Loading...
HomeMy WebLinkAbout20071050 Ver 2_Site Plan_20081003Reynolds & Jewell 11 See Sheet L102 See Sheet L104 Landscape Architecture Land Planning 218 Snow Ave Raleigh NC 27603 X919) 821-5074 fax X919) 821-5139 www.rey noldsjewe II. co m Project : Centennial Campus Greenway Phase II Raleigh, North Carolina Client: NC State University NCSU Project No.: 080004 RJ Project No.: 061204 Drawing Title : Indicator Map NOTES: FUTURE PHASE ~ LIMITS OF PHASE II 1. THE CONTRACTOR SHA DNTRACTOR SHALL VERIFY Reynolds (NOT INCLUDED IN CONTRACT) (INCLUDED IN CONTRACT) EXISTING GRADES SHOWN GRADES SHOWN ON THE PLANS PRIOR TO COMMEP WORK OPERATIONS. IOR TO COMMENCING ANY 'ERATIONS. & Jewell 2. THE CONTRACTOR SHA DNTRACTOR SHALL PROVIDE EROSION CONTROL MEAS CONTROL MEASURES AS REQUIRED BY NC DEPART ENVIRONMENTAL NATURA ) BY NC DEPARTMENT OF MENTAL NATURAL RESOURCES TO PREVENT SOIL EROSI01~ NT SOIL EROSION AND , DISCHARGE OFSOIL-BEAR :~E OF SOIL-BEARING WATER Landscape Architecture RUNOFF OR AIRBORNE DU ADJACENT PROPERTIES, N DR AIRBORNE DUST TO IT PROPERTIES, WALKWAYS, Land Planning i ° AND PROTECTED NATURAI ~TECTED NATURAL AREAS. 3. UPON COMPLETION Of COMPLETION OF PROPOSED 218 Snow Ave . , INSTALLMENTS, REMOVE EI ENTS, REMOVE EROSION AND FATION CONTROLS. RESTORE Raleigh NC 27603 DWQ STREAM IMPACT AREA #7 SEDIMENTATIONCONTROI ~ ~ AND STABLIZE AREAS DISTI 3LIZE AREAS DISTURBED DURING 0 -30 BUFFER ENCROACHMENT: 1 100 SF REMOVAL. L. 30'-50' BUFFER ENCROACHMENT: 865 SF (919) 821-5074 fax (919) 821-5139 www.reynoldsjewell.com BUFFER ENCROACHMENT NECESSARY TO DWQ STREA '-30' BUFFE 30'-50' BUFFE STREAM IMPACT AREA #7 CROSS EXISTING CULVERTED BUFFER ENCROACHMENT: 1 100 SF ' INTERMITENT STREAM ' BUFFER ENCROACHMENT: 865 SF Consultants: BUFFER ENC NEW ASPHALT PATH SHALL TERMINATE / CROSS EXIS AT PROPERTY BOUNDARI~ INTERMITEN SCOPE OF WORK; ACTUAL LIMITS OF 2~ .R ENCROACHMENT NECESSARY TO ~S EXISTING CULVERTED f ~MITENT STREAM ~v ~o 2 _ s 0 SCALE: 1" = 30' 0 WORK SHALL BE A NARROW PATHWAY ~ CONFINED TO EXTENTS OF PROPOSED GRADING ALONG PROPOSED PATH S; ~s; _ Seal: ~~:Soil Te\Site SCOPE OF WORK ACTUAL LIMITS OF WORK SHALL BE A NARROW PATHWAY CONFINED TO r,+, EXTENTS OF PROPOSED GRADING ALONG \ \ ~ NEW TEMPORARY SILT FENCE ~ soi~ rest site \ N ~ ail Test Site #8 PROPOSED PATH Y Project r ~ \ Soil Test Site #7 ry ~t~~,i~ NCSU Centennial 5 Soil Test Site #6 ~ ~ , Greenways Phase 2 ; ~ Raleigh, North Carolina \ ~ ~ NEW ASPHALT PATH; 8' WIDE WITH 1' - _ ~1° ~ ~ ~ ~ ~ ~ \•c~ ABC APRON ON EACH SIDE Client: \ \ \ \ \ ~ l ~ ~ v., { t Soil Test Site #5 NC State University t t ~ ~ r ~ i~ .f Project No.: 080004 SO k \ ~ r 't ~ ~ ' _ f. ~ _ , 9 ~ _ _ ' ' 6 ~ ~ ~ ~ \ ~ X C 281 ~ ~ ,poll Test Site #4 ~ ~ \ ~ \ ~ ~ N ~ , ~ \ ~ ~ \ n ~ ~ ~ \ ~ \ \ \ INSTALL ( ~ \ \ _ / + \ 1 PIPES T i ~ I I NE \ ~ ~ ~ STALL 3 24 CORRUGATED HALF ~ - _ Soil Test Site #3 PIPES TO CONVEY STORMWATER l \ ~ BENEATH PATHWAY ~ ~ ~ ~ \ i~ ¦ ~ u NEW TEMPORARY SILT FENCE ~ ~ ~1 .l _ . Ij Soil Test Site #2 I ~ ~ ~ .l, , o ~ s O. 1 ~ \ , I `~5 t` I ~ it ~ n Soil Test Site # 1 \ N N ~ ~ ~ o J l= ~ ~ I ~ ~ ~ ~ II I ~ \ SOIL PROBING ROBING APPROXIMATELY EVERY 50 ' a r ~n~ t ~ R _ , ~ ~ t ~7 k ~ ~ T ~ i i / ~ 30' I , B U FF E R 1 O Y r i ~ \ i ~ ~ ~ ~ ~ ~ i ~ ~ ~ Y ~ 7 ~o - LIMITS OF PHASE II ~ r ~ \ ~ i INCLUDED IN CONTRACT ~ - - ,r , \ ~ I f k ~ ~ ~ ~ ~ ~ i ~ 1 'Cp ~ 1 UNDERGROUND UTILITIES NOTES ~ ~ ~ ~ ~ 7 1. LOCATIONS OF ANY UNDERGROUND OR OVERHEAD UTILITIES SHOWN ON THESE PLANS ARE \ ~ ~ APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD PRIOR TO BEGINNING LAYOUT AND PRIOR TO a' I r 0 ~ ~ BEGINNING ANY CONSTRUCTION OPERATIONS, ALL CONTRACTORS AND SUB-CONTRACTORS WHO ARE ~ I i MOVING EARTH & DIGGING IN THE GROUND SHALL HAVE ALL UTILITIES FIELD MARKED. ® ~ ~ 2. THE CONTRACTOR SHALL INSPECT ALL EXISTING UTILITIES MARKED ON THE SITE. IF DISCREPANCIES ARE ~2 ~ 8~ a _ N FOUND WHICH MAY AFFECT THE PROPOSED DESIGN, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE NOT INCLUDED IN N ~00 n, ~ ~ ARCHITECT PRIOR TO PROCEEDING WITH ANY AFFECTED WORK. X N CONTRACT N 4 2 2s 0 281 _ NOTES 1. ALL MEASUREMENTS ARE TAKEN AT 90 DEGREES, UNLESS NOTED OTHERWISE. ~ ~ 2 8~ ~ ~ .00~ , 2. SHOULD SITE CONDITIONS CHANGE, OR IF ANY DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE LEGEND , 2 ARCHITECT FOR A WRITTEN DETERMINATION PRIOR TO PROCEEDING WITH AFFECTED WORK. 82 . S~ ~ 3. THE CONTRACTOR SHALL ERECT PEDESTRIAN BARRICADES AND FENCING WITH SIGNAGE AS REQUIRED TO PREVENT PEDESTRIAN o INTRUSION INTO THE LIMITS OF WORK AT ALL TIMES. GRADES SHOWN FOR o, - EROSION CONTROL MAINTENANCE PRC 4. THE CONTRACTOR SHALL LOCATE ALL BASE LINES, LAYOUT DIMENSIONS, AND PERFORM LAYOUT STAKING PRIOR TO INSTALLING ENANCE PROGRAM INSPECTION SCHEDULE: ~ FUTURE GREENWAY ~ ~ X80 IMPROVEMENTS. WHERE DISCREPANCIES ARE FOUND BETWEEN THE PLAN AND THE SITE CONDITIONS, THE CONTRACTOR SHALL 1. ALL EROSION AND SEDIMENT CONTROL PRACTICE; ~ ~TROLPRACTICESWILLBEINSPECTEDANDMAINTAINEDBY G REFERENCE ONLY SEE INFORM THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. • • • • NOT IN CONTRACT CONTRACTOR FOR STABILITY AND OPERATIONS FOLL( ~ a m OPERATIONS FOLLOWING EVERY RUN-OFF PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDS -n PLAN ABOVE FOR PHASE II JEEK. ANY NEEDED REPAIRS OR SEDIMENT REMOVAL SHALL BE MADE ~ 5. CONTRACTOR SHALL REMOVE AND DISPOSE OF MATERIAL IN ACCORDANCE WITH CITY OF RALEIGH DUMPING REGULATIONS. IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGf GOOD WORKING ORDER MAY RESULT IN ISSUANCE C CTICES AS DESIGNED. FAILURE TO KEEP EROSION CONTROL DEVICES IN ~ GRADING AT END OF NEW LT IN ISSUANCE OF A STOP WORK ORDER. 