Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3170604 - Deal Road Subdivision (4)
Drainage Report for Deal Road Town of Weddington, Sandy Ridge Township Union County, NC CORPORATE SEAL C-2165 �4 NCBELS 1o0 i Prepared for: Deal Road Ventures, LLC 113 Indian Trail Road # 274 Indian Trail, NC 28079 Prepared by: DESIGN RESOURCE GROUP design resource group, pa 2459 Wilkinson Boulevard, Suite 200 Charlotte, NC 28208 Phone: (704) 343-0608 Fax: (704) 358-3093 C-2165 June 23, 2017 •Z ; ° SEAL 36289 = ���� ••��INEEFL.•Q�=� /// vi P����\\\\. 6/23/17 FJ Drainage Report for Deal Road TABLE OF CONTENTS Chapter 1 — Executive Summary 1.1 Introduction 1.2 Vicinity Map 1 3 Existing Conditions 1.4 Proposed Project 1.5 Summary of Results 16 Conclusion 1.7 References Chapter 2 — Hydrologic Analysis — Detention Analysis 2.1 Detention Summary 2.2 Proposed Detention Pond Analysis Chapter 3 — Storm Drain Hydraulic Analysis 31 Ditch Design 32 NCDOT Pipe Data Sheet - Hw/D Calculations 3.3 Drop Inlet Calculations Chapter 4 - Erosion Control Calculations Sediment Basin Calculations Chapter 5 - Appendix Appendix A: Pre Development Drainage Exhibit Appendix B• Post Development Drainage Exhibit Appendix C: NOAA Rainfall Data Prepared By: Design Resource Group, P.A. 635-002 6/21/2017 SECTION 1 2 3 4 Drainage Report for 635-002 Deal Road 6/21/2017 1.1 - Introduction The proposed Deal Road Subdivision is a single-family development in Town of Weddington within Union County, North Carolina. The property fronts along Deal Road. A Vicinity Map has been included to better detail this area (see below) This drainage report has been designed to specifically address the requirements set forth in by the Town of Weddington. In the subsequent sections of this report, a hydraulic analysis of the proposed storm drainage system has been provided, along with storm water detention calculations and the design of all appurtenances that go along with these specific topics. 1.2 — Vicinity Map 1.3 - Existing Conditions This site is +/- 19.96 acres total area consisting of parcels 06099011A, 06072003A and 06072003E. The 100 year storm event has been analyzed to demonstrate that there is more than 6 -inch freeboard provided in the post developed condition. I A summary of the significant storm events analyzed in this report and the subsequent runoff assumed to be leaving this property are referenced in the table below: �- Prepared By: } Design Resource Group, P.A. i Drainage Report for 635-002 Deal Road 6/21/2017 TABLE 1 Summary of Existina Conditions Storm Event Existing Peak Flow cfs 1 -Year, 24 Hour Storm 1.51 2 -Year, 24 Hour Storm 3.81 10 -Year, 24 Hour Storm 13.3 25 -Year, 24 Hour Storm 20.63 50 -Year, 24 Hour Storm 27.04 100 -Year, 24 Hour Storm 34.08 1.4 - Proposed Proiect The proposed Deal Road subdivision project is a low density development which includes 15 single family lots (0.84 D U A) along with all necessary infrastructure to serve the proposed development. The proposed infrastructure is to include. storm drainage, water and sewer services, ditch type streets and the construction of one dry detention pond to meet the state and Town of Weddington's storm water detention requirements All lots will only be cleared and graded to the front setback as necessary To achieve the necessary water quality, surface ditches of 100+ feet in length will convey the majority of the stormwater runoff to the proposed detention pond The proposed routed peak flows generated by the runoff in the developed condition are summarized in the table below. TABLE 2 Summary of Proposed Conditions 1.5 - Summary of Results In accordance with the standards set forth in the NCDEQ Division of Water Quality Stormwater Manual and the Town of Weddington Stormwater Manual, the existing and developed conditions Prepared By: Design Resource Group, P.A. Proposed Peak Proposed Routed Storm Event Flow Peak Flow cfs cfs 1 -Year, 24 Hour Storm 3.75 1.13 2 -Year, 24 Hour Storm 6.89 2.61 10 -Year, 24 Hour 18.19 8.61 Storm 25 -Year, 24 Hour 26.39 14.13 Storm 50 -Year, 24 Hour 33.47 19.74 Storm 100 -Year, 24 Hour 41.15 25.22 Storm 1.5 - Summary of Results In accordance with the standards set forth in the NCDEQ Division of Water Quality Stormwater Manual and the Town of Weddington Stormwater Manual, the existing and developed conditions Prepared By: Design Resource Group, P.A. Drainage Report for Deal Road 635-002 6/21/2017 were modeled for analysis and verification of the proposed design Using the methodology set forth in the design manual, the results were routed using HydroCAD (Ver 10) Storm Water Modeling System. The calculations leading to the following results are available for review in Chapter 2 of this report For a quick reference, we have provided the following table comparing these scenarios TABLE 3.1 Detention Pond Summary Existing vs. Developed Conditions Overall Existing Peak Flow cfs Developed Peak Flow cfs Developed Routed Peak Flow cfs Difference 1 -yr Peak Flow (cfs) 1.51 3.75 1.13 -0.38 2 -yr Peak Flow (cfs) 3.81 6.89 2.61 -1.20 10 -yr Peak Flow (cfs) 13.3 18.19 8.61 -4.69 25 -yr Peak Flow (cfs) 20.63 26.39 14.13 -6.50 50 -yr Peak Flow (cfs) 27.04 33.47 19.74 -7.30 100 -yr Peak Flow (cfs) 34.08 41.15 25.22 -8.86 Per Table 3 above, the developed peak flows are designed to exit the site at similar locations as the existing conditions 1.6 — Conclusion Per the results of our analysis, it is our opinion that the construction of the onsite development and related appurtenances will result in no negative downstream impacts With the proper construction of the onsite storm drain system and associated facilities, our analysis shows that all onsite runoff will be safely collected and conveyed through the development and, ultimately, discharged in compliance with the specifications set forth in the NCDEQ Division of Water Quality Stormwater BMP Manual. Prepared By: Design Resource Group, P.A. Drainage Report for 635-002 Deal Road 6/21/2017 1.7 - References °NCDEQ Division of Water Quality Stormwater BMP Manual" NCDENR, Division of Water Quality. January, 2017 "Town of Weddington Zoning Ordiance, Article XIII Division 6/ Drainage, Storm Water Management & Wetland Protection. Prepared By: Design Resource Group, P.A. rf i Chapter 2 — Hydrological Analysis — Detention Analysis 2.1— Detention Summary Chapter 2 — Hydrological Analysis 2.2 — Proposed Detention Pond Analysis 2.2.1— 1 Year, 24 Dour Storm. 2.:0:0 POST -PA TO DETENTION POND k DETENTION 2:01 POST -DEVELOPED UNDETA, INED AREA 'Subcat Reach on Link r -I Post Confluence 635-002 Deal Road Pond Type 11 24 -hr 1 -yr Rainfall=2.93" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 2 Time span=0.00-60.00 hrs, dt=0.05 hrs, 1201 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2.00: POST -DA TO Runoff Area=313,993 sf 22 48% Impervious Runoff Depth=0 63" Tc=30 5 min CN=69 Runoff=3 17 cfs 0 380 of Subcatchment2.01: POST -DEVELOPED Runoff Area=251,603 sf 1 78% Impervious Runoff Depth=0 25" Flow Length=736' Tc=16 2 min UI Adjusted CN=58 Runoff=0.78 cfs 0 121 of Reach 1 R: Post Confluence Inflow=1 13 cfs 0 501 of Outflow= 1.13 cfs 0 501 of Pond P01: DETENTION POND Peak Elev=559 86' Storage=0.127 of Inflow=3 17 cfs 0 380 of Outflow=0 58 cfs 0.380 of Total Runoff Area = 12.984 ac Runoff Volume = 0.501 of Average Runoff Depth = 0.46" 86.73% Pervious = 11.261 ac 13.27% Impervious = 1.723 ac 635-002 Deal Road Pond Type 1124 -hr 1 -yr Rainfall=2.93" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10.00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2.00: POST -DA TO DETENTION POND Runoff = 3.17 cfs @ 12.30 hrs, Volume= 0.380 af, Depth= 0.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -yr Rainfall=2.93" Area (sf) CN Descriotion 41,470 98 Roofs, HSG B 29,100 98 Paved roads w/curbs & sewers, HSG B 243,423 61 >75% Grass cover, Good, HSG B 313,993 69 Weighted Average 243,423 61 77.52% Pervious Area 70,570 98 22.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 305 Direct Entry, See caclulations in project folder Subcatchment 2.00: POST -DA TO DETENTION POND Hydrograph ' I ' ' ' ' ' ❑Runoff 09,1 I I I I I I 3 ______-_I_,____r_�__I___T Type II 24 -;hr__ 11 1 syr Rainfall=2.93" I I I I I I I - Runoff Area=313'993, sf I I I I I I I I I I I ' Runoff! Vol;urne=0.;360; of W 21 1 1 Runoff Depth®0.63" 3 I I I I I I I I I I I I I . T&30', niin CN 11, 1 -- I =69 I I I I I I I I I I I ---------- - - - - - ---- - - -- -- - -- -- 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ze .. ....I. .., ..I .. , .. .I ... I / ./ , I .. .I I .. .. 0 2 4 6 8 10 12 14 16 18 20I 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52-94 56 58 60 Time (hours) 635-002 Deal Road Pond Type 1l 24 -hr 1 -yr Rainfall=2.93" Prepared by Microsoft Printed 6/21/2017 HydroCAD010 00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Runoff = 0.78 cfs @ 12.16 hrs, Volume= 0.121 af, Depth= 0.25" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -yr Rainfall=2.93" Area (so CN Adi Description 247,116 58 0 7 Woods/grass comb., Good, HSG B 4,487 98 065 Unconnected roofs, HSG B 251,603 59 58 Weighted Average, UI Adjusted 247,116 58 58 98.22% Pervious Area 4,487 98 98 1.78% Impervious Area 4,487 100 00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.7 100 0.1000 I ------I--,--- 0.16 Sheet Flow, Sheet Flow - 606-596 Woods. Light underbrush n= 0.400 P2= 3.54" 1.4 139 0.1100 1.66 Shallow Concentrated Flow, Shallow Concentrated - 596-580 _ / 01 I I Woodland Kv= 5.0 fps 1.6 367 0.5900 3.84 Shallow Concentrated Flow, Shallow Concentrated - 580-558 Woodland Kv= 5.0 fps 2.5 130 00310 0.88 Shallow Concentrated Flow, Shallow Concentrated Woodland Kv= 5.0 fps 16.2 736 Total Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA 0 85 ------' 0 8-: 075- 7507 0 7 065 - -r - - - - I �-- 06 55 055- 0 5 0 v 0 45 -- 2 0 4 6= ------'-- -- 035 - -------L-- 03 I ------I--,--- 0 25 02 0 15 _ / 01 I I n n5 II I Hydrograph I I I I I I I I I I ����7+.