HomeMy WebLinkAbout20170765 Ver 1_401 Application_20170621SINCE FROEHLING & ROBERTSON, INC. Engineering Stability Since 1881 2505 Hutchison -McDonald Road Charlotte, North Carolina 28269 F, T 704.596.2889 1 F 704.596.3784 1 8 a 1 NC License #F-0266 FR June 16, 2017 Ms. Karen Higgins North Carolina Division of Water Resources 401 & Buffer Permitting Branch 512 North Salisbury Street Raleigh, NC 27604 Re: Pre -Construction Notification for NWP 14 and WQC 3886 Authorization Commerce Station Substation Huntersville, Mecklenburg County, North Carolina F&R Project No. 63V-0038 Ms. Higgins: NY 5_0 JUN 2 1 2011 201 70765 Froehling & Robertson, Inc. (F&R) is submitting this Pre -Construction Notification (PCN) to the US Army Corps of Engineers (USACE) for written concurrence for allowable impacts to Waters of the US. F&R has also submitted a copy to the US Army Corps of Engineers (USACE). F&R has been contracted by Dewberry Engineers, Inc. to provide wetland consulting services on behalf of the Electricities and the Town of Huntersville for the above -referenced Subject Site located at 12240 Old Statesville Road in Huntersville, Mecklenburg County, North Carolina. The Subject Property is located within the Yadkin—Pee Dee River Basin. PROJECT DESCRIPTION The intent of the project is to construct a ten (10) foot wide gravel access roadway to provide vehicular access to a new Duke Power electrical substation structure. The roadway will be constructed within the limits of an established access easement traversing the Subject Site. The project will require the installation of a permanent fifteen (15) foot length of eighteen (18) inch Type III Reinforced Concrete Pipe culvert within a reach of linear wetland. In addition, an approximate 0.008 -acre isolated wetland area may be impacted by grading activities within the limits of disturbance. A timber mat span stream crossing will also be constructed above the ordinary high-water mark within the Cane Creek streambed. The project has been designed in accordance with the NCDEQ Erosion and Sediment Control Planning and Design Manual and the Charlotte -Mecklenburg Stormwater Design Manual. HQ: 3015 DUMBARTON ROAD RICHMOND, VA 23228 USA T804.264.2701 F 804.264.1202 www.fandr.com VIRGINIA • NORTH CAROLINA • SOUTH CAROLINA • MARYLAND • DISTRICT OF COLUMBIA A Minority -Owned Business PURPOSE AND NEED The primary purpose of the proposed culvert is to allow for the construction of a gravel access drive providing vehicular access to a new Duke Power electrical substation structure. The new access drive will prevent the need for greater impacts to Cane Creek by providing the most efficient route to the proposed substation from an existing Duke Power sub -station located on an adjacent parcel. AVOIDANCE AND MINIMIZATION The proposed installation of the new culvert is the most efficient and least harmful route to the proposed electrical substation it avoids Cane Creek and the associated perennial tributaries within the limits of the Subject Site. The proposed construction will result in the least amount of grading and engineered fill placement and the shortest possible culvert length with respect to the existing topographic constraints and roadway width requirements. The culvert will be installed with at least a one -foot embedment into the wetland so that it will not impede aquatic life movement or create an upgradient backwater effect. The proposed alignment will intersect the linear wetland feature as close to perpendicular that that is topographically feasible and is the most efficient and cost-effective route to achieve the goals of the project with the least amount of environmental impact. CLOSURE F&R is submitting this Pre -Construction Notification (PCN) with associated Jurisdictional Determination Request, required maps, Waters of the US impact drawings, and project plan drawings to the USACE and NCDWR for written concurrence for the impact listed previously. The proposed impact to the on-site linear wetland is considered a minor impact and not expected to require compensatory mitigation. Best management practices will be utilized throughout the construction phase to prevent sedimentation impact to the on-site and downgradient Waters of the US. Commerce Station Drive PCN Submittal June 16, 2017 Huntersville, North Carolina 2 Project No. 63V-0038 Should your office have questions pertaining to any of the information presented within the following PCN or its attachments, please contact the undersigned at tedwards@fandr.com or 864-444-4210. Respectfully Submitted, FROEHLING & ROBERTSON, INC. Caleb Sullivan Environmental Scientist Attachments: PCN Form Figures Photographs Wetland Data Forms Stream Assessment Forms Site Plans Terron J. Edwards Senior Environmental Scientist Commerce Station Drive PCN Submittal June 16, 2017 Humersville, North Carolina 3 Project No.63V 0038 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ® Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Commerce Station Substation 2b. County: Mecklenburg 2c. Nearest municipality / town: Huntersville 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Wilson D Johnston 3b. Deed Book and Page No. 04654-006 3c. Responsible Party (for LLC if applicable): 3d. Street address: 12346 Old Statesville Road 3e. City, state, zip: Huntersville, NC 28078 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Electricities 4b. Name: Tim Kopacz 4c. Business name (if applicable): Electicities 4d. Street address: PO Box 2819 4e. City, state, zip: Huntersville, North Carolina 4f. Telephone no.: 704.659.7370 4g. Fax no.: 704.509.9937 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Terron Edwards 5b. Business name (if applicable): Froehling & Robertson, Inc. 5c. Street address: 2505 Hutchison-McDonald Rd 5d. City, state, zip: Charlotte, NC 28269 5e. Telephone no.: 704-595-2889 5f. Fax no.: 704-596-3784 5g. Email address: tedwards@fandr.com Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 01911107 1 b. Site coordinates (in decimal degrees): Latitude: 35.388180 Longitude: - 80.823685(DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 63.02 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Cane Creek to Clarke Creek proposed project: 2b. Water Quality Classification of nearest receiving water: Class C 2c. River basin: map is available at Yadkin Pee -Dee (HU 03040105) http://h2o.enr.state.nc.us/admin/maps/ 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is an undeveloped wooded parcel traversed by cleared sanitary sewer and powerline right-of-ways. Typical trees found on this parcel are: red maple (Acer rubrum), American beech (Fagus grandifolia), eastern red cedar (Juniperus virginiana), sweet gum (Liquidambarstyraciflua), and tulip poplar (Liriodendron tulipifera). According to the Soil Survey of Mecklenburg County, on-site soils consist of Cecil Sandy Clay Loam, Enon Sandy Loam, and Monacan Loam. Adjacent property in the vicinity of the project consists of a powerline right-of-way and forested areas. 3b. List the total estimated acreage of all existing wetlands on the property: 0.011 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3,940 linear feet 3d. Explain the purpose of the proposed project: The purpose of this project is to install 15 linear feet of 18 inch Type III reinforced concrete pipe culvert in a linear wetland to accommodate the construction of a gravel drive access to provide access to a new Duke Power electrical substation. 3e. Describe the overall project in detail, including the type of equipment to be used: Under Nationwide Permit (NWP) 14, unavoidable permanent impacts to jurisdictional waters of the U.S. associated with this project are limited to a total of approximately 15 linear feet /.005 acres of linear wetland. The proposed access road will follow the existing terrain as close as possible to minimize the amount of grading and limit the required culvert length. Page 3 of 11 PCN Form —Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: El Yes ®No El Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary El Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ®P ❑ T Road Crossing - Culvert Emergent El Yes ® No ® Corps EJ DWQ 0.005 W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0.005 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number – (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or T —Temporary 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑PFIT 41f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar -Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number– Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) T impact required? —Temporary B1 ❑P❑T El Yes ❑ No B2 ❑P❑T El Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Impacts to on-site jurisdictional waters of the U.S. have been reduced to the maximum extent possible. No impact to the downstream waters is proposed. Dewberry & Electricities also researched the possibility of alternate road alignments through different properties to reduce impacts. Due to property owners unwilling to come to an agreement with the town over road R.O.W. through different properties this alternative was unobtainable. The designed alignment has been engineered to have the shortest length of impact possible. Dewberry & Electricities believes the proposed design represents the least damaging environmental alternative still meeting the goals of the project. b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. BMP's for culvert construction as well as erosion control measures will be strictly enforced throughout project construction. Culvert has the shortest length possible to accommodate a ten foot wide access driveway. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you will have to fill out this entire form — please contact the State for more information. ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% - gravel access driveway 2b. Does this project require a Stormwater Management Plan? TBD 6.22.17 @ County ❑ Yes ❑ No Meeting 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The project involves one culvert in a linear wetland. The culverts were sized using the rational method for computing runoff flow (Q=CiA) and checked for overtopping, headwater and tailwater conditions using Autodesk's Hydraflow Express for Civil 3D. The Charlotte -Mecklenburg Storm Water Design Manual (the Design Manual) was used for the design of the culverts. The Design Manual requires that future land use conditions should be considered when using the Rational Method for calculated storm water runoff (Ch. 2.4.1). There is currently no proposed future developments. 2e. Who will be responsible for the review of the Stormwater Management Plan? NCDEQ 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Huntersville ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ® Other: Charlotte -Mecklenburg 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes' to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Best Management practices will be utilized during road construction and with any future development to prevent sedimentation to on-site and downgradient streams. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater will be generated from this project. Page 10 of 11 PCN Form —Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Natural Heritage Program GIS Data and Asheville Ecological Services Field Office. Carolina Heelsplitter, Smooth Coneflower, Schweinitz's Sunflower, Michaux's Sumac, and Northern Long-eared Bat habitat were listed by the field office that may occur in the proposed project area. No critical habitat has been listed in the proposed project area. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http://www.habitat.noaa.gov/protection/efh/efhmapper/index.html 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? F&R consulted the State Historic Preservation Office (SHPO) online GIS service and found no sites of architectural, historical, or archaeological significance within the project limits. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: The proposed culvert installation will be sufficiently sized to handle flood events and reduce overbank flooding. 8c. What source(s) did you use to make the floodplain determination? FEMA Firm Panel 4650 Map 37104650000J "�\"- -- ` Terron Edwards, F&R, �� ops; n 6.16.2017 As Agent for Electricities Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 11 of 11 11 It 0* a<� Fiambright Rd tiambr►ght Rd ►�J 0 2458 i 10 SITE VICINITY MAP I _ b3 ., FROEHLING & ROBERTSON, INC. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL 2505 Hutchinson -McDonald Road Charlotte, North Carolina I USA T 704.596.28891 F 704.596.3784 Client: Dewberry Engineers, Inc. Project: Commerce Station Substation NWP PCN Location: Huntersville, Mecklenburg County, North Carolina F&R Project No: I 63V-0038 Source: I Google Maps Date: June 16, 2017 1 Scale: Not Shown Figure 1 of 11 tiJ 4 e m 11 ell 8th rt F N _ ey to 11 -.Pw ion l ander" ex i 1 7! t tY:LL tr_L USGS TOPOGRAPHIC MAP FROEHLING & ROBERTSON, INC. Client: Dewberry Engineers, Inc. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL Project: Commerce Station Substation NWP PCN �$cR 2505 Hutchinson -McDonald Road Location: Huntersville, Mecklenburg County, North Carolina F&R Project No: 63V-0038 Charlotte, North Carolina I USA Source: USGS 7.5 -Minute Topo "Cornelius, NC", 1993 T 704.596.2889 1 F 704.596.3784 Date: June 16, 2017 Scale: Not Shown I Figure 2 of tt r t t » Hunt svi lle,, � A .w.. T} M_ Mecklenburg------7 ,l Huuersville .{ -AC.- I K= ♦ -� f 1 AL Oi Rd H�bright e 1 a W` r� t I ti B Ar k8 Wk8 W' -,E_ Ent," /Y &N k E VAP ft Wk _82 s �r "rp Vi's t+ i f �i je YS A PB ! O jl SUBJECT SITE C- E ,{ Frij Lid ..< r ell , i NRCS SOIL SURVEY MAP �Q QC FROEHLING & ROBERTSON, INC. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL 2505 Hutchinson McDonald Road Charlotte, North Carolina I USA T 704.596.2889 1 F 704.596.3784 Client: Dewberry Engineers, Inc. Project: Commerce Station Substation NWP PCN Location: Huntersville, MecklenburgCounty, North Carolina F&R Project No: 63V-0038 Source: Mecklenburg County Soil Survey, 1980 Date: June 16, 2017 Scale: Not Shown Figure 4 of 11 f`z w 1, • _.. 4t 3 F i'„9 4� f,. F a �a �1 0 Ar at' #" ` � d x a R T t; a +p"si?t" a B y � ar 4 S v SUBJECT SITE US F&W SERVICE WETLAND INVENTORY MAP FROEHLINC, & ROBERTSON, INC. Client: Dewberry Engineers, Inc. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL Prosect: Commerce Station Substation NWP PCN F$CR 2505 Hutchinson -McDonald Road Location: Huntersville, Mecklenburg County, North Carolina F&R Project No: 63V-0038 Charlotte, North Carolina I USA Source: US Fish and Wildlife Service T 704.596.2889 1 F 704.596.3784 Date: June 16, 2017 Scale: Not Shown Figure s of 11 Tract Acreage: 63.02 Acres Upland Acreage: 61.96 Acres WOUS Acreage: 0.581 Acres Potential Non -Wetland WOUS T1: 461 Linear Feet / 0.053 Acres Potential Non -Wetland WOUS T2 (Cane Creek): 2,664 Linear Feet 10.43 Acres Potential Non -Wetland WOUS T3: 760 Linear Feet 10.087 Acres Potential Non -Wetland WOUS T4: 55 Linear Feet / 0.005 Acres Potential Wetland WOUS W1: 0.003 Acres Potential Wetland WOUS W2: 0.008 Acres Perennial Stream Intermittent Stream Wetlands N r A, _U PHOTOGRAPH PERSPECTIVES F$cR FROEHLING & ROBERTSON, INC. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL 2505 Hutchinson -McDonald Road Charlotte, North Carolina I USA T 704.596.28891 F 704.596.3784 Client: Engineers, Inc. -Dewberry Pro'ect: Commerce Station Substation NWP PCN Location: Huntersville, Mecklenburg County, North Carolina F&R Project No: 63V-0038 Source: Mecklenburg County GIS System and F&�8.f Date: June 16, 2017 Scale: Not Shown Fig EXISTING SITE CONDITIONS siucr- v� F a �' " FROEHLING & ROBERTSON, INC. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL 2505 Hutchinson -McDonald Road Charlotte, North Carolina I USA T 704.596.2889 1 F 704.596.3784 Client: DewberryEngineers, Inc. Project: Commerce Station Substation NWP PCN Location: Huntersville, Mecklenburg County, North Carolina F&R Project No: 63V-0038 Source: I Dewberry Date: June 16, 2017 1 Scale: As Shown Figure 9 of 11 E I T[- vE+11G +":E:4 ;tOcO. IT c I i s c �[ r c nI i FI u¢ T..El' :EE [ET4 tHEET 4: IT uc Ic cr I IT H."E. Ir—E.]STA6 v•\\�• a i Io- IT �x nce ti Zt wpm w n T < TO xu E .T LL I ra E - 0. Er O LETm S OF THE 0 .. E T EE IETm FEET . ~A - Y _ y _ , may; Lf• OF A IT, i j{51 �� .� E NSA •EtiTs iCl� r s A _ - . - - � 1'EE lEErT+E,F x.: xTuEw LL •• •` f _�•` ', TE AWL T E y� L' ..� CET iTVET ..& MLL7 CMt _ Y 1 1 w 9 -I a PROPOSED 15' Of 18" TYPE III RCP CULVERT PROPOSED ALL F T �[ ,\ t n� n �:; _ WEATHER ACCESS - croc-•a Tw \ '•. _ a.: _ / �4Er [wI.,r>Qr r0. a', z Tom. ROAD - . * tfvc ri ' TLF OF Lam: D[ ,1 u s. r r •rn+ c.. i•e r'LL-w`.�'=mr _ �'�.--rnt�¢+1 s7 E+" • E[O�%Q.4. CTr r SFE UTNE' i i vc KE ,. '�.. ""ten �+ `- - �� v�_ � •_ ' �' � PROPOSED DUKE "' POWER STRUCTURE PROPOSED TIMBER MAT SPAN STREAM CROSSING �f i 1 • E can, EROSION AND SEDIMENT CONTROL PLAN SINr �R = '' FROEHLING & ROBERTSON, INC. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL 2505 Hutchinson -McDonald Road Charlotte, North Carolina I USA T 704.596.28891 F 704.596.3784 Client: Dewberry Engineers, Inc. Project: Commerce Station Substation NWP PCN Location: Huntersville, Mecklenburg County, North Carolina F&R Project No: 63V-0038 Source: Dewberry Date: June 16 2017 Scale: As Shown Figure 10 of ii PROPOESED 10' WIDE ALL EXISTING WEATHER ACCESS ROAD, STREAM SEE DETAL SHEET 05.01 CHANNEL EXISTING STREAM CHANNEL CULVERT TO BE IMBEDDED INTO CHANNEL TO PREVENT UPSTREAM BACKWATER EFFECT AND NOT IMPEDED AQUATIC LIFE MOVEMENT IS L.F. OF 18• RCP CLASS II[ RCP WITH INVERTS TD MATCH EXISTING STREAM CHANNEL STREAM IMPACT INSET SCALE. 1•-5' 0' 2.5' 5' 10' PROPOSED 15' of 18" TYPE III RCP CULVERT DETAIL APPRDAOI \ PROTECT [UT AWES FROEHLING SE ROBERTSON, INC. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL 2505 Hutchinson -McDonald Road Charlotte, North Carolina I USA T 704.596.28891 F 704.596.3784 }rte ♦; f- Project: Commerce Station Substation NWP PCN 4 %-DIVERSIEpI� / IINN CMEL� Source: I Dewberry Date: June 16 2017 Scale: As Shown Figure 11 of 11 $_- DREDGE — ro IT sTDK APPgpTEN C RCTOt SNCL E —ALL TRAP W EREER SIDE RESP015IDLE FOR TORAL SCLCCTIIli & OSTALLATOM TO SUPPORT MCCESSMET EOIVNENT. OF CREEII. TRAP SIZE — — ACCORDM TO LENDiM OF C. ROAD OWMOVD TO THIS PERSPECTIVE PONT ESWL TO SD CU. FT. PER NFw Iaarr Or ROAD suRFIcr nnv STORE APPROACH Di n— TO MIDGE NOT TO EXCEED 0' A STINIEIICNSURFACE FLP/ To TRAP T FLIER EA FILTER rADRic STREAM DE LONGITUDINAL SECTION TIMBER MAT STREAM CROSSING NTS PROPOSED TIMBER MAT SPAN STREAM CROSSING DETAIL FEATURE DETAILS S I H °Client: V� s s' FROEHLING SE ROBERTSON, INC. ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL 2505 Hutchinson -McDonald Road Charlotte, North Carolina I USA T 704.596.28891 F 704.596.3784 DewberryEngineers, Inc. Project: Commerce Station Substation NWP PCN Location: Huntersville, Mecklenburg County, North Carolina F&R Project No: 63V-0038 Source: I Dewberry Date: June 16 2017 Scale: As Shown Figure 11 of 11 PROPOSED COMMERCE STATION SUBSTATION ACCESS DRIVE 12240 OLD STATESVILLE ROAD HUNTERSVILLE, MECKLENBURG COUNTY, NORTH CAROLINA Photograph 1: View of Potential Non -Wetland WOUS T1 facing downstream. Photograph 2: View of Potential Non -Wetland WOUS T2 (Cane Creek) facing south. PROPOSED COMMERCE STATION SUBSTATION ACCESS DRIVE 12240 OLD STATESVILLE ROAD HUNTERSVILLE, MECKLENBURG COUNTY, NORTH CAROLINA Photograph 3: View of Potential Non -Wetland WOUS T2 (Cane Creek), facing downstream. Photograph 4: View of Potential Non -Wetland WOUS T3, facing upstream. PROPOSED COMMERCE STATION SUBSTATION ACCESS DRIVE 12240 OLD STATESVILLE ROAD HUNTERSVILLE, MECKLENBURG COUNTY, NORTH CAROLINA Photograph 5: View of Potential Non -Wetland WOUS T4, facing upstream. Photograph 6: View of Potential Wetland WOUS Wl, facing southwest. 301 PROPOSED COMMERCE STATION SUBSTATION ACCESS DRIVE 12240 OLD STATESVILLE ROAD HUNTERSVILLE, MECKLENBURG COUNTY, NORTH CAROLINA Photograph 7: View of Potential Wetland WOUS W2, facing west. Photograph 8: View of upland area, facing north. WETLAND DETERMINATION DATA FORM -- Eastern Mountains and Piedmont Region Project/Site;' (Om IM(f Q T 'I'01'7 -74 T 177c.? City/County: M �C len `6ur. Sampling Date: Applicant/Owner: DCw (ray State: IVC Sampling Point: ��� -i�✓ef l Investigator(s): G , 5 t, �%� vin Section, Township, Range: i'v�17 P r -,-v ,//I( Landform (hillslope, terrace, etc.): va �>'� Local relief (concave, convex, none): �b Slope m: Subregion (LRR or MLR)Lli ' 11� LaL .3 gW1 1 "I Long: ��©' i �_�� t �/DDatum: � Soil Map Unit Name: All 0 8Y) C (� n �t7 c » NWI classification: lYlz Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (if no, explain In Remarks.) Are Vegetation , Soil or Hydrology significantly disturbed? Are 'Normal Circumstances" present? Ye8 �^ No Are Vegetation , Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes No Is the Sampled Area Hydric Soil Present? Yes r No within a Wetland? Yes- No Wetland Hydrology Present? Yes % No Remarks: T i G, HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required: check all that apply) _ Surface Soil Cracks (136) Y Surface Water (Al) _ True Aquatic Plants (B14) _ Sparsely Vegetated Concave Surface (138) High Water Table (A2) _ Hydrogen Sulnde Odor (C1) Drainage Patterns (1310) _ Saturation (A3) _ Oxidized Rhlzospheres on Living Roots (C3) _ Moss Trim Lines (1316) _ Water Marks (B1) _- Presence of Reduced Iron (C4) Dry -Season Water Table (C2) _ Sediment Deposits (B2) ^ Recent Iron Reduction In Tilled Soils (C6) K Craynsh Burrows (C8) _ Drift Deposits (133) — Thin Muck Surface (C7) _ Saturation Visible on Aerial Imagery (C9) _ Algal Mat or Crust (134) _ Other (Explain in Remarks) _ Stunted or Stressed Plants (D1) T\ Iron Deposits (135) _n Geomorphlc Position (D2) _ Inundation Visible on Aerial Imagery (B7) _ Shallow Aquitard (D3) _ Water -Stained Leaves (B9) Mlcrotopographic Relief (D4) _ Aquatic Fauna (1313) FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes No Depth (inches): Water Table Present? Yes No Depth (inches): �( Saturation Present? Yes No Depth (Inches): Wetland Hydrology Present? Yes / No (Includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous Inspections), If available: Remarks: US Army Corps of Engineers Eastern Mountains and Piedmont - Version 2.0 VEGETATION (Five Strata) — Use scientific names of plants. Absolute Dominant Indicator Tree Stratum (Plot size: ) % Cover Species? Status 1. 2. 50% of total cover: Sapling Stratum (Piot size: } 1. 5. = Total Cover 20% of total cover: = Total Cover ��50% of total cover: 20% of total cover: Shrub Stratu (Plot size: ) 1. G; �,�%(n 6gr- sy ,-qC: fl, 2. 1 e /-V/C, /1 r8 0-4 � /�✓{tr I—V )0 = Total Cover S59% of total cover: 20% of total cover:_ Herb Stratum (Plot size: ) 1. Syn �1 ,rf�su S 0 Mal2. fi 3. C A ri X G rr 7 Sampling Point: bp/- W f ( Number of Dominant Species That Are OBL, FACW, or FAC: (A) Total Number of Dominant �L Species Across All Strata: ' i (B) Percent of Dominant Species O That Are OBL, FACW, or FAC: (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species x 1 = FACW species x2= FAC species x3= FACU species x4= UPI. species X5= Column Totals: (A) (B) Prevalence Index = B/A = Hydrophytic Vegetation Indicators: 1 - Rapid Test for Hydrophoc Vegetation 2 - Dominance Test is >50% 3 - Prevalence Index is _<3.0' 4 - Morphological Adaptations' (Provide supporting data in Remarks or on a separate sheet) _ Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Tree -- Woody plants, excluding woody vines, approximately 20 it (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Sapling — Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and less than 3 in. (7.6 cm) DBH. Shrub — Woody plants, excluding woody vines, approximately 3 to 20 it (1 to 6 m) in height. Herb —Ali herbaceous (non -woody) plants, including herbaceous vines, regardless of size, and woody plants, except woody vines, less than approximately 3 ft (1 m) in height. 11. Woody vine — All woody vines, regardless of height. ? = Total Cover 50% of total cover: a % S 20% of total cover: u Woody Vine Stratum (Plot size: ) 1. 2. Hydrophytic = Total Cover Vegetation X 50% of total cover: 20% of total cover: Present? Yes ' ` No rs here or on a separate sheet.) US Army Corps of Engineers Eastern Mountains and Piedmont —Version 2.0 SOIL to Depth Matrix (inches) Color (moist) % 0-12_ UMS/1 TO 1) 1 - Hydric Soil Indicators: Sampling Point: D f'- W(r- t to document the indicator or Redox Features Color (moist) °/a Type Loc? Texture Remarks S�Lo !�c Alf RM=Reduced Matrix, MS=Masked Sand Grains. 21-ocation: PL=Pore Lining, M=Matrix. Indicators for Problematic Hydric Soils3: Histosol (Al) _ Histic Epipedon (A2) _ Black Histic (A3) Hydrogen Sulfide (A4) Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) Depleted Below Dark Surface (A11) _ Thick Dark Surface (Al2) _ Sandy Mucky Mineral (S1) (LRR N, MLRA 147,148) _ Sandy Gleyed Matrix (S4) _ Sandy Redox (S5) _, Stripped Matrix (S6) Restrictive Laver (if observed): Type: I I PC IN Depth (inches): /'2 f Dark Surface (S7) _ Polyvalue Below Surface (S8) (MLRA 147, 148) _ Thin Dark Surface (S9) (MLRA 147, 148) _ Loamy Gieyed Matrix (F2) Depleted Matrix (F3) _ Redox Dark Surface (F6) Depleted Dark Surface (F7) _ Redox Depressions (F8) Iron -Manganese Masses (F12) (LRR N, MLRA 136) Umbric Surface (F13) (MLRA 136, 122) Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147) _ 2 cm Muck (A10) (MLRA 147) _ Coast Prairie Redox (A16) (MLRA 147, 148) _ Piedmont Floodplain Soils (F19) (MLRA 136, 147) _ Very Shallow Dark Surface (TF12) Other (Explain in Remarks) 31ndicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes x No US Army Corps of Engineers Eastern Mountains and Piedmont —Version 2.0 WETLAND DETERMINATION DATA FORM - Eastern Mountains and Piedmont Region l C Project/Site:CBmrnyreSSb,7r, 7 mrl City/County: �&Aleot�j Sam l�n Applicant/Owner: r^D Pf'i w /,e(T�/ State: f,f' _ Sampling Point: ( f'„? l� 1 Y� Investigator(s): . J tr %%f (/6 ✓t Section, Township, Range: // O'+”-' ZIVTT ',' Me Landform (hillslope, terrace, etc.): �/ Local relief (concave, convex, none): Slope lT �S6 LaSubregion (LRR or MLRA): 77SS Long; - 210, �' 4�a Datum: ,^ t r f�it^l Ot; + m NWI classification: Soil Map Unit Name: _ D - {7 °`� 7" Are climatic / hydrologic conditions on the site typical for this time of year? Yes 11/1 No (If no, explain in Remarks.) Are Vegetation . Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes J` No Is the Sampled Area Hydric Soil Present? Yes No within a Wetland? Yes No Wetland Hydrology Present? Yes No Remarks: �a Jr, too:n�f /z �t l�fn 7 cr T(rl (✓�`3 A r, C/7/ cr HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required: check all that apply) _ Surface Soil Cracks (136) Surface Water (Al) ^_ — True Aquatic Plants (614) Sparsely Vegetated Concave Surface (68) High Water Table (A2) _ Hydrogen Sulfide Odor (C1) _ Drainage Patterns (1310) Saturation (A3) — Oxidized Rhizospheres on Living Roots (C3) _-_, Moss Trim Lines (616) Water Marks (131) _ Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _ Sediment Deposits (132) _ Recent Iron Reduction in Tilled Soils (C6) _ Crayfish Burrows (C8) _ Drift Deposits (B3) _ Thin Muck Surface (C7) _ Saturation Visible on Aerial Imagery (C9) _ Algal Mat or Crust (134) _ Other (Explain in Remarks) _ Stunted or Stressed Plants (131) _ Iron Deposits (135) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (B7) _ Shallow Aquitard (D3) _ Water -Stained Leaves (139) _ Microtopographic Relief (D4) _ Aquatic Fauna (613) _ FAC -Neutral Test (135) Field Observations: Surface Water Present? Yes No Depth (inches): Water Table Present? Yes No Depth (inches): Saturation Present? Yes No Depth (inches): Wetland Hydrology Present? Yes No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Eastern Mountains and Piedmont — Version 2.0 VEGETATION (Five Strata) — Use scientific names of plants. ?? Absolute Dominant Indicator Tree Stratum (Plot size: J�) % Cover S� Status 1. t�✓ rr%1> rvy 90 I/ TW -1 J = Total Cover j�0°j° of total cover: 20% of total cover: Sa lin Strum {Plot size: f ) 4. a 0 = Total Cover c� 50% of total cover: 10 20% of total cover: f Shrub Stratum (Plot size: 1. 4 Sampling Point: Jy) _ VPI_ Number of Dominant Species That Are OBL, FACW, or FAC. (A) Total Number of Dominant = Total Cover Species Across All Strata: (B) Percent of Dominant Species Herb Stratum (Plot size: ) 1. /yt r f YUj. - el I `� ars lk) f (101 MC That Are OBL, FACW, or FAC: (AIB) Prevalence Index worksheet: 3. Total % Cover of. Multiply by: 4 OBL species x i = 6 FACW species x2= a. FAC species X3= FACU species x4= UPL species X5= Column Totals: (A) (B) Prevalence Index = BIA = Hydrophytic Vegetation Indicators: _ 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50% _ 3 - Prevalence Index is <_3.0' — 4 - Morphological Adaptations' (Provide supporting data in Remarks or on a separate sheet) Problematic Hydrophytic Vegetation' (Explain) 6. 'Indicators of hydric soil and wetiand hydrology must be present, unless disturbed or problematic. = Total Cover Definitions of Five Vegetation Strata: 501% of total cover: 20% of total cover: Tree –Woody plants, excluding woody vines, Herb Stratum (Plot size: ) 1. /yt r f YUj. - el I `� ars lk) f (101 MC approximately 20 it (6 m) or more in height and 3 In. (7.6 cm) or larger in diameter at breast height (DBH). Sapling – Woody plants, excluding woody vines, _Y 2• 3. approximately 20 It (6 m) or more in height and less than 3 in. (7.6 cm) DBH. Shrub -- Woody plants, excluding woody vines, approximately 3 to 20 it (1 to 6 m) in height. Herb–All herbaceousnon-wood ( y) plants, including herbaceous vines, regardless of size, and woody plants, except woody vines, less than approximately 3 4 5. 6 7• a. 9. ft (1 m) in height, 10. 11. �= Total Cover 50% of total cover: 'f -Z 20% of total cover: Woody Vine Stratum (Piot size: ) 1. 2. 3. 4. 5. = Total Cover 50% of total cover: 20% of total cover: Remarks: (Include photo numbers here or on a separate sheet.) Woody vine – All woody vines, regardless of height_ Hydrophytic Vegetation Present? Yes No US Army Corps of Engineers Eastern Mountains and Piedmont –Version 2.0 SOIL Sampling Point: 1) Pa ` VP/_ Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of Indicators.) Depth Matrix Redox Features (inches)Color (moist) % Color (moist) % Type Loc 'texture Remarks �0 9 - 6" r f( 1/3 ) 00 Sr C/ o IOY�lln Sc6/CU 10+ D=DeDietion. RM=Reduced Matrix. MS=Masked Sand Hydric Soil Indicators: _ Histosol (Al) _ Dark Surface (S7) _ Histic Epipedon (A2) _ Polyvalue Below Surface (S8) (MLRA 147, 148) _ Black Histic (A3) _ Thin Dark Surface (S9) (MLRA 147, 148) _ Hydrogen Sulfide (A4) _ Loamy Gleyed Matrix (F2) _ Stratified Layers (A5) _ Depleted Matrix (F3) _ 2 cm Muck (A10) (LRR N) _ Redox Dark Surface (F6) Depleted Below Dark Surface (A11) _ Depleted Dark Surface (F7) — Thick Dark Surface (Al2) ^ Redox Depressions (F8) — Sandy Mucky Mineral (Si) (LRR N, _ Iron -Manganese Masses (F12) (LRR N, MLRA 1479148) MLRA 136) _ Sandy Gleyed Matrix (S4) _ Umbria Surface (F13) (MLRA 136,122) — Sandy Redox (S5) Piedmont Floodplain Solis (F19) (MLRA 148) Stripped Matrix (S6) Red Parent Material (F21) (MLRA 127, 147) Restrictive Lay1e (if ob$erved): Type: 0 C KAA Depth (inches): Remarks: Indicators for Problematic Hydric Sc 2 cm Muck (A10) (MLRA 147) Coast Prairie Redox (A16) (MLRA 147, 148) ____ Piedmont Floodplain Solis (F19) (MLRA 136,147) Very Shallow Dark Surface (TF12) Other (Explain in Remarks) 31ndicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes No X US Army Corps of Engineers Eastern Mountains and Piedmont – Version 2.0 NC DWO Stream Identification Form Version 4.11 Date:) Project/Site: Cow�n-iPffe Sr,yion Latitude: Evaluator: r �, J( /`(J� County: lufi%(P;) �VT3 Longitude: Total Points: Stream is at least intermittent D Stream Determination cl Ephemeral Other if z 19 orperennial if? 30' IntermittenkPiLennfaV e.g. Quad Name: _WWAI A. Geomorphology Subtotal = 1 S - S ) Absent Weak Moderate Strong 18. Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 1 0 0.5 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 01 0 0.5 1 3 4. Particle size of stream substrate 0 1 2 24. Amphibians 5. Active/relict floodplain W 1 2 3 6. Depositional bars or benches 0 1 FACW = 0.75; OBL - 1.5 3 7. Recent alluvial deposits 'perennial streams may also be Identified using other methods. See p. 35 of manual. 1 2 3 8. Headcuts CO) 1 2 3 9. Grade control CO 0.5 1 1.5 10. Natural valley 0 0.5 1 1.5 11. Second or greater order channel No =9 Yes = 3 artificial ditches are not rated; see discussions in manual B. Hvdrologv (Subtotal = la ) 12. Presence of Baseflow 0 1 2 tT 13. Iron oxidizing bacteria 1 2 3 14. Leaf litter 021 0.5 0 15. Sediment on plants or debris 0 0.5 1 1.5 16. Organic debris lines or piles 0 0.5 1 1 17. Soil -based evidence of high water table? No = 0 1 rYes = 3 C. Biology (Subtotal = 18. Fibrous roots in streambed 2 1 0 19. Rooted upland plants in streambed 2 1 0 20. Macrobenthos (note diversity and abundance) 1 2 3 21. Aquatic Mollusks 1 2 3 22. Fish 0 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0.5 1 1.5 25. Algae 0 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL - 1.5 Other = 0 'perennial streams may also be Identified using other methods. See p. 35 of manual. Notes: Sketch: NC DWO Stream Identification Form Version 4.11 Date: �--� 1 Project/Site:C�`n�(« Syrrr0/! Latitude:SS S176' Evaluator: �', ,� �(jt/�r/7 County: /Vlil' Longitude: _20 C()d 8 Total Points: Stream is at least intermittent Stream Determination (circle o e Ephemeral Intermitten Perennia Other e.g. Quad Name:CCu n ('. C der. k) if t 19 or perennial if z 30* 2. Sinuosity of channel along thalweg 0 A. Geomorphology (Subtotal Absent Weak Moderate Strong 1a. Continuity of channel bed and bank 0 1 2 1. 2. Sinuosity of channel along thalweg 0 1 2 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 1 0.5 3 4. Particle size of stream substrate 0 1 2 3 5. Active/relict floodplain (T)1 0.5 2 3 6. Depositional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 1 2 3 8. Headcuts 0 1 2 3 9. Grade control 0.5 1 1.5 10. Natural valley 0 J5 1 1.5 11. Second or greater order channel = 0 Yes = 3 Sketch: cq 44 artificial ditches are not rated; see discussions in manual B. Hvdroloov (Subtotal = I I 1 12. Presence of Baseflow 0 1 2 3 13. Iron oxidizing bacteria 0 1 3 14. Leaf litter 1. 1 0.5 0 15. Sediment on plants or debris 0 0.5 1.5 16. Organic debris lines or plies 0 0.5 1 1.5 17. Soil -based evidence of high water table? No = 0 t~ es = 3 C. Bioloov (Subtotal = `6•-1 ) 18. Fibrous roots in streambed 2 1 0 19. Rooted upland plants in streambed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 0 2 3 21. Aquatic Mollusks 0 1 2 3 22. Fish 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0 0.5 1 25. Algae 0 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 Other = 0 *perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: cq 44 NC DWO Stream Identification Form Version 4.11 Date: �- 8 -( Project/Site: C6mrnP/re Minn % 1. 4a�b� Latitude: 35,�a7 7s Evaluator: C S J�f (/moi n County: /R/ ckl(,b,r I Longitude: - W. '32 Total Points: ^ Stream is at least intermittent �` Stream Determination (circ tae) Other if a 19 or perennial if,'- 30 r Ephemeral Intermitter erenntal I e.g. Quad Name: A. Geomorphology Subtotal = I,5 ' J) Absent Weak Moderate Strong 1a' Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 1 2 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 1 2 3 4. Particle size of stream substrate 0 1 2 3 5. Active/relict floodplain (V 1 2 3 6. Depositional bars or benches 0 1 FACW = 0.75; OBL = 1.5 3 7. Recent alluvial deposits *perennial streams may also be identified using other methods. See p. 35 of manual. 1 2 3 8. Headcuts 1 2 3 9. Grade control 0.5 1 1.5 10. Natural valley 0 1 1.5 11. Second or greater order channel No = 0) I Yes = 3 "artificial ditches are not rated; see discussions in manual B_ Hvdroloov (Subtotal = 10-� ) 12. Presence of 13aseflow 0 1 2 13. Iron oxidizing bacteria 0 2 3 14. Leaf litter 1.5 1 0 5 0 15. Sediment on plants or debris 0 0.5 U 1.5 16. Organic debris lines or piles 0 0.5 1.5 17. Soil -based evidence of high water table? No = 0 Yes = 3' C. Biologv (Subtotal = ('. S ) 18. Fibrous roots in streambed 2 1 0 19. Rooted upland plants in streambed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 1 2 3 21. Aquatic Mollusks 1 2 3 22. Fish 0.5 1 1.5 23. Crayfish CV 0.5 1 1.5 24. Amphibians 0 00-5')1 1.5 25. Algae 0.5 1 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 Other = 0 *perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: NC DWO Stream Identification Forza Version 4.11 Date:101Pro Project/Site: Cb'ai,3�e&e ?Q7,ar� Latitude: Evaluator: r. , .a �. I!' 4? F I County: 1/j(c k1W Ul Longitude: -W Total Points: Stream Determination (circle one) Other S f7Pc rn Stream is at ,east intermittent Sys ff z 19 or erenniai if;a 30* Ephemeral Intermittent Perennial e.g. Quad Name: A. Geomorphology (Subtotal= t ) Absent Weak Moderate Strong I" Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 1 0 3 3. In -channel structure: ex. riffle -pool, step -pool, rip le -pool sequence 0 es = 2 3 4. Particle size of stream substrate 0 1 2 3 5. Active/relict floodplain 0 1 2 3 6. Depositional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 i 2 3 8. Headcuts 1 2 3 9. Grade control See p. 35 of manual. 0.5 1 1.5 10. Natural valley OC 0.5 1 1.5 11. Second or greater order channel No = Yes = 3 artificial ditches are not rated; see discussions in manual B. Hvdroloqv (Subtotal = '06 ) 12. Presence of Baseflow 0 1 3 13. Iron oxidizing bacteria 0 1 2 3 14. Leaf litter 1.5 1 0. 