Loading...
HomeMy WebLinkAbout20170852 Ver 1_Bridge #244 Application_20170710r .e�STARTF yo.w w �aN{�' , T :ly ' ' 3, , s�-�� �-� - h y �% � Y' :. _�� � Cr +'y`f. w�n -:�.� , ����._ ; STATE �F NQRTH CAROLINA DEPARTMENT OF TRA��SPO►RTATT�7iV Ro� CoO�Ez� Cr�V£RNOR J�� �, �a i � Mr. Eric Alsmeyer U_ S_ A��rmy Corps afEngineers Raleigh Regulatnry Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 J��s H. Ti�ocDorr, III SECRETARY Subject: Na�ionwide Permit #3 Replace Bridge #24� on SR 1422 Alleghany County, North Carolina Project Number: 17BP11.R124 (No T1WR Permit Fee R+equired) Dear Mr. Alsmeyer: The North Carolina Department of Transportation is scheduled to replace Bridge #244 vvith a new bridge at the same location. The existing three span concrete bridge has significant levels af deterioratian and wil� be replaced with a new single spaxn concrete bridge. Izlnpacts incIud� 8linear feet of bank stabilization and 47 linear feet of tem or dew____.._ _at. erin� far intexior hent removal and riprap piacement. No on-site detour is prapased. As you knc�w, the northeastert� quadrant of this bridge falls w�ithin the edge of the conservation easement for the Glade Creek II Mitigation Site. We have obtained approval from the TRT to praceed wiih the replacernent. Owr Locations and Surveys Unit is currently drafting the docurnents necessary for the 5tate Property Off ce to release the small arxzaunt of the easement needed to demolish and recanstxuct the bridg�. We will not proceed until all of those right-of-way issues are resalved. Construction of this praject will require i�ripacts to waters of the United Sta.tes in the New River Basin. The exisfir�g b�ridge crosses G�ade Creek {Class: C; Trout} and is located in a trout watershed. This project daes not dra�in to designated critieal habitat for the elk ioe mussel. This project was reviewed for the presence o�' threatened and enc�angered species in the field and I have aiso included a query of the NCI`1HP database. Based an the project area mapped with m.y request, the clatabas� search indicates that there are no xecords of any fedexaliy listed tl�reatened or endangered species, zznpflrtant natural communities Qr Mr�iling tiddress: NC DEPAA'TMENT OF "1'RANSPOR'FATION DIVISION 1 i 801 STATESVII.LE ROAD NQItTH WII.KESBOkO, NC 28659 7'elephone: (336) &b7-911 I Far: (33b) 667-4549 CustomerService: ]-877-368-4968 Gt�ebsite.- wwvr.nedat.gav Mr_ Eric Alsmeyer Alleghany Bridge #2�44 June 9, 2017 natural areas within the proposed project boundary. There wiIl be appro�mately 0.1 acres of iree cuttzng at the project location due to cut and fiIl work. The NLEB is lisied as a pratected species in this county but t�e project does not fall within 0.25 miles of any red HUC identif ed in the SLOPES spelled out in the Nationwide Permit Regional Canditinns. We do nat antici�aate aaiy impact to any other federally listied species. Cultural resource cornpliance work ha� been compI�ted. No archaeological resources or historic properties will be affected by this praject (see attached). . The project impacts are nc�t sigaiificant in nature a.nd should not remove or degrade e�isting water quality uses. Starmwater will be routed through grass or rock linec� datche�, depending an the ditch line slope. Pipe si�es used will be the minirnum necessary to create a safe roadway. By utilizing the erosion coz�trol measures autlined in the attachments to tnis application, downstream water quality standards will be prnteeted. AlI appropriate BMPs will be used during construction. Attached is a Precanstruction Notification FQnn, plari sheets with proposed erosion control measures, a marked county map and a marked tapography xa�.ap. By copy of this el�ct�onac letter, it is requested that Mrs. Mar1a Chaxnbers with the North Garolina Wildlzfe Resources Commissian comment c�irectly to you concerning the 4f�4 Natic�nwide Permit a�plication wzth a copy sent to me. We would like ta begin CCIIlSi�'UCtlOf1 as soon as possible. If further information is required, piease l�t me know. Your early review and consideration will be appreciated. 