��+���I1(r �------'---------'--�----'--'--+------�--------�-�---- Runoff _L_______________IL_-__I__I__L_____ - � - I -- - -- --- ------ ----_-1-' yr-Rainfall=2:93"-- I I I - - - - - - -II- - Runoff i4rea'=251- 603 sf - --------I-- IRunoffVolume= - I I 1 -�- � I-------� -� I � � 10.'121af - I I I I I I I I -II - Runoff Depth=0.25" -'------------------- -------Flow-Length 736--- I I --;-------------------;--; ----- Tc=1G2rr>iin- - - --' - - --- U 1!Adj uSt6d_ 6, N=58-- I - - - - - - - -'- - - - - - - - -'- - - - - -I- -I- - + --------------- I -----F--------I I I I I I I I I I I I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 635-002 Deal Road Pond Type 1124 -hr 1 -yr Rainfall=2.93" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10 00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 5 Summary for Reach 1 R: Post Confluence [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 12 984 ac, 13 27% Impervious, Inflow Depth = 0.46" for 1 -yr event Inflow = 1.13 cfs @ 12 18 hrs, Volume= 0.501 of Outflow = 1.13 cfs @ 12 18 hrs, Volume= 0.501 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Reach 1 R: Post Confluence Hydrograph Time (hours) ■ Inflow ❑ Outflow 635-002 Deal Road Pond Type 1124 -hr 1 -yr Rainfall=2.93" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 6 Summary for Pond P01: DETENTION POND Inflow Area = 7.208 ac, 22.48% Impervious, Inflow Depth = 0.63" for 1 -yr event Inflow = 3.17 cfs @ 12.30 hrs, Volume= 0.380 of Outflow = 0.58 cfs @ 13.45 hrs, Volume= 0.380 af, Atten= 82%, Lag= 69.1 min Primary = 0.58 cfs @ 13.45 hrs, Volume= 0.380 of Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 559.86' @ 13.45 hrs Surf.Area= 0.129 ac Storage= 0.127 of Plug -Flow detention time= 94.4 min calculated for 0.380 of (100% of inflow) Center -of -Mass det. time= 94.4 min ( 1,001.0 - 906.7 ) Volume Invert Avail.Storage Storage Description #1 558.00' 1.575 of Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) - 558.00 0.007 0.000 0.000 560.00 0.139 0.146 0.146 562.00 0.200 0.339 0.485 564.00 0.270 0.470 0.955 566.00 0.350 0.620 1.575 i Device Routing Invert Outlet Devices #1 Primary 557.40' 36.0" Round Culvert _ L= 83.3' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 557.40'/ 556.57' S=0.0100'/' Cc= 0.900 n=0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 557.80' 4.0" Vert. 1 YR Orifice/Grate C= 0.600 #3 Device 1 560.10' 36.0" W x 4.0" H Vert. 2 YR & 10 YR Orifice/Grate C= 0.600 #4 Device 1 561.60' 28.0" W x 3.0" H Vert. 25 YR Orifice/Grate C= 0.600 - #5 Device 1 562.75' 48.0" x 48.0" Horiz. Overflow C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=0.58 cfs @ 13.45 hrs HW=559.86' (Free Discharge) 't --=Culvert (Passes 0.58 cfs of 35.01 cfs potential flow) - 2=1 YR Orifice/Grate (Orifice Controls 0.58 cfs @ 6.62 fps) 3=2 YR & 10 YR Orifice/Grate ( Controls 0.00 cfs) =25 YR Orifice/Grate ( Controls 0.00 cfs) =Overflow ( Controls 0.00 cfs) 635-002 Deal Road Pond Type 1124 -hr 1 -yr Rainfall=2.93" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 7 I I I I I �IId� I I I I I I 3- 2 - LL 2 (1 I I 3 I I 0 I I I I I I I I I I 1 I 1 I I I Pond P01: DETENTION POND Hydrograph I I I I i I I I I I ] El Primary Inflow Areal=7.20$ ac - I I I I I I I I I I I Peak Ejov=559x8,6° I I I I I I I I I I I Storage=0.127 of I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I i I I i I I I I "':�'� ',`e.lGf r.'i!s?iri ////�. G'. s� 1,u5.:,..: _ • rh/cQ_`.":."Y�`3 Time (hours) 2.2.2 — 2 Year, 24 Hour Storm POST -ATO DETENTI N POND k DETENTION Subcat Each on Link POST -D VELOPED UNDET INED AREA R'l Post Confluence - 635-002 Deal Road Pond Type 11 24 -hr 2 -yr Rainfall=3.54" Prepared by Microsoft Printed 6/21/2017 -- HydroCAD® 10.00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 2 Time span=0.00-60.00 hrs, dt=0.05 hrs, 1201 points -- Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2.00: POST -DA TO Runoff Area=313,993 sf 22.48% Impervious Runoff Depth=0.98" Tc=30.5 min CN=69 Runoff=5.38 cfs 0.587 of j Subcatchment2.01: POST -DEVELOPED RunoffArea=251,603 sf 1.78% Impervious Runoff Depth=0.47" Flow Length=736' Tc=16.2 min UI Adjusted CN=58 Runoff=2.19 cfs 0.226 of Reach 1 R: Post Confluence Inflow=2.61 cfs 0 813 of Outflow=2 61 cfs 0.813 of r-, Pond P01: DETENTION POND Peak Elev=560.34' Storage=0.195 of Inflow=5.38 cfs 0.587 of Outflow=1.77 cfs 0 587 of 1 i Total Runoff Area = 12.984 ac Runoff Volume = 0.813 of Average Runoff Depth = 0.75" 86.73% Pervious =11.261 ac 13.27% Impervious = 1.723 ac 635-002 Deal Road Pond Type 11 24 -hr 2 -yr Rainfall=3.54" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2.00: POST -DA TO DETENTION POND Runoff = 5.38 cis @ 12.28 hrs, Volume= 0.587 af, Depth= 0.98" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0 05 hrs Type II 24 -hr 2 -yr Rainfall=3 54" Area (sf) CN Description 41,470 98 Roofs, HSG B 29,100 98 Paved roads w/curbs & sewers, HSG B 243,423 61 >75% Grass cover, Good, HSG B 313,993 69 Weighted Average 243,423 61 77.52% Pervious Area 70,570 98 22 48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.5 Direct Entry, See caclulations in project folder Subcatchment 2.00: POST -DA TO DETENTION POND Hydrograph -------------------------------------------------------- --I ------- 6 I I I I I I I I I I I I I I I I I I I I I I i I I I I I I I ----------- ----------------- -- -�- -1---- Typ Ie !-24=hr- 5 1 1 1 1 21 yr Rainfall=3.54" I I I I I I I I I I I I I I --- -- - - --- --r- - --Runoff Area=313;993 sf- 4 1 1 1 1 1 1 1 I I I I I I I I I I I Runoff; V®I'�1ume=0.;58711 of - Runoff Dellpth=0.98" 3 3 Tc=30:511 min LL 1 1 I I CN=169 I 2 I I I I I I 1 I I I I I I I I I I I I I I 1 I I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ❑Runoff 635-002 Deal Road Pond Type 1124 -hr 2 -yr Rainfall=3.54" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Runoff = 2.19 cfs @ 12.13 hrs, Volume= 0.226 af, Depth= 0.47" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0 05 hrs Type II 24 -hr 2 -yr Rainfall=3.54" Area (so CN Ad*I Description 247,116 58 Woods/grass comb., Good, HSG B _ - 4,487 98 Unconnected roofs, HSG B 251,603 59 58 Weighted Average, UI Adjusted 247,116 58 58 98.22% Pervious Area 4,487 98 98 1.78% Impervious Area 4,487 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.7 100 0.1000 016 Sheet Flow, Sheet Flow - 606-596 Woods- Light underbrush n= 0.400 P2= 3.54" 14 139 01100 1.66 Shallow Concentrated Flow, Shallow Concentrated - 596-580 Woodland Kv= 5.0 fps 1.6 367 05900 3.84 Shallow Concentrated Flow, Shallow Concentrated - 580-558 Woodland Kv= 5.0 fps 2.5 130 0.0310 0.88 Shallow Concentrated Flow, Shallow Concentrated Woodland Kv= 5.0 fps 16.2 736 Total Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Hydrograph I I I I I 1 i I I I I I I I I I I I I I I I I ' ' �`;2'�19:cfs� I I � � � � � 1 � 1 1�� ❑Runoff -- T 2 1 1 1 1 1 1 !2-'Y r Rainfall=3.54" I I I I 1 I I Runoff Area=251 11603! sf I I I I I I ROW I I I I I RU1,7W Volume 0.I;226; of I I I I I I I I Runoff Depth=0.47" 1 1 1 1 1 ROW -Leh th�736!- LL I I I Tc=16 2 r>r� i r� 1 U� Adjusted =;58 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 635-002 Deal Road Pond Type// 24 -hr 2 -yr Rainfall=3.54" Prepared by Microsoft Printed 6/21/2017 HydroCAD®10 00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 5 Summary for Reach 1 R: Post Confluence [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 12.984 ac, 13.27% Impervious, Inflow Depth = 0.75" for 2 -yr event Inflow = 2.61 cfs @ 12.14 hrs, Volume= 0.813 of Outflow = 2.61 cfs @ 12.14 hrs, Volume= 0.813 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Reach 1 R: Post Confluence Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) FInflow [I Outflow 635-002 Deal Road Pond Type// 24 -hr 2 -yr Rainfall=3.54" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10.00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 6 Summary for Pond P01: DETENTION POND , Inflow Area = 7.208 ac, 22.48% Impervious, Inflow Depth = 0.98" for 2 -yr event Inflow = 5.38 cfs @ 12.28 hrs, Volume= 0.587 of Outflow = 1.77 cfs @ 12.83 hrs, Volume= 0.587 af, Atten= 67%, Lag= 33.1 min Primary = 1.77 cfs @ 12.83 hrs, Volume= 0.587 of Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 560.34' @ 12.83 hrs Surf.Area= 0.149 ac Storage= 0.195 of Plug -Flow detention time= 114.0 min calculated for 0.587 of (100% of inflow) Center -of -Mass det. time= 113.9 min ( 1,005.2 - 891.3 ) Volume Invert Avail.Storage Storage Description #1 558.00' 1.575 of Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 558.00 0.007 0.000 0.000 560.00 0.139 0.146 0.146 562.00 0.200 0.339 0.485 56400 0.270 0.470 0.955 566.00 0.350 0.620 1.575 Device Routing Invert Outlet Devices ' #1 Primary 557.40' 36.0" Round Culvert _ L= 83.3' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 557.40'/556.57' S=0.0100'/' Cc= 0.900 Uj n=0.011 Concrete pipe, straight & clean, Flow Area= 7 07 sf #2 Device 1 557.80' 4.0" Vert. 1 YR Orifice/Grate C= 0.600 #3 Device 1 560.10' 36.0" W x 4.0" H Vert. 2 YR & 10 YR Orifice/Grate C= 0.600 #4 Device 1 561.60' 28.0" W x 3.0" H Vert. 25 YR Orifice/Grate C= 0.600 - #5 Device 1 562.75' 48.0" x 48.0" Horiz. Overflow C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=1.75 cfs @ 12.83 hrs HW=560.34' (Free Discharge) 't --=Culvert (Passes 1.75 cfs of 44.99 cfs potential flow) 2=1 YR Orifice/Grate (Orifice Controls 0.65 cfs @7.41 fps) 3=2 YR & 10 YR Orifice/Grate (Orifice Controls 1.11 cfs @ 1.56 fps) =25 YR Orifice/Grate ( Controls 0.00 cfs) =Overflow ( Controls 0.00 cfs) i 635-002 Deal Road Pond Type 1124 -hr 2 -yr Rainfall=3.54" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 7 Pond P01: DETENTION POND Hydrograph ® Inflow 6 'J.3H''C�S ❑ Primary Inflow Arda=T.206-ac-- I I I I I I I I I I I I I 5 ! Peak E1dv=560;.314" I I St®rage=0.195af 4 I I I I I I I I I I I I I y I I I I I I I I I I I I V I I I I I I I I I I I I I 3 3 I I I I I I I I I I I I I O LL 2- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 2.2.3 — 10 Year, 24 Hour Storm 2:,00 POST- ATO DETENTI N POND F of DETENTION Subcat Reach on Link 2:01 POST -D VELOPED UNDET INED AREA 1R Post Confluence 635-002 Deal Road Pond Type 11 24 -hr 10 -yr Rainfall=5.16" Prepared by Microsoft Printed 6/21/2017 HydroCAD®10 00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 2 Time span=0.00-60.00 hrs, dt=0.05 hrs, 1201 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2.00: POST -DA TO Runoff Area=313,993 sf 22.48% Impervious Runoff Depth=2.07" Tc=30.5 min CN=69 Runoff=12.43 cfs 1 246 of Subcatchment2.01: POST -DEVELOPED RunoffArea=251,603 sf 1.78% Impervious Runoff Depth=1.26" Flow Length=736' Tc=16.2 min UI Adjusted CN=58 Runoff=8.06 cfs 0.605 of Reach 1 R: Post Confluence Inflow=8.61 cfs 1.852 of Outflow=8 61 cfs 1.852 of Pond P01: DETENTION POND Peak Elev=561.32' Storage=0.357 of Inflow=12 43 cfs 1.246 of Outflow=5.71 cfs 1 246 of Total Runoff Area = 12.984 ac Runoff Volume = 1.852 of Average Runoff Depth = 1.71" 86.73% Pervious =11.261 ac 13.27% Impervious = 1.723 ac 635-002 Deal Road Pond Type 1124 -hr 10 -yr Rainfall=5.16" Prepared by Microsoft Printed 6/21/2017 HydroCAD010 00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2.00: POST -DA TO DETENTION POND Runoff = 12.43 cfs @ 12.26 hrs, Volume= 1.246 af, Depth= 2.07" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -yr Rainfall=5.16" Area lsfl CN Description 41,470 98 Roofs, HSG B 29,100 98 Paved roads w/curbs & sewers, HSG B 243,423 61 >75% Grass cover, Good, HSG B 313,993 69 Weighted Average 243,423 61 77.52% Pervious Area 70,570 98 22.