Loading...
HomeMy WebLinkAbout20170838 Ver 1_401 Application_20170706STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR July 6, 2017 Mr. Thomas Steffens U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W Sth St. Washington, NC 27889 Mr. Robert Ridings DWQ-Transportation Permitting Unit 1650 Mail Service Center Raleigh, NC 27609 JAMES H. TROGDON, III SECRETARY SUBJECT: Nationwide Permit 18 Application and Water Quality Certification Request for Flood Counter Measures in Princeville, NC Edgecombe County. WBS #4.103311 Dear Sirs: NCDOT is proposing the use of one duckbill check valve (DCV) on the 36 inch diameter RCP cross pipe under US 64 just east of the NC 33 and US 64 interchange. Installing a DCV on the 36 inch diameter pipe will potentially reduce the amount of flooding for more frequent events and provide more storage for flow coming from the RCBC during less frequent events. The purpose of this project is to provide a feasible flood countermeasure to reduce the amount of flooding in Princeville during heavy rain events. This project involves removing one section of 36" RCP and adding a standard junction box and an 18' steel pipe and installing the DCV on the end of this pipe. This 18' pipe will be placed on a bed of class 1 riprap to provide a stable and non-erosive foundation. The expected impacts are 0.01 acres of wetland fill and OA1 acres of wetland mechanized clearing. If you have any questions or need any additional information, please contact Chad Coggins, Division Environmental Officer at (252) 640-6427. Your time and effort are appreciated. Respectfully submitted, DocuSigned by: Cl�.d, Co�►n,S �����8���� Mailing Address: NC DEPARTMENT OF 'I'RANSPORTATION DIVISION FOUR POST OFFICE BOX 3165 WILSON, NC 27895 Telephone: (252) 640-6400 Customer Service: 1-877-368-4968 Website.• www.ncdot.gov Locatian: 509 WARD BLVD WILSON, NC 27895 Q�oF wArF9Qc � Y � � a � Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Princeville Flood Countermeasures 2b. County: Edgecombe 2c. Nearest municipality / town: Princeville 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: � Agent ❑ Other, specify: 4b. Name: Chad Coggins 4c. Business name NCDOT Div. of Highways (if applicable): 4d. Street address: PO Box 3165 4e. City, state, zip: Wilson, NC 27895-3165 4f. Telephone no.: 252-640-6427 4g. Fax no.: 4h. Email address: tccoactins(a�ncdot.pov 5. AgenUConsultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax na.: 5g. Email address: Page 2 of 12 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude: 35.86795 Longitude: - 77.52005 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 1 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Tar River proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: Tar 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Forestry and Agriculture are the predominant land uses in the vicinity of this project. 3b. List the total estimated acreage of all existing wetlands on the property: .10 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 LF. 3d. Explain the purpose of the proposed project: The purpose of this project is to provide a feasible flood countermeasure to reduce the amount of flooding in Princeville during heavy rain events. 3e. Describe the overall project in detail, including the type of equipment to be used: NCDOT is proposing the use of one duckbill check valve (DCV) on the 36 inch diameter RCP cross pipe under US 64 just east of the NC 33 and US 64 interchange. Installing a DCV on the 36 inch diameter pipe will potentially reduce the amount of flooding for more frequent events and provide more storage for flow comin from the RCBC durin less fre uent events. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown Comments: wetlands delineated by DEO and USACE rep 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � Na 6b. If yes, explain. Page 4 of 12 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): � Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem ora T W1 � P❑ T fill Open water fringe � Yes � Corps .01 � No ❑ DWQ W1 � P❑ T MC Open water fringe � Yes � Corps .01 � No ❑ DWQ W 1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W 1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ � � P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts .02 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑P❑T ❑PER ❑Corps ❑ INT ❑ DWQ S1 ❑P❑T ❑PER ❑Corps ❑ INT ❑ DWQ S2 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Page 5 of 12 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem ora T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 12 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. � Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for impact Stream name mitigation (square feet) (square feet) Tem ora T re uired? B1 ❑P❑T ❑Yes ❑ No B2 ❑P❑T ❑Yes ❑ No B3 ❑P❑T ❑Yes ❑ No 64❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 7 of 12 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Several of these DCV were proposed all but this one was eliminated for less invasive alternatives 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All construction equipment will be staged and operated from upland areas. DOT will also install silt fencing to protect the streams and wetlands adjacent to this project, and safety fencing will be used to delineate those environmentally sensitive areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes � No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires � Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 9 of 12 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes � No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes � No Comments: only extended a pipe and installing DVC 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? ❑ Yes � No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: only extended a pipe and installing DVC 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governmenYs jurisdiction is this project? N/A ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State � Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes � No, MCDC is letter.) on file Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Only extended a pipe and installing a DVC 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 11 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes � No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS search and habitat assessment made onsite 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? GIS search 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? On existing R/W 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FRIS DocuSigned by: Chad Coggins �� ���5 7/5/17 FA1 DF1361A89464... Applicant/Agent's Signature Applicant/Agent's Printed Name (AgenYs signature is valid only if an authorization letter from the Date applicant is provided.) Page 12 of 12 F F � � � � � � � � � � � / /,. DENOTES FILL IN WETLAND ` � � \ ��� PERMIT DRAWING � �� SHEET 1 OF 3 , �� �, �_ � � �� � � �� � � l/ �` � <. � �, � � , �� DENOT�LEARING NIZED �� �,, � � � � � � � �� _ �, �� � � � ��� � b4-37 �� ���� . , ��_ _ �, . � i � , �, � \\ � �, , �- o // � �� � a � . � �� z � � ,� Ca REIVI � ���1 �% OF 36" � � � � , �,. � �_ // � �_ /� � ,� -- , � , �, _ � �� � � � � - � SITE 1 ���_ �B �� \_� - - �0' 0' �0' �I �,��'-1��. SC��E � � ; �� � � � �* `` �f �i" � D I P (C L 5�5�� � �� , � � � � �** `� � � � ,\ `* , :� � � � � � ��***�*�,� � �59 _ A , � ��� � \� � ��"� �� � � � � � � � \ \ � ��� , � � \� 3 �� � � - �� ��, � ��� � \ F F � � � � � � � � � � � DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING SITE 1 � �;i'�� �� � ; ��..,� �J J i��l �'`,�'-1��, SC��E \� //� rtrcnni i urcHvvii�� � �� SHEET 2 OF 3 � � // � // � � // � /� /% � 64-37 �� � \ � // � Z REM l�'/OF 36" �� � �� � � � � � � i" DIP (CL 55) �� � � � � 59 � � � � �� / /