Loading...
HomeMy WebLinkAbout20170803 Ver 1_B-5609_Permit Package_Wetland_170616_201706281 Ii�;}�it�°��+ North Carolina Department of Transportation �� � t (] r"lliti�r'���� ] , ..,,,,, Highway Stormwater Program ;�;; STORMWATER MANAGEMENT PLAN �`"•���°° '-�� � (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 45564.1.1 TIP No.: B-5609 County(ies): Hertford Page 1 of 1 General Project Information WBS Element: 45564.1.1 TIP Number: B-5609 Project Type: Bridge Replacement Date: 5/18/2017 NCDOT Contact: And Jordan, PE Contractor / Desi ner: Sun ate Desi n Group Address: Hydraulics Unit Address: g05 Jones Franklin Rd 1590 Mail Service Center Raleigh, NC 27606 Ralei h, NC 27699-1590 Phone: 919 707-6720 Phone: 919 859-2243 Email: a'ordan ncdot. ov Email: belam sun atedesi n.com City/Town: Ahoskie Count ies : Hertford River Basin(s): Chowan CAMA County? Yes Wetlands within Project Limits? Yes Pro'ect Description Project Length (lin. miles or feet): 0.16 Surrounding Land Use: Agriculture and Forest Proposed Pro'ect Existin Site Project Built-Upon Area ac.) 0.434 ac. 0.364 ac. Typical Cross Section Description: Two paved lanes (total 22'). 5' paved shoulders on each side (8' with guardrail). Varying Liverman Mill Rd Bridge over Cutawhiskie Swamp: two way paved lanes (total 18') fill and cut slopes (see project XSC's for detailed information). with soft shoulders on each side. Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 931 Year: 2037 Existin : 570 Year: 2017 General Project Narrative: The North Carolina Department of Transportation (NCDOT) has proposed to replace the bridge on Liverman Mill Road that crosses over the Cutawhiskie Swamp. The proposed (Description of Minimization of Water two lane structure is a multiple span bridge with three spans (1 @55'(21 "), 1@70'(24"), 1@45'(21 ")) cored slab with 4' end bent caps. The proposed bridge will have deck drains, Quality Impacts) however they will not discharge over open water. Cutawhiskie Swamp is a FEMA limited detail study with non-encroachment widths established. Regulatory floodways are delineated on the FIRM and flood profiles have not been developed. This structure has been designed to have as little environmental and surface water impacts as possible. Velocities at jurisdictional features and wetlands are non-erosive with velocities under 2 feet per second. Waterbod Information Surface Water Bod 1): Cutawhiskie Swam NCDWR Stream Index No.: 25-4-8-8 NCDWR Surface Water Classification for Water Body Prima Classification: Class C Supplemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: Impairments: None Aquatic T&E S ecies? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Brid e Spannin Water Bod ? Yes Deck Drains Dischar e Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Dischar e Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) 0 �o � � � See Sheet 9-/1 For Index of Sheets See Sheef 7��B For Conventlonal Symbols � � •, � V � � O V ����� �� ������ �������� �� �Y ����� �ll' ���1LJI1 V'V' ��� HERTFORD COU1�lTY LOCATI011L• BRIDGE 1V0. 28 ON SR 1137 OVER CUTAWHISKIE CREEK TYPE OF WORK GRADING, PAVI11tG, DRAINAGE, A11tD STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT BEGIN TIP PROJECT B-560! -L- POC STA. 13 + 15.00 -L- POT STA. 16+35.75 jO SR 1142 � n c � �� _ N � � �m I �n; �rn� � m� � � �, END TIP PROJECT B-5609 -L- POC STA. 21 + 60.00 / CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. + 713\ / T O /VC 46) �� �O� ti PERMIT DRAWING SHEET 1 OF 7 DOCUMENT NOT CONSIDERED FINAL I UNLESS ALL SIGNATURES COMPLETED I J Prepa.ed f r�he North Carolina oepa.rmem fTransponarion HyDRAULICS ENGINEER GRAPHIC SCALES DESIGN DATA PROJECT LENGTH I�he olfiCe f °$�° aooa wes a a� a s���� s3a � SUNGATE DESIGN GROUP P A, ADT 20V = 570 N� '', No �F3�os 50 25 0 50 l00 ADT 2037 = 931 %�� ���p�' �� � �,i �-,�: � K= X��a LENGTH ROADWAY TIP PROJECT B-5609 = 0.127 MI. Zo,2 ST,,NDARD S,.E��,c,,,,oNs � ��oQ PLANS D XX /a LENGTH STRUCTURE TIP PROJECT B-5609 = 0.033 MI. RIGHT oF WAY DATE: TIM GOINS, PE e.E. o � so 25 0 5o ioo — o� TOTAL LENGTH OF TIP PROJECT B-5609 = 0.160 MI. ''"°�E°' t:N�,"r�" s'�"AT°'�: � ° T— XX /o Apri110 2017 _ � o I V= 60 MPH LETTING DATE: ROADWAY DESIGN � � PROFILE (HORIZONTAL) * TTST =XX% DUAL XX% JERRY JAVELLANA, PE ENGINEER ��� o� September 20, 2017 � Q� �O S O �O zO FUNC CLASS = — PROJECT DESfGN ENGlNEER `p�p�1' � � LOCAL ROAD NCDOT CONTACT JOHN ABEL, PE PROFILE (VERTICAL) SUB—REGIONAL TIER rrso�Fcr sNc�xr-an-aonnwAv nssicnr �� SIGNATURE: o' Prepared by PROJECT REFERENCE NO. SHEET NO. R p � � � � � � � � —� — ' ' �� � SUNGATEDESIGNGROUPP.A. B—SEOJ J� � � ROAOWAY DESIGN HYDRAULICS � HY AULIC A A ENGINEER ENGINEER l8" RCP Sto. 20+39 -L- °°�e"aale�9i,"Ncz� oisa�esso - BM 'A' NC L-cense No. C-3]0� — _ RR SPIKE lN BASE OF l8" GUM ORAINAGE AREA = 0.4 AC ELEV.=29.50' DESIGN FREQUENCY = 25 YRS I I -L- STA18+30.1/. 34' LT DESIGN DISCHARGE = 0.8 CFS DESIGN NW ELEVATION = 25.5 FT DOCUMENT NOT ONSIDERED FINAL UNLESS ALL SIGN URES COMPLETED l00 YEAR DISCHARGE _ l.2 CFS — BRIDGE HYDRAULIC DATA �— l00 YEAR HW ELEVATION = 25.5 FT DESIGN DISCHAR6E = 2600 CFS � OVERTOPPlN6 FREOUENCY= 500+ YRS I DESIGN FREOUENCY = 25 YRS OVERTOPPlN6 DISCHARGE _�•5+ CFS PERMIT DRAWING DESIGN HW ELEVATION = 29.8 FT OVERTOPPIN6 ELEVATION = 28A FT END G DE S H E ET 4 O F 7 BASE DISCHARGE = 3800 CFS EGI BRDGE END B IDGE -L- STA. 1+60 BASE FREQUENCY = l00 YRS L- S A. 1+ 3 J5 -L STA 18 + 08.2 � EL. =';28.4 ' i BASE HW ELEVATION = 26.62 FT BEGIN GRADE � OVERTOPPING DISCHARGE _ <5200 CFS _L- 5 . 13.