28~ ~ ~ ° BOARDWALK 82 6. LANDSCAPE ARCHITECT SHALL STAKE LOCATIONS OF PROPOSED WALKS PRIOR TO 2. SEDIMENT SHALL BE REMOVED FROM BLOCK AND So. OM BLOCK AND GRAVEL INLET PROTECTION DEVICE WHEN STORAGE ASPHALT PAU~NCi CAPACITY HAS BEEN APPROXIMATELY 50%FILLED. GI INSTALLAION. _Y 50% FILLED. GRAVEL SHALL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. S PROPERLY. 7. ALL PROPOSED WALKS ABUTTING EXISTING WALKS SHALL MEET FLUSH. 3. SEDIMENT SHALL BE REMOVED FROM BEHIND THE S OM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE SHALL BE INSTALI SHALL BE INSTALLED AS NECESSARYTO MAINTAIN A BARRIER. DD 1 1 /07/2007 1 ~ FROM A TEMPORARY SEDIMENT OR EROSION CONTROL DEVICE CID 10/02/2008 BOARDWALK 4. ALL SEDIMENT SHALL BE REMOVED FROM A TEMPC PRIOR TO ITS REMOVAL. TEMPORARY CONTROL DEVI Y CONTROL DEVICES SHALL BE REMOVED BY STARTING UP STREAM OR Issue: UP SLOPE TO INSURE SEDIMENT CONTROL DURING RED TROL DURING REMOVAL PROCESS. ILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO Drawn By: BM GENERAL NOTE: 5. ALL SEEDED AREAS SHALL BE FERTILIZED, RESEEDED SPECTIFICATIONS TO MAINTAIN A VIGOROUS, DENSE POROUS, DENSE VEGETATIVE COVER. Checked By: SURVEY PROVIDED BY OTHERS. EXISTING GRADES AND LOCATION OF EXISTING 0-30' BUFFER ZONE 6. SEDIMENT MAY Nor BE DUMPED WHERE EROSION NHERE EROSION CAUSES AN UNSIGHTLY SCAR OR WHERE SEDIMENT Scale: ~ , ~ OO SQ FT CAN REACH A STREAM. REMOVE SEDIMENT FROM TH STRUCTURES AND UTILITIES MUST BE FIELD VERIFIED. PROPOSED WALKS, STRUCTURES, AND sPREADTHE MATERIALTO UNIFORM DEPTH,sEEDANC :DIMENT FROM THE DEVICES AND PLACE IT IN A SUITABLE LOCATION. DEPTH, SEED AND STABLIZE IT. 1 "=40'-0" FINAL GRADES WILL BE DETERMINED IN FIELD. 7. NO LAND DISTURBING ACTIVITY BEYOND THAT REQ EYONDTHAT REQUIRED TO INSTALL APPROPRIATE EROSION CONTROL ~ Drawing Title : MEASURES MAY PROCEED UNTIL EROSION CONTROL >SION CONTROL MEASURES ARE INSPECTED AND APPROVED BY ;T. 30,-50~ BUFFER ZONE OWNER AND LANDSCAPE ARCHITECT. ALL WALKWAYS ARE TO BE ACCESSIBLE WITH SLOPES LESS THAN 5% WITHOUT HANDRAILS. Layout Plan 865 SQ FT 8. SEED OR OTHERWISE PROVIDE GROUND COVER D ',OUND COVER DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION FOR ALL EXPOSED SLOPES WITHIN 15 WORKI WITHIN 15 WORKING DAYS OF COMPLETING ANY PHASE OF GRADING. 9. INSTALL SILT FENCE AROUND ALL CATCH BASINS, D CATCH BASINS, DROP INLETS OR INLET STRUCTURES WITHIN THE CONSRUCTION/DISTURBED AREAS. ~ ~ Sheet No. : i 0 20 40 80 160 / ~ ~ / L~ 1 01 \ L ~ r - ~ ~ - I F / ~ 29 OO ; NOTES: )TES: L.L " ~ ~ T x ~ 11. THE CONTRACT01 HE CONTRACTOR SHALL VERIFY Reynolds ¦ 2 ~ EXISTING GRADES SH TING GRADES SHOWN ON THE J PLANS PRIOR TO CO. NS PRIOR TO COMMENCING ANY SOIL PROBING APPROXIMATELY EVERY 50' WORK OPERATIONS. W RK OPERATIONS. & Jewell . i/ i ' ; ~ 2. THE CONTRACTOI HE CONTRACTOR SHALL PROVIDE EROSION CONTROL i C, ~ 6ION CONTROL MEASURES AS l; REQUIRED BY NC DEI ~ - !UIRED BY NC DEPARTMENT OF . ~ ~ ~ ~ C~ ~ ENVIRONMENTAL Np ~ ~ TO PREVENT SOIL ER( 'IRONMENTAL NATURAL RESOURCES 'REVENT SOIL EROSION AND DISCHARGE OF SOIL :HARGEOFSOIL-BEARING WATER Landscape Architecture ~ ~ LIMITS OF PHASE II ~ RUNOFF OR AIRBORP TOFF OR AIRBORNE DUST TO ~ (INCLUDED IN CONTRACT) ® " ¦ ADJACENT PROPERT ACENT PROPERTIES, WALKWAYS, Land Planning I AND PROTECTED NA ~ ° , ) PROTECTED NATURAL AREAS. ~ / FILL TO ~ , o + ' 13. UPON COMPLETIC 1PON COMPLETION OF PROPOSED 218 Snow Ave \ ~ / . ~ MEET NEW E 27 ~ INSTALLMENTS, REMC ALLMENTS, REMOVE EROSION AND ~ \ \ / BOARDWALK SEDIMENTATION COI ¦ ' ANDSTABLIZEAREAS IMENTATION CONTROLS. RESTORE Raleigh NC 27603 ) STABLIZE AREAS DISTURBED DURING REMOVAL. 1OVAL. (919) 821-5074 1 L- fax (919) 821-5139 ~ - www.reynoldsjewell.com \ \ NOT INCLUDED IN \ \ \ CONTRACT a Consultants: ~ \ \ 1 ~ {I L r o l ' r. I o r PHASE II GRADING PLAN -END OF NEW BOARDWALK I ^ a ~ I 1~ 11 I ~ ' ~ ~ ' I ~ ~ T~ L~~ ~ v- ~X , l ! ( ~ ' ry~ SCOPE OF WORK; ACTUAL LIMITS OF WORK SHALL BE A NARROW PATHWAY CONFINED TO ~C ' - EXTENTS OF PROPOSED GRADING ALONG ~ PROPOSED PATH Seal: ¦ ~ ~ ry a ~ u l 1~ ~°~z ~ ~ ~~~n ~ I j l r f r~ ,j Aso ' _ _ i _ _ u L Project x 2 , So NCSU Centennial e - <9 ~ - _ _ Lx_x-x _x_xx-x~X~X_ 6 - Greenways Phase 2 28~ ~ , ~ : i. i i Raleigh, North Carolina d ~ ~ ....I. °o N ~y/ i _ ~vJ y~ ~ Client: 11 NC State University - 2 ~ ~ ~ o-- L' 1 _ - Project No.: 080004 _ ~ ¦ - _ 1 NEW TEMPORARY SILT FENCE I l n i n ~ r. ~X ~ - J - ~ ~ , _ , i i__ c = I ; i11111LJ I i ~ ' ~ . o - ~ ~i ~ ~ ` SOIL PROBING APPROXIMATELY EVERY 50'~ i/ _ ~1 ' ¦ i i - ~s tr Y ' 0 ' ~t ~ -J ~ l ! ~ - ~ _ LIMITS OF PHASE II , / , ~ r ¦ L~ _ ~ ~ \ ~ (INCLUDED IN CONTRACT) ~ ~ ~y~~ _ ~ _ ~ ~ ~ , m~ ~ ~ ~ ~ , \ ~ tii~ y J_..... o ~ ~ ~ ~ ,y - r._ ~ ~ ~ ~ 1 _ J J r ~ ~ ~ ~ ® ~ ~ ~ r _ ® d ~ ~ \ i ( iI ~ ' / 1 ~ \ \ ~ \ \ NOT INCLUDED IN ~ ~ ~ej ~ f \ \ \ CONTRACT f N N Paz 1 I C 7 I ~ ~ ~ ~ zap ~ ' ~ t ~ \ I \ 281 • 284 2g 2s~x r; J ~ ~ q GRADES SHOWN FOR , , . W FUTURE GREENWAY • ' 28 ~3 • O, ~ ~gN 2 28 G REFERENCE ONLY; SEE a' ~ 2 ~N ~ ~ 2~o M J ~ 2g2 0 283 G -n PLAN ABOVE FOR PHASE II 2~ MIN r F ~ GRADING AT END OF NEW x ~ _ • 282 ~ - 280 28 ~ ~ ~ BOARDWALK 250 ~ ~o _ 2$1 1 ~ " • _ ~ / < n/ 1 28 ~ ~ 2 _ _ - 8 - - _ ~ - ~ ~ ~ ~ 282 • - ~ s N • o• - ~ • N • V - - 280.80 + ~ SO 28p • U ~ 5~ ~ UNDERGROUND UTILITIES NOTES ~ - ~ ' q • ~ , ~ . - - _ • 281 ?82 1. LOCATIONS OF ANY UNDERGROUND OR OVERHEAD UTILITIES SHOWN ON THESE PLANS ARE i . • ~ ~ ~ + 280.50 5~~~ . • q APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD PRIOR TO BEGINNING LAYOUT AND PRIOR TO N 27 BEGINNING ANY CONSTRUCTION OPERATIONS, ALL CONTRACTORS AND SUB-CONTRACTORS WHO ARE ~ MOVING EARTH & DIGGING IN THE GROUND SHALL HAVE ALL UTILITIES FIELD MARKED. e ! 0 28 282 282, `Zal ~ Orb 0 2. THE CONTRACTOR SHALL INSPECT ALL EXISTING UTILITIES MARKED ON THE SITE. IF DISCREPANCIES ARE ~ j FOUND WHICH MAY AFFECT THE PROPOSED DESIGN, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH ANY AFFECTED WORK. _ ~ ~ \ / / ~ NOTES ~ \ i - ~ / 1. ALL MEASUREMENTS ARE TAKEN AT 90 DEGREES, UNLESS NOTED OTHERWISE. 2. SHOULD SITE CONDITIONS CHANGE, OR IF ANY DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE e ARCHITECT FOR A WRITTEN DETERMINATION PRIOR TO PROCEEDING WITH AFFECTED WORK. 3. THE CONTRACTOR SHALL ERECT PEDESTRIAN BARRICADES AND FENCING WITH SIGNAGE AS REQUIRED TO PREVENT PEDESTRIAN INTRUSION INTO THE LIMITS OF WORK AT ALL TIMES. EROSION CONTROI JN CONTROL MAINTENANCE PROGRAM/ INSPECTION SCHEDULE: 4. THE CONTRACTOR SHALL LOCATE ALL BASE LINES, LAYOUT DIMENSIONS, AND PERFORM LAYOUT STAKING PRIOR TO INSTALLING IMPROVEMENTS. WHERE DISCREPANCIES ARE FOUND BETWEEN THE PLAN AND THE SITE CONDITIONS, THE CONTRACTOR SHALL 1. ALL EROSION AND SED INFORM THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. CONTRACTOR FOR STABIL 20SION AND SEDIMENT CONTROL PRACTICES WILL BE INSPECTED AND MAINTAINED BY CTOR FOR STABILITY AND OPERATIONS FOLLOWING EVERY RUN-OFF PRODUCING RAINFALL BUT IN =LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS OR SEDIMENT REMOVAL SHALL BE MADE LEGEND NO CASE LESS THAN ONC 5. CONTRACTOR SHALL REMOVE AND DISPOSE OF MATERIAL IN ACCORDANCE WITH CITY OF RALEIGH DUMPING REGULATIONS. IMMEDIATELY TO MAINTAI ~TELYTO MAINTAIN ALL PRACTICES AS DESIGNED. FAILURE TO KEEP EROSION CONTROL DEVICES IN GOOD WORKING ORDER VORKING ORDER MAY RESULT IN ISSUANCE OF A STOP WORK ORDER. • • • • NOT IN CONTRACT 6. LANDSCAPE ARCHITECT SHALL STAKE LOCATIONS OF PROPOSED WALKS PRIOR TO 2. SEDIMENT SHALL BE REP TENT SHALL BE REMOVED FROM BLOCK AND GRAVEL INLET PROTECTION DEVICE WHEN STORAGE INSTALLAION. CAPACITY HAS BEEN APP Y HAS BEEN APPROXIMATELY 50~ FILLED. GRAVEL SHALL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONC T POOL NO LONGER DRAINS PROPERLY. 7. ALL PROPOSED WALKS ABUTTING EXISTING WALKS SHALL MEET FLUSH. 3. SEDIMENT SHALL BE REP IENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP ASPHALT WALK AT THE FENCE. THE SEDIM =NCE. THE SEDIMENT FENCE SHALL BE INSTALLED AS NECESSARYTO MAINTAIN A BARRIER. DID 1 1 /07/2007 CID 10/02/2008 4. ALL SEDIMENT SHALL BE PRIOR TO ITS REMOVAL. T DIMENT SHALL BE REMOVED FROM A TEMPORARY SEDIMENT OR EROSION CONTROL DEVICE ITS REMOVAL. TEMPORARY CONTROL DEVICES SHALL BE REMOVED BY STARTING UP STREAM OR UP SLOPE TO INSURE SEDI~ TO INSURE SEDIMENT CONTROL DURING REMOV,4L PROCESS. Issue: GENERAL NOTE: ELEVATED BOARDWALK s. ALL SEEDED AREASSHP =EDED AREAS SHALL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO Drawn By: BM SPECTIFICATIONS TO MAID ~ATIONS TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. Checked By: IENT MAY NOT BE DUMPED WHERE EROSION CAUSES AN UNSIGHTLY SCAR OR WHERE SEDIMENT Scale: SURVEY PROVIDED BY OTHERS. EXISTING GRADES AND LOCATION OF EXISTING b. sEDIMENT MAY Nor BE CAN REACH A STREAM. F NCH A STREAM. REMOVE SEDIMENT FROM THE DEVICES AND PLACE IT IN A SUITABLE LOCATION. STRUCTURES AND UTILITIES MUST BE FIELD VERIFIED. PROPOSED WALKS, STRUCTURES, AND sPREADTHE MATERIALTo SHE MATERIAL TO UNIFORM DEPTH, SEED AND STABLIZE IT. r 1 "=40'-0" FINAL GRADES WILL BE DETERMINED IN FIELD. No LAND DlsruRBINO, 1ND DISTURBING ACTIVITY BEYOND THAT REQUIRED TO INSTALL APPROPRIATE EROSION CONTROL CONCRETE PATH MEASURES MAYPROCEEC .S MAY PROCEED UNTIL EROSION CONTROL MEASURES ARE INSPECTED AND APPROVED BY Drawing Title : OWNER AND LANDSCAPE ALL WALKWAYS ARE TO BE ACCESSIBLE WITH SLOPES LESS THAN 5~ WITHOUT HANDRAILS. AND LANDSCAPE ARCHITECT. 8. SEED OR OTHERWISE PF ~R OTHERWISE PROVIDE GROUND COVER DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN Layout Plan EROSION FOR ALL EXPOSE I FOR ALL EXPOSED SLOPES WITHIN 15 WORKING DAYS OF COMPLETING ANY PHASE OF GRADING. 9. INSTALL SILT FENCE ARC CONSRUCTION/DISTURBE[ LL SILT FENCE AROUND ALL CATCH BASINS, DROP INLETS OR INLET STRUCTURES WITHIN THE CTION/DISTURBED AREAS. Sheet No. : gi 0 20 40 80 160 L~ 102 i V I } 4 1 ~ t i NOTES: NOTES: i ~ ~ ~ ~ i ~ ^ a_ I it I I i j V/ I ~ ~ , ! i ~il.