Loading...
HomeMy WebLinkAbout20170848 Ver 1_Build Maps_20170710�M `�J � N V •, � V � � O V See Sheet 9-A For Index of Sheets ����� �� ����1Lll �������� �� V ll���l/�'� �� �1.L�1LJY�� 1l � WILI�ES C � U1�T Y LOCATI011L• BRIDGE 1110. 960403 f� 960700 OVER LITTLE CREEK 0111 SR 1302 (CASEYS BRANCH RD.) TYPE OF WORK GRADI11lG, DRAI11tAGE, PAVIIVG � STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT '� 0 \ LREV-ULV�x1+ �� ���� \V�� �.�,�,z�a � � � �',� 96040� SITE : \ l � . �'d -LREV- SITE 1 \ ,\ \� � �_ ��, - \ _��y�� yi� G BE IN CULVERT -LREV- ST .13 +2 + BEGIN PROJECT 17BP.II.R.120 -L- POT STA.10 + 96.00 THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. GRAPHIC SCALES 30 15 0 30 60 PLANS 30 15 0 30 60 PROFILE (HORIZONTAL) DESIGN DATA ADT 2016 = 100 ADT FY = WA DHV = WA � = w,a T = 6 % * V = 25 MPH * (TTST =3% + DUAL =; FUNC CLASS = RURAL LOCAL SUBREGIONAL TIER PROJECT LENGTH + CUL_VERT �7"A.13"+ 6�+/- 960700 _ � SITE 3 � �� � � -� % DEAD ;%',��` / �_= END ��� � � ,� �` � END CULVERT - . + 3 +/- /- DET- PT Sta. l2 + 73.17 _ -LREV- POC STA.16 + END LENGTH ROADWAY PROJECT DB118-960403 & 960700 = 0.099 MILES LENGTH STRUCTURE PROJECT DB11B-960403 & 960700 = 0.015 MILES TOTAL LENGTH PROJECT DB11B-960403 & 960700 = 0.114 MILES NCDOT COIVTACT.• VIRGINIA MABRY MANAGER - PR70RITY PROJECTS UNIT -L- POC STA. l7 + 00. DO _�sRs 200� r1P�� GR\D N PERMIT DRAWING STATe PROJe� REFeRe^'Oe N° SHEET 1 OF 10 �a�v, 17BP.��.R.�ZO 17BP.11.R.120 SHEET TOTA� fiXEETS � , UTIL., fLW CONST. MOUNTAIN CREEK CONTRACTORS, INC. 205 EAST CENTRAL AVENUE CATAWBA. NC 28609 � 1223 Jones Franklin Rd. � Raleigh, N.C. 27606 �j ETHERILL ���e�se No.F-0377 ENGINEERING Bus: 919 851 8077 Faz: 919 851 8107 TRANSPoRlAT/ON PLANNING/DES/GN - BR/OGE/STRUCTURE DES/GN CNIL/SITE DESiGN - Gl5/GPS - CONSTR(/CTION OBSERVATION BRIDGE'S #960403 £� #960700 EXPRESS DESIGN BUILD: DIVISION lIB - YEAR S Prepored for: DII�ISION OF HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 27610 20/2 STANDARD SPECIF/CATIONS RIGHT OF WAY DATE: EDWARD G.. WETHERILL, PE PROJECT ENGlNEER MAY 17, 2016 LETTING DATE: GREG S. PURVIS, PE MAY 17� ZO�6 PROJECT DESIGN GNG/NLGR PRELIMI11tARY R�ADWAY PLA1�S BRIDGE #: S UBMITTAL #: SUBMITTAL DATE: 1�I$lE1LdA�i[dN�lEB� �1L�N� DO NOT USF. FOR CONSTRUCTiON ll1W'1��1�'ll�1L� ll ll� 1C1La-ilLV � DO NOT USE FOR RdW ACqU15IT10N �OCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. 