+15. 0 ! � I _ -- —_ OVERTOPPING FREQUENCY= <500 YRS EL. -2 39 �� OVERTOPPING ELEVATION = 29.0 FT � + N = FT TO BE REMOV D I I �' DATE OF SURVEY = 2-19-16 - PI = 15+50.00 PI = I8+75.00 � o' i EL = 30J0' > Pl = 20+g0.00 W.S.ELEVATION _ �o S�E VC = 82'� z�o' EL = 28.24' VC = l00' o AT DATE OF SURVEY - l6•9 FT K- 1000 K= 44 , ii �, VC = ll5' R MOVE XIST R ADWA R OVE EXIST R ADWAY � K= 64 FI L TO NG �� A PROX CL EL=2 .0 � � � APP OX CL EL=18. O.400 % ( J/.4 (+) .300 % (+ 0.40 0% 82% — — — — — � � r- r r- — — — — — �2% � i+i0.3300% i — � �, �� --- r -- I I I I I I I � �.�, �, _- � �,'� ��� -.d I I �I I z2tirn �02tiv� � � < Q ss• iN �U�ul �<r' zc�c[�n �� � I �� �v z�i,o I = I I ��v I��u �i��� � i W �� i`i� sii�eiaennr � I I I I I I �10�� ��� ��� I��n� � � �� i' No s eweo I I I I I I I I ti�� W i�: � � I + �� ; i, �s � v � -- � `_� _ I I I I I I � �� NW N 2 19-16 —'6 9 �' FOR —L — PLAN SEE SHEET 4 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 I I � n , ; � ; I I I I I I � ; , ; � ;- � 0 2.5 5 PROJ. REPERENCE NO. SHEET NO. N �Di B5609 X-2 � 5 5 0 5 0 5 0 5 0 25 20 1 1 1 1 20 25 30 5 0 5 0 5 0 5 0 5 PERMIT DRAWING SHEET 5 OF 7 _ 0.0_0 0. 30 88 e� O 8 e8 �e 88 � 8 88 88 �B o _ _ _--- \ 3 H N C EA I G — -- � — _ — — \ o x � °� - --- - 23 04 � W 16+ 0.00 -- -- SITE 1 _ I LB , 0.0 0 0. 30 SITE 2 �IL I W T D _ — ---- — _ 3;� o �B _ 3 � _ _ w � A D CLE RI G . .. _ . . • W � . . . .. . . . . . . -..- . _ .. .. . .. . . . - -- _ . 16 + 0.00 — W B 0.0 4 0. 44 3 FI L N E LA --- — — _ 3:� � _ 3 � . _ - _W \ � - � � N L A ING � — � a � � s a 3 -- E T5 + .0� j a � o= T — — �m °' �`�,°S 5 0 5 0 5 50 45 0 5 30 25 20 1 1 1 1 20 25 0 5 0 5 0 5 0 5 0 � �m � 0 2.5 5 PROJ. REPERENCE NO. SHEET NO. N � B5609 X-3 � 5 5 0 5 0 5 0 5 0 25 20 1 1 1 1 20 25 30 5 0 5 0 5 0 5 0 5 PERMIT DRAWING SHEET 6 OF 7 ---- SITE 3 3 o ee �eee � � w 3 — — — — — � — — _ � � � '� x 23 07 --- — — 18 + 0.00 — __ _ _ — _ _ _ 0.0_0 0. 30 _ _ _ _ ee oe ee o e eo ee _ _ o _ _ __ � o — W � — --- _ — � — — --- � - W � - - - - - - � � - — - . — 16 25 __ — _ _ — _ _ _ 0.0 0 _ 0. 30 e e ee ee oo e e ee ee � , � � � , � � I 3 3 � � W w � — — — — — � — � -- — — � i � r � � a 15 25 s a + . � � � � E a � , I I � o= .� — �m °' N`�,°S 5 0 5 0 5 0 5 0 5 0 25 20 1 1 1 1 20 25 0 5 40 45 50 5 60 65 0 � m WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 14+95 to 16+59 -L- LT ROADFILL 0.05 0.04 2 16+13 to 16+60 -L- RT ROADFILL < 0.01 0.01 3 17+93 to 18+08 -L- RT ROADFtLL < 0.01 < 0.01 SUB TOTALS *: 0.05 0.05 0 0 *Rounded totals are sum of actual impacts NOTES: Site 1: Fill in Wetland 2,133 SF, Hand Clearing 1,545 SF Site 2: Fill in Wetland 50 SF, Hand Clearing 521 SF Site 3: Fill in Wetland 102 SF, Hand Clearing 136 SF Total: Fill in Wetland 2, 285 SF, Hand Clearing 2,202 SF 2013 10 24