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.5 Direct Entry, See caclulations in project folder Subcatchment 2.00: POST -DA TO DETENTION POND 13 I 12 „ I I I I 10 I I g I I - m 8 I I I 1 -,- -1- -'- -- G u 6- 4- 432 3- 2 1 I I i Hydrograph FF'��✓✓yy++-------'--'----' - '- -------I---'---- ❑Runoff __TY pe II -247 - - - - - - - - --I- - - - - - -I--------- I --------- 10 -Yr Rainfal1=5.16" r------i-T------T-r--1--' -1--'- r - l - -- _-__ -- _-'- __R-LinoffAr-ea=3'13'993,'sf_ 7 - - - -; --'-- - --------- -Ruhoff-Vo1uine'=1-.246,af - 1 'Runoff De the I I I i I I I I 1 - d= - - min I� � I I I I I I I I I I I -r- -- -T- T - I --I-- I-------- --I- ■C I --T---- I I I I i I I I I I 7 I - I I I I I I I I I I I I I -� ------ -- T --'----' - J ----'-- 1--I--- --- -- -'- - ` ----'- -� -I --- - I 1 I I I I I I I I I I I I I -_I_ _ _ __ _-__I_- ___ _ I I I I I I I I I I I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (hours) -� 635-002 Deal Road Pond Type 11 24 -hr 10 -yr Rainfall=5.16" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Runoff = 8.06 cfs @ 12.11 hrs, Volume= 0.605 af, Depth= 1.26" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -yr Rainfall=5.16" Area (sf) CN Adi Description 247,116 58 (feet) Woods/grass comb., Good, HSG B 4,487 98 10.7 Unconnected roofs, HSG B 251,603 59 58 Weighted Average, UI Adjusted 247,116 58 58 98.22% Pervious Area 4,487 98 98 1.78% Impervious Area -j 4,487 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.7 100 0.1000 0.16 Sheet Flow, Sheet Flow - 606-596 Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 139 0.1100 1.66 Shallow Concentrated Flow, Shallow Concentrated - 596-580 Woodland Kv= 5.0 fps 16 367 0.5900 3.84 Shallow Concentrated Flow, Shallow Concentrated - 580-558 Woodland Kv= 5.0 fps 2.5 130 0.0310 0.88 Shallow Concentrated Flow, Shallow Concentrated Woodland Kv= 5.0 fps 16.2 736 Total Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Hydrograph � --------T------I-- - -----7- -- ----I---- ---------1- ------- I � 9- ------ - I I I I I I I I I I I I � I I I f7 Runoff 1 IL ' t I I I 8 I Type 0 24 Thr I I I r R- a i nfa 11 #5 l I - ,------- -- -,-- r - - - - ----T- RLtnof# Area=251--A0-3-sf - r 6 - - I I 1 1 1 1 51I 1 1 _1 OV --kW =05af -------Ruoum ---------------------'-- I^5 Runoff Depth=11.26" -1------1--I --�-------I------------- 4- --I--- I- 1- C I I I -� I 1 1 1' I-= I M I --,-,Ir- ,� 4 IoW L�ehgth=736 -- 1- I 1 1 I 1 I 1 1 I 'I I 1 1 = I _r_ � _ __ _1__r_ ____ ___T__1__1_ _ r_, _ _1_ __ _l _T^_16, �iI n�In__ 3 I 1 2 --------= -;------------------1----�_-Adjusfed_G_h1-=15-8_ I I I i I I I I I I 1 I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 635-002 Deal Road Pond Type// 24 -hr 90 -yr Rainfall=5.96" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 5 Summary for Reach 1 R: Post Confluence [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 12 984 ac, 13 27% Impervious, Inflow Depth = 1.71" for 10 -yr event Inflow = 8.61 cfs @ 12.11 hrs, Volume= 1.852 of Outflow = 8.61 cfs @ 12.11 hrs, Volume= 1.852 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-60 00 hrs, dt= 0 05 hrs Reach 1 R: Post Confluence Hydrograph I I I I I I I I I I I ■Inflow ❑ Outflow Fnflov r Area 119 4 ac I I I I I I I I I I I I I I I I I I I I I � I I I - ------r- ------ -------- -- ------------ -7------ I I I I I I I I I I I I I I I I I i I I I I I I I I I I I I I I I I I I I I I I I I I I i I I I I I I I I I I I I � I I 1 - J - _ - _ _ _ L _ _ - _ _ _ _ _ I_ _------ I--------- I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 635-002 Deal Road Pond Type 1124 -hr 10 -yr Rainfal1=5.16" Prepared by Microsoft Printed 6/21/2017 HydroCAD®10 00-19 s/n 03942 02016 HydroCAD Software Solutions LLC Page 6 Summary for Pond P01: DETENTION POND Inflow Area = 7.208 ac, 22.48% Impervious, Inflow Depth = 2.07" for 10 -yr event Inflow = 12.43 cfs @ 12.26 hrs, Volume= 1.246 of Outflow = 5.71 cfs @ 12.63 hrs, Volume= 1.246 af, Atten= 54%, Lag= 21.8 min Primary = 5.71 cfs @ 12.63 hrs, Volume= 1.246 of Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 561.32' @ 12.63 hrs Surf.Area= 0.179 ac Storage= 0.357 of Plug -Flow detention time= 93.5 min calculated for 1.246 of (100% of inflow) Center -of -Mass det. time= 93.4 min ( 961 3 - 867.9 ) Volume Invert Avail.Storage Storage Description #1 558.00' 1.575 of Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 558.00 0.007 0.000 0.000 560.00 0.139 0.146 0.146 562.00 0.200 0.339 0.485 564.00 0.270 0.470 0.955 566.00 0.350 0.620 1.575 A Device Routing Invert Outlet Devices #1 Primary 557.40' 36.0" Round Culvert L= 83.3' RCP, groove,end projecting, Ke= 0.200 Inlet/ Outlet Invert= 557.40'/556.57' S= 0.0100 T Cc= 0.900 n=0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 557.80' 4.0" Vert. 1 YR Orifice/Grate C= 0.600 #3 Device 1 560.10' 36.0" W x 4.0" H Vert. 2 YR & 10 YR Orifice/Grate C= 0.600 #4 Device 1 561.60' 28.0" W x 3.0" H Vert. 25 YR Orifice/Grate C= 0.600 #5 Device 1 562.75' 48.0" x 48.0" Horiz. Overflow C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=5.71 cfs @ 12.63 hrs HW=561.32' (Free Discharge) t- =Culvert (Passes 5.71 cfs of 60.35 cfs potential flow) 2=1 YR Orifice/Grate (Orifice Controls 0.77 cfs @ 8.82 fps) 3=2 YR & 10 YR Orifice/Grate (Orifice Controls 4.94 cfs @ 4.94 fps) =25 YR Orifice/Grate ( Controls 0.00 cfs) =Overflow ( Controls 0.00 cfs) 635-002 Deal Road Pond Type 1124 -hr 10 -yr Rainfall=5.16" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 7 Pond P01: DETENTION POND Hydrograph 1 _ J _ 1 _ 1 I I I I I I I I I I I I I I I I ❑ Primary InfloWAre6=7.208 ac I I I I I I I I I I I I I I I I I I Peak- Elev 561 ,2' - I I I I I I I I I I I I Storage 0_ ._357_ of I I I I I I I I I I I I I I I 1 I I I I I I I J _ J _ _ _ _ _ _ - _ J _ _ _ _ - _ 1 _ J ------ L _ 1 ------ I_ _ L ------ _____ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I JI I I I I I I I I I I I I I I I I I I I I I I -I - i ---- -- -- - I I I I I I I I I I I I I I I I I I I I Time (hours) 2.2.4 — 25 Year, 24 Hour Storm 2.00 POST- DETENTI )A TO )N POND k DETENTION POST -D VELOPED UNDET INED AREA Su4 Reach on L ink Post Confluence iJ 635-002 Deal Road Pond Type// 24 -hr 25 -yr Rainfall=6.15" Prepared by Microsoft Printed 6/21/2017 - HydroCADO 10.00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 2 Time span=0.00-60.00 hrs, dt=0.05 hrs, 1201 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2.00: POST -DA TO Runoff Area=313,993 sf 22.48% Impervious Runoff Depth=2 83" Tc=30.5 min CN=69 Runoff=17 25 cfs 1.700 of Subcatchment2.01: POST -DEVELOPED RunoffArea=251,603 sf 1.78% Impervious Runoff Depth=1 85" Flow Length=736' Tc=16.2 min UI Adjusted CN=58 Runoff=12.51 cfs 0.891 of Reach 1 R: Post Confluence Inflow=14.13 cfs 2.591 of Outflow=14.13 cfs 2.591 of Pond P01: DETENTION POND Peak Elev=562 00' Storage=0.485 of Inflow=17.25 cfs 1.700 of ,— Outflow=8.64 cfs 1.700 of Total Runoff Area = 12.984 ac Runoff Volume = 2.591 of Average Runoff Depth = 2.39" 86.73% Pervious =11.261 ac 13.27% Impervious = 1.723 ac 635-002 Deal Road Pond Type// 24 -hr 25 -yr Rainfall=6.15" Prepared by Microsoft Printed 6/21/2017 -- HydroCAD®10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2.00: POST -DA TO DETENTION POND Runoff = 17.25 cfs @ 12.26 hrs, Volume= 1.700 af, Depth= 2.83" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -yr Rainfall=6.15" Area (sf) CN Description 41,470 98 Roofs, HSG B _ 29,100 98 Paved roads w/curbs & sewers, HSG B 243,423 61 >75% Grass cover, Good, HSG B ' 313,993 69 Weighted Average 243,423 61 77.52% Pervious Area 70,570 98 22.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.5 Direct Entry, See caclulations in project folder Subcatchment 2.00: POST -DA TO DETENTION POND Hydrograph _ ,e_ _ --,--I I I I I I I I I -------l--i----I -----------------------'---- f��1�7�25rcfs•� -- ,- - 1 ---- ❑Runoff ,7---, Type II 24hr 16 15 I - - �. ------- - - -- --' - �- 25 -yr Rainfall=6.'f5'�- I- I I I 14 ---- 1Are ---- I - ----; -; ---'-- - --; ff a=3-1'3-;993 sf - Rd ' _' 13 12 ----'-- — -1----- -----------=--- - - -- --=----'-- --- - - - Runoff Volume=1:700 of y 11 - II T -I- T 7 -------- R- - -RUn- o- -ff-DII1epi*I,1 -. I109 --I ---- '' 6 -I --I --1I ---- -iI � --'I --�--- ---- --------------- -- ---- -- - -- -- I-----------1--';--- N16 b, I I 5 _ / 1 - --'-- _ 1 _ _ q _ ' 2 I - - --- ----------1--------- - -I-- 1- _ - - - - - - - - - - - - - - - 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Time (hours) 635-002 Deal Road Pond Type// 24 -hr 25 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Pape 4 Summary for Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Runoff = 12.51 cfs @ 12.10 hrs, Volume= 0.891 af, Depth= 1.85" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0 00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -yr Rainfall=6.15" Area (sfl CN Adi Description 247,116 58 (feet) Woods/grass comb., Good, HSG B 4,487 98 10.7 Unconnected roofs, HSG B 251,603 59 58 Weighted Average, UI Adjusted 247,116 58 58 98.22% Pervious Area 4,487 98 98 1.78% Impervious Area 4,487 3 7 1 - I I I I 100 00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.7 100 01000 0.16 Sheet Flow, Sheet Flow - 606-596 ------r---- 10Runoff --r- ------r------r--i--I----r--I---`-----I---------r-r---- - �4rea=2511 603 sf Woods- Light underbrush n= 0.400 P2= 3.54" 1.4 139 0.1100 1.66 Shallow Concentrated Flow, Shallow Concentrated - 596-580 3 7 1 - I I I I o Woodland Kv= 5.0 fps 1.6 367 0.5900 3.84 Shallow Concentrated Flow, Shallow Concentrated - 580-558 -, -, --I - - -,--'-- - -, - ---1-----------T16.2�--, -- i- c=� ' 4 I I I I I _ I _ _ _ _ _ _ __N=158 Adj Woodland Kv= 5.0 fps 2.5 130 0.0310 0.88 Shallow Concentrated Flow, Shallow Concentrated 2 Woodland Kv= 5.0 fps 16.2 736 Total Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Hydrograph 14 I I I I 1 I I_ T- unoff 