__. I i ~ i I i ~ I. THE CONTRAC ~ ~ ~ ~ ~ ORK OPERAiIO I ~ EXISTING GRADES . THE CONTRACTOR SHALL VERIFY Reynolds XISTING GRADES SHOWN ON THE f ~ - 1 I ~ SANS PRIOR TO U, I; LANS PRIOR TO COMMENCING ANY 5 4 r ~ ~ I I ?ORK OPERATIONS. & Jewell 4-,_ 1` ~ t . THE CONTRACTOR SHALL PROVIDE i j EROSION CONTR ' ~ REQUIRED BY NC ~ ~ ENVIRONMENTAL ROSION CONTROL MEASURES AS EQUIRED BY NC DEPARTMENT OF ~ - ~ ~ / TO PREVENT SOIL NVIRONMENTAL NATURAL RESOURCES D PREVENT SOIL EROSION AND i 1 l ~ n _ , r/" I DISCHARGE OF S I RUNOFF OR AIRB J J~.._.. dSCHARGE OF SOIL-BEARING WATER Landscape Architecture r t UNOFF OR AIRBORNE DUST TO 0 ~ ~ , ' _ r~Z ADJACENT PROP _J I ,DJACENT PROPERTIES, WALKWAYS, Land Planning wl - AND PROTECTED j ,ND PROTECTED NATURAL AREAS. 0 - ~ , _ i 3. UPON COMPL MSTALLMENTS, RE I _ - _ SEDIMENiATION . UPON COMPLETION OF PROPOSED 218 Snow Ave 1 JSTALLMENTS, REMOVE EROSION AND AND STABLIZE AR ~ ~ REMOVAL. EDIMENTATION CONTROLS. RESTORE Raleigh NC 27603 ,ND STABLIZE AREAS DISTURBED DURING EMOVAL. ~ a~ • E ~ I I i (919) 821-5074 c~ ~ fax (919) 821-5139 0 t 4 ~ i a Y: www.reynoldsjewell.com 1:/ I I Consultants: ,r ! I ~ i ~ j j - ~ - ~ ~ % l~ 1 ~ - ~ ~ 1 ~ 1 ~ ~ - / ~ / ~ ~ ~ ~ ~ ~ r 1` ~ ~ - i + / ~ ~ 1 i ~ ~ " ~ ~ j ~ i I ~ ~ J , i ~ ~ ~ ~ Y ~ ~ ~ , nl r l~~ ~+,~28~1`± r, i \ \ / ~ - ~ ~ J ~ ~ ~ 0 III MHA 1 ~ o~ `l ~ - - 1, o ~E) ~ ~ . J~ ti 1 1 ~ ~ ~ - av s ~ ~ g ~Z n~ ~ l~ ; ~ ~ ~ ~ ~ EXISTING PATH ~ ~ ~ d t _ ~ i ! i ! /i \ ~ ~ ` I I NEW ASPHALT PAVING; BETWEEN Seal: ~ ! ~ I a I/ ~ ~ 1 ~ \ ~ ~ \ ~ ~ NEW BRIDGE AND EXISTING PATH I ~ ~ r ,1 ~ ! ~ 1 ~ j" ! 1 ~ i ~ ~ , J ,~l ~ 1 i i J i ~ r ~ ~ ~ ~ ~ \ NEW BRIDGE; OFFSET 5' FROM SEWER LINE; POINT OF i j ~ ~ ~ ti ~ ! i; CC t LIMITS QF,~ ~ ~ ~ \ \ \ ~ BEGINNING AT INTERSECTION OF BRIDGE PHASE II ~ ~ ~ I ~ NORTHEAST CORNER AND EDGE OF EXISTING ~ 1 r ~ __----4_ a ~ NOT INCLUDED LUDED (INCLUDED IN ~ ~ ~ ~ GREENWAY; CONTINUE RIP RAP BANK STABILIZATION ~ ~ AND CARRY 10' SOUTH OF NEW BRIDGE ON BOTH I NORTH CREEK (TRACT CONTRACT) ~ 'I BANKS; ALIGN RIP RAP AT TOP AND BOTTOM OF BANK IN CONTRACT POND #1 0 ~ / I WITH EXISTING RIP RAP Project I t ~ ~ ' ~ ~ ~ I LIMITS OF PHASE II INCLUDE; SOIL BORING TESTS AT NCSU Centennial t~ t BRIDGE ABUTTMENT LOCATIONS, NEW BRIDGE, ASPHALT EXISTING RIP RAP BANK ~ f , ~ I~ / ' / / I PAVING NECESSARY TO MEET EXISTING PATH ON EAST Greenways Phase 2 ( STABILIZATION• TYP. / ~ { ~ ~ i Raleigh, North Carolina -tk ~ ~ j ,1 ~ ~ r S9 I f j ~ END ONLY, RIP RAP ON BANKS, AND RESEEDING ~E j 1. ~ r~ i .y ~r 0 t ~ ~ _ ~ ! I I DWQ STREAM IMPACT AREA #1 Client: / \ 35°46'04.22"N 78°40'47.68"W NC State University ~ ~ 0'-30' BUFFER ENCROACHMENT: 1,090SF I °'1 ;'fr }J ~ Project No.: 080004 ~f ~ ~ I' I ~ / 30'-50' BUFFER ENCROACHMENT: 0 SF ~ ~ ~ ~ r J ~ I I NEW TEMPORARY SILT FENCE; AT TOE . - t ' ~ „t J 1 II I ~ r ~ ~ I I / I I OF SLOPE, BOTH SIDES OF BRIDGE, f ~ I ' ~ BOTH SIDES OF BANK; TYP. t: s ~ ~ Q _ _ / j - / /';j~ / / a--~J~ o ~ ~ ~ ~ • ~ ~ ~ l".7q-~v r~ ~ ~T~~~ ~ r / / ~y / SCALE: 1" = 30'-0" . ~ i~ / / / g ~ , Y _ ~ ~ ~~y.` S ~~1 0.1F ~ ~F' { w ~ c ~ ~ ~ ~ .281 4 - _ , / N ~:+281± `L ~ .r'r ~ .r' o. ~ ~ k ~ ~ 3 ~ \ J ~ ~ ~ ~ ~ J O ~ . ~ ~ O ~o EXISTING PATH UU \ i ~ F. S/0 NEW ASPHALT PAVING; BETWEEN N I ~ NEW BRIDGE AND EXISTING PATH 284 2 UO 4 k ~~3 NEW BRIDGE; OFFSET 5' FROM SEWER LINE; POINT OF by ~o - ~ LIMITS 0 BEGINNING AT INTERSECTION OF BRIDGE ® NORTHEAST CORNER AND EDGE OF EXISTING PHASE II ~ 283 GREENWAY; CONTINUE RIP RAP BANK STABILIZATION NOT INCLUDED (INCLUDED IN 2ss ~ AND CARRY 10 SOUTH OF NEW BRIDGE ON BOTH ~ IN CONTRACT CONTRACT) BANKS; ALIGN RIP RAP AT TOP AND BOTTOM OF BANK WITH EXISTING RIP RAP 2s2 ~1 LIMITS OF PHASE II INCLUDE; SOIL BORING TESTS AT BRIDGE ABUTTMENT LOCATIONS, NEW BRIDGE, ASPHALT m PAVING NECESSARY TO MEET EXISTING PATH ON EAST END ONLY, RIP RAP ON BANKS, AND RESEEDING DWQ STREAM IMPACT AREA #1 i 35°46'04.22"N 78°40'47.68"W I ~ 0'-30' BUFFER ENCROACHMENT: 1,090SF 30'-50' BUFFER ENCROACHMENT: 0 SF - - NEW TEMPORARY SILT FENCE; AT TOE ~ ~ OF SLOPE, BOTH SIDES OF BRIDGE, BOTH SIDES OF BANK; TYP. _ s, 0 EXI TIN PARKIN AREA S G G AND BOAT DOCK UNDERGROUND UTILITIES NOTES LEGEND 1. LOCATIONS OF ANY UNDERGROUND OR OVERHEAD UTILITIES SHOWN ON THESE PLANS ARE PHASE IIB BEGINS HERE APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD PRIOR TO BEGINNING LAYOUT AND PRIOR TO ~ ~ ~ ~ NOT IN CONTRACT BEGINNING ANY CONSTRUCTION OPERATIONS, ALL CONTRACTORS AND SUB-CONTRACTORS WHO ARE IN TALL RIP-RAP DETENTI NBA IN AB VE S 0 S 0 MOVING EARTH & DIGGING IN THE GROUND SHALL HAVE ALL UTILITIES FIELD MARKED. PATH; CARY STORMWATER THROUGH (3) 24" ~ i - r ~ HALF PIPES UNDER PATHWAY INTO RIP RAP 2. THE CONTRACTOR SHALL INSPECT ALL EXISTING UTILITIES MARKED ON THE SITE. IF DISCREPANCIES ARE LEVEL PREADER 'f S , FOUND WHICH MAY AFFECT THE PROPOSED DESIGN, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH ANY AFFECTED WORK. EXISTING PATH NEW SILT FENCE NOTES EROSION CONTROL MAINTENANCE PROGRAM 1. ALL MEASUREMENTS ARE TAKEN AT 90 DEGREES, UNLESS NOTED OTHERWISE. .E PROGRAM/ INSPECTION SCHEDULE: ~ METAL BRIDGE 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE 2. SHOULD SITE CONDITIONS CHANGE, OR IF ANY DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE