail: glenn catts@ncsu.edu Fax: (919) 515-7231 9,-., V,-j- Co n-7 n-7 oytS °c ??I n?Rv 01 rfrt# .. r Y S s,: E 210 } 7 w S ? ? Y Y J 71 Y? i4 FL € yt Ek ' ? c O u 12'5 ' 3 ? V ? z .nlV N 1: ' O R O ? ?o p? z F 1ST ? pMy ?:.? - i A i ? - ? ? p+U}6,?1D n 01, e:3!` <l? V 41, ? Pfnd?e Ohsio? 4 ConnectGIS Page l ofd Parcels WEINGARTEN HUGHES SURF CITY 4225-08-6026- Name: PIN. Sale Price: VENTURE 0000 Deed Deed: 3506/124 8/11/2008 Plat: NOPLAT Date: Address: 2600 CITADEL PLAZA DR STE 300 City: HOUSTON State: TX Land Building Zip: 77086 94254 24649 Value: Value: Total Deferred Value: 0 118903 Subdivision: Value: Tax Neighborhood: 00 G01 C53 R40 Zone: SEEMAP Codes: Property Address: 220 NC HWY 210 E Acres: 27.56 Township: TOPSAIL Property ON S/W SIDE 210 DEED581 51 J3 10 Description: 56 V 16 P 1:754 feet NTY Fender County GIS N This map Is poeparec to the Inven" C real orolpe tj found t•thln this JUANKI dn, am is cchawaed from hetGrded 0!!011, pNtS, Ono COW pualk Fe"Wds and OSID. Vsen of M maG we hereD3 "Milled that 4k! aforenwIt 'M puDOC pnmary In(Mmabon SotYtes should be tonsupeo br the vier tatson o1 the l ahsormatbn COntaYleO on this w-W Pendlt CDuntj assumes no legal responfSoNry so, the Intom+etgn ? ?-. [Mmlhld on g4S mDG. I ConneetGIS Pageoof.L., Name: Deed: City: Land Value: Total Value: Tax Codes: Acres: 1:754 feet PIN: Plat: State: Building Value: Subdivision: Zone: Township: 7 A Parcels 4225-17-2617-0000 Sale Price: Address: Zip: Deferred Value: Neighborhood: Property Address: Property Description: Pender County GIS Wl?i l' S TINS map 11 prepared to lie Inventory of real propeiV IOU" ¦RM MN judsdtflon. and ts cdraoped from retarded deeds. pats. and oteroNitlc repass and data. Users of tras map are nereOy Waded Bette aloremermorled "Olic pnmay Worrnaaon W.fees should be consulled for ae tiNascatlon of the abrmaadn cantaaled an tils nup. Pender County assumes od "al responsively Ur tae Irlbns+aiGm contained on Ws mad. H7ri?P��1- fi VQ XI -m R 71, Ry+i11L I 1]4[' fA @6i1q!?P136 22!44 91845 2999 Affachmen?`q MCI SE.G1 I Soutkern Environmental Group, Inc. EnWOnmontal, Devc1opmon; and Conservation AdvL-,m wrlw.eegjws PAGE 83!13 L.LC ?? ? ?Fs; ? J?ki.? ? ? f ?'f-S ._._??, har? grant -1 1 frl?ndQlen! No+?J p ? 0AW YAW M a erx c arding en?ironnlen?l consulsing mccs on rcal prop.crt ovvn4d Under Cantrdct bi to ! ? Fri at ?I C ?? 17 in 16- T '' Al 1 •i uu'' ??illil•C ?e?uttty?pu??de.s; ryorth ?arp[ino• vQzx. y? 1150-%h C04st Road, Sme F. • Wdmi-sswn. No4 Ciarptna u+l 2 .tims 910.45Z.2.711 • IWaw. .616140-20? " 094daae1 P i.7''j 6.cnr Rb0 GYc !n 1 AUG-17-2006 09:17AM FAX:919 848 9854 ID: 2/2'd 66822Sb0I6:01 ..-~.?r? F 0-Q'R% • • .nom, t At 1 m1Y I+/V.? n rlrr . PACE:002 R=100% :W02id Lb:oti 9002-LT-qnu