0 15. Sediment on plants or debris 0 0.5 U111 1.5 16. Organic debris lines or plies 0 1 1.5 17. Soil -based evidence of high water table? No = 0 es = C. Bloloqv (Subtotal = (0 18. Fibrous roots In streambed 3 2 1 0 19. Rooted upland plants in streambed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 1 2 3 21. Aquatic Mollusks 0 1 2 3 22. Fish 0 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0 0.5 1 1.5 25. Algae 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 Other = 0 *perennial streams may also be Identified using other methods. See p. 35 of manual. Notes: Sketch: DRAWING INDEX GENERAL T1.01 COVER SHEET CIVIL C0.01GENERAL NOTES C1.01 EXISTING CONDITIONS PLAN C3.01 EROSION AND SEDIMENT CONTROL PLAN C5.01 CONSTRUCTION DETAILS ZONING, FLOODPLAIN & WATERSHED INFORMATION ZONED: CORPORATE BUSINESS DISTRICT (CB) PERMITTED USE: LIGHT INDUSTRIAL OPEN SPACE: 1,014,487 SF SETBACK: Electricities FRONT BUILD—TO—LINE: 15' (UNLESS STAFF APPROVED 80' BUFFER) REAR SETBACK: 15' SIDE SETBACK: 15' MAX HEIGHT: MAXIMUM HEIGHT PER ARTICLE 4 OF THE PH. (704) 659-7370 HUNTERSVILLE TOWN ZONING ORDINANCE SIDEWALK: 5' MINIMUM, BOTH SIDES CHARLOTTE HISTORIC DISTRICT: NO WATER QUALITY BUFFERS PARCEL INSIDE WATER QUALITY BUFFER: YES POST CONSTRUCTION DISTRICTS APPLICANT: JURISDICTION: N/A DISTRICT: N/A FEMA AND COMMUNITY FLOODPLAIN Electricities FEMA PANEL #: 3710465000J FEMA PANEL DATE: 03/02/2009 FEMA FLOOD ZONE: OUT COMMUNITY FLOOD ZONE: OUT WATERSHED PROTECTION DISTRICTS WATERSHED NAME: CLARKE BUILT UPON AREA: SITE ACREAGE: 5.39 AC PROJECT AREA: 3.27 AC BUA OF PROJECT AREA: 0.36 AC = 11.0% (ONLY INCLUDES IMPROVEMENTS ON THE FOLLOWING PLANS) PURPOSE STATEMENT: THE PURPOSE OF THIS PLAN SET IS FOR THE CONSTRUCTION OF A SUBSTATION ACCESS DRIVE AND A TRANSMISSION LINE WITHIN THE TOWN OF HUNTERSVILLE'S PROPERTY LIMITS. EPM REFERENCE NUMBERS: • #328773 COMMERCE STATION PARK — CONCEPTUAL / SKETCH PLAN J351143 COMMERCE STATION INDUSTRIAL PARK — CONSTRUCTION DOCUMENTS K—wlo,below. #369584 COMMERCE STATION PARK — RTAP Callb-f— Yo.di. #370980 COMMERCE STATION PARK — RECORD PLATS 4 5 COMMERCE STATION SUBSTATION EROSION AND SEDIMENT CONTROL HUNTERSVILLE, NORTH CAROLINA 95% CONSTRUCTION PLANS LOCATION MAP SCALE: NTS VICINITY MAP SCALE: 1" = 800' CONTACTS OWNER: APPLICANT: ENGINEER: Gerald Vincent Tim Kopacz Dewberry Engineers Inc. Town of Huntersville Electricities Robert S. Notte, P.E., P.O. Box 664 P.O. Box 2819 LEED AP Huntersville, NC 28070 Huntersville, NC 28070 9300 Harris Corners PH. (704) 875-6541 PH. (704) 659-7370 Parkway, Suite 220 gvincent®huntersville.org FAX (704) 509-9937 Charlotte, NC 28269 TKopoczOelectricities.org PH. (704) 509-9918 FAX (704) 509-9937 snotte®dewberry.com SUBMITTAL SET NUMBER ❑ PRELIMINARY ❑ CONSTRUCTION ■ APPROVAL O REVISION ❑ BIDDING ❑ RECORD fO Dewberry* Dewberry Engineers Inc. m w�.� vaw«gr. s�:ro ac GNvbBs, N�2B2gD Plwne: TO Fu: TBO.SOB.BB17 NCBELBELS gr -0939 Z J O F- < Ow m U z U (/) Z O o W p OZ € p O o Z < s C/) w Z ) U Q Z= OC Z 0 W 0 2i Fn o Lo 2iO O fr U W SEAL CAAO�i', `O US/o 9 9 PREII I�1®1&iY` T FOR W ST 1C ION =PO "AGI NEEP �i.�: KEY PLAN REVISIONS DRAWN BY EAM APPROVED BY RSN CHECKED BY RSN DATE MARCH 17, 2017 TITLE COVER SHEET PROJECT NO. 50087270 T1.01 SHEET NO. 1 OF 5 GENERAL NOTES 1. THE DISTURBANCE AREA FOR THIS PROJECT IS APPROXIMATELY 3.28 ACRES (142,670 SF) OF WHICH, THE PROPOSED IMPROVEMENTS WILL PRODUCE A NET IMPERVIOUS AREA OF APPROXIMATELY 0.35 ACRES (15,700 SF). 2. BASE DATA FROMMECKLENBURG COUNTY GIS AND SURVEY PROVIDED BY DEWBERRY ENGINEERING INC. DATED AUGUST 3, 2015. 3. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO EXISTING UNDERGROUND FACILITIES AT, OR CONTIGUOUS TO, THE SITE IS BASED ON INFORMATION AND DATA FURNISHED TO THE ENGINEER BY CHARLOTTE MECKLENBURG UTILITIES (CMU). THE OWNER AND ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ANY SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR REVIEWING AND CHECKING ALL SUCH INFORMATION AND DATA (PRIOR TO CONSTRUCTION) FOR LOCATING ALL UNDERGROUND FACILITIES SHOWN OR INDICATED; FOR COORDINATION OF THE WORK WITH THE OWNERS OF SUCH UNDERGROUND FACILITIES DURING CONSTRUCTION; AND FOR THE SAFETY AND PROTECTION THEREOF RESULTING FROM THE WORK; ALL OF WHICH WILL BE AT NO ADDITIONAL COST TO THE OWNER. 4. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, FENCES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. THE CONTRAC f01t SHALL HAND EXCAVATE WITHIN 5' OF ALL BUILDINGS, WALLS, AND STRUCTURES. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 5. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE ENGINEER. 6. THE LOCATION OF ALL EXISTING UTILITIES ACROSS THE LINES OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS, AND WHERE SHOWN ARE ONLY APPROXIMATE. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL LOCATE ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. 7. ALL MATERIALS AND CONSTRUCTION SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS. 8. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY DEPTHS OF ALL UTILITY CROSSINGS. 9. CONTRACTOR SHALL PROVIDE ALL CONSTRUCTION SIGNS, 10. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ELEVATIONS OF ALL POINTS OF CONNECTION OR PROPOSED WORK TO EXISTING CURBS, ROADS, ETC. 16. MATERIAL LAYDOWN AND STORAGE SHALL BE WITHIN PROJECT AREA. 17. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ON ADJACENT PROPERTIES BEYOND WHAT IS SHOWN. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 18, THE CONTRACTOR SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK, AND OTHER ACCUMULATIONS. 19. ANY CONSTRUCTION OR USE WITHIN THE AREAS DELINEATED AS COMMUNITY ENCROACHMENT (0.1') FLOODWAY ENCROACHMENT AREA IS SUBJECT TO RESTRICTIONS IMPOSED BY THE FLOODWAY REGULATIONS OF MECKLENBURG COUNTY. 20. NON-STANDARD ITEMS (I.E. PAVERS, IRRIGATIONS SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE TOWN/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. 7 Z n EROSION AND SEDIMENT CONTROL NOTES 1. CUT OR FILL LEAVING OR ENTERING THE SITE MUST BE IMPORTED FROM OR EXPORTED TO A SITE WITH AN APPROVED EROSION AND SEDIMENT CONTROL PLAN. 2. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 3. IMPLEMENT THE REQUIREMENTS OF THE STATE APPROVED EROSION CONTROL PLAN. NOTIFY NCDENR AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. 4. NO LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL ALL APPLICABLE EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED IN LOCATIONS AS SHOWN ON THE CONTRACT DRAWINGS. IF CLEARING IS REQUIRED FOR INSTALLATION OF A GIVEN MEASURE, ALL OTHER MEASURES SHALL BE INSTALLED FIRST. THE NECESSARY LAND DISTURBANCE ACTIVITIES REQUIRED FOR INSTALLATION OF THE GIVEN MEASURE MAY THEN PROCEED. LIMITS OF CONSTRUCTION SHOWN ON DRAWINGS INCLUDE LIMITS OF LAND -DISTURBING ACTIVITIES AS WELL AS ACCESS WAYS TO NON -LAND -DISTURBING WORK AREAS. CONTRACTOR SHALL MINIMIZE LAND DISTURBANCE. NO LAND -DISTURBING ACTIVITIES SHALL BE PERFORMED 'DOWNSTREAM' OF EROSION CONTROL DEVICES. 5. UTILITIES SHOWN IN APPROXIMATE MANNER ONLY. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES PRIOR TO DEMOLITION, CONSTRUCTION OR LAND DLSTURBANCF ACTIVITIES BEGIN. 6. TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE HAS BEEN STABILIZED. 7. THE CONTRACTOR SHALL CONDUCT PROJECT INSPECTIONS OF EROSION CONTROL MEASURES WEEKLY AND AFTER 1/2" OR LARGER RAIN EVENTS. ALL CONTROL DEVICES SHALL BE MAINTAINED AS SPECIFIED BY THE CONTRACT DOCUMENTS. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE TO FACILITATE RAINFALL MONITORING. THE CONTRACTOR SHALL MAINTAIN THESE RECORDS AT THE ON-SITE OFFICE FOR AUDIT BY CONTRACTING OFFICER. INSPECTIONS ARE REQUIRED UNTIL PROJECT STABILIZATION IS EVIDENT BY 95% VEGETATIVE GROWTH FOR AREASPROVIDED SEEDING, AT SUCH TIME THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL DEVICES. ADDITIONALLY, CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING 'SELF -INSPECTIONS' INDICATING DATE DEVICES INSTALLED AND STABILIZATION MEASURES ARE INITIATED. THE 'SELF -INSPECTION' REPORTS SHALL BE MAINTAINED AND SUBMITTED TO GOVERNMENT ONCE STABILIZATION OF PROJECT HAS BEEN ACCOMPLISHED AND TEMPORARY MEASURES REMOVED. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON-SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. 9. CONTRACTOR SHALL PROVIDE MEASURES NECESSARY TO PREVENT THE TRACKING OF SEDIMENT OR DEBRIS OFF-SITE. ANY SEDIMENT OR DEBRIS TRACKED OFF-SITE SHALL BE SWEPT/REMOVED DAILY. 10. PURSUANT TO NO GENERAL STATUTE 113A -54.1(e), THE CONTRACTOR SHALL CONDUCT 'SELF INSPECTIONS' OF EROSION CONTROL DEVICES AT COMPLETION OF EACH CONSTRUCTION PHASE AND DOCUMENT SUCH INSPECTIONS AS OUTLINED IN 15A NCAC 04B .0131. 11. CONTRACTOR SHALL MAINTAIN COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES SHALL BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE MAINTAINED BY THE CONTRACTOR ON-SITE AT ALL TIMES. 3. 1. OBTAIN ALL NECESSARY PERMITS FROM GOVERNMENT AGENCIES 2. 5ET UP AN ON-SITE PRE -CONSTRUCTION CONFERENCE WITH THE TOWN OF HUNTERSVILLE AND NCDEQ. q FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS SUBJECT TO FINE. 3. INSTALL SILT FENCE AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL 5. THESE DEVICES. 4. CALL FOR ON-SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT 6. AND CLEARING AND GRUBBING MAY BEGIN. 7 5. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 6. BEGIN SITE GRADING OPERATIONS. 7. TEMPORARILY SEED ALL DISTURBED AREAS THAT ARE TO REMAIN INACTIVE FOR MORE THAN 5 WORKING DAYS. 8. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 9. CONSTRUCT PROPOSED IMPROVEMENTS AND STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 10. CONTACT LAND DEVELOPMENT INSPECTOR TO CONDUCT INSPECTION ON STORM DRAINAGE, SIDEWALKS, DRIVEWAY IMPROVEMENTS, ALL ASPECTS OF ROAD CONSTRUCTION, ETC, 11. FINISH CONSTRUCTION OF PROPOSED IMPROVEMENTS. 12. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. SEEDING NOTES SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. MULCHED AREA SHALL BE TACKED WITH A POLYMER BASED TACIFIER. APPLY POLYMER PER MANUFACTURING RECOMMENDATIONS SPECIFIC TO EACH AREA OF APPLICATION (LE. STEEP SLOPES, FLAT AREAS, ETC.). REAPPLY POLYMER AS NECESSARY TO PREVENT EROSION DURING VEGETATION ESTABLISHMENT. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. VEGETATION SHALL BE ESTABLISHED ON ALL DISTURBED AREA WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF GRADING ACTIVITIES OR WHERE CONSTRUCTION WILL TEMPORARILY CEASE FOR MORE 21 CALENDAR DAYS. CONTRACTOR SHALL WATER SEEDED AREAS AS NECESSARY TO ESTABLISH VEGETATION CONTRACTOR SHALL WARRANT VEGETATION GROWTH FOR ONE YEAR. 8. TRAFFIC SHALL NOT BE ROUTED ACROSS CENTERLINE WITH CONES OR DRUMS DURING NON -WORKING HOURS. CONTRACTOR MUST BE ON SITE OR CHANGE PAVEMENT MARKING APPROPRIATELY. 9. GENERALLY, THE PEAK FLOW OF TRAFFIC OCCURS IN MECKLENBURG COUNTY BETWEEN THE HOURS OF 7-9 A.M. AND 4-6 P.M., MONDAY THROUGH FRIDAY. DURING THESE HOURS, CONSTRUCTION ACTIVITY THAT INVOLVES A LANE CLOSURE WILL NOT BE ALLOWED ON THOROUGHFARE STREETS EXCEPT IN EMERGENCY SITUATIONS OR WITH APPROVAL FROM THE TOWN PUBLIC WORKS AND/OR NCDOT. 10. THE AGENCY DOING THE WORK SHALL PROVIDE FLAGGERS AND/OR POLICE CONTROL WHEN REQUIRED. CONTRACTOR MAY ALSO BE REQUIRED TO PROVIDE A UNIFORMED OFFICER TO CONTROL TRAFFIC WHEN WORKING IN AND AROUND A SIGNALIZED INTERSECTION. 11. EVERY ATTEMPT SHALL BE MADE TO SCHEDULE AND EXPEDITE THE WORK TO CAUSE THE LEAST INCONVENIENCE TO THE TRAVELING PUBLIC. 12. IN SITUATIONS NOT COVERED IN THIS DESIGN, THE PROTECTION OF THE TRAVELING PUBLIC AND THE PROTECTION OF THE WORKERS ON SITE WILL DICTATE THE MEASURES TO BE TAKEN CONSISTENT WITH THE CITY OF CHARLOTTE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 13. THE CONTRACTOR, UTILITY COMPANY, OR GOVERNMENTAL AGENCY INVOLVED IN THE WORK SHALL NOTIFY MECKLENBURG COUNTY LAND DEVELOPMENT AND/OR NCDOT OF THE CONSTRUCTION START DATE AND ANY MAJOR WORK WHERE THE NUMBER OF TRAVEL LANES ARE REDUCED FROM NORMAL CONDITIONS OR THE STREET IS REQUIRED TO BE CLOSED. EXCEPT IN EMERGENCIES, THE FOLLOWING NOTIFICATION IS REQUIRED: CONSTRUCTION START DATE - 5 WORKING DAYS IN ADVANCE CLOSING 1 OR MORE TRAVEL LANES DURING PEAK TRAVEL TIMES - 5 WORKING DAYS PRIOR TO THE SCHEDULED WORK CLOSING A STREET - 10 WORKING DAYS PRIOR TO THE SCHEDULED WORK. THIS LEAD-TIME IS NECESSARY FOR PLANNING AND NOTIFYING THE PUBLIC OF EXPECTED CHANGES IN THE NORMAL TRAFFIC CONDITIONS, 14. THE COUNTY ENGINEER OR NCDOT OR THEIR REPRESENTATIVES ARE AUTHORIZED TO STOP ANY CONSTRUCTION OR MAINTENANCE ACTIVITY WHICH IS NOT PROPERLY SIGNED AND BARRICADED AS REQUIRED BY THIS STANDARD, THE WATCH, AND/OR THE MUTCD UNTIL SUCH REQUIREMENTS ARE MET. 15. THIS DESIGN STANDARD CANNOT BE USED FOR ALL ROADWAY CONSTRUCTION SITUATIONS. IT IS INTENDED ONLY TO BE USED AS A GUIDEL NE. SPECIFIC SITUATIONS MAY REQUIRE ENGINEERING JUDGMENT IN THE PLACEMENT OF TRAFFIC CONTROL DEVICES BECAUSE OF LIMITED VERTICAL AND/OR HORIZONTAL SIGHT DISTANCE. 16. WHEN PERSONNEL AND/OR EQUIPMENT ARE WITHIN 2' OF THE EDGE OF AN OPEN TRAVEL LANE (5' ON STATE MAINTAINED ROADS), THE CONTRACTOR SHALL REFER TO THE WATCH FOR PROPER LANE CLOSURE. 17. OPERATIONAL SIGNS ARE GENERALLY MOUNTED ON PORTABLE SUPPORTS. THESE ARE USUALLY USED FOR SHORT-TERM OPERATIONS TO WARN AND GUIDE TRAFFIC. ADVANCED WARNING SIGNS (CONSTRUCTION AHEAD) SHALL BE MOUNTED ON STATIONARY SUPPORTS SEVEN DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION OF THE ROADWAY. 18, ALL DRUMS SHALL BE BALLASTED IN SUCH A MANNER THAT THEY WILL BE STABLE UNDER WIND AND VEHICLE ACTION. BALLASTING SHALL BE DONE WITH SANDBAGS OR OTHER YIELDING MATERIAL SITUATED IN THE BASE OF THE DRUMS. 19. CONSTRUCTION WORK SHALL NOT BE ALLOWED ON BOTH SIDES OF THE ROAD SIMULTANEOUSLY WITHIN THE SAME AREA, UNLESS THE ROADWAY IS MEDIAN DIVIDED. 20. AT THE END OF EACH WORK DAY THE CONTRACTOR SHALL BACKFILL UP TO THE EDGE AND ELEVATION OF THE EXISTING PAVEMENT AREAS WITHIN 2 FEET OF AN OPEN TRAVEL LANE THAT INCLUDE A DROP OFF OF MORE THAN 3 INCHES IN ACCORDANCE WITH THE WATCH (SEE FIGURE 1). 