5incerely, Heath Slaughte Division Environment.�.1 4fficer Enclosures cc: Marla Chambers, NCV�RC IVlark Johnson, Division Bridge Program Technician Zack Souther, Roadside Environmental Field �peratians Technician C��ce Use Only: C41"E]S flC�1011 I�I f10. aWQ pfOJ� f10. Form Version 1.3 Dec 1 Q 2008 Pre�Construction Notification C Form A. A Iicant Informatian 1. Processing 1 a. Fype(s} of approval sought ftom the Corps: � Section 404 Permit ❑ 5ection 1 D Permit 1 b. Specifiy Nationwide Parmit (NWP) number: 3 or General Permit (GP) number: 9c. Has #he NWP or GP number been verified by the Corps? ❑ Yes � No 1 d. T}Ipe(s} of appro�aE sought from the DWQ (check al! that apply): ❑ 401 Water Quality Certi#ication — Regular ❑ Non-404 Jurisdictional Genera! Permit ❑ 409 Water Quali#y Cer#ification — Express ❑ Riparian BufFer Auihorization 1 e. Is th[s noti#ication solely for the record Far #he record only for DWQ 4�1 For the record only for Corps f'ermi#: because written approval is not required? Certifcatian: � Yes ❑ No ❑ Yes � No 1f. Is paym�nt inta a mitigation bank or in-lieu fee program proposed #or mitigation � Y� � Nfl of impacts? If so, attach the acceptance letter from mitigation bank ar in-lieu fee program. 1g. Is the project locatecf in any of NC's twenty coastal counties. if yes, answer 1h ❑�"es � No below. i h. Is the project located vuithin a 1VC DGM Area of E�wironmental Concern (A�C)7 ❑ Yes � No 2. Project Information 2a. Name of project: Bridge #244 an SR 1422 2b. County: Alleghany 2c. Nearest munic�pality / #own: Sparta 2d. 5ubdivisian name: � 2e. NCDOT only, T.I.P. or state 17BP.11.R.124 project no: 3. Owner Informatian 3a. Name{s) on Recordec! Deecf: NCDOT 3b. Deed Book and Page No. 3e. Responsible Party (for LLC if applicabl�e): 3d. S#reet address: 801 S#atesviile Road 3e. City, state, zip: f�orth Wilkest�oro, NC 28659 3f. Telephone no_: 338-903-9202 3g. Fax no.: 336-6G7-4549 3h. Email address: hsfaugh#er r[�Dncdot.gov Page 1 of 10 E'CN Form — Version 1.3 Deeember 90, 2008 Version 4. Applicant Inforination (if difFerent from nwr�er} 4a. ApplRcan# is: ❑ Agent ❑ Clther, specify: 4b. Name: 4c. Brasiness name (if applicable): 4d. Streei address: 4e. City, state, zip: 4f. Te�ephane na.: 4g. Fax no.: 4h. Email address: 5. AgentlConsu�tant Inforntation tif appficablej 5a. Name: 5b, Business narne (i# applicablej: 5c. Street address: 5d. Ci#y, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email adclr�ss: Page 2 of 10 PCN Form -- Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Properly IdentiFcation 1a. Property identifcatian no. (tax PIN or parcel ID): 1 b. Site caordina#es (in decimal degree5); Latitude: 36.47643 Longitude: - 81 A6123 (DD.dDDdDD) {..�p.DDdU17D) 1c. Property size: 0.9 acres 2. Surtace waters 2a. Name of nearest body of water {stream, river, e#c.) to �lade Creek proposed project: 2b. Water QuaEity Classification of nearest raceiving water: C; Trout 2c. River basin: New 3. Project Description 3a. Describe the existing conditions on the site and the generaf land use ir� the yciniry of the projec# at the time of this application: Substandard bridge ta be replaced with new bridge in a rura[ area 3b. Lfst the totaf estimated acreage of a11 existing wetlands on the property: 0 acres 3c, �Est the totat estima#ed linear feet of all existing streams {intermittent and perennia!) on the property: 100 finear f�e# 3d. Expfain the purpose of the �Oropased �ro3ect: LJpgrade substandard stream crossing 3e. Oescribe the overall praject in detail, inc4uding the type of equipment ta he used: See attached couer letter. 