960403 £� 960700 E-003 09 /23 /16 DETAIL D RIP RAP AT EMBANKMENT ( Nor ro scale) 10'min.-Y �- Ditch 1.0'min. 1 Grade � 7'S � GEOTEXTILE � Longitudinal Slope=l.5 Fi�Ft. Type of Liner= 17 TONS,CL I Rip-Rap Geotextile= 24 Sq. Yds. -LREV- STA. 11 + 50 (RT) DETAIL E INLET CHANNEL TYPICAL �LT TO RT LOOKING OOWNSTREnM) (NOT TO SCAIf� COIR FI9ER MATfING EXCAVATE ON OENCH CtA55 IRIP ftAP TRANSITION FROM WITH GEOTE%TILE APPROX.38'UPSTREAM N.G. DEPTH VARIES OF INLFT BED ELFV. 1396.30' 2 TO EIEV �� 1395.80' ELEV.-1 ]96.8' AT PROP RCBC INLET fILL =501L AND SEEDS �1 FT. THICK) CLASS IRIP RAP C1n55 B RIP RAP WITH GEOTEXTIIE WITH GEOTfXiILE (1 FT. THICK� CHANNEL WIDTH VARIES BENCH WIDTH VARIES FROM E%ISTING CHANNEL FROM 0' TO 9.5' BASE WIDTH TO il' WIDE (SEE PtAN vIEW) (SEE PLAN VIEW� CLASS I RIP 2AP WITH GFOTEXTILE 'NOTE TRANSITION ALONG FXTENTS ]�.1 StOPE TO FXISiING BANK StOPE -GROSS SECTION VIEW- <- FLOW FILL -501L ANp SEEDS EXCAVATION �t FT. THICK) COI�R FIBER TfING CLASS B ftIP RAP WITH GEOTEXiILE EXISTING GROUND 2' TALL SILL �i FT. TMICK) Est Closs B Rip Rap - 16 Tons �o FT Esf Soil with Seeds - 12 . yd. Est Coir Fiber Matting - 17 sq. yd. Est CI I RR - 42 Tons Esf GeoTezfile Fobric - 108 sq. yd. -PROFILE VIEW- Es} ooe - sa ��. yd. DETAIL F OUTLET CHANNEL TYPICAL �LT TO RT LOOKING DOWNSTREAM) �NOT TO SCALf) COIR FIBER MATfING EXCAVATE ON BENCH CL455 IRIP R4P TRANSITION FROM Ol1iLE! �✓ITH GEOTE%TILE OF PROPOSED RCBC TONG. OEPiH VARIES APPROX Sl' POWNSTRE OF OUTLET fROM OUTLEf � �. EtEV = 1,39].3'to BEO ELEV.=1,393.3' ELEV. = 1,39].1' FILL =501L AND SEE�S (1 FT.THICK� CUSS IRIP RAP CV+SS B RIP RAP WITH WITH GEOTfXfILF GfOTEXTIIE �1 FT.THICK) CHANNEL WI�TH VARIES FROM BENCH WI�TH vqRiES 11' Wi�E AT OUTLET TO FROM �' TO 9 5' E%IST�NG CHANNEL WIDTH �SEE PLAN VIEW� �SEE PUN VIEW) Ctn55 I RiP RAP WITH GEOTEXTIIE 'NOTF TRANSITION ALONG EXffNTS ]�.1 StOPE TO f%ISiING BANK SLOPE -CROSS SECTION VIEW- E%CAVATION � FLOW FILL -501L AND SEED'. COIR FIBER �l FT.THICK) MATTING EXISTING GROUND C1A55 B RIP RAP WITH GEOTEX�ILE Z�TqLL51LL Esi Closs 8 Rip Rop - 74 Tons �� F�-���cK� Est Soil wifh Seeds - 10 . yd. io �r Est Coir Fi6er Matting - 32 sq. yd. Est CI I RR - 85 Tons Est GeoTexfile Fabric - 190 sq. yd. Est DDE - 53 ��. yd. _pROFILE VIEW- DETAIL J CHANNEL REALIGNMENT ( Not to $cale) Natural Nat�ral Ground \ .