CONTRACTOR FOR STABILITY AND OPERATIONS FOLLOWING E' ACTICES WILL BE INSPECTED AND MAINTAINED BY JS FOLLOWING EVERY RUN-OFF PRODUCING RAINFALL BUT IN ARCHITECT FOR A WRITTEN DETERMINATION PRIOR TO PROCEEDING WITH AFFECTED WORK. NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIF YNEEDED REPAIRS OR SEDIMENT REMOVAL SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. FAIL > DESIGNED. FAILURE TO KEEP EROSION CONTROL DEVICES IN ~ 3. THE CONTRACTOR SHALL ERECT PEDESTRIAN BARRICADES AND FENCING WITH SIGNAGE AS REQUIRED TO PREVENT PEDESTRIAN GOOD WORKING ORDER MAY RESULT IN ISSUANCE OF A STOP ANCE OF A STOP WORK ORDER. \ INTRUSION INTO THE LIMITS OF WORK AT ALL TIMES. CONCRETE PATH 2. SEDIMENT SHALL BE REMOVED FROM BLOCK AND GRAVEL I ;K AND GRAVEL INLET PROTECTION DEVICE WHEN STORAGE 4. THE CONTRACTOR SHALL LOCATE ALL BASE LINES, LAYOUT DIMENSIONS, AND PERFORM LAYOUT STAKING PRIOR TO INSTALLING CAPACITY HAS BEEN APPROXIMATELY 5070 FILLED. GRAVEL SHE LED. GRAVEL SHALL BE CLEANED OR REPLACED WHEN THE ~ DD 1 1 /07/2007 SEDIMENT POOL NO LONGER DRAINS PROPERLY. IMPROVEMENTS. WHERE DISCREPANCIES ARE FOUND BETWEEN THE PLAN AND THE SITE CONDITIONS, THE CONTRACTOR SHALL CID 10/02/2008 INFORM THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. 3. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT JD THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP a AT THE FENCE. THE SEDIMENT FENCE SHALL BE INSTALLED AS NE INSTALLEDAS NECESSARYTO MAINTAIN A BARRIER. ~ ~ ~ - ~ ~ ` Issue: 5. CONTRACTOR SHALL REMOVE AND DISPOSE OF MATERIAL IN ACCORDANCE WITH CITY OF RALEIGH DUMPING REGULATIONS. ELEVATED BOARDWALK 1 1 4. ALL SEDIMENT SHALL BE REMOVED FROM A TEMPORARY SE[ PRIOR TO ITS REMOVAL. TEMPORARY CONTROL DEVICES SHAL ,TEMPORARY SEDIMENT OR EROSION CONTROL DEVICE ~ ~ OL DEVICES SHALL BE REMOVED BY STARTING UP STREAM OR ~ Drawn By: BM 6. LANDSCAPE ARCHITECT SHALL STAKE LOCATIONS OF PROPOSED WALKS PRIOR TO UP SLOPE TO INSURE SEDIMENT CONTROL DURING REMOVAL P JNG REMOVAL PROCESS. ~ Checked By: INSTALLAION. 1 , i r Scale: 5. ALL SEEDED AREAS SHALL BE FERTILIZED, RESEEDED AS NECE SEEDED AS NECESSARY, AND MULCHED ACCORDING TO ~ DENSE VEGETATIVE COVER. ~ ~ NEW A PHALT PATH ' 7. ALL PROPOSED WALKS ABUTTING EXISTING WALKS SHALL MEET FLUSH. ASPHALT PATH SPECTIFICATIONS TO MAINTAIN A VIGOROUS, DENSE VEGETATI S ,8 1 i 1 "=40'-0" 6. SEDIMENT MAY NOT BE DUMPED WHERE EROSION CAUSES P WITH 1 GRAVEL APRON OSION CAUSES AN UNSIGHTLY SCAR OR WHERE SEDIMENT ~ CAN REACH A STREAM. REMOVE SEDIMENT FROM THE DEVICE " BOTH SIDES ROM THE DEVICES AND PLACE IT IN A SUITABLE LOCATION. ~ 1 Drawing Title: GENERAL NOTE: SPREAD THE MATERIALTO UNIFORM DEPTH, SEEDAND STABLIZE 0'-30' BUFFER ZONE :ED AND STABLIZE IT. ~ " ~ " i i I ENCROACHMENT 7. NO LAND DISTURBING ACTIVITY BEYOND THAT REGUIREDTO FAT REQUIREDTO INSTALL APPROPRIATE EROSION CONTROL ~ I I 1 Layout Plan SURVEY PROVIDED BY OTHERS. EXISTING GRADES AND LOCATION OF EXISTING MEASURES MAY PROCEED UNTIL EROSION coNTRO~ MEASURE ~ ,090 Sq ft OWNER AND LANDSCAPE ARCHITECT. )NTROL MEASURES ARE INSPECTED AND APPROVED BY ~ " " , STRUCTURES AND UTILITIES MUST BE FIELD VERIFIED. PROPOSED WALKS, STRUCTURES, AND ~ ~ FINAL GRADES WILL BE DETERMINED IN FIELD. a. sEED oR oTHERwISE PROVIDE GROUND covER DEVICES o OVER DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN t " 30'_50' BUFFER ZONE EROSION FOR ALL EXPOSED SLOPES WITHIN 15 WORKING DAYS i WORKING DAYS OF COMPLETING ANY PHASE OF GRADING. ENCROACHMENT 9. INSTALL SILT FENCE AROUND ALL CATCH BASINS, DROP INLE 4SINS, DROP INLETS OR INLET STRUCTURES WITHIN THE Sheet No. : ALL WALKWAYS ARE TO BE ACCESSIBLE WITH SLOPES LESS THAN 5% WITHOUT HANDRAILS. ~ Sq ft CONSRUCTION/DISTURBED AREAS. 0 20 40 80 160 1,:' L~ 103 NOTES: OTES: 1. THE CONTRACTC THE CONTRACTOR SHALL VERIFY Reynolds EXISTING GRADES S (STING GRADES SHOWN ON THE PLANS PRIOR TO C( \NS PRIOR TO COMMENCING ANY WORK OPERATIONS DIRK OPERATIONS. & Jewell ~ EXISTING PARKING AREA \ 2. THE CONTRACTC THE CONTRACTOR SHALL PROVIDE ~ I AND BOAT DOCK EROSION CONTROL DSION CONTROL MEASURES AS REQUIRED BY NC DI DUIRED BY NC DEPARTMENT OF . ~ PHASE IIB BEGINS HERE ENVIRONMENTAL N VIRONMENTAL NATURAL RESOURCES. Landscape Architecture ~ INSTALL RIP-RAP DETENTION BASIN ABOVE ~ PATH; CARY STORMWATER THROUGH (3) 24" Land Planning HALF PIPES UNDER PATHWAY INTO RIP-RAP ~ ~ i LEVEL SPREADER 218 Snow Ave ~ ~ i ~ i ~-j ~ ~ ____,%I I ; ~ ~ i I~ I NEW SILT FENCE Raleigh NC 27603 (919) 821-5074 i fax (919) 821-5139 www.reynoldsjewell.com I ~ I T _ Consultants: - - - PHASE I (EXISTING) ENDS HERE - - \ ~ \ \ NEW ASPHALT PATH, 8' WIDE 'IDE ~ITH 1' GRAVEL APRON ON )N ~ ~ BOTH SIDES ~a Seal: . t k I Project NCSU Centennial Greenways Phase 2 LAKE RALEIGH Q~D~ VT Raleigh, North Carolina Client: ~ ' NC State University Project No.: / ~ ~ / / / / ~ / ~ ~ ~ ~ ~ / / \ ~ \ - / ~ ~ ~ ~ ~ ti ~ \ / / ~ / ,I ~ ~ / / ~ / \ r i i' ~ ~ \1 ~ , i ~ ~ ~ V ~ ' ~ ii , 1 t t 1 ~ 'ti 3 A ~1 1 - i UNDERGROUND UTILITIES NOTES 0 n 1. LOCATIONS OF ANY UNDERGROUND OR OVERHEAD UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD PRIOR TO BEGINNING LAYOUT AND PRIOR TO ;1 ~ ~ BEGINNING ANY CONSTRUCTION OPERATIONS, ALL