Loading...
HomeMy WebLinkAbout20050732 Ver 39_Stormwater Approval_20170705WaterResources ENVIRONMENTAL QUALITY July 5, 2017 Mr. Lee Bowman NNP Briar Chapel LLC 1312 Briar Chapel Parkway Chapel Hill INC 27515 Subject: APPROVAL OF STORMWATER MANAGEMENT PLAN Briar Chapel SD East Dear Mr. Bowman: PAT MCCRORY Gommor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director DWR # 05-0732 v39 Chatham County The Division of Water Resources (Division) recently reviewed the proposed stormwater management plan (SMP) for the subject project as required by Individual 401 Water Quality Certification #3567 issued by the Division on February 3, 2017. Submittal of the SMP satisfies Condition No. 3 of the 401 Certification for this Phase of the project and is subject to the requirements below. 1. The Division approves the SMP consisting of two (2) wet detention basins (ponds) and all associated stormwater conveyances, inlet and outlet structures, and grading and drainage patterns depicted on plan sheets dated June 13, 2017, which are incorporated by reference and are enforceable by the Division. The following conditions also apply 115A NCAC 02H .0506(b)(5)]: a. The maximum allowable drainage area for the approved Wet Detention Basin #31 shall be 427,940 square feet and the maximum allowable built -upon area within that drainage area shall be 248,840 square feet. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the Division. [15A NCAC 02H .0506(b)(5)] b. The maximum allowable drainage area for the approved Wet Detention Basin #32 shall be 589,234 square feet and the maximum allowable built -upon area within that drainage area shall be 500,980 square feet. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the Division. [15A NCAC 02H .0506(b)(5)] c. The approved SCMs shall be constructed and operational before any permanent building or other structure is occupied at the site. [35A NCAC 02H .0506(b)(5)] d. The SMP may not be modified without prior written authorization from the Division. [15A NCAC 02H .0506(b)(5)] State of North Carolina I Environmental Quality I Water Resources 1617 Mail service Center I Raleigh, North Carolina 27699-1617 919 807 6300 NNP -Briar Chapel LLC DWR# 2005-0732 v39 Request for Additional Information Page 2 of 2 e. Maintenance activities for the two (2) wet detention basins shall be performed in accordance with the notarized O&M agreements signed by Mr. Lee Bowman of NNP Briar Chapel LLC on April 25, 2017. The O&M agreement shall transfer with the sale of the land or transfer of ownership/responsibility for the Stormwater Control Measures (SCMs). The Division shall be notified promptly of every transfer. [15A NCAC 02H .0506(b)(5)) f. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at https:Hedocs.deq.nc.gov/Forms/Certificate-of-Completion). [15A NCAC 02H .0506(b)(5)] Please contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: DWR 401 & Buffer Permitting Branch File Gareth Avant, McKim & Creed (via email) DWR RRO