� ,L.1 Ground f/o\ r D d Min. D= 1 A Ft. �er \� Min. d=D B � Coir Fiber B= 4.0 Ft. Matting Est. 26 C.Y. of Coir Fiber Matting Slope=5.0% -L- STA. 16+12.5 TO STA. 16+45(LT) DETAIL H INLET CHANNEL TYPICAL (�T TO RT LOOHING DOWNSTREAM� �NOT TO SCALE) COIR FIBER MATTING ON BENCH CLA55 I RIP RAP E%CAVATE WITH GEOTE%TILE � TRANSITION FROM BEO TRANSITION FROM ELEV.1403.10 APPRO%. NG, APPROX.50'UPSTREAM 50' UPSTREAM TO INLET OF INLEi BED BENCH ELEV. - 1 60310' ELEV.=1,60].3' TO ELEV = 1 A0130' FILL =501L AND SEEDS AT PROP RCBC INLET (l Ft.iHICK� CUSS B RIP RAP CtASS I RIP RAP NITH GEOTEXfILE �l FT. THICK) WITH GEOTEXTILE BENCH WIDiH VARIES CNANNEL WIDTH VAftIES FROM 0'TO 85' FROM E%ISTING CHANNEL �SEE PLAN VIEW) BASE WIDTH TO 10' WIDE CL4S5 IRIP RAP WITH GEOTEXTILE �SEE PLnN VIEW� `NOTE TRANSITION ALONG EXTENTS 2:1 SLOPE TO EXISTING BANK SLOPE -CROSS SECTION VIEW- E FLOW FILL =SOIL AND SEEDS EXCAVATION �l FT. THICK) COI�R FIBER TTING tt CLASS B RIP RAP wITH GEOTEXiILE E%ISTING GROUND 2' TALt SILL (1 FT. THICK) Est Class B Rip Rap - 10 Tons io Fi Est Soil with Seeds - 7 cu. yd. Es� Coir Fiber Moifing - 24 sq. yd. Est CI I RR - 75 Tons Est GeoTex}ile Fa6ric - 771 sq. yd. -PROFILE VIEW- Es+ ooe - 92 c�. yd. DETAIL I OUTLET CHANNEL TYPICAL (LT TO RT IOONING DOWNSTREAM� COIR FIBER MATTING INOT TO SCALF) ON BENCH EXCAVATE CLA55 I RIP RAP 1 WITH GEOTEXTILE I TRANSITION FROM OUTLET DEPTH VARIES iJ pF PROPOSED RCBC TO N'�'- PRO% 35' DOWNSTREAM . OF OUTLET FROM OUTLET INV = 1 400.30' �o BFD FLl =501L AND SEE�S ELEV. �- 1,398.9' (1 FT. THICK) � p� CLA55 I RIP RAP CIASS B RIP RAP WITH wITH GEOTEXTILE GEOiE%TILE �l FT. iHICK� BfNCH WIDTH VARIES CHANNEt WI�TH VARIES FROen FROM 0' TO 8.5' 10' WIDE AT OUTLET TO (SEE PIAN VIEW) EXISTING CHANNFL WI�TH CLA55 I RIP RAP �SEE PLAN VIEW� WITH GEOTEXiILE 'NOTf TRANSRION ALONG F%TENTS �:1 SLOPF TO EXISTING BANK SLOPE -CROSS SECTION VIEW- <- FLOW EXCAVqTION FIIL =SOIL AND SEEDS COIR FIBER (1 FT. THICK; MATTING ) E%ISTING GROUND CLA55 8 RIP RAP WITH GEOTEXTILE 2� TALL SILL Est Closs B Rip Rop - 9 Tons �� F�. ���cK� Esf Soil wifh Seeds - 7 yd. w Fr Es} Coir Fiber Mo}iing -�76 sq. yd. Est CI I RR - 34 Tons Esf GeoTextile Fabric - 79 sq. yd. Esf DDE - 47 ��. yd. _pROFILE VIEW- DETAIL 960403 (NOT TO SCALE) SKEWED MULTI-BARREL