CONTRACTORS AND SUB-CONTRACTORS WHO ARE \ MOVING EARTH & DIGGING IN THE GROUND SHALL HAVE ALL UTILITIES FIELD MARKED. , 0 2. THE CONTRACTOR SHALL INSPECT ALL EXISTING UTILITIES MARKED ON THE SITE. IF DISCREPANCIES ARE ` FOUND WHICH MAY AFFECT THE PROPOSED DESIGN, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH ANY AFFECTED WORK. I 1 y } I. } ~y__~_____ ~ v `l~ _ _ _ NOTES ' ` ~ I. 1. ALL MEASUREMENTS ARE TAKEN AT 90 DEGREES, UNLESS NOTED OTHERWISE. ~ , 7 2. SHOULD SITE CONDITIONS CHANGE, OR IF ANY DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ~ t 1 ARCHITECT FOR A WRITTEN DETERMINATION PRIOR TO PROCEEDING WITH AFFECTED WORK. fit, _ ~ ~ 'r 3. THE CQNTRACTOR SHALL ERECT PEDESTRIAN BARRICADES AND FENCING WITH SIGNAGE AS REQUIRED TO PREVENT PEDESTRIAN ZJ , y INTRUSION INTO THE LIMITS OF WORK AT ALL TIMES. ~ ~ y'~ , ~ ' 4. THE CONTRACTOR SHALL LOCATE ALL BASE LINES, LAYOUT DIMENSIONS, AND PERFORM LAYOUT STAKING PRIOR TO INSTALLING 7 r IMPROVEMENTS. WHERE DISCREPANCIES ARE FOUND BETWEEN THE PLAN AND THE SITE CONDITIONS, THE CONTRACTOR SHALL LEGEND INFORM THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. 5. CONTRACTOR SHALL REMOVE AND DISPOSE OF MATERIAL IN ACCORDANCE WITH CITY OF RALEIGH DUMPING REGULATIONS. I ~ 6. LANDSCAPE ARCHITECT SHALL STAKE LOCATIONS OF PROPOSED WALKS PRIOR TO INSTALLAION. ~ BOARDWALK ` DD 1 1 /07/2007 7. ALL PROPOSED WALKS ABUTTING EXISTING WALKS SHALL MEET FLUSH. O DDC R 1 /M/ 08 Issue: A PHALT PATH S , Drawn By: BM Checked By: ~ 4 Scale: ENERAL N TE~ G 0. 1 "=40'-0" BASE MAP IS A WAKE COUNTY GIS AERIAL MAP. EXISTING GRADES AND LOCATION 0-30' BUFFER ZONE F EXI TIN TR T RE AND TILITIE M T BE FIELD VERIFIED PR P ED WALK 0 SQ FT O S G S UC U S U S US 0 OS S, Drawing Title: STRUCTURE AND FINAL GRADES WILL BE DETERMINED IN FIELD. Layout Plan ALL WALKWAYS ARE TO BE ACCESSIBLE: 30-50 BUFFER ZONE 2.5% SLOPE WITHOUT HANDRAILS OR 0 S FT Q >5.8!33~ WITH HANDRAILS AT MAX 30'RUN AND 5' LANDINGS @2~ SLOPE ~ ) Sheet No. : ~ ~ 0 20 40 80 160 1 ! _ 1 ~ ~ L~ 104 1 , i ~ NOTES: OTES: / \ \ \ ~ 1 ~ \ 1. THE CONTRACT \ ~ ~ \ \ EXISTING GRADESS THE CONTRACTOR SHALL VERIFY Reynolds ti (STING GRADES SHOWN ON THE ti ti `P PLANS PRIOR TO C \ ~ \ ~ \ WORK OPERATION 2. THE CONTRACT / \ \ EROSION CONTROL \NS PRIOR TO COMMENCING ANY \1 DIRK OPERATIONS. & Jewell ti THE CONTRACTOR SHALL PROVIDE I DSION CONTROL MEASURES AS \ REQUIRED BY NC D \ \ \ ~ \ ENVIRONMENTAL N DUIRED BY NC DEPARTMENT OF l VIRONMENTAL NATURAL RESOURCES. Landscape Architecture t~ I / ~ Land Planning \ \ 218 Snow Ave Raleigh NC 27603 s t G) DWQ STREAM IMPACT AREA #2 I (919) 821-5074 '-30' BUFFER ENCROACHMENT: 1,360 SF fax (919) 821-5139 30'-50' BUFFER ENCROACHMENT: 985 SF www.reynoldsjewell.com 1 r4 - -'Y - - - BUFFER ENCROACHMENT NECESSARY FOR PATH Consultants: t 'x... - TO CROSS CULVERTED TEMPORAL STREAM 1t / i t SCOPE OF WORK; ACTUAL LIMITS OF WORK V~ ~ 1 SHALL BE A NARROW PATHWAY CONFINED TO XX EXTENTS ALONG PROPOSED PATH y ' p \ 7 ~ ~ ~ \ , ~ ~ ~ ~ ~ 1 , 1 ~ l } ~ ~ ~ I Seal: ~ ~ ` `I ~ . 4 I J \ ` ~ e i . ~ ~ ` 1 - ~ ~ ~ ~ i ` r r ~ Project NCSU Centennial _ ~ F . Greenways Phase 2 Raleigh, North Carolina t t ~ t t ~ I t ~ ~ - SCALE: 1" = 30' ~ . Client: ti, NC State University ~ 0 rJ ~ N Project No.: I ~ a N / ~ ~ NEW ASPHALT PATH CONNECTS I ~ T EXI TIN T NNEL 0 S G U NEW ASPHALT PATH 8' WIDE WITH 1' GRAVEL APRON ON EACH SIDE NEW SILT FENCE \ ~ ti, PEDEg~AN T / ~ ~ \ 'ti DWQ STREAM IMPACT AREA #2 r ~ ~ ~ ~ _ t 0'-30' BUFFER ENCROACHMENT: 1,360 SF ~ - 30'-50' BUFFER ENCROACHMENT: 985 SF i nr.i t BUFFER ENCROACHMENT NECESSARY FOR PATH TO CROSS CULVERTED TEMPORAL STREAM SCOPE OF WORK; ACTUAL LIMITS OF WORK ~ ~ I 1 I HALL BE A NARROW PATHWAY CONFINED TO ~ EXTENTS ALONG PROPOSED PATH ~ 1 ~ ~ ~ _ - - ~ a ~ \ ~ ~ ~ > ~ Ada . ~ r ` ~ i > ~ _ _ ~ ~ x ~ ~ ~ ~ , ~ ~ _ 1 ~ ~ n ~ ~ ~ ~ ~ ~ ~ .may r, UNDERGROUND UTILITIES NOTES 1. LOCATIONS OF ANY UNDERGROUND OR OVERHEAD UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD PRIOR TO BEGINNING LAYOUT AND PRIOR TO BEGINNING ANY CONSTRUCTION OPERATIONS, ALL CONTRACTORS AND SUB-CONTRACTORS WHO ARE MOVING EARTH & DIGGING IN THE GROUND SHALL HAVE ALL UTILITIES FIELD MARKED. 2. THE CONTRACTOR SHALL INSPECT ALL EXISTING UTILITIES MARKED ON THE SITE. IF DISCREPANCIES ARE FOUND WHICH MAY AFFECT THE PROPOSED DESIGN, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH ANY AFFECTED WORK. NOTES ~ p _ I ~ 1. ALL MEASUREMENTS ARE TAKEN AT 90 DEGREES, UNLESS NOTED OTHERWISE. ® ~ 2. SHOULD SITE CONDITIONS CHANGE, OR IF ANY DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT FOR A WRITTEN DETERMINATION PRIOR TO PROCEEDING WITH AFFECTED WORK. 3. THE CONTRACTOR SHALL ERECT PEDESTRIAN BARRICADES AND FENCING WITH SIGNAGE AS REQUIRED TO PREVENT PEDESTRIAN INTRUSION INTO THE LIMITS OF WORK AT ALL TIMES. 4. THE CONTRACTOR SHALL LOCATE ALL BASE LINES, LAYOUT DIMENSIONS, AND PERFORM LAYOUT STAKING PRIOR TO INSTALLING IMPROVEMENTS. WHERE DISCREPANCIES ARE FOUND BETWEEN THE PLAN AND THE SITE CONDITIONS, THE CONTRACTOR SHALL INFORM THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. LEGEND 5. CONTRACTOR SHALL REMOVE AND DISPOSE OF MATERIAL IN ACCORDANCE WITH CITY OF RALEIGH DUMPING REGULATIONS. 