13 12.5ccfs', - -_ - -ype_n-24 hr - 12 I 25 -yr Rainfall=6.15" ------r---- 10Runoff --r- ------r------r--i--I----r--I---`-----I---------r-r---- - �4rea=2511 603 sf 9 �' I I � I -;- --;-- - - - - ----;---- -;--;-Runoff-Voluilxtle=0:891;af - ^ t -Runoff- Depth=1-.85"- 3 7 1 - I I I I o --------- -- - - --,-- - - ------ ------;--,-Flow Length=73-6'-- 6 I I I I I � 5 -, -, --I - - -,--'-- - -, - ---1-----------T16.2�--, -- i- c=� ' 4 I I I I I _ I _ _ _ _ _ _ __N=158 Adj _-lJl ---- _ 3 I I 2 1 I I I I I I I I I I I I I 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 635-002 Deal Road Pond Type 1124 -hr 25 -yr Rainfall=6.15" Prepared by Microsoft Printed 6/21/2017 HydroCAD010 00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 5 Summary for Reach 1 R: Post Confluence [40] Hint- Not Described (Outflow= Inflow) Inflow Area = 12 984 ac, 13.27% Impervious, Inflow Depth = 2.39" for 25 -yr event Inflow = 14.13 cfs @ 12.15 hrs, Volume= 2.591 of Outflow = 14 13 cfs @ 12.15 hrs, Volume= 2.591 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Reach 1 R: Post Confluence Hydrograph I ----7-� ----I-- - - - - - T� rI -T� - - - - - --I I - - - - - - -I - - - - - -- Inflow ❑ Outflow --------- -------- -Inflow-Areal-1-2:984 -ac - � I I I I I I I I I I I I I I I I I I � I I =--I- -- - - - --I- - ---- _ --------- ------ I- - ------ - - - - - I I I I I I I I I I I I I I i i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I i I I I I _ _ _ _ -- - _ _ _ _ _ I_ _ I_ _ _ _ _ _ _I I- - - - _ I I I I I - � I I I __ I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 635-002 Deal Road Pond Type// 24 -hr 25 -yr Rainfall=6.15" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 6 Summary for Pond P01: DETENTION POND Inflow Area = 7.208 ac, 22.48% Impervious, Inflow Depth = 2.83" for 25 -yr event Inflow = 17.25 cfs @ 12.26 hrs, Volume= 1.700 of Outflow = 8.64 cfs @ 12.58 hrs, Volume= 1.700 af, Atten= 50%, Lag= 19.5 min Primary = 8.64 cfs @ 12.58 hrs, Volume= 1.700 of Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs - Peak Elev= 562.00' @ 12.58 hrs Surf.Area= 0.200 ac Storage= 0.485 of Plug -Flow detention time= 85.3 min calculated for 1.700 of (100% of inflow) Center -of -Mass det. time= 85.3 min ( 944.1 - 858.8 ) r� Volume Invert Avail.Storage Storage Description J #1 558.00' 1.575 of Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store _ (feet) (acres) (acre-feet) (acre-feet) 558.00 0.007 0.000 0.000 560.00 0.139 0.146 0.146 562.00 0.200 0.339 0.485 564.00 0.270 0.470 0.955 566.00 0.350 0.620 1.575 Device Routing Invert Outlet Devices #1 Primary 557.40' 36.0" Round Culvert L= 83.3' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 557.40'/ 556.57' S=0.0100'/' Cc= 0.900 n=0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 557.80' 4.0" Vert. 1 YR Orifice/Grate C= 0.600 #3 Device 1 560.10' 36.0" W x 4.0" H Vert. 2 YR & 10 YR Orifice/Grate C= 0.600 #4 Device 1 561.60' 28.0" W x 3.0" H Vert. 25 YR Orifice/Grate C= 0.600 #5 Device 1 562.75' 48.0" x 48.0" Horiz. Overflow C= 0.600 Limited to weir flow at low heads I' LJ Primary OutFlow Max=8.63 cfs @ 12.58 hrs HW=562.00' (Free Discharge) t -=Culvert (Passes 8.63 cfs of 69.15 cfs potential flow) 2=1 YR Orifice/Grate (Orifice Controls 0.84 cfs @ 9.67 fps) 3=2 YR & 10 YR Orifice/Grate (Orifice Controls 6.33 cfs @ 6.33 fps) =25 YR Orifice/Grate (Orifice Controls 1.45 cfs @ 2.49 fps) =Overflow ( Controls 0.00 cfs) 635-002 Deal Road Pond Type 11 24 -hr 25 -yr Rainfall=6.15" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 7 Pond P01: DETENTION POND Hydrograph 1 _ 1 —----— L _ L —-—--— L — L -----— I— _ L —-- 17.2-5 _17.25 cfs I I ' I I I ' I I I I I I • I • 118:64 0 • I I ' I I -----------------;--InfloW Area=7.-208- ac - ! ------------------+-,--- I I I I I I Peak -Eley; 562;.010' - I I 1 I I I I I I I I I I I I I Stora a=0.485 of I I I I I I I I I I I I I I I I I I I I I I I I 11 I I I I I r - r I— -r I r - - - I I I I I I I I I I I I I I I I — — — — — — — I I I ---'-- ----'- -'- - -- I I I I — — — — — — — — — — — — I I I I I I I I I I I I I J _ _ — _ _ — _ — 1 _ _I_ _ _ _ I I I I I I I _ _ L _ J _ _ — _ _ _ L _ 1 _ _ _ _ — — I_ _ L _ _ _ _ _ —I_ _ L I I I I I I I I IL I 1 _ J _ _ _ _ _ _ L _ 1 _ _ _ _ _ _ L _ IL — _ _ _ _I_ I I I I I I I I I I I I I I I I %''.�'�I,.!� !!// 2�'�%✓�LL�lI�4Lt/J1fe.'rfir`���1*L'j+i�. .. �G �,6�,+—.'fi,�'y%�i„�y may/////!/!//!/O!///!///!///!/!!/!//////lfTime (hours) F Inflow ❑ Primary 2.2.5 — 50 Year, 24 Hour Storm C. POST-EATO DETENTIN POND I� DETENTION POST-D�VELOPED UNDET INED AREA 'S.ubcat Each on L ink Post Confluence 635-002 Deal Road Pond Type 1124 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10.00-19 s/n 03942 02016 HydroCAD Software Solutions LLC Page 2 Time span=0.00-60.00 hrs, dt=0 05 hrs, 1201 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2.00: POST -DA TO Runoff Area=313,993 sf 22 48% Impervious Runoff Depth=3 47" Tc=30.5 min CN=69 Runoff=21.32 cfs 2.086 of Subcatchment2.01: POST -DEVELOPED RunoffArea=251,603 sf 1 78% Impervious Runoff Depth=2 38" Flow Length=736' Tc=16.2 min UI Adjusted CN=58 Runoff=16 42 cfs 1 143 of Reach 1 R: Post Confluence Inflow=19.74 cfs 3 230 of Outflow=19 74 cfs 3 230 of Pond P01: DETENTION POND Peak Elev=562 52' Storage=0 593 of Inflow=21.32 cfs 2.086 of Outflow=10 61 cfs 2.086 of Total Runoff Area = 12.984 ac Runoff Volume = 3.230 of Average Runoff Depth = 2.98" 86.73% Pervious = 11.261 ac 13.27% Impervious = 1.723 ac 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCAD@ 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2.00: POST -DA TO DETENTION POND Runoff = 21.32 cfs @ 12.26 hrs, Volume= 2.086 af, Depth= 3.47" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0 00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 50 -yr Rainfall=6.95" Area (sf) CN Description 41,470 98 Roofs, HSG B 29,100 98 Paved roads w/curbs & sewers, HSG B 243,423 61 >75% Grass cover, Good, HSG B 313,993 69 Weighted Average 243,423 61 77.52% Pervious Area 70,570 98 22.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.5 Direct Entry, See caclulations in project folder Subcatchment 2.00: POST -DA TO DETENTION POND Hydrograph 23-_1 � --II -------- i' ----------- ❑Runoff 21.3_ 2�;C,fs-------II 22: I I I I 21' - - -----------------}-------- I I I --'---- - ------Type-H-24hr - 20= , 19= 50 -yr Rainfall=6.95 " S _ _ Y _ _ _ _I_ _ _ _ — — r. _ _ _ _ _ _ _ _ t _ _— _ _ _ - _ Y _ _ t _ _ _ — _ _I_ — _ _ _ _ _ _ _I_ _ _ _ — _ -7 _ r _ t _ ,7 _ _ _ — _ _ _ _ _ _ _ -;-- - - - - -- ------ -----Rdn®ff Are&3 1- 993 sf - 16 _1___ I_____ c _L——___—__1I1_�I1 I________— I__..___'__ L_ 1____ 15 I I I I I I I I I I I � I Volume=2.086; of 14 ,3_ ---'_------ -----1---_--I----i- - - - - ----------- - - - - - - - - - -- --1-Runoff -- -- s � Runoff Depth 3.47"- 3 12 ---------- *,-r------r----I-- -r---r--- T - -I- - - - - - - - -----r-7---- o 11 I _ I I Tc=30.5' i 10 M n y- 9 — A W: 9_ _ 7 -4---------r--------r---—--r---i---- I -----------I---------r- ---- 6 I "—j----j---—(—r——-----—r--I—---—-----—--I-— I — -— — — —— —I-- -- -- i l 5 - -'---- -�---- - - �/ I + --I --' -- -a- '--------- - - - - - I -a- - I I I I I I I I I I —— —I— 3 - - - -- —------ —- �� ' -'--' ---'-- --- --'--'——------- - - - - -- '- - -- 2 _i_—__I_____ _ _____}______y_.y_____}—_I_________I--__—____F_}____ 1 I I I I I I I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) - 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Paoe 4 Summary for Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Runoff = 16.42 cfs @ 12.10 hrs, Volume= 1.143 af, Depth= 2.38" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 50 -yr Rainfall=6.95" Area (sf) CN Adi Description - 247,116 58 Woods/grass comb., Good, HSG B - 4,487 98 Unconnected roofs, HSG B 251,603 59 58 Weighted Average, UI Adjusted 247,116 58 58 98.22% Pervious Area 4,487 98 98 1.78% Impervious Area 4,487 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.7 100 0.1000 0.16 Sheet Flow, Sheet Flow - 606-596 Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 139 0.1100 1.66 Shallow Concentrated Flow, Shallow Concentrated - 596-580 Woodland Kv= 5.0 fps 1.6 367 0.5900 3.84 Shallow Concentrated Flow, Shallow Concentrated - 580-558 Woodland Kv= 5.0 fps 2.5 130 0.0310 0.88 Shallow Concentrated Flow, Shallow Concentrated Woodland Kv= 5.0 fos 16.2 736 Total Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Hydrograph 16:42' 1 1 _ 16 T _ - 1 _ r - T _ _1 _ _ _ _ r _ - ®Runoff 11: I I I -I .-;cfs I T I----- i----1--r-T--I--I--r- ----r-T-----------'----1----r-T-'i-- 16 - - TY ple-ll_�4=Lll__ +---'--*--1--I----+--1-------- 1- + 1 5 V30 9 -'iiI ------I _----Ir --------- ----i- -- ---'�� -- I n5o1II --0 ff�-yr - r-Re� aa1II -=in2ILi f-5all-�=60'III .391II 5s" 14- 13 4 12 lm1:143; ofRunofVoue 10 --, -- Runoff D-,.38"fI� - - - - - - --TT+'-----I11--r---- r+r---+II --_-1 --_-'-_-II"---I1I T F_IW _- _LI_ eM 8 -"th-'-_-_- �1i_- 311 fi-_1 t 0 AT r-I-rT-1 7 - I -611 1 J 5 ;UIAdjA e0_58 _I LI - I 3 - - -,- -I- - --_- -I- - - - -- _'- - J - -- _ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 Time (hours) 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 5 Summary for Reach 1 R: Post Confluence [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 12.984 ac, 13.27% Impervious, Inflow Depth = 2.98" for 50 -yr event Inflow = 19.74 cfs @ 12.12 hrs, Volume= 3.230 of Outflow = 19.74 cfs @ 12.12 hrs, Volume= 3.230 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs I I 221(,"1------- Q_ d r 21---- 1,9.74cfs Reach 1 R: Post Confluence Hydrograph -' I -----'----------- � -I ------I -------� -� _ -II --� -------I -------- I*- --- --.