4. JurisdiCtianal Determ9nations 4a. Have }urisdictional wetl�nd or stream determinations by the Corps or Sfa1e been reques#ed or obtained for this property 1 ra ect �ncludin all nor hases m the ast? ❑ Yes � No ❑ Unknown P J i� 9 P� P )� p Comments: 4b. If the Corps made the jurisdictianal determinatir�n, what type of determination was made? ❑ Prefiminary ❑ Final 4c. If yes, who rJelineated the jurisdictional areas? AgencyfConsultant Campany: Name (if known): Other: 4d. If yes, list the dates af khe Corps jurisdictional deterrr�inations or State de#erminations and attach documentation. 5. Projeci History 5a. Have permits or certifrcations been requested or obtained for � Yes � Na ❑ Unknown this project (inclucfing all prior phases) in the pas#? 5b. If yes, explain in detail according to "help file" instructians_ 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � IVo 6b. If yes, explain. Page 3 af 10 PCN Form — Version 1_3 December 1 d, 2�08 V�rsion C. Proposed Impacts Inventory 1. Impacts 5ummary 1 a. Which sections were completed b�low for yc�ur project {check a11 that appiy): ❑ Wetlands � Streams - tribuiaries ❑ Suffers ❑ Open Waiers ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then camplete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. We#land impac� �'ype of jurisdiction numher — Type of impact Type of wetland Forested (Corps - 40�4, 10 Area of impact Permanent (P) or (if k�own) DWQ — nan-�4�U4, ot#ier} (acrEs) Tem ora W1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ � � �, 0 T ❑ Yes ❑ Gorps ❑ No ❑ �WQ �� � P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ �� � �, 0 T ❑ Yes ❑ Corp5 [j Na ❑ DWQ W6 ❑ P � T ❑ Yes ❑ Carps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Camments: 3. Stream Impact�s If there are perennia! or intermitten# stream impacts (inc�uding temporary impacts) proposed on the site, then complete this question for all s#ream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type af impac# Stream narrae Perennial Type of jurisdiction A�eraga lmpact number - (PER) or {Corps - 404, 10 stream length Permanent (P) or intermittent TemporarY i� (I��� �WQothe � -404, �fi �t j (lin �ar feet $� � P � T Riprap & �lade Creek � �'ER � Corps �� �� Dewatering ❑ lNT � DWQ S2 ❑ P❑ T ❑ FER ❑ Corps ❑ 1hIT ❑ �WL2 S3 ❑ P 0 T ❑�'E� [�] Corps ❑ II�T ❑ DWQ �4 ❑ �, ❑ � ❑ PER ❑ Corps ❑ !NT ❑ DWQ S5 ❑ P[] T ❑ P�� � Corps ❑ INT ❑ �WQ 56 ❑ P � T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stre��n and tributary impacts �� 3i. Comments: 47 feet dewatering, 8 bank hardeninglriprap Page4of10 PCN Form — Version 1.3 �ecember 10, 20U8 Version 4. Open Water Irr�pacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sour�ds, the Atlantic �cean, or any other open water of the lJ.S. then indi�idually list ali open water impacts below. 4a. 4b_ 4c. 4d. 4e. Op�n water Name of waterbody i►npact number -- (if applicable) Type of impact Wateri�ody type Area of impact {aeres) Permanent {P) or Tem ora O'! ❑P�T t72 ❑P❑T �3 ❑P❑T 04 ❑P�T 4f. Total open water impac#s 4g. Comments: 5. Pond or Lak+� Constructiun If ond or lake cnnstruction ro osed, then com lete khe chart below. 5a. 5f�. 5c. 5d. 5e_ Wetl�nd Impacts (acres} Stream Impacts (f�ei) Upland Pond ID Proposed use or pur{�ose (acres) number of pond Flooded Filled Exeavaied Flooded Filled Excav�ated Flooded P1 P2 Sf. Tatal 5g. Comments: NIA 5h. Is a dam high hazard permit required? ❑ Yes � No If yes, permit !D no: 5i. F�cpected pond surface area (acres): 5j. 5ize of pan�i watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWi,�) If project wiil impact a protected riparian bufFer, then complete the chart beEow. If y�es, then individually list ail buffer impacts below. If an im acts re uire miti ation, then au MUST fill aut Sectian 1] af this farm. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Praject is in which protectecE basin? ❑ Catawba ❑ Randleman 6b. fic. 6d. 6e. 6f. Bg. Buffer impact number — Reasnn Buffer Zone 1 impact Zone 2 irnpact Permanent (P} or for Stream name mitigation (square feet) (square feet} Tem ora im act re uired? B1 ❑P[]T ❑Yes ❑ No B2 ❑ P ❑ T ❑ Yes Q No B3 ❑POi ❑Yes ❑ Na 6h. Total baifer impacts 6i. Gomments: Page 5 of 'E 0 PCCV Forin — Versian 1.3 �ecember 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Speci�icafly describe measures taker� ta avoid or minimize the proposed impacts in designing project. Stream crossing is being repiaced with another spanning structure with no interior bents. 