6. LANDSCAPE ARCHITECT SHALL STAKE LOCATIONS OF PROPOSED WALKS PRIOR TO INSTALLAION. D Dl~ I 7. ALL PROPOSED WALKS ABUTTING EXISTING WALKS SHALL MEET FLUSH. BOARDWALK /1/'02'/'2'008 Issue: Drawn By: BM Checked By: ASPHALT PATH Scale: GENERAL NOTE: 1 "=50'-0" BASE MAP IS A WAKE COUNTY GIS AERIAL MAP. EXISTING GRADES AND LOCATION Drawing Title: OF EXISTING STRUCTURES AND UTILITIES MUST BE FIELD VERIFIED. PROPOSED WALKS, 0-30' BUFFER ZONE Layout Plan STRUCTURE AND FINAL GRADES WILL BE DETERMINED IN FIELD. 1360 SQ FT ALL WALKWAYS ARE TO BE ACCESSIBLE: 2-5% SLOPE WITHOUT HANDRAILS OR 30'-50' BUFFER ZONE Sheet No. : >5.8.33% WITH HANDRAILS AT MAX 30'RUN AND 5' LANDINGS @2% SLOPE 985 SQ FT 0 25 50 100 200 105 NOTES: OTES: \ \ THE CONTRACTOR SHALL VERIFY Reynolds DWQ STREAM IMPACT AREA #4 1. THE CONTRACT BUFFER ENCROACHMENT NECESSARY FOR PANS ROR TO C PATHWAY TO CROSS TEMPORAL STREAM; `"°RK°`ER""°" 0'-30' BUFFER ENCROACHMENT: 1,100 SF 2. THECONTRACT 30'-50' BUFFER ENCROACHMENT: 761 SF EROSIONCONTROI (STING GRADES SHOWN ON THE \ \ BU \NS PRIOR TO COMMENCING ANY ~ P \ DIRK OPERATIONS. & Jewell THE CONTRACTOR SHALL PROVIDE DSION CONTROL MEASURES AS REQUIRED BY NC D ENVIRONMENTAL N DUIRED BY NC DEPARTMENT OF VIRONMENTAL NATURAL RESOURCES. NEW ELEVATED BOARDWALK; Landscape Architecture ~ MAX 30" HT. ABOVE GRADE Land Planning . ~ 218 Snow Ave • . Raleigh NC 27603 (919) 821-5074 Soil Test Site # 10 ~ DWQ STREAM IMPACT AREA #4 ~ fax (919) 821-5139 ` ~ Soil Test Site #11 ~ www.reynoldsjewell.com `Soil Test Site #12 ~ Consultants: \ ~ ~ 1 ir.Soil Test Site #14 Sp'_ / Soil Test Site #13` 0„ - / ~7 BUFFER ENCROACHMENT NECESSARY FOR PATHWAY TO CROSS TEMPORAL STREAM; ~ ~ ~ \ / ~ - , 0'-30' BUFFER ENCROACHMENT: 1,100 SF ~ 30'-50' BUFFER ENCROACHMENT: 761 SF ~ _ ~ \ / i ~ • ~ .sue ~ \ ~ ~ ` NEMAX 30"AHT. ABOVE BADE - „ \ ~ ~ ~ ~ ~ e 1 ~ ~ ~ ~ ~ - ~ _ ~a I'~Soil Test Site #10 ~ ~ ~ a - V ~ioil Test Site #11 `Tes` # ~ \ \ \ L Soil Tess Site # 1~ ` ~ \ ~ \ ~ ` ``SCALE: 1"= 30' ~ ~ ~ ~ ~ a~ ~ ~ ' ~ ' DWQ BUFFER IMP _ _ _ _ ~ ~ ~ ~ 0-30' BUFFER ENCROACHMEN =ER IMPACT AREA #3 - - - \ ~ ~ \CHMENT: 785 SQ FT ~ ~ \ ~ ~ ~ Y Seal: \ r_ I' 30-50' BUFFER ENCROACHME I ~ ~ NEW OBSERVATION DECK; ACHMENT: 283 SQ FT ~ ~ ~ ~ ~ ~ ~ - J DECK; HEIGHT MAY ~ ~ ~ ~ \ ~ - ~ ~ ~ EXCEED 30" GUARDRAI ' \ ~ ~ ~ ~ BUFFER ENCROACHMEN - - _ ~ ~ ~ (MEDIATE AREA AROU BOARDWALK AT EDGE OF S DWQ BUFFER IMPACT A AER #3 ` _ ~ \ \RDRAILS REQUIRED ~ \ \ . ,CHMENT LIMITED TO \ \ ~ ~ ~ ,AROUND ELEVATED ~ ~ ~ \ aE OF STREAM BANK ~ 0-30' BUFFER ENCROACHMENT: 785 SQ FT ~ ~ ~ . 30-50' BUFFER ENCROACHMENT: 283 SQ FT ~ ~ _ \ ~ \ \ ~ \ ~ Project NEW OBSERVATION DECK; HEIGHT MAY ~ ~ \ \ NCSU Centennial EXCEED 30" GUARDRAILS REQUIRED \ \ \ Greenways Phase 2 BUFFER ENCROACHMENT LIMITED TO ~ \ \ \ Raleigh, North Carolina (MEDIATE AREA AROUND ELEVATED ~ ~ BOARDWALK AT EDGE OF STREAM BANK ~ \ ~ \ \ \ \ Client: \ NC State University Project No.: / ~ ~ ~ ~ ~ \ \ \ ~ \ \ \ ~ . \ \ ~ ~ ~ ~ ~ ~ ~ \ ~ , ~ ~ ~ ~ ~ DWQ BUFFER IMPACT AREA #5 \ 0-30' BUFFER ENCROACHMENT: 1,045 SQ FT ~ ~ ~ ~ 30-50' BUFFER ENCROACHMENT: 853 SQ FT \ \ ` ~ ~ NEW 30' ELEVATED BOARDWALK; ~ ~ ~ \ ~ MAX 30" HT. ABOVE GRADE ~ ~ ~ ~ ` BUFFER ENCROACHMENT NECESSARY FOR \ ~ \ \ \ ~ ~ ~ ~ PATH TO CROSS TEMPORAL STREAM ~ ~ ~ ~ ~ \ \ ~ ~ ` I I NEW SILT FENCE ~ ~ ~ ` ` I \ \ ~ \ ice; ~ ~ ~ ~ ~ \ \ ~ ~ ~T \ t ~ 1 \ _ << a i I~ r ~ i t i a i ~ a a \ ~ ~ j~ I ~ t i r r I~ ~ r' ~ 1~ SCALE: 1" = 30' I ~ a ~ a l ~ ~ ~ 1 } a ~ ~ ~ a a ~ ~ ~ \ ~ ~ I i ~ ~ I ~ ~ ~ . I I ~ ~ UNDERGROUND UTILITIES NOTES 1. LOCATIONS OF ANY UNDERGROUND OR OVERHEAD UTILITIES SHOWN ON THESE PLANS ARE ~ ~ APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD PRIOR TO BEGINNING LAYOUT AND PRIOR TO ~ ~ DWQ BUFFER IMPACT AREA #5 \ ~ BEGINNING ANY CONSTRUCTION OPERATIONS, ALL CONTRACTORS AND SUB-CONTRACTORS WHO ARE << \ -30' BUFFER ENCROACHMENT: 1,045 SQ FT ~ ~ ~ MOVING EARTH & DIGGING IN THE GROUND SHALL HAVE ALL UTILITIES FIELD MARKED. I ~ 30-50' BUFFER ENCROACHMENT: 853 SQ FT ~ ~ . ~ 2. THE NTRA T R HALL IN PE T ALL EXI TIN TILITIE MARKED N THE ITE. IF DI REPAN IE ARE a CO C O S S C S G U S 0 S SC C S , \ ~ ~ NEW 30' ELEVATED BOARDWALK; ~ \ ~ 1 FOUND WHICH MAY AFFECT THE PROPOSED DESIGN, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE 1 ARCHITECT PRIOR TO PROCEEDING WITH ANY AFFECTED WORK. a ~ a \ MAX 30" HT. ABOVE GRADE ~ ~ ~ ~ ~f 1 f ' BUFFER ENCROACHMENT NECESSARY FOR \ ~ ~ NOTES ~ t 1. ALL MEASUREMENTS ARE TAKEN AT 90 DEGREES, UNLESS NOTED OTHERWISE. i { PATH TO CROSS TEMPORAL STREAM ~ ~ ~ ~ i ' a a ~ , 2. SHOULD SITE CONDITIONS CHANGE, OR IF ANY DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT FOR A WRITTEN DETERMINATION PRIOR TO PROCEEDING WITH AFFECTED WORK. i I I ANEW SILT FENCE - - ~ ~ I ~ r 3. THE CONTRACTOR SHALL ERECT PEDESTRIAN BARRICADES AND FENCING WITH SIGNAGE AS REQUIRED TO PREVENT PEDESTRIAN ~ , ~ ~ ~ ~ ~ INTRUSION INTO THE LIMITS OF WORK AT ALL TIMES. ~ , ~ ~ ~ , x 4. THE CONTRACTOR SHALL LOCATE ALL BASE LINES, LAYOUT DIMENSIONS, AND PERFORM LAYOUT STAKING PRIOR TO INSTALLING ~i IMPROVEMENTS. WHERE DISCREPANCIES ARE FOUND BETWEEN THE PLAN AND THE SITE CONDITIONS, THE CONTRACTOR SHALL LEGEND