Loading...
HomeMy WebLinkAbout20070124 Ver 1_Site Inspection_20081002O?O? W AT F9?G September 29, 2008 Mr. J. J. Swain, Jr., P.E. Division Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Subject: Inspection NC Highway 146 Widening DWQ Project No. 070124 TIP Project No. R-2813B Buncombe County Dear Mr. Swain: On September 11, 2008, I visually inspected the construction work on the NC Highway 146 project (Long Shoals Road) in Buncombe County. It appears that most of the rough grading work has been completed. Work has started on new west bound on and off ramps at the intersection of Interstate 26 and NC 146. Construction of the new bridge over the French Broad River is underway with bents being constructed on the east side of the river. Work is underway for the widening of NC146 on the west side of the French Broad River. The project appears to be in good condition. Please continue to maintain the sediment and erosion control structures so that State surface waters can be protected. Please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828.296.4500. Sincerely,, o D ' -,-w? ta Michael R. Parker Environmental Senior Specialist Attachment cc: Roger Bryan, Division 13, DEO Ronnie Clark, Resident Engineer Ed Ingle, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office hCarolma (Swain) NC Highway 146 Inspection Letter September 2008 No One Naturally North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 2964500 Customer Service Internet: www.ncwaterquality.org FAX (828) 299-7043 1-877-623-6748 4V UM GcT F.110G F. Easley, Governor 11yy?? .0 RossJr., Secretary No'gaa(? artment o & d Natural Resources o qT? ?QeQ(/Coleen H. Sullins, Director Rv2Y Division of Water Quality An Equal Opportunity/Affirmative Action Employer DW_ Q Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: September 11, 2005 uncombe Region: Asheville County: B F DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 4014:1 07-0124V.5 NW Permit IP Project Name: Location of Project: I NC Highway 146 Widening NC Highway 146 Long Shoals Road From west of NCSR 2501 to east of I-26 in Buncombe County Project Complete: ?Yes X No Activities (DOT): X? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit X? Wetland Mitigation ? Stream Restoration X? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other Fill If no, estimated date of completion: Water Quality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: x0 yes ? no Estimate 0.40 acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited DWO Site Visits for DOT Projects Background Info Name of Waterway(s) French Broad River and two unnamed tributaries to FBR. Basin/ Subbasin: FBR 040302 Wetland Type: []Isolated X[]Non-Isolated (Waters of US) Stream Class: []Class B ?303d Listed ?WS-II ?WS-V ?SB X?Class C ?ORW []Trout ?WS-III []NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert []Bottomless Culvert X?Bridge []Bottomless Arch X?Riprap Inlet/Outlet Stabilization X[]Fill Authorized Wetland Impacts: ?0 - 1/10`h acre X?1/1 ld' to 1/3`d acre X? 1 /3`d to 1.0 acre ?> 1.0 acre Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet Additional comments: 0.38 acres of wetlands and 467 linear feet of stream mitigation through EEP. On site stream relocation of 78 linear feet of ut to FBR at Site 2. Work underway a new bridge over FBR. One bent on east side of river compete and one under construction. New westbound on and off ramps at intersection of I-26 and NC 146 under construction along with two retaining walls at the northeast corner of the project. Construction continuing along widening part of NC 146 on west side of French Broad River. Continue to maintain erosion control devices and continue with seeding and matting as required. Project looked to be in good condition and shape.