1b. Specifically describe measures taken ta avoid or minimiz� the p�oposed impacts through construction techniques. All appropriate BMPs will be used durinq construction 2. Compensatory Mitigation for Impact9 to Waters af t�e U,S. ar Water� of the State 2a. Does ti�e project require Compensatory Mitiga#ion for impacts to Wat�rs of the 11.S. or Waters of the State? 2b. If yes, mitigation is required by (check all ihat apply): 2c. !f yes, which mitigation option will be used for this project? 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation 8ank: 3b. Credifis Purchased (attach receipt and letter} 3c. Camments: 4. Complete if Making a Payment to In-lieu �ee Pragram ❑ Yes � No ❑ DWQ ❑ Corps ❑ Mitigation bank [� Payme�t to in-lieu fee pragram ❑ Permittee Respansible Mitigation Type 4a. ApproVa! letter from in-lieu fee program is attached. ❑ Yes Quantity 4b. Stream mitigatian reques#ed: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm �] cool 4d. Buffer mitigation requested (DWQ only): 4e. Riparian wetland mitigation requested: 4f. Non-r�parian wetland mitigation requested: 4g. Coastal (tidal) wefland mitigatian requested: 4h. Comments: 5. Camptete if Using a Permittee Responsible Mitigation Plan square feet acres acres acres �coid 5a_ If using a permittee respansible mitigation pEan, provide a description af #he proposed mitigation plan. Page 6 of 10 PCEV Farm — Version 1.3 December 10, 200$ Version 6. Buffer Mitigation (5fi.�te Regutated Ripar�ar� Buffer Rules) — required by DWQ 6a. Will the projeck result in �n impact within a pro#ected riparian buff�r that requir�s ❑ Yes � No buffer mitigation? 6b. I� yes, then identify the square feet vf impact to each zor�e af the riparian bufFer that requires m�tigation. Calculate the amount of mitigation required. Gc. 6d. 6e. ZQ�� Reason for irnpact 7otal impact Multiplier Required mitigation (square feet) {square feetj Zone 1 3{2 for Catawba) Zane 2 �.g 6f. Total buffer mitigatian r�quired: �g. If buffer mi#igatian is required, discuss what type of mitigation is praposed (e.g., payment ta private mitigaiior� bank, perrr�ittee respansible riparian buffer r�stoeatian, paymer�t into an appro�ed in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Farm — Version 1.3 December 1 Q, 2E}08 Versivn E. Stormwater Management and Diffuse Ffow Plan [required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it acijacent to prntected riparian buf�ers iden#ified � Yes � IVo within one af the NC REparian Buffer Pratection Rules? 1 b. If yes, then is a difFuse flow plan incfuded? If no, explain why. Comments: ❑ Yes ❑ Na 2. Stormwater Mana ement pian 2a. WFiat is ihe overall percent imperviousness of this project? 40 �/a 2b. Does this project require a Stormwater Management Plan� � Yes ❑ No 2c_ if this praject E?OE5 [dOT require a Stormwater Managerneni Pfan, expla�n why: 2d. If this projeci DOES require a 5tarmwater Mar�agement Plan, then pro�ide a brief, narrafive description of the plan: ❑ Certified Local Go�ernment 2e. Who will he responsible for the re►riew of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 4D1 Unit 3. Certified Local Government Starmwater Rev7ew 3a. In which lacak government's jurisdiction is this praject? ❑ Phase II 3b. Which of the folfowing focally-implemented stormwater management p�ograms ❑ NSW appfy (check a[[ that appfy): ❑ USMP ❑ Waier Supply Watershed ❑ Qther: 3c. Has the approved Stormwater Management Plan wittr proof of appro�al been ❑ Yes ❑ PVo attached7 4. DWQ Stormwater Pro ram Review 0 Coastal caunties ❑ HQW 4a. Which of the foilowing state-impfernented stvrmwater management programs apply � pR� (check al( that apply}: ❑ S�ssion