CULVERT LOW FLOW CHANNEL,SILLS AND FLOOD PLAIN *NOTES: 1) NATIVE MATERIAL BETWEEN SILLS IN THE NWERT SHALL PROVIDE A CONTINUOUS LOW FLOW CHANNEL. NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM AT THE PROJEGT SITE DURING CONSTRUCTION.ONLY MATERIAL THAT IS EXCAVATED FROM THE STREAM BED MAY BE USED TO LINE THE LOW FLOW CULVERT BARREL. RIP-RAP MAY BE USED TO SUPPLEMENT THE NATIVE MATERIAL IN THE HIGH FLOW NLVERT BARREL 5�. IF RIP-RAP IS USED TO LINE THE HIGH LOW CULVERT BARREL(S), NATIVE MATERIAL SHOULD BE PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE FOR ANIMAL PASSAGE NATIVE MATERIAL IS SUBIECT TO APPROVAL BY iHE ENGINEER AND MAY BE SUBJECT TO PERMIT CONDITIONS. 2) SILLS ARE TO BE 1.0 FT. WIDE, CAST SEPARATELY AND ATTACHED BY DOWELS. 3) TOP OF LOW fLOW SILLS SHOULD MATCH STREAM BED ELEVATION IN LOW FLOW CHANNEL OF STREAM. (THALWEG) 4) DO NOT SET ELEVATION OF HIGH SILLS ABOVE BANK FUIL. 5) NUMBER OF SILLS DETERMINED BY THE ENGINEER. FLOOD �N� J �, BENCH e I ...�...— tNa�wec 'L' ./ ... _..._•. �— 71.0' —�1 FILL WITH NATIVE M TO $ILL HEIGHT ' 0 ,�L NI I -3" siu �nP.� 5.0' SILLS AT INLET AND OUTLET JB 1 � F \� FLOOD PLAIN I BENCH L \TB_ � � THALWFG �,_3„� ..._...� NUMBER OF SILL5=10 ON 10.5 FT MAX CENTERS FROM DOWNSTREAM SILL PLAN VIEW FiC� PERMIT DRAWING SHEET 2 OF 10 DETAIL 960700 �NOT TO SCALE) SKEWED MULTI-BARREL CULVERT LOW FLOW CHANNEL,SILLS AND FLOOD PLAIN 'NOTES: 1) NATIVE MATERIAL BETWEEN SILLS W THE NWERT SHALL PROVIDE A CONTINUOUS LOW FLOW CHANNEL. NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM AT THE PROIECT SITE DURING CONSTRUCTION.ONLY MATERIAL THAT IS EXCAVATED FROM THE STREAM BED MAY BE USED TO LINE THE LOW FLOW NWERT BARREL. RIP-RAP MAY BE USED TO SUPPLEMENT THE NATIVE MATERIAL IN THE HIGH FLOW NLVERT BARREL(S). IF RIP-RAP IS USED TO LINE THE HIGH FLOW CULVERT BARREL(S�, NATIVE MATERIAL SHOULD BE PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE FOR ANIMAL PASSAGE. NATIVE MATERIAL IS SUBJECT TO APPROVAL BY THE ENGINEER AND MAY 8E SUBIECT TO PERMIT CONDITIONS. 2) SILLS ARE TO BE 1.0 FT. WIDE, CAST SEPARATELY AND ATTACHED BY DOWELS. 