INFORM THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. ~ ~~Soil Test Site # 5. CONTRACTOR SHALL REMOVE AND DISPOSE OF MATERIAL IN ACCORDANCE WITH CITY OF RALEIGH DUMPING REGULATIONS. x DID 1 1 /07/2007 6. LANDSCAPE ARCHITECT SHALL STAKE LOCATIONS OF PROPOSED WALKS PRIOR TO ' ~ ~ ~ DID WO0 =7/2008 INSTALLAION. ~ x ~ ELEVEATED BOARDWALK r'! x x a .x~~\ ~ Issue: 7. ALL PROPOSED WALKS ABUTTING EXISTING WALKS SHALL MEET FLUSH. , , f Drawn By: BM Checked By: E ~ I w~>, ~ Scale: ASPHALT PATH i GENERAL NOTE: x ~ , ~ ~ ~ 1 "=40'-0" a BASE MAP IS A WAKE COUNTY GIS AERIAL MAP. EXISTING GRADES AND LOCATION x Drawing Title: 1 ~ OF EXISTING STRUCTURES AND UTILITIES MUST BE FIELD VERIFIED. PROPOSED WALKS, x 0-30' BUFFER ZONE ~ , Layout Plan STRUCTURE, AND FINAL GRADES WILL BE DETERMINED IN FIELD. 2,145 SQ FT I . / ~ ~ \ ~ 1 f~y \ \ \ ALL WALKWAYS ARE TO BE ACCESSIBLE: 2.5% SLOPE WITHOUT HANDRAILS OR ` ~ \ ~ \ ~ . v Sheet No. : >5-8.33% WITH HANDRAILS AT MAX 30'RUN AND 5' LANDINGS C~2% SLOPE 30'-50' BUFFER ZONE 1,614 SQ FT WALKWAYS HIGHER THAN 30" ABOVE GRADE MUST HAVE GUARDRAILS ~ ~ \ ~I SCALE:1"=30' 0 20 40 80 160 \ ~ I L~ 106 1 a NOTES: OTES: 1. THE CONTRACT EXISTING GRADES S THE CONTRACTOR SHALL VERIFY Reynolds (STING GRADES SHOWN ON THE PLANS PRIOR TO C WORK OPERATIO 2. THE CONTRACT EROSION CONTROL \NS PRIOR TO COMMENCING ANY DIRK OPERATIONS. & Jewell THE CONTRACTOR SHALL PROVIDE DSION CONTROL MEASURES AS REQUIRED BY NC D ENVIRONMENTAL N DUIRED BY NC DEPARTMENT OF VIRONMENTAL NATURAL RESOURCES. ~ Landscape Architecture Land Planning 218 Snow Ave ~ ~ Raleigh NC 27603 (919) 821-5074 fax (919) 821-5139 www.reynoldsjewell.com Consultants: ~ ~ \ ` / ~ \ DWQ BUFFER IMPACT AREA #6 0-30' BUFFER ENCROACHMENT: 1,886 SQ FT ~30-50' BUFFER ENCROACHMENT: 2,254 SQ FT \ ~ BUFFER ENCROACHMENT NECESSARY FOR PATH TO CROSS TEMPORAL STREAM \ \ ~ NEW 20' ELEVATED BOARDWALK; \ ~ MAX 30" HT. ABOVE GRADE ' ~ ~ ~ \ Seal: . . ~ / ~ s_~.: 1 i ' Project ~ ~ ~ NCSU Centennial Greenways Phase 2 Raleigh, North Carolina ~ ~ I~ O ~ ~ . ~ Client: 1 ~ 0 0~ NC State University Project No.: ~ i ~i', ~ ~ ~ ` ~ \ ERNATE PATH ~ ~ ' i I 1 ~ . \ ` ~ ~ ~ , ~ I ~ ~ ~ ~ ~ \ NEW ASPHALT PATH; 8' WIDE WITH 1' ~ ~ ~ \ \ ~ ` `SOO- ABC APR\ ON EACH SIDE \ t(Soil Test Site #15 \ \ ~ v ~ SCOPE OF WORK; ACTUAL LIMITS OF WORK HALL BE A NARROW PATHWAY CONFINED TO GREENWAY PATH ENDS AT ^ ` EXTENTS ALONG PROPOSED PATH TUNNEL CONNECTION v~^~ ~ \ ~ (Soil Test Site #16 \ SO'~~ \ ~ \ ~ \ \ - r ` NEW SILT FENCE SCALE: 1" = 30' ` 'Y \ AREA #6 \ ~ ` \ ~ ~ 0-30' BUFFER NC OACHMENT: ~ ~ ~ 30-50' BUFFER ENCROACHMENT: \ ~ \ ` ' \ BUFFER ENCROACHMENT NECE \ ~ ~ \ ` ` ~ PATH TO CROSS TEMPORAL STR ~ \ ~HMENT: 1,886 SQ FT \CHMENT: 2,254 SQ FT TNT NECESSARY FOR ORAL STREAM ~ \ ~ ` ` NEW 20' ELEVATED BOARDWALK; ARDWALK; ~ ~ ~ ~ ~ MAX 30" HT. ABOVE GRADE ADE ` e. ` ~ ~ . . { i ` UNDERGROUND UTILITIES NOTES ~ l / ~ ~ / ti, ~ 1 ~ ~ ~ ~ 1. LOCATIONS OF ANY UNDERGROUND OR OVERHEAD UTILITIES SHOWN ON THESE PLANS ARE y x ~ APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD PRIOR TO BEGINNING LAYOUT AND PRIOR TO ~ ~ ~ 'OO ~ ~ BEGINNING ANY CONSTRUCTION OPERATIONS, ALL CONTRACTORS AND SUB-CONTRACTORS WHO ARE MOVING EARTH & DIGGING IN THE GROUND SHALL HAVE ALL UTILITIES FIELD MARKED. r' ' ~ , ~ PO 2. THE CONTRACTOR SHALL INSPECT ALL EXISTING UTILITIES MARKED ON THE SITE. IF DISCREPANCIES ARE ~ ~ r ~O FOUND WHICH MAY AFFECT THE PROPOSED DESIGN, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE f ARCHITECT PRIOR TO PROCEEDING WITH ANY AFFECTED WORK. ,f ~ ~ M ' / NOTES _ - - - 1. ALL MEASUREMENTS ARE TAKEN AT 90 DEGREES, UNLESS NOTED OTHERWISE. - ~ \ / ' 2. SHOULD SITE CONDITIONS CHANGE, OR IF ANY DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ~ ARCHITECT FOR A WRITTEN DETERMINATION PRIOR TO PROCEEDING WITH AFFECTED WORK. ~ 3. THE CONTRACTOR SHALL ERECT PEDESTRIAN BARRICADES AND FENCING WITH SIGNAGE AS REQUIRED TO PREVENT PEDESTRIAN ~ INTRUSION INTO THE LIMITS OF WORK AT ALL TIMES. ~ 4. THE CONTRACTOR SHALL LOCATE ALL BASE LINES, LAYOUT DIMENSIONS, AND PERFORM LAYOUT STAKING PRIOR TO INSTALLING IMPROVEMENTS. WHERE DISCREPANCIES ARE FOUND BETWEEN THE PLAN AND THE SITE CONDITIONS, THE CONTRACTOR SHALL / INFORM THE LANDSCAPE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. LEGEND 0 ~ GREENWAY PATH ENDS AT 5. CONTRACTOR SHALL REMOVE AND DISPOSE OF MATERIAL IN ACCORDANCE WITH CITY OF RALEIGH DUMPING REGULATIONS. TUNNEL CONNECTION 6. LANDSCAPE ARCHITECT SHALL STAKE LOCATIONS OF PROPOSED WALKS PRIOR TO INSTALLAION. ELEVATED BOARDWALK 7. ALL PROPOSED WALKS ABUTTING EXISTING WALKS SHALL MEET FLUSH. ~ DID 1 1 /07/2007 ASPHALT PATH D E~-- Q 1 W=008 GENERAL NOTE: Issue: Drawn By: BM BASE MAP IS A WAKE COUNTY GIS AERIAL MAP. EXISTING GRADES AND LOCATION 0-30' BUFFER ZONE Checked By: OF EXISTING STRUCTURES AND UTILITIES MUST BE FIELD VERIFIED. PROPOSED WALKS, 1,886 SQ FT Scale: STRUCTURE, AND FINAL GRADES WILL BE DETERMINED IN FIELD. 1 "=40'-0" ALL WALKWAYS ARE TO BE ACCESSIBLE: Drawing Title: 2-5% SLOPE WITHOUT HANDRAILS OR 30'-50' BUFFER ZONE 2,254 SQ FT >5.8.33% WITH HANDRAILS AT MAX 30 RUN AND 5 LANDINGS (@2% SLOPE) Layout Plan Sheet No. : J 1 0 20 40 80 160 L~ 107