Law 2006-248 ❑ Other: 4b. Mas the appro+red Stormwater Managertient Plan with proof of approval been aftached? ❑ Yes ❑ No 5. DWQ 40'1 Unit Stormwaber Review 5a. Does the 5tormwater Management Plan meet the appropriate requirements? � y�� ❑ No 5b. Fia�e all of the 401 Unit s�bmittaE requirements been rr�et? ❑ Yes ❑ No Page 8 ofi 10 PCN �orm — Version 1.3 December 1fl, 2008 Version F. Supplementary fnformation 1. Env�ronmentaE Documentation (DWQ Requireenent) 1 a. Does the project in�ol�e an expenditure of public (federal/state/lacal} funds or the � Y�S ❑ No use of public (federallstate) land? 1 b. ff you answer�d "yes° to the above, does the praject require preparation of an environrnental document pursuant ta the requirements of the Na6anal or State ❑ Yes � No (North Carofir�a} Environmentaf Policy Aci (NEPAIS�PA}? 9 c. If you answered "yes" to the abo�e, has the document re�few been finalized by tlie State Clearing hlause? (If so, attach a cnpy of the NEPA or SEPA finaE approval letter.) ❑ Yes ❑ �o Comments: 2. Violations {DWQ Fiequirement) 2a. fs the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated We#land Rules (15A NGAC 2H .1300), DWQ Surtac�e Water or Weilanci Standards, ❑ Yes � No or Ri�arian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit appfication? 0 Yes � No 2c. !f yau answered "yes° ta ane ar both of the above questians, pro�ide an explanation of the violation(s): 3. Cumuiative Impacts (DWQ Requirement) 3a. �II this project (based on past and reasonabiy anticipatEd future impacts} resuli in � Yes � No additional de�elopmee�t, which could impaet nearby downstream wa#er quali#� 3b_ If yau answered "yes" to the above, submit a qualitatiwe or quantitative eumulati�e impact analysis in accordance w�th the most recent DWC� policy. If you answered "na,�' pravide a short narrati�e descriptian. 4. Sewage Disposal tDWQ Ftequirement) 4a. Clearly detail the ultimate treatment methocis and disposition (non-discharge or discharge) of wastewater genera#ed from th� proposed project, or availabie capacity of the subject facility. N/A Page9of10 PCN �orm — Version 1.3 december 10, 20Q8 Versian 5. Endangered Species and Designated Critical Habitat (Carps Requirementj 5a. Will this projec# occur in or ne�r an area with federally prs�teeted species or ❑ Yes � No habitat? 5b. Ha�� you checked with the USFWS concerning Endangered Species Ac# � Y�s � fVo impacts? ❑ Raleigh 5c. If yes, indicate the USFlNS Field Office you have contacted. ❑ Ashevill� 5d. What data saurces did you use to cletermine wMether your site would irr�pact Endangered Species or C?esignaied Criticai Habita#? GIS and �isual observation and Natura! Heritage Program 6. Essential Fish Mabitat (Gvrps Requirement) 6a. Will this project occur in or near an area designated.as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to d�termine wf3ether your site would impact Essential Fish Habitat? NOAA 7, Historic or Prehistoric Cultural Resources (Corps Requiremeni� 7a. Wiil this pro�ect accur in or near an area tha# the state, federaf or tribal governments ha�e designatec� as having histonc or cultural preservation � Yes � No status {e.g., National Historic Trus# designation or proper#ies significant in North Carolina history and archaealogyj? 7b. What data sources did you use #o determine whether your site wat�ld impact historic or archeoiogical resources? Project was reviewed by the OFtE. Project was deterrriined ts� ha�e na effect. 8. Flood 2one Designation (Corps Requirement) 8a. �II this project occur in a F'EMA-designated 100-year floodplain? ❑ Yes � No Sb. ff yes, explain how project meets FEMA requirements: 8c. What source(s) did you use tv make the floodplain determEnation? FRIS �. Heath Slaughter �� 6/9/17 ApplicantlAgent's Printed Name Applicant/Ag� t's Signature Date (Agent's si nature is vaGd onfy if d authorization letter from the applicant is rovideci_) Page 10 of 10 PCN Form — Version 1.3 December 10, 20{38 Versian