3) TOP OF LOW FLOW SILLS SHOULD MATCH STREAM BED ELEVATION W LOW FLOW CHANNEL OF STREAM. (THALWEG) 4) DO NOT SET ELEVATION OF HIGH SILLS ABOVE BANK FULL. 5) NUMBER OF SILLS DETERMINED 8Y THE ENGINEER. {HPLWEG L r-10.0' —�1 SILLS AT INLET AND OUTLET •�� BAGK FILL WITH NATIVE MATERIAL TO SILL HEIGHT $ILL $ILL \TB_TB 1' 1' FLOOD PLAIN NUMBER OF SILLS=3 BENCH ON Ib Ff - 6 IN CENTERS FROM q5 SILL PLAN VIEW OD PL41N BENCH � ■ ■■■■ ���� � e:vi ��� �� :' ; �:0�; , � •, �■�■■ .�v�... �• � .� �� ���II ��!�� ■ ■■■■ ���� � e:vi ��� �� :' ; �:0�; , � •, �■�■■ .�v�... �• � .� �� ���II ��!�� PERMIT DRAWING SHEET 5 OF 10 CU LVERT 960403 �-� oo �-�, 50 �-�, oo �-� 0 50 , o , 0 2 0 ��_ � _ _ ---_ _ � .___�._ _ -: � � � i __ ___ ___ ___ - i - _ - -. E � -_-- -- ' I rn���� _ ��1E?S� - I i 1I _ _ -- ° �� _ � I�-�1 I li� �I_I . - , � � I I I-L��1 � � � _ -���� � G�� _ �/t1`1 1 I B_ IE ��__ T__ T 1; C�iTM� T BAR E � 1 - __ C-LZ30�Il�I�' C5I E _I ��IlC - ' ' ' 100YR, W. . ELEV, 1,401J' ' -' -i � 4� Q --_ I I -- . .�:�I�LE�-T,4� ---------- ___ __� .____._ _ _ ._ - '---' -- I�L T LI E �� � LOWEST ADJA EN7 GRADE EI�EV=1,403.0' _ --- -- -- . �'_ � � I , I � �' � � TB RT i (AT BLOCK D ELLING) , E _ � I� T I-� E l I I ,__. ���'I.-iyl -���' I _ �i 4OO 1 I _ _ _ I ' _ ,- . . . ~ " , i � . . : � TB LT � i --- , . �..... _ �_ ' -- -_ � . -' .., I' :. - �� �•., � i �_ . .. I � , � - T . �-�� .I� I� � �' _ . _ �. ���a���,�a����� � I • . _ ,� i i i � - T _ �� ' I� EXISTING TREAM BED �- I ._-__ B I R I I �� I I I � , I ' ' r f l I ' I I I � I I I I��I �'. T...-' I... I . 4. { I I I I_ I_ I ___ I_ _. 1390I � --- � _ �._...T,------ � � � i � WS PROFILE DATE OF IW I' __ _ - --- - I i i II �sII� E I 2�1I 6 - E r _ ---- � � � � I II I__ II I�2. b/� I_ � R I - � � _ k, s�i��`ir��4 !� �RiQ�� 'v� ��)I� � ��i,�43.r � I , � u RE � A� iE � 1380 '� ' ' ��- ----� �'� '�P��� ��� �'� �', I E�'� �'� �pu �'� �Q � � �� �' �TRW�I��'� �'� �'� �I R � - - - - - -- __-_ __��__� � � _�_�_ _�� � � � � � � _�_, �_�_� � � _�_,_�I= =-� - PERMIT DRAWING SHEET 6 OF 10 CULVERT 960700 (—)15 0(—)10 0(—) 0 5 0 1 0 1 0 _ __ __ ._-- , , _ -LREY- ST .] 5+ 79 ! � � I _ _ SKEW = 45�00' 00" „ I I I RIGI�TM�'OS�T BA RE',L L� � I� �l�f� � WI H 1�51 LS• L F M S,T ARREL LOOKIN DOW! STRE 12� OqS�II�1C p,��'J�N�STR'IE�,�/�l � -- _ _' ._ , N A �U y I I II ,I I�� _ �� - _ _ - - - PROP. GRA E= 1,407.7 ' I I I I I I I I I I I I -- -- - -- � 2� �� I _ _ _ _--_ __I__ _ __ ___ -- _._ _ __ _ , 1 . .�ELEV.=1,407�' I I _ _ _.. _ - - -- I I � i � PRO OS I I R�,�dVl/ II I�CT i i 25YR, W.S. ELEV.