21. PAVEMENT MARKINGS ARE TO BE INSTALLED BY THE CONTRACTOR, PRE -LINES MUST BE APPROVED BY THE COUNTY OR NCDOT PRIOR TO PLACEMENT OF THE PAVEMENT MARKINGS. LEGEND EXIS-ING PROPERTY LINE ..... ....................... FUTURE E_=CTFICITIS PRGP�RTY LIKE , XISTING SANTARY 574ER __....................... EXISTING GIS TOPOGRAPHY MINOR ... EXSTING GIS TOPOGRAPHY MAJOR.. ._...__.- ._... EXSIING V SURVEY _0F0GRAPHY MINOR .._ __... EXISTING 1' SURVEY TOPOGRAPHY MA„ OR ..... .... _.. _. _. EXISTING WETLAND AREA ..........._.. EXISTING TEFF H\E................ ........ ..._.... _ EXISTING TFLE_.........................___......,..... ti..•J EXISTING STORM DRAIN ...... _..... .................. .. EXSTING UND_RCRCLNG GAS __._............. EXSTING STREAM ... ..... ......... ........._._............... PROPOSED TREELINE..................................... PROPOSED 1' TOPOGRAPHY ................ _....... - -:n PROPOSED LIMITS OF DISTURBANCE ............ _____________ PROPOSED SILT FENCE ................................ ©-X-X- PROPOSED TREE PROTECTION FENCE .......... ®moo_ PROPOSED TEMPORARY SEEDING ................. Q PROPOSED PERMANENT SEEDING ................. PROPOSED MULCHING .................................. PROPOSED CONSTRUCTION ENTRANCE........... AND ACCESS DRIVE ..................................... PROPOSED TIMBER MAT STREAM CROSSING.. If Dewberry® Dewberry Engineers Inc. rie c.- P. -Y. suite 22C CNvbtle. NC 2B2G0 PM1one: TOC.SOiAi19 Pu: Toasoa.can N-13 Aerry.wm N[9EL5 NFU939 J O co Z F - Z OLu ~ U Z p W p a C U G_ z Ix p 00 U) U D 5 0 r Z~ z Q Z Z 0 O0 0 rn O rr W SiIL , I i, , DSCARO� IV =OP�FESSrpH 9', PRE I�1Y` T FOR 00 ST -Ab ION t . ��'�FRT S. N�.•�• KEY PLAN No. I DATE I BY I Description REVISIONS DRAWN BY EAM APPROVED BY RSN CHECKED BY RSN DATE MARCH 17, 2017 TITLE GENERAL NOTES PROJECT NO. RX67270 C0.01 SHEET NO. 2 OF 5 NEW STABILIZATION TIMEFRAMES SITE AREA DESRCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS O PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES AND SLOPES HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES SEEDING NOTES SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. MULCHED AREA SHALL BE TACKED WITH A POLYMER BASED TACIFIER. APPLY POLYMER PER MANUFACTURING RECOMMENDATIONS SPECIFIC TO EACH AREA OF APPLICATION (LE. STEEP SLOPES, FLAT AREAS, ETC.). REAPPLY POLYMER AS NECESSARY TO PREVENT EROSION DURING VEGETATION ESTABLISHMENT. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. VEGETATION SHALL BE ESTABLISHED ON ALL DISTURBED AREA WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF GRADING ACTIVITIES OR WHERE CONSTRUCTION WILL TEMPORARILY CEASE FOR MORE 21 CALENDAR DAYS. CONTRACTOR SHALL WATER SEEDED AREAS AS NECESSARY TO ESTABLISH VEGETATION CONTRACTOR SHALL WARRANT VEGETATION GROWTH FOR ONE YEAR. 8. TRAFFIC SHALL NOT BE ROUTED ACROSS CENTERLINE WITH CONES OR DRUMS DURING NON -WORKING HOURS. CONTRACTOR MUST BE ON SITE OR CHANGE PAVEMENT MARKING APPROPRIATELY. 9. GENERALLY, THE PEAK FLOW OF TRAFFIC OCCURS IN MECKLENBURG COUNTY BETWEEN THE HOURS OF 7-9 A.M. AND 4-6 P.M., MONDAY THROUGH FRIDAY. DURING THESE HOURS, CONSTRUCTION ACTIVITY THAT INVOLVES A LANE CLOSURE WILL NOT BE ALLOWED ON THOROUGHFARE STREETS EXCEPT IN EMERGENCY SITUATIONS OR WITH APPROVAL FROM THE TOWN PUBLIC WORKS AND/OR NCDOT. 10. THE AGENCY DOING THE WORK SHALL PROVIDE FLAGGERS AND/OR POLICE CONTROL WHEN REQUIRED. CONTRACTOR MAY ALSO BE REQUIRED TO PROVIDE A UNIFORMED OFFICER TO CONTROL TRAFFIC WHEN WORKING IN AND AROUND A SIGNALIZED INTERSECTION. 11. EVERY ATTEMPT SHALL BE MADE TO SCHEDULE AND EXPEDITE THE WORK TO CAUSE THE LEAST INCONVENIENCE TO THE TRAVELING PUBLIC. 12. IN SITUATIONS NOT COVERED IN THIS DESIGN, THE PROTECTION OF THE TRAVELING PUBLIC AND THE PROTECTION OF THE WORKERS ON SITE WILL DICTATE THE MEASURES TO BE TAKEN CONSISTENT WITH THE CITY OF CHARLOTTE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 13. THE CONTRACTOR, UTILITY COMPANY, OR GOVERNMENTAL AGENCY INVOLVED IN THE WORK SHALL NOTIFY MECKLENBURG COUNTY LAND DEVELOPMENT AND/OR NCDOT OF THE CONSTRUCTION START DATE AND ANY MAJOR WORK WHERE THE NUMBER OF TRAVEL LANES ARE REDUCED FROM NORMAL CONDITIONS OR THE STREET IS REQUIRED TO BE CLOSED. EXCEPT IN EMERGENCIES, THE FOLLOWING NOTIFICATION IS REQUIRED: CONSTRUCTION START DATE - 5 WORKING DAYS IN ADVANCE CLOSING 1 OR MORE TRAVEL LANES DURING PEAK TRAVEL TIMES - 5 WORKING DAYS PRIOR TO THE SCHEDULED WORK CLOSING A STREET - 10 WORKING DAYS PRIOR TO THE SCHEDULED WORK. THIS LEAD-TIME IS NECESSARY FOR PLANNING AND NOTIFYING THE PUBLIC OF EXPECTED CHANGES IN THE NORMAL TRAFFIC CONDITIONS, 14. THE COUNTY ENGINEER OR NCDOT OR THEIR REPRESENTATIVES ARE AUTHORIZED TO STOP ANY CONSTRUCTION OR MAINTENANCE ACTIVITY WHICH IS NOT PROPERLY SIGNED AND BARRICADED AS REQUIRED BY THIS STANDARD, THE WATCH, AND/OR THE MUTCD UNTIL SUCH REQUIREMENTS ARE MET. 15. THIS DESIGN STANDARD CANNOT BE USED FOR ALL ROADWAY CONSTRUCTION SITUATIONS. IT IS INTENDED ONLY TO BE USED AS A GUIDEL NE. SPECIFIC SITUATIONS MAY REQUIRE ENGINEERING JUDGMENT IN THE PLACEMENT OF TRAFFIC CONTROL DEVICES BECAUSE OF LIMITED VERTICAL AND/OR HORIZONTAL SIGHT DISTANCE. 16. WHEN PERSONNEL AND/OR EQUIPMENT ARE WITHIN 2' OF THE EDGE OF AN OPEN TRAVEL LANE (5' ON STATE MAINTAINED ROADS), THE CONTRACTOR SHALL REFER TO THE WATCH FOR PROPER LANE CLOSURE. 17. OPERATIONAL SIGNS ARE GENERALLY MOUNTED ON PORTABLE SUPPORTS. THESE ARE USUALLY USED FOR SHORT-TERM OPERATIONS TO WARN AND GUIDE TRAFFIC. ADVANCED WARNING SIGNS (CONSTRUCTION AHEAD) SHALL BE MOUNTED ON STATIONARY SUPPORTS SEVEN DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION OF THE ROADWAY. 18, ALL DRUMS SHALL BE BALLASTED IN SUCH A MANNER THAT THEY WILL BE STABLE UNDER WIND AND VEHICLE ACTION. BALLASTING SHALL BE DONE WITH SANDBAGS OR OTHER YIELDING MATERIAL SITUATED IN THE BASE OF THE DRUMS. 19. CONSTRUCTION WORK SHALL NOT BE ALLOWED ON BOTH SIDES OF THE ROAD SIMULTANEOUSLY WITHIN THE SAME AREA, UNLESS THE ROADWAY IS MEDIAN DIVIDED. 20. AT THE END OF EACH WORK DAY THE CONTRACTOR SHALL BACKFILL UP TO THE EDGE AND ELEVATION OF THE EXISTING PAVEMENT AREAS WITHIN 2 FEET OF AN OPEN TRAVEL LANE THAT INCLUDE A DROP OFF OF MORE THAN 3 INCHES IN ACCORDANCE WITH THE WATCH (SEE FIGURE 1). 21. PAVEMENT MARKINGS ARE TO BE INSTALLED BY THE CONTRACTOR, PRE -LINES MUST BE APPROVED BY THE COUNTY OR NCDOT PRIOR TO PLACEMENT OF THE PAVEMENT MARKINGS. LEGEND EXIS-ING PROPERTY LINE ..... ....................... FUTURE E_=CTFICITIS PRGP�RTY LIKE , XISTING SANTARY 574ER __....................... EXISTING GIS TOPOGRAPHY MINOR ... EXSTING GIS TOPOGRAPHY MAJOR.. ._...__.- ._... EXSIING V SURVEY _0F0GRAPHY MINOR .._ __... EXISTING 1' SURVEY TOPOGRAPHY MA„ OR ..... .... _.. _. _. EXISTING WETLAND AREA ..........._.. EXISTING TEFF H\E................ ........ ..._.... _ EXISTING TFLE_.........................___......,..... ti..•J EXISTING STORM DRAIN ...... _..... .................. .. EXSTING UND_RCRCLNG GAS __._............. EXSTING STREAM ... ..... ......... ........._._............... PROPOSED TREELINE..................................... PROPOSED 1' TOPOGRAPHY ................ _....... - -:n PROPOSED LIMITS OF DISTURBANCE ............ _____________ PROPOSED SILT FENCE ................................ ©-X-X- PROPOSED TREE PROTECTION FENCE .......... ®moo_ PROPOSED TEMPORARY SEEDING ................. Q PROPOSED PERMANENT SEEDING ................. PROPOSED MULCHING .................................. PROPOSED CONSTRUCTION ENTRANCE........... AND ACCESS DRIVE ..................................... PROPOSED TIMBER MAT STREAM CROSSING.. If Dewberry® Dewberry Engineers Inc. rie c.- P. -Y. suite 22C CNvbtle. NC 2B2G0 PM1one: TOC.SOiAi19 Pu: Toasoa.can N-13 Aerry.wm N[9EL5 NFU939 J O co Z F - Z OLu ~ U Z p W p a C U G_ z Ix p 00 U) U D 5 0 r Z~ z Q Z Z 0 O0 0 rn O rr W SiIL , I i, , DSCARO� IV =OP�FESSrpH 9', PRE I�1Y` T FOR 00 ST -Ab ION t . ��'�FRT S. N�.•�• KEY PLAN No. I DATE I BY I Description REVISIONS DRAWN BY EAM APPROVED BY RSN CHECKED BY RSN DATE MARCH 17, 2017 TITLE GENERAL NOTES PROJECT NO. RX67270 C0.01 SHEET NO. 2 OF 5 E Mill Oro E I A I SiA'OM1' OR.��� \��q"owv oP 10�F PCIERTV DEOSCFEATED fIIEREON` / / I J J I I BOOK 410, FG 690LOPE F?gEMENT CREALOT 2 o y14Cp=KPA11cL 28TD L AREA: 5.24 ��---- TL K EPHEMERAL STR�,".M A�` \\,\_ ➢ RE'15BPERC SAVDS SAY-'FADF2 $t✓r \ / I ♦ IPIN 2"CMME SiAIIp YS \ ` ` F SANG IB 1 +ERT / � 3EI SYfF�'8(1 \ ABED E '1b610, GE — L n _�5 ��F-TAA }1NR�COF F SnSTATIDV LOY�V SCR BED N PI�KCHASE�.GREEMEN E IC -IES SI OWn O EFC �HEES-6..pN \\ \ ZONED7L \`\ I v , 1 N/F 61L ON D. JOHNSTON ``J —��� •\ \ _� DS. 4664, PG 06 \ \\ ♦� '.,IN: ZONING: C3 F.'.vV v — —ECC TUFFER 130- \\ \ �— vvv v v ��\ ��\ \ l'll' (� ,��� / / , ,ia • ��� i i// ) ) \\\\... , it\\\\\\\ ----; —� '\ 1 I 1 ill/.11llllr ✓,���—_\ �. \ � � / �,/,-,-„;�:; :— - / � �� , / / / i l �? \�`_,—���\ — —,� ) 1 1 / l llllJllll -'/,'ice �� \ \ \\\\'� /' ✓'' '/ , �'”- E —TI 'POW ' \\ / L14E 6 u I I I`y� vv X\\\�\ I I \ \ 1 1 UHL 1111//////( %i� //'— \\\\\\\\� /1111 \ `\ 1 1 \ \ \ \���\ \ v �� \ t \ �wLvA 1111 I f 1 I I v vv vv A l I I I l If/// r 1/- 1; \ \\ \ 1 I I I I 1 111 I ,/� , `\ \ \ \ _ i 11III�IiIII \\ \ 1 I I I,1 llll I ', / // /; ,' `\ \ �`\\\`\� _ / //J�f' 1 / l % —� �\ \\ \\ I I I I I I i 11111'11 t J , ,/' 1) I rI I I II!1/1t 1 ��; /J/ \ ���\\�� / ,i / / �'' \\ \ 1 I I I I I I I/ul i \\ , 1 J c / If Dewberry® Dewberry Engineers Inc Clwbtls--ml p—pPte Fu'. 4 .SOY.DYJ) —1;1.55NL-29 J Z O llill/llIlrr > Ocr // I \ \\ Z U) -------- U) - --------------- ~ i EE LOWHSIDE (n --------- T AN5_J__ z TRANS I 0 z iV7 1 FHTGHE HHG.I�I SIDE SIDE Q UNDER UNDEEER CONST. CONST. TL K EPHEMERAL STR�,".M A�` \\,\_ ➢ RE'15BPERC SAVDS SAY-'FADF2 $t✓r \ / I ♦ IPIN 2"CMME SiAIIp YS \ ` ` F SANG IB 1 +ERT / � 3EI SYfF�'8(1 \ ABED E '1b610, GE — L n _�5 ��F-TAA }1NR�COF F SnSTATIDV LOY�V SCR BED N PI�KCHASE�.GREEMEN E IC -IES SI OWn O EFC �HEES-6..pN \\ \ ZONED7L \`\ I v , 1 N/F 61L ON D. JOHNSTON ``J —��� •\ \ _� DS. 4664, PG 06 \ \\ ♦� '.,IN: ZONING: C3 F.'.vV v — —ECC TUFFER 130- \\ \ �— vvv v v ��\ ��\ \ l'll' (� ,��� / / , ,ia • ��� i i// ) ) \\\\... , it\\\\\\\ ----; —� '\ 1 I 1 ill/.11llllr ✓,���—_\ �. \ � � / �,/,-,-„;�:; :— - / � �� , / / / i l �? \�`_,—���\ — —,� ) 1 1 / l llllJllll -'/,'ice �� \ \ \\\\'� /' ✓'' '/ , �'”- E —TI 'POW ' \\ / L14E 6 u I I I`y� vv X\\\�\ I I \ \ 1 1 UHL 1111//////( %i� //'— \\\\\\\\� /1111 \ `\ 1 1 \ \ \ \���\ \ v �� \ t \ �wLvA 1111 I f 1 I I v vv vv A l I I I l If/// r 1/- 1; \ \\ \ 1 I I I I 1 111 I ,/� , `\ \ \ \ _ i 11III�IiIII \\ \ 1 I I I,1 llll I ', / // /; ,' `\ \ �`\\\`\� _ / //J�f' 1 / l % —� �\ \\ \\ I I I I I I i 11111'11 t J , ,/' 1) I rI I I II!1/1t 1 ��; /J/ \ ���\\�� / ,i / / �'' \\ \ 1 I I I I I I I/ul i \\ , 1 J c / If Dewberry® Dewberry Engineers Inc No. I DATE BY Description REVISIONS DRAWN BY EAM APPROVED BY RSN CHECKED BY RSN DATE MARCH 17, 2017 TITLE EXISTING CONDITIONS PLAN PROJECT NO. C 1.01 SHEET NO. 3 OF 5 Clwbtls--ml p—pPte Fu'. 4 .SOY.DYJ) —1;1.55NL-29 J Z O Ocr H Z U) O w U) U ~ � U Z Z (n O o woQ z � 0 z Q O o Q LLJ U H :DN C �w W Z U)Z Q Z = Er Z u.l O U 0 Lo O rn O W SEAL t��" , " CA"o PREW FOR W S`ii J ION �'eFRr S ND. KEY PLAN SCALE: 1' = 0' SD' 25' 50' 100' No. I DATE BY Description REVISIONS DRAWN BY EAM APPROVED BY RSN CHECKED BY RSN DATE MARCH 17, 2017 TITLE EXISTING CONDITIONS PLAN PROJECT NO. C 1.01 SHEET NO. 3 OF 5 t 1 I \ 1aR0k �dMMlRCE/star oN TWNNTE L O 1 COMM E\s-T C \\\\\ / DE D SOC 4 \ \ OT 2/ OF .7A AR01 41, / /G'ALI R.A: ap.96G1 A LOn \\.— MERAL S REAM-I� \` FISTING 8 Cl14Cf//E RTIC 7 A r, -owN OF N11-iBSV LLE PROPOESED 10' WIDE ALL l uaG A PCR-IOn of rear \ '/ ' ' ' \ / ' ' ' / / EXISTING WEATHER ACCESS ROAD, 11\ \ \ \>>tll 1 / //;'///// /'// Illi!/ / I R ERn DESGRisEDwi ceeD / , / / -�a�� / , STREAM SEE OETAL SHEET C5.01 .SO oPE F�4 rnENi CR04TEG�RE Ei11, /" ' / // // / / / / i ' ��\�/",/ /" l l I ( ( ( l l CHANNEL EXISTING Lor 2 oI'.y_AP COOK 44. PAGE //',' / / / / / / .� ' � � /' ,'�,1 / / ( I I I f CHANNEL SIR AM ///// s+7� ? TC -AL AREA: 5.248 ACRES ' / CONTRACTAR SHALL -INSTALL DRIVEWAY APRWUP❑OT-COMPLETIDN- �`\\\\\ / OF THE PROJECT SEE DETAMSHEET— 1 �o IS L.F. OF 18' RCP CLASS III RCP / / WITH INVERTS TO MATCH 'DRWE,WA /I/RgN/ ' L //A,///,� ,' / EXISTING STREAM CHANNEL 5���-E�[[[16ET�AI�L` 'SHptT/CSUI x / RC uN` cows rRucT ON f.,., i SCAE, � , /8TEE ^37ETf ll S14Er' C OTS /'/ J i i / /' / / // //' ETRE TSINSET 0' 2.5' 5' 10' / It It r• �5 _ / — ��/EDLINOOK 61115, PAGE 6`0 05 / � 1 IN: O1 61115, PACE ------------ FUTURELAHSI JfI QBE DE ! 'I — i�TRAlli 7NS. TRANS. 7H6-- `� / /� 0,1 I — RE PH. UNDER C i UNIDER ___' / / / / I I 'C I I I II \ \\ •RO\ \` \ \ `\ �_-- ' _ ` — __------_—_�// / j -J' / ' i I J Irlrl l l — ' __ ------------------- \ _ 7 t ROP s G ING EX ST1NG�`wySON-y\IoPc, INs�av \ a7. jy� u \ \ \ ❑ ITfClNS DB 4064. Pc\06 STs\\' 141'��'s@ -72 \ p NU IN1- SIN 15 L.F. DF STREAM IMPAC -- zy~'3EE-SiREAM IMPACTS �\ a\ `,' — — o ReEL_2.e --. \ \- I \?• \ \ \ \ \ , \ INSET, THiS SHEET FOR—,* -CROSS-SE`TIDN 1" \ \ \ \� _ --_�_---- _ FiBEO Y6g1J.\<�' rB� --"- �\ N601165.97 v v ALF. OF 18'-RC�CLASSZII\RCPw /'� v I �T45t19a.3s_ R EL UP C 5 PVD P 71CF5 A�Y'AiIvAIL DEaJCT1B 5 ' / \ \�'�` oF_HA NR CONDE TAncv or" scR'�BED N r E?s� N — ' /'�!