------ ■Inflow - ' - - - - - I - ------ - - - -- ❑Outflow Inf_ ea�,-; l -®w+ �r1-27.9-84 - -.9-84aC - ------------------------------ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I f I I t I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1______I__ L___ -__I__I_-____ i I 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) - 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Pa-ge 6 Summary for Pond P01: DETENTION POND Inflow Area = 7.208 ac, 22.48% Impervious, Inflow Depth = 3.47" for 50 -yr event Inflow = 21.32 cfs @ 12.26 hrs, Volume= 2.086 of Outflow = 10.61 cfs @ 12.58 hrs, Volume= 2.086 af, Atten= 50%, Lag= 19.4 min Primary = 10.61 cfs @ 12.58 hrs, Volume= 2.086 of Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 562.52' @ 12.58 hrs Surf.Area= 0.218 ac Storage= 0.593 of Plug -Flow detention time= 79.2 min calculated for 2.084 of (100% of inflow) Center -of -Mass det. time= 79.3 min ( 932.3 - 852.9 ) Volume Invert Avail.Storage Storage Description #1 558.00' 1.575 of Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store _(feet) (acres) (acre-feet) (acre-feet) 558.00 0.007 0.000 0.000 560.00 0.139 0.146 0.146 562.00 0.200 0.339 0.485 564.00 0.270 0.470 0.955 566.00 0.350 0.620 1.575 Device Routing Invert Outlet Devices #1 Primary 557.40' 36.0" Round Culvert L= 83.3' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 557.40'/556.57' S=0.0100'/' Cc= 0.900 n=0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 557.80' 4.0" Vert. 1 YR Orifice/Grate C= 0.600 #3 Device 1 560.10' 36.0" W x 4.0" H Vert. 2 YR & 10 YR Orifice/Grate C= 0.600 #4 Device 1 561.60' 28.0" W x 3.0" H Vert. 25 YR Orifice/Grate C= 0.600 #5 Device 1 562.75' 48.0" x 48.0" Horiz. Overflow C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=10.61 cfs @ 12.58 hrs HW=562.51' (Free Discharge) L=Culvert (Passes 10.61 cfs of 76.17 cfs potential flow) 2=1 YR Orifice/Grate (Orifice Controls 0.90 cfs @ 10.27 fps) 3=2 YR & 10 YR Orifice/Grate (Orifice Controls 7.22 cfs @ 7.22 fps) -- =25 YR Orifice/Grate (Orifice Controls 2.49 cfs @ 4.27 fps) =Overflow ( Controls 0.00 cfs) 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 7 Pond P01: DETENTION POND Hydrograph I I I I I ® Inflow 21,.,32 efs ; [IPrimary22: 23 InfIOw;Area=7.200 ac 21- 20- _-_--_,__I___ _ ______i_�______}_ ___ lea+k-Flew=562'5;2" - 19_ __,'. I I I I 18 17- �, - - - ------I--, - - - --I-- --------- ---,--,---------,------, - - - - - - - -- - - - - - - -L- - - - -- --- - - - - -- --- - - ;-----St®rage ;0.593-af - 16- 15. '', ___---I--r- -r-- i -- - - - -r I - r - I F I r I r---- - -------'- -- --------'--------- ----- N w 13. I I I I I + I I I I + I I 3 12 ''' ---- 1'0..6'1'cfs�;----- -------------- J - - - - - - ------------------ --- LL 10- i I I I I 1 I I I I I I I I I ] _ _ 7 _ - - - _ - _I_ J _ _I_ - - - _ - 1 _ J _ _ - - - _ L _ J _ _ _ - _ _ L _ 1 _ _ _ _ _ _I_ _ L - _ - _ - _I_ 5 - - - - -- --'-►f ---'---- - --'--- --'---=--------'--'------- - - - - ---- -;---- 3- 2 1 0 2 4 6 6 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 4O'42 44 46 48 50 52 54 56 58 60 Time (hours) 2.2.6 — 50 Year, 24 Hour Storm 2.00 POST -DA TO DETENTION POND DETENTION 2.01 POST -D VELOPED UNDET INED AREA Subcat Reach on Link Post Confluence 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 2 Time span=0.00-60 00 hrs, dt=0.05 hrs, 1201 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2.00: POST -DA TO Runoff Area=313,993 sf 22.48% Impervious Runoff Depth=3 47" Tc=30 5 min CN=69 Runoff=21 32 cfs 2 086 of Subcatchment2.01: POST -DEVELOPED RunoffArea=251,603 sf 1 78% Impervious Runoff Depth=2 38" Flow Length=736' Tc=16 2 min UI Adjusted CN=58 Runoff=16 42 cfs 1.143 of Reach 1 R: Post Confluence Inflow=19.74 cfs 3 230 of Outflow=19.74 cfs 3 230 of Pond P01: DETENTION POND Peak Elev=562 52' Storage=0 593 of Inflow=21 32 cfs 2.086 of Outflow=10 61 cfs 2.086 of Total Runoff Area = 12.984 ac Runoff Volume = 3.230 of Average Runoff Depth = 2.98" 86.73% Pervious = 11.261 ac 13.27% Impervious = 1.723 ac 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCAD@ 10.00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2.00: POST -DA TO DETENTION POND Runoff = 21.32 cfs @ 12.26 hrs, Volume= 2.086 af, Depth= 3 47" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 50 -yr Rainfall=6.95" Area (sfl CN Descriotion 41,470 98 Roofs, HSG B 29,100 98 Paved roads w/curbs & sewers, HSG B 243,423 61 >75% Grass cover, Good, HSG B 313,993 69 Weighted Average 243,423 61 77.52% Pervious Area 70,570 98 22.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.5 Direct Entry, See caclulations in project folder Subcatchment 2.00: POST -DA TO DETENTION POND Hydrograph I ' I I I I ' I ' ' ' I ' I ❑Runoff 23 ---,--I '21`32,�cfs T _ _I _ _ _ _ T _ , - --I----T--I---------I---------r-r----- 22 �, - -- - _ _ 21 . I I ---- - - - - -- -------------,----,-------+----------�/pe-H-24I;hr- 20 ,9 50 -yr Rainfall=6.95" 18_ - -r - - - - I ----- � -r--------*--I----r-�--I----*--I---------I---------r--�---- 17 -L ----;---- -;--- -Runoff -rea- - -- ,6 . -- , , ---- ----- ',r _ _ - ----I----- --993 -- -�------1--I----�-�--I-Runoff 15 I I I I I � I I I I I RunoffVolume -2.--L-1---- 086 of 14 ----------- E I I ---- -----------------=--'------------------------- I I _I � ----.--� -_1I -1I -RunoffDe th=3 47" - .... 12 I r --I- 11 Tc=30.min 10 - 9 I I CN -69 9- a- - - - - - - - - - L - - - - - - - - L _ 7 _T____I____,_r________T__I____r_-__I____7__I_________I_________r_T____ 6_ - _ _I_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _I_ _ - _ T _ _ _ _I_ _ _ _ - _ _I_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _I_ _ _ _ - - _ _ _ I I 5 _ I- - - - - -I I 2 � ----- - - - -- -I---------+---I---- ---------------------+---- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 Time (hours) 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Runoff = 16.42 cfs @ 12.10 hrs, Volume= 1.143 af, Depth= 2.38" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 50 -yr Rainfall=6 95" Area (sf) CN Adl Description 247,116 58 (feet) Woods/grass comb., Good, HSG B 4,487 98 10.7 Unconnected roofs, HSG B 251,603 59 58 Weighted Average, UI Adjusted 247,116 58 58 98.22% Pervious Area 4,487 98 98 1.78% Impervious Area 4,487 100 00% Unconnected Tc Length Slope Velocity Capacity Description _ (min) (feet) (ft/ft) (ft/sec) (cfs) 10.7 100 0.1000 0.16 Sheet Flow, Sheet Flow - 606-596 14 -yr , I - 13 Woods: Light underbrush n= 0.400 P2= 3.54" 1.4 139 0.1100 1.66 Shallow Concentrated Flow, Shallow Concentrated - 596-580 10-: V - _". I I � ---------; k-- -------I-------------I---- T -R - Depth=2.36-'-- Woodland Kv= 5.0 fps 1.6 367 0.5900 3.84 Shallow Concentrated Flow, Shallow Concentrated - 580-558 7- - I I -i----I---------------+--I---------I----+----------- x .A Woodland Kv= 5.0 fps 2.5 130 0.0310 0.88 Shallow Concentrated Flow, Shallow Concentrated 4 -' ----- -` k --- 1----'-- - J 3 Woodland Kv= 5.0 fps 16.2 736 Total Subcatchment 2.01: POST -DEVELOPED UNDETAINED AREA Hydrograph 18 -j - -- - -- - -F - -- - - - - -- T - -I - - -- - - ❑ Runoff -----,- T-- - - - - r -I ------T ----------- - - - - - - - - F 7---- - ----' 16.42 17-:- cfs, i I I I I -,-,- �-----i--I-----,-,--I---- - I------l---�'---y--- e�A,---- - -I - 15 50 Rainfall=6.95" 14 -yr , I - 13 - - - ----- -----' --'-J--'- I ' Rlun®ff Area=251 603' of ;Run®ff Vol une=1:13; of 11 - 10-: V - _". I I � ---------; k-- -------I-------------I---- T -R - Depth=2.36-'-- 3 9 O M8 E , ___I__ ___ _____ _ FIo Length;■ 3Vi.=- ' _/Mt_ _ T---------r-----i--� YY - - - T - - - - r - T - - - - - - - T - - - - - - T - - -I- - r - - - - - r - T 7- - I I -i----I---------------+--I---------I----+----------- x .A b, 5 I Adjusted CN =;S9 __bI 4 -' ----- -` k --- 1----'-- - J 3 I I I I I I I I I I I I I -' - - -- ---- -' - -- -'-------- - - - - -- '--' 'Z ) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCADO 10 00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 5 Summary for Reach 1 R: Post Confluence [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 12.984 ac, 13 27% Impervious, Inflow Depth = 2.98" for 50 -yr event Inflow = 19.74 cfs @ 12 12 hrs, Volume= 3 230 of Outflow = 19.74 cfs @ 12.12 hrs, Volume= 3.230 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-60.00 hrs, dt= 0 05 hrs Reach 1 R: Post Confluence Hydrograph 22 --------------- -----19+; -- Q 7@'._� ------------------------r- I------I--I------�-------- - - I I - 1 ______1_______1______L_1--____I__L_----_I__I___--__ ■Inflow ❑ Outflow 21 cfs';---------r-7------ -1-2- 20 9-84 --===-74 -Ifffl6W-//�P��=x -ac s ' - -' - - --------- - - - - - - - - - - - '- - - - --- ---------------------- 18' I I I I I I I I w _ _ _ _ _ - I _ _ _ _ _ _ 15 I 14 13 _ -; - - - N (� 12- `- -' I I I ; '• I I I I I I I I I 11 I I I I I I I i I I I � C 10 - LL - 7 I I I I I I I I I I I I ' , - -I 4- 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCAD®10.00-19 s/n 03942 @2016 HydroCAD Software Solutions LLC Page 6 Summary for Pond P01: DETENTION POND Inflow Area = 7.208 ac, 22.48% Impervious, Inflow Depth = 3.47" for 50 -yr event Inflow = 21.32 cfs @ 12.26 hrs, Volume= 2.086 of Outflow = 10.61 cfs @ 12.58 hrs, Volume= 2.086 af, Atten= 50%, Lag= 19.4 min Primary = 10.61 cfs @ 12.58 hrs, Volume= 2.086 of Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 562.52' @ 12.58 hrs Surf.Area= 0.218 ac Storage= 0.593 of Plug -Flow detention time= 79.2 min calculated for 2.084 of (100% of inflow) Center -of -Mass det. time= 79.3 min ( 932.3 - 852.9 ) Volume Invert Avail.Storage Storage Description #1 558.00' 1.575 of Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 558.00 0.007 0.000 0.000 560.00 0.139 0.146 0.146 562.00 0.200 0.339 0.485 564.00 0.270 0.470 0.955 566.00 0.350 0.620 1.575 Device Routing Invert Outlet Devices #1 Primary 557.40' 36.0" Round Culvert L= 83.3' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 557.40'/ 556.57' S=0.0100'/' Cc= 0.900 n=0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf J #2 Device 1 557.80' 4.0" Vert. 1 YR Orifice/Grate C= 0.600 #3 Device 1 560.10' 36.0" W x 4.0" H Vert. 2 YR 810 YR Orifice/Grate C= 0.600 #4 Device 1 561.60' 28.0" W x 3.0" H Vert. 25 YR Orifice/Grate C= 0.600 #5 Device 1 562.75' 48.0" x 48.0" Horiz. Overflow C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=10.61 cfs @ 12.58 hrs HW=562.51' (Free Discharge) 'L =Culvert (Passes 10.61 cfs of 76.17 cfs potential flow) 2=1 YR Orifice/Grate (Orifice Controls 0.90 cfs @ 10.27 fps) 3=2 YR & 10 YR Orifice/Grate (Orifice Controls 7.22 cfs @ 7.22 fps) =25 YR Orifice/Grate (Orifice Controls 2.49 cfs @ 4.27 fps) =Overflow ( Controls 0.00 cfs) 1 I L` 635-002 Deal Road Pond Type// 24 -hr 50 -yr Rainfall=6.95" Prepared by Microsoft Printed 6/21/2017 HydroCAD® 10.00-19 s/n 03942 © 2016 HydroCAD Software Solutions LLC Page 7 21 41 I I I I I I I I I I � I I I I I I ' I I Pond P01: DETENTION POND I Hydrograph I I I I S:fs ❑ Inflow Prima ry Inflow Area=7®206 ac -,--------j- I I I I I I I I I I ------ ----- Pealk-EI6v"562:251 I I i - I Storage=0.59-3-af I I I I I I - I I I I I I I I I I I I I I I ) I I I I i I I I I I I I I I I I I I I I i -_----_I_-'----- I I I I I I I -I--Ir---r--r--I------r-i------r-1------r-r I I I I I I I I I I I I I I I I I I I I I r --- J � I II 1 _ J _ _ _ _ _ _ 1 _ 1 _ - - _ _ - L _ 1 - _ _ _ - _ L _ 1-7 r -r I I I I I L _ - _ _ _ _I_ -r -r---- I I I Time (hours) 58 60 Chapter 3 — Storm Drain Hydraulic Analysis 3.1— Ditch Design Channel Report Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3D@ by Autodesk, Inc - Ditch 1 to DI -1 - 2 Year Event _ Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) I! = 1.50 Invert Elev (ft) = 602.00 Slope (%) = 1.00 N -Value = 0.060 (—; Calculations ! Compute by: Known Q Known Q (cfs) = 1.28 Elev 604.00 I, 603.50 603.00 i 602.50 602.00 601.50 (ft) Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.63 = 1.280 = 1.19 = 1.07 = 3.98 = 0.41 = 3.78 = 0.65 0 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) Depth (ft) 2.00 1.50 1.00 050 M9 n rn Channel Report Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3DO by Autodesk, Inc i Ditch 1 to DI -1 - 5 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 602.00 Slope (%) = 1.00 N -Value = 0.060 - Calculations Compute by: Known Q Known Q (cfs) = 1.49 Elev 604.00 603.50 603.00 I -J 602.50 .I 60200 601.50 i A Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.66 = 1.490 = 1.31 = 1.14 = 4.17 = 0.44 = 3.96 = 0.68 0 1 2 3 4 5 6 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 M n r1n 7 8 9 10 11 v vv Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D@ by Autodesk, Inc Ditch I to DI -1 - 10 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 602.00 Slope (%) = 1.