Loading...
HomeMy WebLinkAbout20160126 Ver 2_Certification of Completion_20170705� � ENERGY IAND & INFRASTRUCTURE June 27, 2017 401 Transportation Permitting Unit North Carolina Division of Water Resources 1650 Mail Service Center Raleigh, NC 27699-1650 RE: CERTIFICATE OF COMPLETION PIEDMONT NATURAL GAS, LINE 423 GAS LINE PROJECT, PHASES 1A and 18 16-0126V2 AND 16-0413 GASTON, LINCOLN, AND CATAWBA COUNTIES, NORTH CAROLINA Enclosed please find the Certificate of Completion for the Piedmont Natural Gas Line 423 gas line project in Gaston, Lincoln, and Catawba Counties, North Carolina. If you have questions or need additional information please contact me at (615) 383-6300 or by email at suzanne. herron@eli-Ilc.com. Sincerely, ENERGY LAND 8 INFRASTRUCTURE, PLLC (bR� " Suzanne . erron, P.E., CPESC PE 0405 Enclosures �o �C�C�od�D JUL-52011 �s �air"�Ta aEw�rtnr�cu�rt 1420 Donelson Pike. Suite A-2. Nashville. Tennessee 37217 www.eli-Ilc.com 615.383.6300 ENGINEERS � SURVEYORS � INFRASTRUCTURE � ENVIRONMENTAI CERTIFICATE OF COMPLETION NCDWRProjectNo.: ��� O��IOJ% Coanty: ��v0. Applicant: � Na1wQ� 6� � ProjectName: �M. 4ti3 ��Q. ��1AS ��� 1'le�Ct� Date of Issuance of 401 Water Quality Certificatlon: � ����/ Certificate of Completion Upon complerion of all work approved within the 401 Water Quatity CeRifica6on or applicabla Buffer Rules, and any subsequent modifications, the applicant is required to retum this certificate to the 405 Transportation Permitting Unit, North Cazolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form mey be retumed to NCDWR by the applicant, the applicanPs authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicanl's CerNJlcntion I, , hereby state that, to the best of my abilities, due cere and diligence was used in the observadon of the construction such that the conshuction was observed to be built within substantiel compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifica6ons, and other supporting materials. Signature: Date: Agent's Certificatlon I, ��� �:� , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construcdon such that the construction was observed to be built wiUtin substantial compliance and intent of ttte 401 Water Quality Certification and Buffer Rules, the approv lans and specificat'ons, and othu supporting materials. Signature: ' Date: (,.� 17-�VI �'I Engineer's Certi n Partial Final I, as a duly registered Professionel Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abiliGes, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial complience and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifica6ons, and other supporting materials. Signature Date Registration No. ����od�� JUL - 5 2011 ���ir^wnTa�" rEra�rnr� uxr