=1,4�05.6' _ � _ _ EXISTI G. BRIDGE (TO B� II EM11�'V I)�� I I� il !II - - �� -2�1_QR_ELA i i , - - y�� �-- �IE3RM4AL-�- �I I I I ��7TJ I�ll`�IlGFr- A�fER- EtEVATT - -- � �� �I -- ---- -- --- -- - - � �- � � I I I - �K_DY�LELLlNG)----- . �' — -- MI'ES _AQJACEI�LT G ELEY_ -1�4_ I ! � _ _� _ -----�---- I II I II II I_ _ � ' � RT_ �'�T- - -�--- I��,' � - - - -- --- .� ... �-- i ,� ... I I � F1LE�6ATE OF�SURVE��i/2�=. �T ' ' - - � - �---I- ' - - - I -- -- - � � I II TI3�E ' _��TE. � --SQI��Y. �/22_ 91�i�_- 1,49 1---. -_- _ __ - I . y4��ROXIMATE� -2-1-FT kJP-STR€ OF--EXIST-I�IG-BRID�E-�1� R�,4M-FA��- �� - ---------------- -------__ _---- - ---- I- _ �� _ � - - -- - ii i � �� � - Illi I _ I I - - I I - , iP�, i. ,�,+� I 'I �iaL'!� �� STRI;JCTURE � PERMIT DRAWING SHEET 7 OF 10 CU LVERT 960700 DETOU R 5 � � � CULVERT CONSTRUCTION SEQUENCE BRI DGES 960403 & 960700 PHASE 1 REFERENCE NO. SHEET NO. �.11,R,l2O EC-6/CONST.4 PERMIT DRAWING SHEET 8 OF 10 1. INSTALL SPECIAL STILLING BASINS AND IMPERVIOUS DIKES 7& 8. INSTALL GEOTEXTILE IN STREAM BED THEN LAY 24" TEMPORARY PIPE NO. 3 AND BYPA55 PUMP. INSTALL TWO bb" CSP'S AND TEMPORARY HEADWALLS. 2. CONSTRUCT DETOUR ALIGNMENT AND SHIFT TRAFFIC ON TO DETOUR ALIGNMENT 3. INSTALL SPECIAL STILLING BASINS, IMPERIVOUS DIKES 1& 2, LAY 24" TEMPORARY PIPE NO. 1 AND BYPASS PUMP. ALSO FACILITATE "TEMPORARY PIPE TIE" FOR 24" CSP DETOUR CROSSPIPE. 4. REMOVE EXISTING BRIDGE 960700 AND BYPASS PUMP UNTIL BOTTOM SLAB OF CULVERT 960700 IS IN PLACE. 5. CONSTRUCT THE BARRELS OF PROPOSED CULVERT 960700, THE WESTERN WINGWALLS OF 960700 AND CHANNEL IMPROVEMENTS ON THE LEFT BANK AT THE DOWNSTREAM END OF THE CULVERT. b. REROUTE 24 INCH TEMPORARY PIPE NO. 1 THROUGH CULVERT 960700. 7. INSTALL IMPERVIOUS DIKES 3& 4. BYPASS PUMP UNTIL BOTTOM SLAB OF CULVERT 960403 IS IN PLACE. THEN LAY 24" TEMPORARY PIPE NO. 2 THROUGH CULVERT. NOTE: ONLY A PORTION OF CULVERT 960403 WILL BE CONSTRUCTED IN PHASE 1 UP TO THE NOTED CONSTRUCTION JOINT. 8. CONSTRUCT BARRELS OF CULVERT 960403, THE WESTERN WING WALLS, AND THE UPSTREAM CHANNEL IMPROVEMENTS. 9. CONSTRUCT -LREV- ALIGNMENT. VO ��CONSTANCEKS�C�ARK E� �o; S �� � o PAUL C. BREDEN AND WIFE. � ,�,� � LOUISE C. BREDEN � � � i Z�' � � v' � 60' 0' 60' O 1 1� i�■ I � GRAP��IIC SCAL�- _Q =AD -ND 5 � CULVERT CONSTRUCTION SEQUENCE BRI DGES 960403 & 960700 PHASE 2 1. SHIFT TRAFFIC FROM DETOUR ON TO -LREV- ALIGNMENT AND REMOVE DETOUR ALIGNMENT AND ASSOCIATED DETOUR DRAINAGE. 