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 1.64 Elev (ft) Section 60400 60350 60300 60250 602.00 601.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.69 = 1.640 = 1.43 = 1.15 = 4.36 = 0.46 = 4.14 = 0.71 - T - 1 2 3 4 5 6 7 Reach (ft) Depth (ft) 2.00 1 50 1.00 050 FIXOT41 -r) r1r) 8 9 10 11 v vv � L , sion Control Materials Design Software Version 5.0 Project Name: Deal Road Project Number: 121120 Project Location: Weddington, NC Channel Name: Ditch 1 Discharge 1.64 Peak Flow Period 24 Channel Slope 0.01 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardance Class D Vegtation Type Mix (Sod & Bunch) Vegetation Density Good 75-95% Soil Type Sandy Loam Unreinforced Vegetation - Class D - Mix (Sod & Bunch) - Good 75-95% North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 Fax 812.867.0247 www.nagreen.com Phase Reach Discharge Velocity Normal Nlannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern Unreinforced Straight 1.64 cfs 0.75 0.85 ft 0.108 3.33 lbs/ft2 0.53 lbs/ft2 6.27 STABLE Vegetation ft/s Underlying Straigh 1.64 cfs 0.75 0.85 ft -- 0.04 lbs/ft2 0.003 lbs/ft2 12.57 STABLE -- Substrate I ft/s Channel Report Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3D0 by Autodesk, Inc Ditch 2 to DI -1 - 2 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 602.00 Slope (%) = 4.00 N -Value = 0.060 - Calculations Compute by: Known Q Known Q (cfs) = 1.56 Elev (ft) - - 7 604.00 60350 60300 60250 60200 601 50 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.52 = 1.560 = 0.81 = 1.92 = 3.29 = 0.45 = 3.12 = 0.58 Depth (ft) 2.00 1.50 1 00 0.50 1 2 3 4 5 6 Reach (ft) 7 8 9 10 11 Channel Report Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3D@ by Autodesk, Inc Ditch 2 to DI -1 - 5 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 602.00 Slope = 4.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 1.82 Elev (ft) Section 60400 603.50 603.00 602.50 60200 601 50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.55 = 1.820 = 0.91 = 2.01 = 3.48 = 0.47 = 3.30 = 0.61 Depth (ft) 2.00 2 3 4 5 6 7 Reach (ft) 8 9 10 11 1 50 1.00 050 IIMO _n r1n Channel Report Hydraflow Express Extension for Autodesk@) AutoCADO Civil 3DO by Autodesk, Inc Ditch 2 to DI -1 - 10 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 602.00 Slope (%) = 4.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.00 Elev (ft) Section 604.00 60350 60300 60250 602.00 601 50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.57 = 2.000 = 0.97 = 2.05 = 3.60 = 0.49 = 3.42 = 0.64 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1.50 1 00 0.50 9 1O, _n Gn 9 10 11 - vv North American Green Project Name: Deal Road Project Number: 121120 Project Location: Weddington, NC Channel Name: Ditch 2 Discharge 2 Peak Flow Period 24 Channel Slope 0.04 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardance Class D Vegtation Type Mix (Sod & Bunch) Vegetation Density Fair 50-75% Soil Type Sandy Loam Unreinforced Vegetation - Class D - Mix (Sod & Bunch) - Fair 50-75% Phase Reach Discharge Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern Unreinforced Straight 2 cfs 1.6 0.65 ft 0.084 3.33 lbs/ft2 1.61 lbs/ft2 2.07 STABLE Vegetation ft/s Underlying Straigh 2 cfs 1.6 0.65 ft -- 0.04 lbs/ft2 0.022 lbs/ft2 1.59 STABLE -- Substrate I ft/s Channel Report Hydraflow Express Extension for Autodesk® AutoCADO Civil 3D0 by Autodesk, Inc Ditch 3 to DI -2 - 2 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 578.00 Slope (%) = 8.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 3.86 Elev (ft) Section 580.00 57950 57900 57850 578.00 577.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.64 = 3.860 = 1.23 = 3.14 = 4.05 = 0.64 = 3.84 = 0.79 1 2 3 4 5 6 Reach (ft) Depth (ft) 200 1.50 1.00 0.50 _n rn 7 8 9 10 11 v Channel Report Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3D@ by Autodesk, Inc Ditch 3 to DI -2 - 5 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 578.00 Slope (%) = 8.00 N -Value = 0.060 -, Calculations Compute by: Known Q Known Q (cfs) = 4.49 Elev (ft) Section 58000 579.50 579.00 578.50 57800 577.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.68 = 4.490 = 1.39 = 3.24 = 4.30 = 0.68 = 4.08 = 0.84 1 2 3 4 5 6 7 Reach (ft) 8 9 10 11 Depth (ft) 200 1 50 1.00 050 _n Gn Channel Report Hydraflow Express Extension for Autodesk® AutoCADO Civil 3DO by Autodesk, Inc Ditch 3 to DI -2 - 10 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 578.00 Slope (%) = 8.00 N -Value = 0.060 - -I Calculations Compute by: Known Q Known Q (cfs) = 4.94 Elev (ft) Section 580.00 579.50 579.00 578.50 578.00 577.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.71 = 4.940 = 1.51 = 3.27 = 4.49 = 0.71 = 4.26 = 0.88 1 2 3 4 Depth (ft) 200 1.50 1.00 050 MIX n Gn 5 6 7 8 9 10 11 vvV Reach (ft) North American Green ®� 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 AMERICAN Tel. 800.772.2040 Fax 812.867.0247 GREEN www.nagreen.com sion Control Materials Design Software Version 5.0 Project Name: Deal )toad Project Number: 121120 Project Location: Weddington, NC Channel Name: Ditch 3 Discharge 4.94 Peak Flow Period 24 Channel Slope 0.08 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardance Class D Vegtation Type Mix (Sod & Bunch) Vegetation Density Fair 50-75% Soil Type Sandy Loam SC250 - Class D - Mix (Sod & Bunch) - Fair 50-75% Phase Reach Discharge Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Patter SC250 Unvegetated Straight 4.94 cfs 4.71 0.59 ft 0.038 2.5 lbs/ft2 2.95 lbs/ft2 0.85 UNSTABLE E ft/s SC250 Reinforced Straight 4.94 cfs 3.41 0.69 ft 0.059 8 lbs/ft2 3.47 lbs/ft2 2.31 STABLE E Vegetation ft/s Underlying Substrate Straight 4.94 cfs 3.41 0.69 ft -- 0.8 lbs/ft2 0.527 lbs/ft2 1.52 STABLE -- ft/s Channel Report Hydraflow Express Extension for Autodesk@ AutoCAD@ Civil 3D@ by Autodesk, Inc Ditch 4 to LVWA - 2 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 580.00 Slope (%) = 8.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.27 Elev (ft) Section 582.00 581.50 581 00 58050 58000 57950 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.53 = 2.270 = 0.84 = 2.69 = 3.35 = 0.52 = 3.18 = 0.64 Depth (ft) 2.00 1 50 1 00 0.50 9"1 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCADO Civil 3D@ by Autodesk, Inc Ditch 4 to LWA - 5 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 580.00 Slope (%) = 8.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.11 Elev (ft) Section 58200 581 50 581.00 580.50 580.00 57950 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.51 = 2.110 = 0.78 = 2.70 = 3.23 = 0.50 = 3.06 = 0.62 Depth (ft) 200 1 50 1.00 0.50 1 2 3 4 5 6 7 Reach (ft) 8 9 10 11 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD@ Civil 3D@ by Autodesk, Inc Ditch 4 to LW -1 - 10 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 580.00 Slope (%) = 8.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.90 Elev (ft) UO/- UU 581 50 581 00 580.50 58000 579.50 Section Highlighted Depth (ft) Q (Cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.58 = 2.900 = 1.01 = 2.87 = 3.67 = 0.57 = 3.48 = 0.71 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1.50 1.00 050 ME n r1n 9 10 11 v vv sion Control Materials Design Software Version 5.0 Project Name: Deal Road Project Number: 121120 Project Location: Weddington, NC Channel Name: Ditch 4 Discharge 2.904 Peak Flow Period 24 Channel Slope 0.08 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardance Class D Vegtation Type Mix (Sod & Bunch) Vegetation Density Fair 50-75% Soil Type Sandy Loam C 125 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 Fax 812.867.0247 www.nagreen.com Phase Reach Discharge Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern C 125 Straight 2.9 cfs 6.24 0.39 ft 0.022 2.25 lbs/ft2 1.97 lbs/ft2 1.14 STABLE D Unve etated ft/s Unreinforced Vegetation - Class D - Mix (Sod & Bunch) - Fair 50-75% Phase Reach Discharge Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern Unreinforced Straight 2.9 cfs 2.65 0.6 ft 0.069 3.33 lbs/ft2 3.021bs/ft2 1.1 STABLE Vegetation ft/s Underlying Straigh 2.9 cfs 2.65 0.6 ft -- 0.04 lbs/ft2 0.062 lbs/ft2 0.57 UNSTABLE -- Substrate ft/s Channel Report Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3DO by Autodesk, Inc Ditch 5 to LUV -1 - 2 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 580.00 Slope (%) = 1.33 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.27 Elev (ft) Section 58200 581 50 581 00 580.50 58000 57950 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.74 = 2.270 = 1.64 = 1.38 = 4.68 = 0.52 = 4.44 = 0.77 Depth (ft) 2.00 1.50 1.00 0.50 WO -050 0 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) -I ? Channel Renort Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3DO by Autodesk, Inc Ditch 5 to LWA - 5 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 580.00 Slope (%) = 1.33 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) .I = 2.64 Elev (ft) Section 582.00 581.50 I j 581.00 i 580.50 j I 580.00 579.50 I^ I I I Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.78 = 2.640 = 1.83 = 1.45 = 4.93 = 0.55 = 4.68 = 0.81 1 2 3 4 5 6 7 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 � $I _n An 8 9 10 11 v� Channel Report ', Hydraflow Express Extension for Autodesk@) AutoCADO Civil 3DO by Autodesk, Inc Ditch 5 to HW -2 - 10 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 580.00 Slope (%) = 1.33 N -Value = 0.060 -, Calculations 1 Compute by: Known Q Known Q (cfs) II = 2.90 Elev 582.00 581.50 j 581.00 58050 580.00 ;ft) Section NZ 1 2 3 4 5 6 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Jun 15 2017 = 0.81 = 2.900 = 1.97 = 1.47 = 5.12 = 0.57 = 4.86 = 0.84 7 8 9 10 11 Depth (ft) 2.00 1.50 1 00 050 M _n r1n Channel Report Hydraflow Express Extension for Autodesk® AutoCADO Civil 31319 by Autodesk, Inc Ditch 5 to LW -1 - 10 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 580.00 Slope (%) = 1.33 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.90 Elev (ft) Section 58200 581 50 581 00 58050 580.00 579.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 21 2017 = 0.81 = 2.900 = 1.97 = 1.47 = 5.12 = 0.57 = 4.86 = 0.84 Depth (ft) 2.00 1 50 1.00 050 Foyff -0.50 0 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3D@ by Autodesk, Inc Ditch 6 to Pond - 2 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 572.00 Slope (%) = 2.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 1.87 Elev (ft) Section 574.00 57350 57300 572.50 57200 571 50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Jun 15 2017 = 0.64 = 1.870 = 1.23 = 1.52 = 4.05 = 0.48 = 3.84 = 0.68 Depth (ft) 200 1 2 3 4 5 6 7 Reach (ft) 8 9 10 11 1 50 1.00 0.50 1 O, _n Rn Channel Report Hydraflow Express Extension for Autodesk(D AutoCAD@ Civil 3D® by Autodesk, Inc Ditch 6 to Pond - 5 Year Event Triangular Area (sqft) Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 572.00 Slope (%) = 2.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.18 Elev (ft) Section 57400 573.50 57300 572.50 572.00 571 50 ` Thursday, Jun 15 2017 Highlighted Depth (ft) = 0.67 Q (cfs) = 2.180 Area (sqft) = 1.35 Velocity (ft/s) = 1.62 Wetted Perim (ft) = 4.24 Crit Depth, Yc (ft) = 0.51 Top Width (ft) = 4.02 EGL (ft) = 0.71 1 2 3 4 5 6 Reach (ft) 7 8 9 10 11 Depth (ft) 200 1.50 1 00 0.50 M _n rn Channel Report Hydraflow Express Extension for Autodesk® AutoCAD@ Civil 3D@ by Autodesk, Inc Ditch 6 to Pond - 10 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 580.00 Slope (%) = 2.00 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.40 Elev (ft) Section 58200 581 50 581.00 58050 580.00 57950 Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Jun 15 2017 = 0.70 = 2.400 = 1.47 = 1.63 = 4.43 = 0.53 = 4.20 = 0.74 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1 50 1.00 050 ME _n r1n 9 10 11 v vv North American Green NORTH 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 AMER I CAS! Tel. 800.772.2040 i� i® Fax 812.867.0247 GREEN' www.nagreen.com sion Control Materials Design Software Version 5.0 Project Name: Deal Road Project Number: 121120 Project Location: Weddington, NC Channel Name: Ditch 6 Discharge 2.4 Peak Flow Period 24 Channel Slope .02 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardance Class D Vegtation Type Mix (Sod & Bunch) Vegetation Density Fair 50-75% Soil Type Sandy Loam Unreinforced Vegetation - Class D - Mix (Sod & Bunch) - Fair 50-75% Phase Reach Discharge Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern Unreinforced Straight 2.4 cfs 1.28 0.79 ft 0.086 3.33 lbs/ft2 0.99 lbs/ft2 3.37 STABLE -- Ve etation ft/s Underlying Straigh 2.4 cfs 1.28 0.79 ft -- 0.04 lbs/ft2 0.013 lbs/ft2 2.68 STABLE -- Substrate I ft/s Channel Report Hydraflow Express Extension for Autodesk@ AutoCAD® Civil 3D® by Autodesk, Inc I _y Ditch 7 to Pond - 2 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 _ Total Depth (ft) = 1.50 Invert Elev (ft) = 572.00 i Slope (%) = 1.43 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.47 iJ Elev (ft) Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Jun 15 2017 = 0.75 = 2.470 = 1.69 = 1.46 = 4.74 = 0.54 = 4.50 = 0.78 Depth (ft) 2.00 1.50 1.00 0.50 ON 1 2 3 4 5 6 7 8 9 Reach (ft) 10 11 Channel Report Hydraflow Express Extension for Autodesk® AutoCADO Civil 3D® by Autodesk, Inc Ditch 7 to Pond - 5 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 572.00 Slope (%) = 1.43 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 2.87 Elev (ft) Section 574.00 573.50 573.00 57250 572.00 571 50 Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Jun 15 2017 = 0.79 = 2.870 = 1.87 = 1.53 = 5.00 = 0.57 = 4.74 = 0.83 1 2 3 4 5 6 7 Reach (ft) Depth (ft) 200 1.50 1.00 050 we n r1n 8 9 10 11 v vv Channel Report Hydratlow Express Extension for AutodesK(D AutoUAL)QP Civil 3DO by Autodesk, Inc Ditch 7 to Pond - 10 Year Event Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 572.00 Slope (%) = 1.43 N -Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 3.16 Elev (ft) Section 57400 573.50 573.00 57250 572.00 571 50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Jun 15 2017 = 0.82 = 3.160 = 2.02 = 1.57 = 5.19 = 0.59 = 4.92 = 0.86 Depth (ft) 200 1.50 1.00 0.50 go] Me r) tin 1 2 3 4 5 6 7 8 9 10 11 vvv Reach (ft) sion Control Materials Design Software Version 5.0 Project Name: Deal Road Project Number: 121120 Project Location: Weddington, NC Channel Name: Ditch 7 Discharge 3.16 Peak Flow Period 24 Channel Slope .0143 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardance Class D Vegtation Type Mix (Sod & Bunch) Vegetation Density Fair 50-75% Soil Type Sandy Loam Unreinforced Vegetation - Class D - Mix (Sod & Bunch) - Fair 50-75% North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 Fax 812.867.0247 www.nagreen.com Phase Reach Discharge Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern Unreinforced Straight 3.16 cfs 1.26 0.92 ft 0.081 3.33 lbs/ft2 0.821bs/ft2 4.08 STABLE Vegetation ft/s Underlying Straigh 3.16 cfs 1.26 0.92 ft -- 0.041bs/ft2 0.012 lbs/ft2 2.89 STABLE -- Substrate ft/s Chapter 3 — Storm Drain Hydraulic Analysis 3.2 — NCDOT Pipe Data Sheet — Hw/D Calculations Chapter 3 — Storm Drain Hydraulic Analysis 3.3 — Drop Inlet Calculation Chapter 4 — Erosion Control Calculations Sediment Basin Calculations Project Name Design Resource Group 2459 Wilkinson Boulevard Charlotte, North Carolina 28208 dra DESIGN JOB N0 635-oo2 BY JDB DATE 6/15/17 P M. 1WVD REVISED. 1/0/1900 SEDIMENT BASINDESIGN RESOURCE GROUP SKIMMER BASIN DESIGN FOR BASIN * Ri DRAINAGEARF.AS RE 'D STORAGE DESIGN CRITERM Total drainage area (TDA) 7.9 1 ac Proposed sediment depth 4 ft Disturbed area(DA) 7.2 ac Bottom elevation of basin 558 msl Re uired sediment Stora a(1800xTDA) 1 12888 cf J Depth of flow over spillway 0.5 ft BASIN CONFIGURATION Elev. Bottom elevation 558 msl Sediment Storage Elevation 562 msl Riser Elevation 564 msl Emergency Spillway 564 msl High Water Elevation 564 msl Top of Embankment 566 1 msl BASINEFFICIENCY Elev. Sediment storage provided: 24299 OKAY Sediment storage required: 12888 cf Surface Area Provided 11771 OKAY S.A. Required 435cft*Q10 *' 10725 sf PLANNED BASIN SIZE (REFER TO EROSION CONTROL PLAN) Elev. Area (SFS Cumulative Volume (CF) 558 3686 0 560 5967 9653 562 8679 24299 564 11771 44749 566 15230 71750 Drawdown Volume= 18702 cft in 3 days Proposed Orifice= 2.10 in Skimmer Arm Dia= 1.5 in Prop Skimmerinv= 559.00 Arm Length= 8.0 ft Attach skimmer pipe to riser structure per details ** 325cft*Q10 for TDA<10 ac RISER DESIGN SKIMMER DESIGNDATA DESIGNFLOW ( =CIA) Storage Volume= 12888 cft Bare soil coefficient 'C' = Pctage of Volume= 69% Dewatering Time= 3 days Depth of flow 0 ft Adjustment Factor- 3810 cft Skimmer Size= 2.5 in 23 cfs Adjusted Orifice= 2.08 in Drawdown Volume= 18702 cft in 3 days Proposed Orifice= 2.10 in Skimmer Arm Dia= 1.5 in Prop Skimmerinv= 559.00 Arm Length= 8.0 ft Attach skimmer pipe to riser structure per details RISER DESIGN CONCRETEANCHOR SIZE DESIGNFLOW ( =CIA) 36 in RISER SPILLWAYDESIGN Bare soil coefficient 'C' = 0.6 Riser pipe diameter 36 lin Area 'A'= 7.9 ac Depth of flow 0 ft 2 yr. storm rainfall intensity, 7'= 4.73 in/hr Riser Flow, Q(r): 0 cfs Design flow from site, 'Q2'= 23 cfs Rizer Size i- T00 SMALL, INCREASE DAME, OUTLET PIPE DESIGN CONCRETEANCHOR SIZE Outlet pipe diameter 36 in Outlet Pipe Flow, Q(p) = 77 cfs Orifice Pipe slope (ft/ft) 0.010 ft/ft Outlet Pipe Flow, Q = 67 cfs Capacity Pipe length(ft) 124 ft Spillway Length, L 10 ft Outlet pipe invert in 557.4 Outlet Pipe Orifice is OKAY Outlet pipe invert out 556.17 Outlet Pi a Capacity is I OKAY EMERGENCYSPILLWAYDESIGN CONCRETEANCHOR SIZE DESIGNFLOW ( =CL4) Length of exposed outlet pipe EMERGENCYSPILLWAYDESIGN Bare soil coefficient 'C' = 0.6 Design Flow = 11 cfs Area 'A'= 1 7.9 ac Spillway Length, L 10 ft 10 yr. storm rainfall intensity, T= 7.03 in/hr Stage 0.75 ft Max Design flow from site, 'Q to '= 33 cfs 11 Page 1 of 1 CONCRETEANCHOR SIZE Length of exposed outlet pipe 1 ft Safety factor 1.2 Buoyancy, B = 2646 lbs Anchor width 5.5 ft Required Volume of Anchor, V(r) = 30.2 cf Anchor Length 5.5 ft Actual Volume of Anchor, V a = 40.2325 cf Anchor Thickness 1.33 ft OKAY Page 1 of 1 Chapter 5 — Appendices Appendix A Pre -Development Drainage Exhibit INv9 IN, Ssns.i9 Nv IN 4S t7 Iff(1 i.pAf N54N 55096 W 5 5416 INV OVi 54a 59 11111 / � ljll r III / f I N6SVII 55505 V N 54423 � � I WV OUT 5040 05 f'IVV IN 54568 NV Ine use of lNe renpienl nolatl Not mpwryaso orngtl41w0 ra DESIGN RESOURCE GROUP LANDSCAPE ARCHITECTURE CIVIL ENGINEERING TRANSPORTATION PLANNING 2459 Wei—BlW SO 200CIft NO 28208 704 348 0608 www 0w cam,,.'Q¢. (•,p� CORP `* O- R TE,i _e 9 16 C- "'� C-2185 i 4: NC6ELS ''��RfSOURCE 6a°N,�`a CONSTRUCTION DOCUMENTS U Q J Z J 0 vi Q a LU#� O" 0N 1i o, z Z c Q Z > F V Z o H Q Z CJ 0 Q Q Q W z O�2z (Y p J LU 0 PRE - DEVELOPMENT DRAINAGE MAP 30 0 30 60 _ �- SCALE 1' = 60' PROJECT# 635-002 0RAWN BY JOB CHECKED BY MVD JUNE 23, 2017 REVISIONS OUT 94] ae pa. I I � \ JOH NO D A v 1 \ IS IZ3 -SNOW OR FORMERLY -CD OD CHRISTINE M LANG D6 3x/552 PA64 RCEL 06069047 \ O� USE SINGLE FAMILY \ ZONING R-40 V:- u \ N I 00.'T .ssaN 5'15977. 