2. CONSTRUCT IMPERVIOUS DIKES 5 AND 6 AND RECONFIGURE IMPERVIOUS DIKE 2. (REMOVE IMPERVIOUS DIKE 1 FROM PHASE 1.) RECONFIGURE 24 INCH TEMPORARY PIPE 1. TEE IN 24 INCH TEMPORARY PIPE 3 IN TO TEMPORARY PIPE 1 WITH A TEMPORARY PIPE TIE. 3. CONSTRUCT EASTERN WINGWALLS OF CULVERT 960700 AND CONSTRUCT REMAINING CHANNEL IMPROVEMENTS OF CULVERT 960700. IN ADDITION, COMPLETE CHANNEL REALIGNMENT OF TRIBUTARY AT OUTLET END, RIGHT BANK OF 960700. 4. REMOVE IMPERVIOUS DIKES 2, 5& b AND 24" TEMPORARY PIPES NO. 1& 3 AND ESTABLISH FLOW THROUGH CULVERT 960700. 5. REMOVE EXISTING BRIDGE 960403. b. CONSTRUCT REMAINING PORTION OF PROPOSED CULVERT 960403 WITH EASTERN WINGWALLS AND DOWNSTREAM CHANNEL IMPROVEMENTS. 7. REMOVE IMPERVIOUS DIKES 3& 4, 24" TEMPORARY PIPE NO. 2, AND SPECIAL STILLING BASINS. ESTABLISH FLOW THROUGH CULVERT 960403. 8. FINALIZE CONSTRUCTION OF -LREV- ASSOCIATED DRAINAGE. �` � PAUL C. BREDEN AND WIFE. �� CECIL E CLARK AND WIFE. a5� �� � LOUISE C. BREDEN � �O CONSTANCE S CLARK � oo � _� S �i 1 N � � � � � �� � ��s ;, � �� � � , REFERENCE NO. SHEET NO. �.11.RJ20 EC-7/CONST.4 PERMIT DRAWING SHEET 9 OF 10 V � Z � � Z�' � � v' � 60' 0' 60' O 1 1� i�■ I � GRAP��IIC SCAL�- _Q =AD -ND WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -LREV- 11+50 RIGHT BANK STABILIZATION < 0.01 15 6 2 -LREV- 12+64 TO 14+37 CULVERT 960403 0.02 < 0.01 108 10 2 -LREV- 12+64 TO 14+37 BANK STABILIZATION 0.02 73 3 -LREV- 15+37 TO 16+27 CULVERT 960700 < 0.01 < 0.01 45 3 3 -LREV- 15+37 TO 16+27 BANK STABILIZATION 0.02 88 3 -LREV- 15+37 TO 16+27 JS Parallel to Roadway < 0.01 < 0.01 38 10 TOTALS*: 0.07 < 0.01 367 29 0 �[����yi SITE 1 Dewatering Length = 6' (Existing Channel Impacts Temp as indicated in table above) SITE 2 (Brg 403) EXISTING BRG 1@ 25'7" Single Span Bridge @ 112 degree skew; length along stream 22' PROPOSED CULVERT 2@ 11'x5' RCBC; Length = 108' SITE 3(BRG 700) Dewatering Length = 10' (Included in Existing Channel Impacts Temp in table above) EXISTING BRIDGE: 1@ 18'10" Single Span Bridge @ 56 degree skew; length along stream 20' PROPOSED CULVERT: 2@ 10'x5' RCBC; Length = 45' BANK STABILIZATION: SITE 2: 960403 Length = 85 Ft.; SITE 3: 960700 Length = 87 Ft. 2016 09 09 *Rounded totals are sum of actual impacts