55 -N0W OR FORMERLY- THOMAS L ELDER III I } O NV BU T 2 51 OB 1315/862 \ d]\ PARCEL 06069046 \ f = 1 USE INGLE FAMILY \ 61<— ZONING R-40 ' I -NOW OR FORMERLY\ DANNI RENEE ORTMAN DB 6404/627 \ PARCEL C6 D69045 USE SINGLE FAMILY I ZONING R-40 4 soar\ \ \\ \ 1 s _ S OF \ \ k -IF W \ p"�\\ \ \ \ _,x ` ��tia`57E� Po� 'N/618 Ine use of lNe renpienl nolatl Not mpwryaso orngtl41w0 ra DESIGN RESOURCE GROUP LANDSCAPE ARCHITECTURE CIVIL ENGINEERING TRANSPORTATION PLANNING 2459 Wei—BlW SO 200CIft NO 28208 704 348 0608 www 0w cam,,.'Q¢. (•,p� CORP `* O- R TE,i _e 9 16 C- "'� C-2185 i 4: NC6ELS ''��RfSOURCE 6a°N,�`a CONSTRUCTION DOCUMENTS U Q J Z J 0 vi Q a LU#� O" 0N 1i o, z Z c Q Z > F V Z o H Q Z CJ 0 Q Q Q W z O�2z (Y p J LU 0 PRE - DEVELOPMENT DRAINAGE MAP 30 0 30 60 _ �- SCALE 1' = 60' PROJECT# 635-002 0RAWN BY JOB CHECKED BY MVD JUNE 23, 2017 REVISIONS Chapter 5 — Appendices Appendix C NOAA Rainfall Data Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 Location name: Matthews, North Carolina, USA*' Latitude: 35.0068', Longitude: -80.721° Elevation: 632.19 ft** s 'source ESRI Maps 'y,e �� '• source USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M Bonnin, D Martin, B Lin, T Parzybok, M Yekta, and D Riley NOAH, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)' Average recurrence interval (years) Duration 1 2 5 10 25 F 25 50 100 200 500 1000 5 -min Soo 592 6.86 7.56 8.35 8.90 9.41 985 10.4 10.7 (462-544) (545-644) (630-746) (692-821) (763-905) (809-965) (851-102) (887-107) (924-113) (949-117) 10 -min 4.00 473 5.50 6.05 6.66 709 7.47 7.81 8.20 8.44 (3 68-4 34) (4 36-5 15) (5 05-5 98) (5 54-6 56) (6 08-7 21) (6 44-7 68) (6 76-8 09) (7 03-8 47) (731-890) (748-919) 15 -min 3.33 3.96 4.64 5.10 5.62 5.98 6.30 6.57 6.88 7.06 (3 07-3 62) 1 (3 65-4 32) (4 26-5 04) (4 67-5 53) (514-610) (544-648) (569-682) (591-712) (613-747) (625-769) 2 28 2.74 3.29 3.69 4.17 4.51 4.82 5.11 5 47 5.72 30 -min (2 11-2 48) 1 (2 52-2 98) 1 (3 02-3 58) 1 (3 39-4 01) 1 (3 80-4 51) 1 (4 10-4 88) 1 (4 36-5 22) 11 (4 60-5 54) 1 (4 88-5 94) (506-623) 1.42 172 2.11 2.40 2.77 3.05 3.32 3.59 -3.-93--]F-4.18 60 -min (1 31-1 55) 1 (1 58-1 87) 1 (1 94-2 30) 1 (2 20-2 61) 1 (2 53-3 01) 1 (2 78-3 31) 1 (3 00-3 60) 1 (3 23-3 89) 1 (3 50-4 26) 1 (3 70-4 55) 0.824 0.996 1.24 1.42 1.65 183 2.01 2.19 2.42 2.60 2 -hr (0 755-0 900) (0 912-1 09) 1 (1 13-1 35) 1 (1 29-1 55) 1 (1 50-1 80) 1 (1 66-1 99) 1 (1 81-2 19) 1 (1 95-2 38) 1 (2 14-2 64) 1 (2 28-2 84) 0.583 0.704 0.877 1-01-F--,.2o--F--1-3- 1.48 1.64 1.84 2.00 3 -hr (0 533-0 641) (0 644-0 774) (0 802-0 964) (0 922-1 11) 1 (1 08-1 31) 1 (1 21-1 46) 1 (1 33-1 62) 1 (1 45-1 78) 1 (1 61-2 01) (174-2 19) 0.351 -O-.4-23-]F-O-.5-29---]F-O-.611- -O-.7-24--]F-O-.8-14--]F-O.-90-6 1.00 1.13 1.24 6 -hr (0 322-0 385) (0 3BB-0 465) (0 484-0 580) (0 558-0 669) (0 656-0 789) (0 733-0 886) (0 810-0 986) (0 887-1 09) 1(0990-1 23) 1 (1 07-1 35) 0.206 0 249 0.312 0 363 -0-4-33--]F-O-.4-9-0-IF-o.-54-9 0.611 0.698 0.769 12 -hr (0 189-0 226) (0 229-0 274) (0 286-0 342) (0 331-0 397) (0 392-0 473) (0 440-0 534) (0 489-0 597) (0 538-0 664) (0 605-0 758) (0 657-0 836) 0.122 0.148 0 185 0 215 0 257 0.290 0.325 0.362 0.412 0.453 24 -hr (0 113-0 132) (0 137-0 160) (0 171-0 201) (0 199-0 233) (0 236-0 278) (0 266-0 314) (0 297-0 352) (0 329-0 392) (0 373-0 448) (0 407-0 493) 0.072 0.087 0.1 -0 -8 -]F --O. 1-25 0.149 0.168 0.187 -0-2-0-8-1 0.236 0.259 2 -day (0 067-0 078) (0 080-0 094 )1(0 100-0 117 (0 116-0 136)1(0 137-0 161) (0 154-0 182) 0 171-0 203) (0 189-0 226) (0 213-0 257 )1(0 233-0 283) 0.051 0.061 0.076 0.088 0.104 0.117 0.130 0.144 0.164 0.180 3 -day (0 047-0 055) (0 057-0 066) (0 070-0 082) (0 081-0 095) (0 096-0 112) (0 107-0 126) (0 119-0 141) (0 132-0 157) (0 149-0 178) (0 162-0 196) 0.040 0.048 0 060 0.069 0 081 0.091 0.102 0.113 0.128 0 140 4 -day (0 038-0 044) (0 045-0 052) (0 055-0 065) (0 064-0 074) (0 075-0 088) (0 084-0 099) (0 093-0 110) (0 103-0 122) (0 116-0 139) (0 127-0 152) 0.027 0.032 0.039 0.044 0.052 0.056 0.065 0.071 0.081 0.088 7 -day (0 025-0 029) (0 030-0 034) (0 036-0 042) (0 041-0 048) (0 048-0 056) (0 054-0 063) (0 060-0 069) (0 066-0 077) (0 074-0 087) (0 080-0 095) 0.021 0.025 0.031 0.035 0.040 0.045 0.049 0 054 0.060 0.065 10 -day (0 020-0 023) (0 024-0 027) (0 029-0 033) (0 032-0 037)1(0 037-0 043) (0 041-0 048) 0 050-0 057) (0 055-0 064) (0 059-0 070 0.014 0.017 0.020 0.022 0.026 0.028 0.031 F-0-0-3-3-1 F-0-0-37-- 0.040 20 -day (0 013-0 015) (0 016-0 018) (0 019-0 021) (0 021-0 024) (0 024-0 027) (0 026-0 030) (0 029-0 033) (0 031-0 036) (0 034-0 040) (0 037-0 043) 0.012 0.014 0.016 0.018 0.020 0 022 0.024 0.025F -0-.0-2-8-1F-0.029 30 -day (0 011-0 012) (0 013-0 015) (0 015-0 017) (0 017-0 019) (0 019-0 021) (0 020-0 023) (0 022-0 025) (0 024-0 027) (0 026-0 030) (0 027-0 032) 0.01-0-1F-0--0-1 1 0.013 0 014 0.016 0.017 0.019 0.020 0.021 0.023 45 -day (0 009-0 010) (0 011-0 012) (0 012-0 014) (0 014-0 015) (0 015-0 017) (0 016-0 018) (0 018-0 020) (0 019-0 021) (0 020-0 023) (0 021-0 024) 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 60 -day (0 008-0 009) (0 010-0 011) (0 011-0 012) (0 012-0 013) (0 013-0 015) (0 014-0 016) (0 015-0 017) (0 016-0 018) (0 017-0 019) (0 018-0 020) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5% Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values Please refer to NOAH Atlas 14 document for more information Back to Top https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0068&lon=-80.7210&dat... 6/21/2017 Precipitation Frequency Data Server 100.000 PF graphical PDS -based intensity -duration -frequency (IDF) curves Latitude. 35.0068°, Longitude -80 7210° L 10.000 -- 5 -min : — 1"in — 3 -day — 15 -min — 4 -day — 30 -min — 7 -day — 604mm — 10 -day — 2 -hr — 20 -day — 3 -hr — 30 -day — 6 -hr — 45 -day — 12 -hr c — 24 -hr _ N 1.000 -•----- .- -_. -..- _ y L 0.100 - .. .... .:.... . .. _. Qj CL` 0.010 – .. ............ ... •----' 0.001 L L L L L E E E E E rp M Ip M M 6A X61 l�0 � N N f�1 V I -L O 0 N 6 100 �q 14Duration 'Q LO ZZ 10 000 c 1000 v c_ c 0100 EL v a a` 0.010 0001' 1 ' ' ' 1 1 1 1 1 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT). Wed Jun 2112-49-53 2017 Back to Too Page 2 of 4 Average recurrence Interval (years) — 1 2 — 5 10 25 50 100 200 500 1000 Duration -- 5 -min — 2 -day — 1"in — 3 -day — 15 -min — 4 -day — 30 -min — 7 -day — 604mm — 10 -day — 2 -hr — 20 -day — 3 -hr — 30 -day — 6 -hr — 45 -day — 12 -hr — 60 -day — 24 -hr https://hdsc.nws.noaa.govlhdsc/pfdslpfds_printpage.html?lat=3 5.0068&lon=-80.7210&dat... 6/21/2017 Precipitation Frequency Data Server Maps & aerials Small scale terrain Large scale map . r S leis Greensboro Durha d r_ R: �� •AsFi pew North Carolina Bhart Otte F ett a 1 4r Green le r� � otuma 9 outh � Page 3 of 4 https://hdse.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0068&lon=-80.7210&dat... 6/21/2017 Precipitation Frequency Data Server Page 4 of 4 Back to Too US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions? HDSC Question s(Oinoaa oov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0068&lon=-80.7210&dat... 6/21/2017 Chapter 5 — Appendices Appendix B Post -Development Drainage Exhibit -NOW OR FORMERLY•- D � JARED & DONETTA B OUFRENE OB 6227/293 -NOW OR FCRMERL-WESLEY PARCEL 06069148 CHAPEL WEDDINGTON ATHLETIC USE SINGLE FAMILY ASSOCIATION ZONING R-40 DS 1648/84 PARCEL`0ONA2 � USE INSTI TUIROD a ZONING RCD / S60 IN Vp lr/� • L jy 1 v I T ' (1 I / Py it r i �� l rt -NOWOR FORMERLY•- BEVE \1 BEVERLY WEATHERS \\ OB 6e55/532 06069 Sat PARCEL Ofi USE SINGLE FAMILY FAMILY ZONING R-40 j / t -NOW OR FORMERLY - RICHARD h HYDE TRUSTEES OB 4952/28 PARCEL USE SINGLE FAMILY \el ZONING R-10 r LOT 44 i -NOW OR FORMERLY \ JEFFREY A & REBECCA R MANEBB //'- NO DEED REFERENCE FOUND \ ( \ PARCEL 06069050\\ 0\/ / USE SINGLE FAMILY ` \ \ 1 / \ ZONING R -a0 LO -NOW OR FORMERLY \ } \\/ ` \ y \ /�✓�/ilJ \ JOHN M & KIMBERLY A ORMISTON(� /leo/'/ }/ OD 6'676/286 PARCEL 06069049 USE SINGLE FAMILY \ ZONING R-40 \ f \ X05\/ Pl/' / c�/\/\/ %I_ \\ .1 n, �\ \\ •I \\ I% P01 v vv vl +fav �vvv l �� �DETENT -NOW OR FORMERLY- x \ \j`I PON JOHNNY RAY & CONNIE S TOMPKINS \ NO DEED REFERENCE FOUND m / \ \ ly 06069048 \ �i� t /\ \ \ 2.00 \ \ L f /O V USE SINCLEFAMILY o cA� j� t /+V / l A \ zONwG R -aa Lcr ,e \ \ \ \ \ \ t \ \ V 1 ,\lam POST -DRAINAGE \ `` y I '1 i � ,�� S1 � _ ►� ISI �� r lip � l I I! ION'Iil l `l I!i -NOW OR FORMERLY-+�, _ GHRISTNE M LANG / �(\ L)_ ro�\ I`\ t AREA \ �I \ OARCELED 6 1616904] \\ ,' / �� ��-\ ��"\ '�- ;I\ v 1 •1 I \ \ 313,993 SF US sINGLE FAMILY eoe^� A ��`�- -G°� G �� A1�'n \ \ ZONING R -4D �oP I / r _ —\ �~— (7.208 AC) - �\ �° 1 \ / S -NOW OR FOODERCT- \ \) / / (�- /A s� -\ ~a, _ ,r,�� \ - Fes_ THOMAS L ELDER III ,/ PARCEL 06069046 \ / II z / '� �- `BB- Y USE SINGLE FAMILY \ \ `NS ' /// ! / \ 1 1\ 1-�-'N f \ >*�+-�� 1_`� _ \ 11,,1 \ ZONING R-40 Era_ / �\ 1 ` �J:<\ v4I I, I I 1 \\ \ gg / / Y v ��v1t�i�� A ``\ \V cr vz \ d /mos>� / /� \ ,,I Y 1 t\ 1 I 1 1 .A -NOW OR FORMERLY\ ,s / LOT '10 / / k i/ i II I o 1 `IV I i`\ III 1 \\II\ 1 I 11 DANNI RENEE ORTMAN / \ r/ f \-- - / / / , / I� I / z \� I '9I I /I Q\ I I _ OB 6a8x/827 \ o\ \li\` I I l I,� \ - I IL 1 � I J I INN O 50.5)9 I 9 /M , r �i I I NII III 1 41 L) N X Z�Z1 3 2.01 IL O �o Z � a J INN "Ix xa X17 / p`e ssNH "It 96 INV IN Sae T6 POST - UNDETAINED INV OUT See 56 r ` AREA i ilI I Q �\ 251,599 SF i1 ' ` (5.776 AC) DRAINAGE MAP 30 D 30 60 SCALE 1' = 60' V PROJECT# 635-002 DRAWN BY JOB CHECKED BY MVO -.T i _ \ LVI tll I - \ \I l \- - I \ USE CE NGLEGFAMILY C8 �k� i l // / I TI = I u l / �\ l 1_ — - \ \ \ \� G/\/ / L^id,i - _ I I I z 1\ I /� / I I ;,� ZONING R-40 1 l I m I Ali II' Il h -7x'' POST DRAINAGE fOO II DEVELOPMENT AREA I �� � \�\ � �\ \ \ \\ 1\ 1\ 1 -------��.�\ 'III I I�I ��•. \ \. � \ \\ \\ � \I 11 11 \I ` \\ \ `\ l \ \ 1\ l j/� { LW SHOWN 30' FROM DEEDED CENTERLINE`T 77 _ _ _�� =� \ a Os- - - Se1S JO 'T roS9 48 `^.� �.o . \ 0) d�3, \ r, H181�•7`M 'nYj3 DEAL ROAD SR#1340 6D' PUBLIC R/W (MONUMENTED) 6ev wawela B--26IB0� o x IN4 5 I I INV\ ATE 560 T 55] m h 01 ATE 561 2t I� ssBn .muo PA a.d are n !/ r U INN O 50.5)9 I zJ Q �i LLI N W 41 L) N X Z�Z1 3 / IL O �o Z � a J INN "Ix xa X17 / p`e ssNH "It 96 INV IN Sae T6 r �n / INV OUT See 56 r \4 p J UJ a DESIGN RESOURCE GROUP LANDSCAPE ARCHITECTURE CIVIL ENGINEERING TRANSPORTATION PLANNING 2459 VVIk,nv66 BIW St. 200 C6a4606 NO 28208 ]043x30608 www 1w m aZ SEAATE L E e C-95 E M,. C-2785 a` NCBELS ''�eRfSDURCE DQua�d CONSTRUCTION DOCUMENTS I SSNN 55568 NV N54)fi6 MV OUi SaJ x6 U zJ Q J w w LLI N W I Q q 6 L) N X Z�Z1 IIZ3 on Zoi9 '^ IL O �o Z � a J Ahm o ❑ z F_ to w Z Ocz I2m� a sV1 5 -oo S<77 O�.11 11TSa2.57 p J UJ Sc I Q POST - DEVELOPMENT DRAINAGE MAP 30 D 30 60 SCALE 1' = 60' V PROJECT# 635-002 DRAWN BY JOB CHECKED BY MVO 5p' PUBLJC ESr ?S DRIVE M/619'w r JUNE 23, 2017 REVISIONS---®R-,�•-� w z m