� TIMBER MAT-STR(•iAM f` �� ` ^`�/ \ i' .r-7" • "' // % \ o E IariFs s owN o PER JReESSAy a\ \ xA \ �WSSING. CTYP.) 4 \''PROPOSEE��ALI� / / \\\ \ , / / / / zoneD WEATHER ACCESS -WS G4.4 T C5.01 � / \\ ' ,.'d_ \ \els—��� ��ROAD\ZYP._--`\�.._a'/'^ �i� — d•/ / / k 601059.76 z5 60]165 1 E 1456387.22 i \`-----4N_.� A'ILS 14 D./JOHNSTON DB: 4664, PG 06 :>w: 015-11-Im ZOVING: CB PCco �'LIEFER 1 \. �\ ���--\�� �\ 1 �' 1 11111 /illi r � ."''��- � �\ '� �i �,i a✓3/""i/-'- /// '��� > 1 1) 11\\\\\\\ '�.. � `,-��` / E%1STItV PDWA %1HE T1 V'/A • \'� \ \\� &\ -\„ � � �-�� � R11•-1� 1 1 I / / /�///////� ��`' ' � `\� �''�III r� �r r y�• �� l� ( ( t � � v'�\'\\' \\1II I I ( :�� \ ) \ ((////////\ /j,�--/\\\\A\ IIII III ( ( ( i r ( \ \ \./\ \\\\` \\\\�\\\\111 NNANEO IB UT A IR I' M' � • i / � ) /' \\v'- �/,///, `-\ \ \ i0 CL A1 -1E CREEK �\ — � \ \ \ 1 �'�• \\ _---�a—_,-- \ ,\ ,\ < �1 "� I \ \ \ \ 1 vv i11111111111l I 1 4 > �\vv`�`�l�v��,��,� �;�____—��l�lllllllll�'1�1 •�� �, i ) l I I I I I I I III l / -rte --- I'f — / -- I I- I I I IIII I l '� � //,� / -- \ \ \\ •� _J l l l ; /; ,/ _: ,�/^w/��\ `\ \ � � I I I I I i I I1 / 1 ll-l�% \�, I I I I i 1!1 r c � .__,,a,/ / �'/ ,' \ `\`—�j��\ —�' �� / / /,�/ /,;/'�-�" — �\ \ 1 I I '�' I �- l�ii,'lll l l •r l/ , ` Dewberry® Dewberry Engineers Inc. m Lwnn P kwq.5�m Z2L CM1UTAtl�. NC 382W PM1orr: TO4.SB9.GYI8 FN�. T0430P.PPJT NCBELS pf-0939 Z J O 0 Cc z ~ f— O W U) U U) Z p o W 0 U Z Z� O_o0Z I ­_W U aw Z F Z (� Q Z = OS`CC Z OU C O Lo O O w SEAL „ CA. FESSlov y' , PRELI I�IY` $ FOR OO ST ION ION '•,FRT S N�..�• KEY PLAN SCALE: 1" = 50' o' 25' 50' 100' REVISIONS DRAWN BY CAM APPROVED BY RSN CHECKED BY RSN DATE MARCH 17. 2017 TITLE EROSION AND SEDIMENT CONTROL PLAN PROJECT NO. 50087270 C3.01 SHEET NO. BOPS I 0 GENTLE SLOPES STEEP SLOPES 100 lbs/acre toll (eaeue 30 lbs/acre Saricea lespedezo t..... 'fled otter August 15) 10 lbs/acre Kabe lespedezo TarletraRle Excoptioas FALL: August 25 -October FALL: August 25 -October 15 Nome Cote winter. February 15 -April 15 Lata winter. February 15 -April 15 SEEDING To e%tend spring seetling into June, add To a%tentl Pring seeding into June, odd DATES 15 lbs/acre hulled Bennudograsa 15 lbs/acre hulled Bermutlagrass 7 days for slopes gloater than 50' h fengffL Overseetling of Kobe lespedezo over tall -seeded Overseedinq of Kobe laspetleza over tall -seeded Nam, except for Perimeters and HOW Zones., tall fescue is very effective. toll fescue is very effective. SEEDING Apply lime and fertilizer per soil tests, or 4000 Apply time ontl fertilizer per soil tests, or 4000 AMENDMENTS lbs/acre limestone and 1000 lbs/acre 10-10-10 lbs/acre limestone and 1000 lbs/Dae 10-10-10 fertilizer. fertilizer. NDRTIT <AROCINA (2'-6” CURB AND GUTTER) 111.1 TO TRAP ORIGINAL /r T A B K FILTER FAHRI FRTER FABRIC STREAM BE NOTE 1 Cover--PmfSHAL SOIL STABILIZATION SHALL BE REQUIRED ON ANY AREA EGF P STABILIZATION W O1 n ffnr SITE WHERE LAND DISTURBING ACTIVITIES HAVE TEMPORARILY DR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE A) ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CLAENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. B> ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT LAND DISTURBING ACTIVITY. WITHIN 14 CALENDAR DAYS FROM THE LAST ILE T, * Tarn cf.ff. ..S}rsatNrtfl�n STANDARD 10/14/09 �j `�ralljj((��i���j�� DRAWING PS TS SEEDING SCHEDULE ORTH CAROLINA 521.1 SEEDING MIXTURE NOTES: 1. A STABILIZED ENTRANCE PAD OF 115 WASHED STONE OR RAIL ROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE TIE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2 FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTON ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR BOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REWIRE PERIODIC TOP DRESSING WIT/ ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBUC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE NHEEIS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. MEN WASHING IS REWIRED IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. N0. 515.1. 6. TOVM MAY REWIRE A STANDARD COMMERCIAL, DRIVEWAY (STD. 106.1 - 116.1) TO ACCESS THE CONSTRUCTION 90 lbs/acro of tall Issue 100 lbs/acre toll (eaeue 30 lbs/acre Saricea lespedezo t..... 'fled otter August 15) 10 lbs/acre Kabe lespedezo TarletraRle Excoptioas FALL: August 25 -October FALL: August 25 -October 15 Nome Cote winter. February 15 -April 15 Lata winter. February 15 -April 15 SEEDING To e%tend spring seetling into June, add To a%tentl Pring seeding into June, odd DATES 15 lbs/acre hulled Bennudograsa 15 lbs/acre hulled Bermutlagrass 7 days for slopes gloater than 50' h fengffL Overseetling of Kobe lespedezo over tall -seeded Overseedinq of Kobe laspetleza over tall -seeded Nam, except for Perimeters and HOW Zones., tall fescue is very effective. toll fescue is very effective. SEEDING Apply lime and fertilizer per soil tests, or 4000 Apply time ontl fertilizer per soil tests, or 4000 AMENDMENTS lbs/acre limestone and 1000 lbs/acre 10-10-10 lbs/acre limestone and 1000 lbs/Dae 10-10-10 fertilizer. fertilizer. NEW STABILIZATION TIMEFRAMES Site Area Description Sisbalutfon TarletraRle Excoptioas FerRneter IIYkeB, swates, d'4dws and slopes 7 days Nome �I Hopn Ouatny, Water (HQW) ZOMS 7 days None Slopes steeper ihacl 3:1 7 days y N Slopes Bre 10' or less In Wroth and are Not steeper Ulan 2:1, 14 days are allowed. p Slopes 3:1 or Uafter 14 days 7 days for slopes gloater than 50' h fengffL cam AN other areas with Slopes IWW than 4:1 14 days Nam, except for Perimeters and HOW Zones., SIZE IF THE DRIVEWAY IS ON A THOROUGHFARE \ e1C B1REEr EDsnxc a+auN sTAeuz•nax rAeroc� uxDEx ry wASlcn sTOxE �"'"°�' STANDARD DRAWING I STABILIZED CONSTRUCTION ENTRANCE NORTH CAROLINA SEE AF PRESEF REOUIR OF TRE RK MULCH, PUCE BANK I AT MEAS NOT CTED BY BARRIER. T Tawnof' STANDARD I 10/14/09 1 DRAWING TREE PROTECTION 6TD. ND. NORTH CAROLINA 6OJ.I ACCESS DRIVE I TEMPORARY CONSTRUCTION ROAD SECTION NTS •:•:+ns••: Fi v ♦. -•war.'.•:•>:cs•�:ccs+r.•:' . •.',••'•:•,•'s�•-IYti,��}.+,:.y�iL•,$'�•,'•,r:;:}�••f ,•W,/.'Y/.itY.a'•r, s.4$,'.,"•"•yf,. : •alb.'w�'i.!+�„:•.�,.•_a'x{?•ac•.v"`S',..'v� �v.'`'''�r`.k.:• v e: .LV nnnnt—anon 1=nnnunl non—Inn?I non-1rn1111r�nnnnliTr�ilnNn-II n � 11 II II � I?U 16-11 IL 11?I II II JI n n n II. 11= I U= - II. II-II?II :II .II?111111 II 11 1 11=1 1 FILTER FMRIL FENCE sH411 BE A MINIM MINIMUM OF 6 UNE w1RE5 WITH 12. 5rl 2. YXMx DETER FABRIC BE USED WHERE MORE TWW b aYS. J. STEEL POSTS SHLLL BE S'-0• IX HENW ITTER GUIDELINES). ME COLOR ORANGE 5 RESERVED rORSW 15ULL�IDENTINCATONUOF ENMRON ENTALLT SENSIINE ME S. 6. DPAIHAGE MEA LM NOT BE GREMEft TUN 1/e ACRE PER 100 FT OF FENCE 7. SLOPE IENGFNs CM NOT IXCEED CRRERM SHOWN IN TREE Be. Ngmf CAROLINA EROSION Alb SEDIMFM CONTROL PW1NRh: MO DESIGN MMIUL 8. W NOT INSTALL sEDIMEm FENCE ACROss SRSNAs, DITCHES, WATER- OR OTHER AREAS OF CONCENm lE0 FLOW, BRED MD SEEDED. I - .AT wgTl VIA16 1. mxcxL,c TO BE xaa I.S.I. I n• Elw. JOINPER­ TO TB S E 6,D. NO, , ., FDR ,DxT DETNL MExT. JI Dorf AMxT PLWTNG STRP• •. rRov Rn axes AN. wrzflsceTwns. Ers FRou A �� AxS. .surly A. p w�sEewnicsDlr""LLTEREHaj, TR A R SWI�m ox DRADEs aEVEE cape to u rAUA v P AVEIfar ••� EXCFTDI'nrfc�wlvAi A5AE ¢r /Y FxP. +oMr DRv(� r,EW'AT WID K6-D,� INiNEWAY CLASSIFIGTON � PLAN VIEW Tw or _ oxrvE B. xm,x vutlEs W"l�r °'1r TDP DF DD1� SECTION A - A (-A• SEE uoTE l) ASD,w • ,As SECTION B - 8 NOT TO SCALE STANDARD RESIDENTIAL DROP CURB TYPE I 10/5/09 DRAWING DRIVEWAY WITH PLANTING STRIP 6>fl. NO. MAINTENANCE NOTE: I INAFTER�FpCH ONLYKDURAINRGTM ORT NRiS�ENi MMEDwnY RNNFNl µ UATYLFASr PROLONCm RAINFALL. ANY REI'AiRS NEEDED SHALL BE MADE IMMEDMTELY. 2. SHWLD TIE FABRIC DECOMPOSE OR BECOME INOT£CTNE PRIM TO THE END OF THE EXPECTED USABLE LIFE MD THE 6MRIa 6TILL IS ECESSARY. ME FMflIC SHALL DE REPlACEO PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH -OX. NNf HDGM OF THE &WRIER. SEDIMENT DEPOSlIS REMAINING IN PLICE AFTER 111E SILL FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO TIE EXISTING ­L EAM DRAWN BY RSN APPROVED BY RSN CHECKED BY MARCH 17, 2017 DATE TITLE NDRTIT <AROCINA (2'-6” CURB AND GUTTER) 111.1 514.1 77{{��1ryIfn1t11LfTa""ofa111� STANDARD 10/14/09 l�i�i{I4'IIN� DRAWING TEMPORARY SILT FENCE 9TD. N0. NORTH CAROLINA 507.1 STONE APPROACH � nnd,p.gyJr TSgS •vTilF -Elf#.{ky �f. � �-i STREAM i EXTEND -aSTONE UPWARD AND TIF CHANNEL REVEGETATE AS NEED T • �� ED G ��F-.+iiikkk PROTECT LUT SLOPES SURFACE FLOW DIVERSION STREAA� CHANNEL � L��''• BRIDGE NOT TO %[EEO 40' STONE APPROACH CONTRACTOR SHALL BE INSTALL TRAP ON EITHER SITS RESPONSIBLE FOR MATERIAL SELECTION 6 INSTALLATION TO OF CREEK. TRAP SIZE WILL VARY ACCORDING TO LENGTH OF SUPPORT NECESSARY EQUIPMENT. ACCESS ROAD DRAINING TO THIS POINT EQUAL TO 50 CLL FT. PER PERSPECTIVE VIEW 100FT OF ROAD SURFACE FLOW DIVERSION TO, STONE APPROACH �U� •�`� TRAP BRIDGE NOT TD EXCEED D' STONE SURFACE FLOW APPROACH DIVE SIM 9 Dewberry" Dewberry Engineers Inc. sa00 Huns C.— P.—Y, suite EBT Cbe —. NC 2a2es I— 704.SOs.ss,a F. TD4.5-37 ww..tlewee"_ NCBELS N-29 Z J O OCr Z ~ O LLI 00 U Z) Z) F— U Z U) Z OR W ¢d Z 2 O 000, Q W Z.U N U) 0 C w W Q Z j_ W Z O O Lb O ch U w SEAL �FSSSFON�/yam'; PREM I�IY` FOR 00 SAV9'Ab ION '0 "moiINES ,RA�: ��OeFRT s. N�AYY• KEY PLAN REVISIONS EAM DRAWN BY RSN APPROVED BY RSN CHECKED BY MARCH 17, 2017 DATE TITLE TO TRAP ORIGINAL /r T A B K FILTER FAHRI FRTER FABRIC STREAM BE LONGITUDINAL SECTION TIMBER MAT STREAM CROSSING NTS 9 Dewberry" Dewberry Engineers Inc. sa00 Huns C.— P.—Y, suite EBT Cbe —. NC 2a2es I— 704.SOs.ss,a F. TD4.5-37 ww..tlewee"_ NCBELS N-29 Z J O OCr Z ~ O LLI 00 U Z) Z) F— U Z U) Z OR W ¢d Z 2 O 000, Q W Z.U N U) 0 C w W Q Z j_ W Z O O Lb O ch U w SEAL �FSSSFON�/yam'; PREM I�IY` FOR 00 SAV9'Ab ION '0 "moiINES ,RA�: ��OeFRT s. N�AYY• KEY PLAN REVISIONS CONSTRUCTION DETAILS PROJECT NO. 50097270 C5.01 SHEET NO. CF, 12' 12' WIDE CONST, EAM DRAWN BY RSN APPROVED BY RSN CHECKED BY MARCH 17, 2017 DATE TITLE CONSTRUCTION DETAILS PROJECT NO. 50097270 C5.01 SHEET NO. CF, 12' 12' WIDE CONST, :9 DRAWING INDEX GENERAL T1.01 COVER SHEET CIVIL CO.01GENERAL NOTES C1.01 EXISTING CONDITIONS PLAN C3.01 EROSION AND SEDIMENT CONTROL PLAN C5.01 CONSTRUCTION DETAILS ZONING. FLOODPLAIN & WATERSHED INFORMATION ZONED: CORPORATE BUSINESS DISTRICT (CB) PERMITTED USE: LIGHT INDUSTRIAL OPEN SPACE: 1,014,487 SF SETBACK: 3710465000J FRONT BUILD—TO—LINE: 15 (UNLESS STAFF APPROVED 80' BUFFER) REAR SETBACK: 15' SIDE SETBACK: 15' MAX HEIGHT: MAXIMUM HEIGHT PER ARTICLE 4 OF THE WATERSHED NAME: HUNTERSVILLE TOWN ZONING ORDINANCE SIDEWALK: 5' MINIMUM, BOTH SIDES SITE LOCATION 5.39 AC CHARLOTTE HISTORIC DISTRICT: NO WATER QUALITY BUFFERS PARCEL INSIDE WATER QUALITY BUFFER: YES POST CONSTRUCTION DISTRICTS JURISDICTION: N/A DISTRICT: N/A FEMA AND COMMUNITY FLOODPLAIN Dewberry Engineers Inc. FEMA PANEL #: 3710465000J FEMA PANEL DATE: 03/02/2009 FEMA FLOOD ZONE: OUT COMMUNITY FLOOD ZONE: OUT WATERSHED PROTECTION DISTRICTS PH. (704) 875-6541 WATERSHED NAME: CLARKE BUILT UPON AREA: FAX (704) 509-9937 SITE ACREAGE: 5.39 AC PROJECT AREA 3.27 AC BUA OF PROJECT AREA: 0.36 AC = 11.09• (ONLY INCLUDES IMPROVEMENTS ON THE FOLLOWING PLANS) PURPOSE STATEMENT: THE PURPOSE OF THIS PLAN SET IS FOR THE CONSTRUCTION OF A SUBSTATION ACCESS DRIVE AND A TRANSMISSION LINE WITHIN THE TOWN OF HUNTERSVILLE'S PROPERTY LIMITS. • EPM REFERENCE NUMBERS: • #328773 COMMERCE STATION PARK — CONCEPTUAL / SKETCH PLAN #351143 COMMERCE STATION INDUSTRIAL PARK — CONSTRUCTION DOCUMENTS KnB wnx.below. J369584 COMMERCE STATION PARK — RTAP Call beror•you dig. #370980 COMMERCE STATION PARK — RECORD PLATS Q COMMERCE STATION SUBSTATION EROSION AND SEDIMENT CONTROL HUNTERSVILLE, NORTH CAROLINA 95% CONSTRUCTION PLANS LOCATION MAP SCALE: NTS VICINITY MAP SCALE: 1' = 800' CONTACTS OWNER: APPLICANT:ENGINEER: Gerald Vincent Tim Kopacz Dewberry Engineers Inc. Town of Huntersville Electricities Robert S. Notte, P.E., P.O. Box 664 P.O. Box 2819 LEED AP Huntersville, NC 28070 Huntersville, NC 28070 9300 Harris Comers PH. (704) 875-6541 PH. (704) 659-7370 Parkway, Suite 220 gvincent®huntersville.org FAX (704) 509-9937 Charlotte, NC 28269 TKopaczOelectricities.org PH. (704) 509-9918 FAX (704) 509-9937 snotte®dewberry.com SUBMITTAL SET NUMBER ❑ PRELIMINARY ❑ CONSTRUCTION ■ APPROVAL ❑ REVISION ❑ BIDDING ❑ RECORD Dewberry® Dewberry Engineers Inc. BBBB H. co,— —.y. SW aI CNubee. NC 1e2eB NCBEl�.,n- SpF-0939 J Z O O CC C/) z co ° 5 ~ (.5 z Z U) W0 5 0 Z p O 0Z F¢— LLJ D s LLj Zco z U Q Z= Wz O O D U) rn O rr U w SEAL PREUIFOR W STM ION 9eFRi S iN�.`° KEY PLAN REVISIONS DRAWN BY FAM APPROVED BY RSN CHECKED BY RSN DATE MARCH 17, 2017 TITLE COVER SHEET PROJECT NO. •M57270 T1.01 SHEET NO. 1OF5 n GENERAL NOTES 1. THE DISTURBANCE AREA FOR THIS PROJECT IS APPROXIMATELY 3.28 ACRES (142,670 SF) OF WHICH, THE PROPOSED IMPROVEMENTS WILL PRODUCE A NET IMPERVIOUS AREA OF APPROXIMATELY 0.36 ACRES (15,7D0 SF). 2. BASE DATA FROM MECKLENBURG COUNTY GIS AND SURVEY PROVIDED BY DEWBERRY ENGINEERING INC. DATED AUGUST 3, 2015. 3. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO EXISTING UNDERGROUND FACILITIES AT, OR CONTIGUOUS TO, THE SITE 15 BASED ON INFORMATION AND DATA FURNISHED TO THE ENGINEER BY CHARLOTTE MECKLENBURG UTILITIES (CMU). THE OWNER AND ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ANY SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR REVIEWING AND CHECKING ALL SUCH INFORMATION AND DATA (PRIOR TO CONSTRUCTION) FOR LOCATING ALL UNDERGROUND FACILITIES SHOWN OR INDICATED; FOR COORDINATION OF THE WORK WITH THE OWNERS OF SUCH UNDERGROUND FACILITIES DURING CONSTRUCTION; AND FOR THE SAFETY AND PROTECTION THEREOF RESULTING FROM THE WORK; ALL OF WHICH WILL BE AT NO ADDITIONAL COST TO THE OWNER. 4. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, FENCES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCLURES FROM DAMAGE, OIL CONTRACTOR SHALL HAND EXCAVATE WITHIN 5' OF ALL BUILDINGS, WALLS, AND STRUCTURES. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 5. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE ENGINEER. 6. THE LOCATION OF ALL EXISTING UTILITIES ACROSS THE LINES OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS, AND WHERE SHOWN ARE ONLY APPROXIMATE. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL LOCATE ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. 7. ALL MATERIALS AND CONSTRUCTION SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS. B. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY DEPTHS OF ALL UTILITY CROSSINGS. 9. CONTRACTOR SHALL PROVIDE ALL CONSTRUCTION SIGNS. 10. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ELEVATIONS OF ALL POINTS OF CONNECTION OR PROPOSED WORK TO EXISTING CURBS, ROADS, ETC. 16. MATERIAL LAYDOWN AND STORAGE SHALL BE WITHIN PROJECT AREA. 17. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ON ADJACENT PROPERTIES BEYOND WHAT IS SHOWN. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 18. THE CONTRACTOR SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE ANDSHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK, AND OTHER ACCUMULATIONS. 19. ANY CONSTRUCTION OR USE WITHIN THE AREAS DELINEATED AS COMMUNITY ENCROACHMENT (0.1') FLOODWAY ENCROACHMENT AREA IS SUBJECT TO RESTRICTIONS IMPOSED BY THE FLOODWAY REGULATIONS OF MECKLENBURG COUNTY. 20. NON-STANDARD ITEMS (I.E. PAVERS, IRRIGATIONS SYSTEMS, FTC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE TOWN/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. CONSTRUCTION SEQUENCE EROSION AND SEDIMENT CONTROL NOTES 1. CUT OR FILL LEAVING OR ENTERING THE SITE MUST BE IMPORTED FROM OR EXPORTED TO A SITE WITH AN APPROVED EROSION AND SEDIMENT CONTROL PLAN. 2. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 3. IMPLEMENT THE REQUIREMENTS OF THE STATE APPROVED EROSION CONTROL PLAN. NOTIFY NCDENR AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. 4. NO LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL ALL APPLICABLE EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED IN LOCATIONS AS SHOWN ON THE CONTRACT DRAWINGS. IF CLEARING IS REQUIRED FOR INSTALLATION OF A GIVEN MEASURE, ALL OTHER MEASURES SHALL BE INSTALLED FIRST. THE NECESSARY LAND DISTURBANCE ACTIVITIES REQUIRED FOR INSTALLATION OF THE GIVEN MEASURE MAY THEN PROCEED. LIMITS OF CONSTRUCTION SHOWN ON DRAWINGS INCLUDE LIMITS OF LAND -DISTURBING ACTIVITIES AS WELL AS ACCESS WAYS TO NON -LAND -DISTURBING WORK AREAS. CONTRACTOR SHALL MINIMIZE LAND DISTURBANCE. NO LAND -DISTURBING ACTIVITIES SHALL BE PERFORMED 'DOWNSTREAM' OF EROSION CONTROL DEVICES. 5. UTILITIES SHOWN IN APPROXIMATE MANNER ONLY. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES PRIOR TO DEMOLITION, CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES BEGIN. S. TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE HAS BEEN STABILIZED. 7. THE CONTRACTOR SHALL CONDUCT PROJECT INSPECTIONS OF EROSION CONTROL MEASURES WEEKLY AND AFTER 1/2" OR LARGER RAIN EVENTS. ALL CONTROL DEVICES SHALL BE MAINTAINED AS SPECIFIED BY THE CONTRACT DOCUMENTS. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE TO FACILITATE RAINFALL MONITORING. THE CONTRACTOR SHALL MAINTAIN THESE RECORDS AT THE ON-SITE OFFICE FOR AUDIT BY CONTRACTING OFFICER. INSPECTIONS ARE REQUIRED UNTIL PROJECT STABILIZATION IS EVIDENT BY 957. VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING, AT SUCH TIME THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL DEVICES. ADDITIONALLY, CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING 'SELF -INSPECTIONS' INDICATING DATE DEVICES INSTALLED AND STABILIZATION MEASURES ARE INITIATED. THE 'SELF -INSPECTION' REPORTS SHALL BE MAINTAINED AND SUBMITTED TO GOVERNMENT ONCE STABILIZATION OF PROJECT HAS BEEN ACCOMPLISHED AND TEMPORARY MEASURES REMOVED. B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON-SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. 9. CONTRACTOR SHALL PROVIDE MEASURES NECESSARY TO PREVENT THE TRACKING OF SEDIMENT OR DEBRIS OFF-SITE. ANY SEDIMENT OR DEBRIS TRACKED OFF-SITE SHALL BE SWEPT/REMOVED DAILY. 10. PURSUANT TO NO GENERAL STATUTE 113A -54.1(e), THE CONTRACTOR SHALL CONDUCT 'SELF INSPECTIONS' OF EROSION CONTROL DEVICES AT COMPLETION OF EACH CONSTRUCTION PHASE AND DOCUMENT SUCH INSPECTIONS AS OUTLINED IN 15A NCAC 048 .0131. 11. CONTRACTOR SHALL MAINTAIN COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES SHALL BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE MAINTAINED BY THE CONTRACTOR ON-SITE AT ALL TIMES. 1. 2. 3. 1. OBTAIN ALL NECESSARY PERMITS FROM GOVERNMENT AGENCIES 2. SET UP AN ON-SITE PRE -CONSTRUCTION CONFERENCE WITH THE TOWN OF HUNTERSVILLE AND NCDEQ. 4 FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS SUBJECT TO FINE. 3. INSTALL SILT FENCE AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL 5. THESE DEVICES. 4. CALL FOR ON-SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT 6. AND CLEARING AND GRUBBING MAY BEGIN. 7 5. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 6. BEGIN SITE GRADING OPERATIONS. 7. TEMPORARILY SEED ALL DISTURBED AREAS THAT ARE TO REMAIN INACTIVE FOR MORE THAN 5 WORKING DAYS. 8. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 9. CONSTRUCT PROPOSED IMPROVEMENTS AND STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 10. CONTACT LAND DEVELOPMENT INSPECTOR TO CONDUCT INSPECTION ON STORM DRAINAGE, SIDEWALKS, DRIVEWAY IMPROVEMENTS, ALL ASPECTS OF ROAD CONSTRUCTION, ETC, 11. FINISH CONSTRUCTION OF PROPOSED IMPROVEMENTS. 12. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. SEEDING NOTES SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION, NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. MULCHED AREA SHALL BE TACKED WITH A POLYMER BASED TACIFIER. APPLY POLYMER PER MANUFACTURING RECOMMENDATIONS SPECIFIC TO EACH AREA OF APPLICATION (I.E. STEEP SLOPES, FLAT AREAS, ETC.). REAPPLY POLYMER AS NECESSARY TO PREVENT EROSION DURING VEGETATION ESTABLISHMENT. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. VEGETATION SHALL BE ESTABLISHED ON ALL DISTURBED AREA WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF GRADING ACTIVITIES OR WHERE CONSTRUCTION WILL TEMPORARILY CEASE FOR MORE 21 CALENDAR DAYS. CONTRACTOR SHALL WATER SEEDED AREAS AS NECESSARY TO ESTABLISH VEGETATION CONTRACTOR SHALL WARRANT VEGETATION GROWTH FOR ONE YEAR. `+ 1 5 TRAFFIC CONTROL NOTES 1. STREET SPACE IS AT A MINIMUM SO NO MORE SPACE SHOULD BE USED FOR CONSTRUCTION OR MAINTENANCE WORK THAN IS ABSOLUTELY NECESSARY. THROUGH BARRICADING AND CHANNELIZATION, THE REMAINING STREET SPACE IS TO BE USED TO CARRY THE TRAFFIC AROUND THE WORK AREA IN THE BEST WAY POSSIBLE UNDER PREVAILING CONDITIONS. 2. TRAFFIC CONTROL DEVICES SHALL BE SET UP PRIOR TO THE START OF CONSTRUCTION OR MAINTENANCE OPERATIONS, AND SHALL BE REMOVED OR RELOCATED AS THE WORK IS FINISHED OR WORK CONDITIONS CHANGE. THE AGENCY DOING THE WORK SHALL PATROL THE WORK SITE AS REQUIRED TO ENSURE THAT ALL TRAFFIC CONTROL DEVICES ARE IN PLACE AND OPERATING AT ALL TIMES. 3. ALL TRAFFIC CONTROL SIGNS FOR THE WORK AREA SHALL BE REFLECTORIZED. THE REFLECTIVE MATERIALS USED SHALL BE EQUAL TO OR BETTER THAN TYPE III, VII, VIII, OR IX RETROREFLECTIVE SHEETING REQUIREMENTS IN SECTION 633 OF THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP -03). 4. AT NIGHT, ADEQUATE BARRICADES WITH REFLECTORIZED MATERIAL AND LIGHTS ARE REQUIRED TO CALL ATTENTION TO AND TO INDICATE THE ACTUAL LOCATION OF OBSTRUCTIONS AND HAZARDS. 5. WHEN NOT IN USE DURING WORK HOURS OR CONSTRUCTION INACTIVITY, EQUIPMENT SHALL BE PARKED A MINIMUM OF 10' AWAY FROM THE TRAVEL LANE IN SUCH A MANNER AS TO NOT CREATE A SIGHT DISTANCE PROBLEM FOR MOTORISTS. 6. THE MINIMUM WIDTH FOR TEMPORARY TRAVEL LANES IS 10' (11' FOR STATE MAINTAINED ROADS); HOWEVER, A 12' LANE IS ADVISABLE ANO SHOUID BE PROVIDED WHENEVER POSSIBLE. 7. WHENEVER TRAFFIC MUST BE ROUTED ACROSS THE CENTERLINE, THE TWO DIRECTIONS OF TRAFFIC MUST BE PHYSICALLY SEPARATED, TRAFFIC CONES CAN BE EFFECTIVELY USED FOR THIS PURPOSE DURING DAYLIGHT HOURS; RETROREFLECTORIZED DRUMS MUST BE USED AT NIGHT. B. TRAFFIC SHALL NOT BE ROUTED ACROSS CENTERLINE WITH CONES OR DRUMS DURING NON -WORKING HOURS. CONTRACTOR MUST BE ON SITE OR CHANGE PAVEMENT MARKING APPROPRIATELY. 9. GENERALLY, THE PEAK FLOW OF TRAFFIC OCCURS IN MECKLENBURG COUNTY BETWEEN THE HOURS OF 7-9 A.M. AND 4-6 P.M., MONDAY THROUGH FRIDAY. DURING THESE HOURS, CONSTRUCTION ACTIVITY THAT INVOLVES A LANE CLOSURE WILL NOT BE ALLOWED ON THOROUGHFARE STREETS EXCEPT IN EMERGENCY SITUATIONS OR WITH APPROVAL FROM THE TOWN PUBLIC WORKS AND/OR NCDOT. 10. THE AGENCY DOING THE WORK SHALL PROVIDE FLAGGERS AND/OR POLICE CONTROL WHEN REQUIRED. CONTRACTOR MAY ALSO BE REQUIRED TO PROVIDE A UNIFORMED OFFICER TO CONTROL TRAFFIC WHEN WORKING IN AND AROUND A SIGNALIZED INTERSECTION. 11. EVERY ATTEMPT SHALL BE MADE TO SCHEDULE AND EXPEDITE THE WORK TO CAUSE THE LEAST INCONVENIENCE TO THE TRAVELING PUBLIC. 12. IN SITUATIONS NOT COVERED IN THIS DESIGN, THE PROTECTION OF THE TRAVELING PUBLIC AND THE PROTECTION OF THE WORKERS ON SITE WILL DICTATE THE MEASURES TO BE TAKEN CONSISTENT WITH THE CITY OF CHARLOTTE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 13. THE CONTRACTOR, UTILITY COMPANY, OR GOVERNMENTAL AGENCY INVOLVED IN THE WORK SHALL NOTIFY MECKLENBURG COUNTY LAND DEVELOPMENT AND/OR NCDOT OF THE CONSTRUCTION START DATE AND ANY MAJOR WORK WHERE THE NUMBER OF TRAVEL LANES ARE REDUCED FROM NORMAL CONDITIONS OR THE STREET IS REQUIRED TO BE CLOSED. EXCEPT IN EMERGENCIES, THE FOLLOWING NOTIFICATION IS REQUIRED: CONSTRUCTION START DATE - 5 WORKING DAYS IN ADVANCE - CLOSING 1 OR MORE TRAVEL LANES DURING PEAK TRAVEL TIMES - 5 WORKING DAYS PRIOR TO THE SCHEDULED WORK - CLOSING A STREET - 10 WORKING DAYS PRIOR TO THE SCHEDULED WORK. THIS LEAD --TIME IS NECESSARY FOR PLANNING AND NOTIFYING THE PUBLIC OF EXPECTED CHANGES IN THE NORMAL TRAFFIC CONDITIONS. 14. THE COUNTY ENGINEER OR NCDOT OR THEIR REPRESENTATIVES ARE AUTHORIZED TO STOP ANY CONSTRUCTION OR MAINTENANCE ACTIVITY WHICH IS NOT PROPERLY SIGNED AND BARRICADED AS REQUIRED BY THIS STANDARD, THE WATCH, AND/OR THE MUTCD UNTIL SUCH REQUIREMENTS ARE MET. 15. THIS DESIGN STANDARD CANNOT BE USED FOR ALL ROADWAY CONSTRUCTION SITUATIONS. IT IS INTENDED ONLY TO BE USED AS A GUIDELINE. SPECIFIC SITUATIONS MAY REQUIRE ENGINEERING JUDGMENT IN THE PLACEMENT OF TRAFFIC CONTROL DEVICES BECAUSE OF LIMITED VERTICAL AND/OR HORIZONTAL SIGHT DISTANCE. 16. WHEN PERSONNEL AND/OR EQUIPMENT ARE WITHIN 2' OF THE EDGE OF AN OPEN TRAVEL LANE (5' ON STATE MAINTAINED ROADS), THE CONTRACTOR SHALL REFER TO THE WATCH FOR PROPER LANE CLOSURE. 17. OPERATIONAL SIGNS ARE GENERALLY MOUNTED ON PORTABLE SUPPORTS. THESE ARE USUALLY USED FOR SHORT-TERM OPERATIONS TO WARN AND GUIDE TRAFFIC. ADVANCED WARNING SIGNS (CONSTRUCTION AHEAD) SHALL BE MOUNTED ON STATIONARY SUPPORTS SEVEN DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION OF THE ROADWAY. 18. ALL DRUMS SHALL BE BALLASTED IN SUCH A MANNER THAT THEY WILL BE STABLE UNDER WIND AND VEHICLE ACTION. BALLASTING SHALL BE DONE WITH SANDBAGS OR OTHER YIELDING MATERIAL SITUATED IN THE BASE OF THE DRUMS. 19. CONSTRUCTION WORK SHALL NOT BE ALLOWED ON BOTH SIDES OF THE ROAD SIMULTANEOUSLY WITHIN THE SAME AREA, UNLESS THE ROADWAY IS MEDIAN DIVIDED. 20. AT THE END OF EACH WORK DAY THE CONTRACTOR SHALL BACKFILL UP TO THE EDGE AND ELEVATION OF THE EXISTING PAVEMENT AREAS WITHIN 2 FEET OF AN OPEN TRAVEL LANE THAT INCLUDE A DROP OFF OF MORE THAN 3 INCHES IN ACCORDANCE WITH THE WATCH (SEE FIGURE 1). 21. PAVEMENT MARKINGS ARE TO BE INSTALLED BY THE CONTRACTOR. PRE -LINES MUST BE APPROVED BY THE COUNTY OR NCDOT PRIOR TO PLACEMENT OF THE PAVEMENT MARKINGS. LFGFNn EXISTING PROPERTY LINE ............. .- ..... ........ NEW STABILIZATION TIMEFRAMES SITE AREA DESRCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS O PERIMETER DIKES, SWALES, 7 DAYS NONE EXSTING 1' SURVEY TOPOGFJ-PHY MINOR DITCHES AND SLOPES EXISTING 1' SURVEY TOPOGRAPHY MAOR .... ...... ........... EXIS71NG WETLAND AREA ...__.... ......._........ HIGH QUALITY WATER (HOW) 7 DAYS NONE �^ ZONES EXSTING STOFM DRAIN _........... ......... N SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE PROPOSED TREELINE..................................... PROPOSED 1' TOPOGRAPHY .........................--.....- NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED t, SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH s ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES SEEDING NOTES SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION, NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. MULCHED AREA SHALL BE TACKED WITH A POLYMER BASED TACIFIER. APPLY POLYMER PER MANUFACTURING RECOMMENDATIONS SPECIFIC TO EACH AREA OF APPLICATION (I.E. STEEP SLOPES, FLAT AREAS, ETC.). REAPPLY POLYMER AS NECESSARY TO PREVENT EROSION DURING VEGETATION ESTABLISHMENT. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. VEGETATION SHALL BE ESTABLISHED ON ALL DISTURBED AREA WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF GRADING ACTIVITIES OR WHERE CONSTRUCTION WILL TEMPORARILY CEASE FOR MORE 21 CALENDAR DAYS. CONTRACTOR SHALL WATER SEEDED AREAS AS NECESSARY TO ESTABLISH VEGETATION CONTRACTOR SHALL WARRANT VEGETATION GROWTH FOR ONE YEAR. `+ 1 5 TRAFFIC CONTROL NOTES 1. STREET SPACE IS AT A MINIMUM SO NO MORE SPACE SHOULD BE USED FOR CONSTRUCTION OR MAINTENANCE WORK THAN IS ABSOLUTELY NECESSARY. THROUGH BARRICADING AND CHANNELIZATION, THE REMAINING STREET SPACE IS TO BE USED TO CARRY THE TRAFFIC AROUND THE WORK AREA IN THE BEST WAY POSSIBLE UNDER PREVAILING CONDITIONS. 2. TRAFFIC CONTROL DEVICES SHALL BE SET UP PRIOR TO THE START OF CONSTRUCTION OR MAINTENANCE OPERATIONS, AND SHALL BE REMOVED OR RELOCATED AS THE WORK IS FINISHED OR WORK CONDITIONS CHANGE. THE AGENCY DOING THE WORK SHALL PATROL THE WORK SITE AS REQUIRED TO ENSURE THAT ALL TRAFFIC CONTROL DEVICES ARE IN PLACE AND OPERATING AT ALL TIMES. 3. ALL TRAFFIC CONTROL SIGNS FOR THE WORK AREA SHALL BE REFLECTORIZED. THE REFLECTIVE MATERIALS USED SHALL BE EQUAL TO OR BETTER THAN TYPE III, VII, VIII, OR IX RETROREFLECTIVE SHEETING REQUIREMENTS IN SECTION 633 OF THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP -03). 4. AT NIGHT, ADEQUATE BARRICADES WITH REFLECTORIZED MATERIAL AND LIGHTS ARE REQUIRED TO CALL ATTENTION TO AND TO INDICATE THE ACTUAL LOCATION OF OBSTRUCTIONS AND HAZARDS. 5. WHEN NOT IN USE DURING WORK HOURS OR CONSTRUCTION INACTIVITY, EQUIPMENT SHALL BE PARKED A MINIMUM OF 10' AWAY FROM THE TRAVEL LANE IN SUCH A MANNER AS TO NOT CREATE A SIGHT DISTANCE PROBLEM FOR MOTORISTS. 6. THE MINIMUM WIDTH FOR TEMPORARY TRAVEL LANES IS 10' (11' FOR STATE MAINTAINED ROADS); HOWEVER, A 12' LANE IS ADVISABLE ANO SHOUID BE PROVIDED WHENEVER POSSIBLE. 7. WHENEVER TRAFFIC MUST BE ROUTED ACROSS THE CENTERLINE, THE TWO DIRECTIONS OF TRAFFIC MUST BE PHYSICALLY SEPARATED, TRAFFIC CONES CAN BE EFFECTIVELY USED FOR THIS PURPOSE DURING DAYLIGHT HOURS; RETROREFLECTORIZED DRUMS MUST BE USED AT NIGHT. B. TRAFFIC SHALL NOT BE ROUTED ACROSS CENTERLINE WITH CONES OR DRUMS DURING NON -WORKING HOURS. CONTRACTOR MUST BE ON SITE OR CHANGE PAVEMENT MARKING APPROPRIATELY. 9. GENERALLY, THE PEAK FLOW OF TRAFFIC OCCURS IN MECKLENBURG COUNTY BETWEEN THE HOURS OF 7-9 A.M. AND 4-6 P.M., MONDAY THROUGH FRIDAY. DURING THESE HOURS, CONSTRUCTION ACTIVITY THAT INVOLVES A LANE CLOSURE WILL NOT BE ALLOWED ON THOROUGHFARE STREETS EXCEPT IN EMERGENCY SITUATIONS OR WITH APPROVAL FROM THE TOWN PUBLIC WORKS AND/OR NCDOT. 10. THE AGENCY DOING THE WORK SHALL PROVIDE FLAGGERS AND/OR POLICE CONTROL WHEN REQUIRED. CONTRACTOR MAY ALSO BE REQUIRED TO PROVIDE A UNIFORMED OFFICER TO CONTROL TRAFFIC WHEN WORKING IN AND AROUND A SIGNALIZED INTERSECTION. 11. EVERY ATTEMPT SHALL BE MADE TO SCHEDULE AND EXPEDITE THE WORK TO CAUSE THE LEAST INCONVENIENCE TO THE TRAVELING PUBLIC. 12. IN SITUATIONS NOT COVERED IN THIS DESIGN, THE PROTECTION OF THE TRAVELING PUBLIC AND THE PROTECTION OF THE WORKERS ON SITE WILL DICTATE THE MEASURES TO BE TAKEN CONSISTENT WITH THE CITY OF CHARLOTTE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 13. THE CONTRACTOR, UTILITY COMPANY, OR GOVERNMENTAL AGENCY INVOLVED IN THE WORK SHALL NOTIFY MECKLENBURG COUNTY LAND DEVELOPMENT AND/OR NCDOT OF THE CONSTRUCTION START DATE AND ANY MAJOR WORK WHERE THE NUMBER OF TRAVEL LANES ARE REDUCED FROM NORMAL CONDITIONS OR THE STREET IS REQUIRED TO BE CLOSED. EXCEPT IN EMERGENCIES, THE FOLLOWING NOTIFICATION IS REQUIRED: CONSTRUCTION START DATE - 5 WORKING DAYS IN ADVANCE - CLOSING 1 OR MORE TRAVEL LANES DURING PEAK TRAVEL TIMES - 5 WORKING DAYS PRIOR TO THE SCHEDULED WORK - CLOSING A STREET - 10 WORKING DAYS PRIOR TO THE SCHEDULED WORK. THIS LEAD --TIME IS NECESSARY FOR PLANNING AND NOTIFYING THE PUBLIC OF EXPECTED CHANGES IN THE NORMAL TRAFFIC CONDITIONS. 14. THE COUNTY ENGINEER OR NCDOT OR THEIR REPRESENTATIVES ARE AUTHORIZED TO STOP ANY CONSTRUCTION OR MAINTENANCE ACTIVITY WHICH IS NOT PROPERLY SIGNED AND BARRICADED AS REQUIRED BY THIS STANDARD, THE WATCH, AND/OR THE MUTCD UNTIL SUCH REQUIREMENTS ARE MET. 15. THIS DESIGN STANDARD CANNOT BE USED FOR ALL ROADWAY CONSTRUCTION SITUATIONS. IT IS INTENDED ONLY TO BE USED AS A GUIDELINE. SPECIFIC SITUATIONS MAY REQUIRE ENGINEERING JUDGMENT IN THE PLACEMENT OF TRAFFIC CONTROL DEVICES BECAUSE OF LIMITED VERTICAL AND/OR HORIZONTAL SIGHT DISTANCE. 16. WHEN PERSONNEL AND/OR EQUIPMENT ARE WITHIN 2' OF THE EDGE OF AN OPEN TRAVEL LANE (5' ON STATE MAINTAINED ROADS), THE CONTRACTOR SHALL REFER TO THE WATCH FOR PROPER LANE CLOSURE. 17. OPERATIONAL SIGNS ARE GENERALLY MOUNTED ON PORTABLE SUPPORTS. THESE ARE USUALLY USED FOR SHORT-TERM OPERATIONS TO WARN AND GUIDE TRAFFIC. ADVANCED WARNING SIGNS (CONSTRUCTION AHEAD) SHALL BE MOUNTED ON STATIONARY SUPPORTS SEVEN DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION OF THE ROADWAY. 18. ALL DRUMS SHALL BE BALLASTED IN SUCH A MANNER THAT THEY WILL BE STABLE UNDER WIND AND VEHICLE ACTION. BALLASTING SHALL BE DONE WITH SANDBAGS OR OTHER YIELDING MATERIAL SITUATED IN THE BASE OF THE DRUMS. 19. CONSTRUCTION WORK SHALL NOT BE ALLOWED ON BOTH SIDES OF THE ROAD SIMULTANEOUSLY WITHIN THE SAME AREA, UNLESS THE ROADWAY IS MEDIAN DIVIDED. 20. AT THE END OF EACH WORK DAY THE CONTRACTOR SHALL BACKFILL UP TO THE EDGE AND ELEVATION OF THE EXISTING PAVEMENT AREAS WITHIN 2 FEET OF AN OPEN TRAVEL LANE THAT INCLUDE A DROP OFF OF MORE THAN 3 INCHES IN ACCORDANCE WITH THE WATCH (SEE FIGURE 1). 21. PAVEMENT MARKINGS ARE TO BE INSTALLED BY THE CONTRACTOR. PRE -LINES MUST BE APPROVED BY THE COUNTY OR NCDOT PRIOR TO PLACEMENT OF THE PAVEMENT MARKINGS. LFGFNn EXISTING PROPERTY LINE ............. .- ..... ........ FUTJRE ELECTFICITHS 'ROP RTY LINE .. _. r _, EXISTING SANITARY SEWER .__.. ..__.___.._ ;- EXSTING GIS TOPOCRAFHY MINOR .____...... EXISTING GIS TOPCORAFHY MAJOR...... ........ .... ...... ......_. EXSTING 1' SURVEY TOPOGFJ-PHY MINOR EXISTING 1' SURVEY TOPOGRAPHY MAOR .... ...... ........... EXIS71NG WETLAND AREA ...__.... ......._........ .•., EXISTING TFFE LINE .___......._...__.........._. ..-. EXISTING TREE .... ........ ._........ ..................... EXSTING STOFM DRAIN _........... ......... EXSTING UNDERGROLND GAS __...... ._.... _ EXSTING STREAM ......... ...... .__..... ......... ......_.-_.. PROPOSED TREELINE..................................... PROPOSED 1' TOPOGRAPHY .........................--.....- PROPOSED LIMITS OF DISTURBANCE ............ _____________ PROPOSED SILT FENCE ................................ © -X-X- PROPOSED TREE PROTECTION FENCE .......... PROPOSED TEMPORARY SEEDING ................. PROPOSED PERMANENT SEEDING ................. PROPOSED MULCHING .................................. PROPOSED CONSTRUCTION ENTRANCE........... AND ACCESS DRIVE ..................................... PROPOSED TIMBER MAT STREAM CROSSING.. i Dewberry® Dewberry Engineers Inc. PC1urbl7 NC zT1W M,r: ]00.50Y DY1B Fv: ]UG.SOB.ew] rrvrn.tlawberry.wm NC0EL5 NF -0939 z _O I- U) Co D U) z O R U) W U CELL G O J O u) Z I- 0V W 2 F- z z 0 o W 0 C U C Z � p 00 55 r :D 5 L� W Z F - Q Z Z s Z 0 o 0 F Ir W SE& r,ruuu„ ooSN 0Aq� ". 20R�FEBSrph9 PRELI INKY` T FOR Cb StAb I -ON %Pp �INEEP A4i A 'eFR7 S. Np"` KEY PLAN REVISIONS DRAWN BY EAM APPROVED BY RSN CHECKED BY RSN DATE MARCH 17, 2017 TITLE GENERAL NOTES PROJECT NO. 50087270 C0.01 SHEET NO, 2 OF 5 C Wo 8 U )2 RC /STATIZ DR. N \ \ \ \\ \\\\\\ \\ \\ \ \ \ \\\ OWI OF NTERSti ILLE G\\AFft'I N 0, \ I F (D S' IBEO Y DEED / / > I 1 \ 1 1 ' I ' 1 ING A FOR'IOf1�OF T-wT 13C51 6 I . 8 SUR,IECT TQ_ , I RR ERI DESCRIBED DIED 5 M I R TED ,I REON. / / J I 1 l J l J I DO 410. PG 880. SUB.lEC7 TO SLOPE EASEMENT CREATED HERETJN.� LST 2 O P DDOK 44. rAGE � \ \\\\� L\� �\ i, J / /% / / //// //' TG`AL AREA524 ACRES IT ITrA cc C ON / I/ - '' / , \ '� rj° ,Y _ /,',' ,''� �% LINJA NEVER LONG` EED OOK I6. ;/ / /� \ ______, ry 9 p 5 CRE5 11 I � � d , , .-., / / / / / / / / / I 141N: D13r30 TorAL\AREA: �s-/ A PH. I SDE OW SIDE /li -------------- --- // I , I 2 \ \ TRANS.; TR NS., I/ / 11 J J 111 \\ \\\ \\\ \ \\-- 74G--_-1 //' -- I F �v� �/ / 0EQ�c'fC��MV R4; E\�15/-l/.'T F. \ \ � ` _-�_ ! 'r FUT RE ; PH. �{I P'OF MO/�F3COK\'9'. 517 \♦ `\ �6- j ODE SIDE CONST. CON T. S\\ ��}Hs_ �, \\ \\`� \\ \ \\\ \`�`_ -��`---'-\>y��\`�--//Wiysou-�oHNs�0.v`� `�\ EPHEMERAL. STR�AM �Fsvu��v -77 '$'� \\ \` Fx,\nNr x• ru �ERTI _ \. '�—�i�',�/ 2S,uvrceminEu-sance FQ_ED ITBESASIDGiDWN ,J'10ES' MJ,ALL ICm s �^,'�\/ // �i • \\\ \\ ,< �'�—_\ � `\ \` `----�' -\ \' l � — /_ \`-_----�---_/.��/' / OT�N@�iSCR BED N PU�TCHASJ-�.6R \rNIT, N \ 1 ZONED C$'FRJ-AaEES ••' )\ y _ WF AILSON D./JOHNSTON 4664, PG 06 N 019-11-07 \ \ �\—`_—���_ •�•` --- //��_ ZOYING. C3 --FCCD ELFFER _ --_ --- � \ \ \` \ \ �-----�%/ �/----iii—.—\.\ �0 \\\\\p \\ �\ /' I \✓ \ \ \ \ /' _—a'"=-,'_--_ \ \ \\ \\111 111 l l �� ,' / 22,/, �_—;���//„r-,%.—�-- \, \\.Z\\\•\�` �—�_ � /� �— -, _`. --, _ \ l � l /•t2%�—� \ / i/. jia � /i ii j//� i i \ \`"\�� \\u� `.� \ \ \ .�/l \ � \ \ f �. _ ----- - �" '\ 1 I I i 1 11, llllll( ✓,��^_ \. \ : � / / /, ,;i.,/ / , � �' .���, / / / l i \—�—' \�' �` - —_ � ��— \\ Exsn Pove4 uFiEIt rbv &' \ \ \\\ 'Ye. \_'.:�� /••�} l J r �\ , 1 I 1 (((////////< / /° — \X\\\\ IIII (I f ((/1�€'1 I r ( \• \\�� �\ \\` �\\\ \\1\1 �• '�) \� \ \\ \ 1 1 1 I I 1 ///�///(l j����:z'��� �; \ \ \ \\\\ J J I I I I \ \ \ 1 \ \ \\ \ ��\ �\ \ \ \ \ •, / J \ TO t:l fRKE CR K ��J WITH �4 \\ \ I I I I I I fi //, 1 I l 1 �\ \ .l 1 1 I I / `----- \ / /• '/ R \ \\ \ 1 I I I I i I I I II�III I I / / '; r •—�' / / (�� v � v v vv v� � — �-- \ 1 I I L III llll II l� J�// //,- `\;\ \ ?\ \ ///,'' � /��\ \ \ \ \\ I I I I I I �I I1 ' l 1(Gl�i- 1 � I I I I I J 1 I. l � (\\�_a.� // r / ,- ,� \ \\\\—�j�Z�;\_-/ �,� /,',/,,�/'/:�'f�• �� \ 1 I I I 1�NI11(�(�117/ 1 •r � /s _ \> \ \IIII ((('L_�--__,i / /'_ \\ \ \ ,f / ,� / 1 I •1 / / l 40 Dewberry' Dewberry Engineers Inc. —C —P.k­ F— 704.5ppAp9] sliN Zx CM1olotle, Nc zlrzea TO4.SOD. 7 F� umm: derAerry.rom NCBFlS pFU919 J Z O IEr ~ Z h- F- O W U) U 2 Z W Z g z� X000 J N U) � Z ~ W,w W Q Z = WZ O O 0 O rn O w SEAL 20P�FESs/O 9' y �� PRE - I�1 LY` T FOR W S9'ION RT KEY PLAN SCALE: 1' = 50' 0' 25' 50' 100' REVISIONS DRAWN BY EAM APPROVED BY RSN CHECKEDBY RSN DATE MARCH 17, 2017 TITLE EXISTING CONDITIONS PLAN PROJECT NO. C1.01 SHEET NO. 3 OF 5 E 1 IU I I I \ 1z C �d14 Rc[/SIATON DR.-'-, / -4 1 \ \ \ \ \ \ \ \ \ \ \ q(F \ / / , / / / / / / / --- / ,/ / ,' " I / / / / / / PROPOESED 10' WIDE ALL BSI G A P R'16N \ \ \ \ \ \ -VWN CF F TERS\"LLE 1Y 1 ac A POR-lon of rM4T EXISTING WEATHER ACCESS ROAD, \ \ ID S' BF.O v DEw / / I 1 \ \ ) I 1 dPl / // / / / / / / / I J / / / / STREAM SEE DETAL SHEET C5.D1 \ \ 6 1 I, SUd1ECT Tf�J , I R �EF-Y JESCRIB_DYty CEEC , / , / / / / / / -9„� , / / / \\ R TEC ,tlEREON. / / J ) ) ) ) ) ) / 1 / / BOOK Oto, PG efiD. SUBJECT Tu / / / / / / / / ' / /� ��// /' / / r I r r r CHANNEL EXISTING SLOPE EASEMENT CREATED NERE'�N� �( i ```� / STREAM LCT 2 OI�4t4P BOOK 4<. PAGE / /' / / / / / / iY /3,2� / /' 1 / w]� 1 I CHANNEL / / FO AREA: 5.248 ACRES It CONTRACTdR SHALL_INSTALL < DRIVEWAY APRON' UPDR -COMPLETION OF TH PROJECT SEE DETAit-SHEEF- / 15 L.F. OF 18' RCP CLASS DI RCP / / / WITH INVERTS TO MATCH ,'DRWEM F�RT1N/ /� /�� ,/,/ ,z / EXISTING STREAM CHANNEL SOE // / / '' STONE/kC 'ESS DRLVE, STREAM IMPACT INSET E A ) / / / / / / / / / / / SCALE �T 1'=5' oMarRUCTnRi E �3' ,8 E •\}'lETfl� S Er' L��`.. �', / / / / / / / /� / ,/ / / / I � �,/! ,' l✓ll (/l�ll'! I 1 � � / -'' /� ��� o � l._ �,/// --- /,!� ;;' ':'j;'; / l / // ( / / / / i 111 1 //// /�/// / /% / / /// // /'//'� ; �/l /" I \ IiI I ✓/VI// 1/ / I /lI IIr//Il�1IIlI II 11 I 1I 1 \�I� I \ \\,�\ I�I v! SLN Wla3B --- --- - F/1428 �9I LIN D/A 01 \1iE\9Nt,/-TE`E5Ra - C1O0N5l\ 800tE 6�� EED TDTAL`AZFAO;�T ACRES //--------------------------- FUTURE ___� --- FUTUE M LWSIDEOWE / / !; / � � I ✓ 4 I/ ✓I I 1 ` \\ — ',----- - - -,- ---------- T ---- A"T Ns. �% `�: / / / , wN D R�14T L \ \\ 1 // r I 1 1 1 1 1 1 i \ _ _ _ / 122 F 0, 'CS01`6p \�T. SV] \\\ 1 �— k1C[[�E M�EE[N[ / / / ' / �gyy1 I I ' I I II \ \\ \\\\ \— ,---- —SIDE ARCO. \ \ \` \\ `_ I COST, I CONNST. / 1FCTAL FFA:9i 9 1 a R 5\\\ \ \ \� LDN.NI�(CNNIf�! Sif�E�iM ER RO.P.aA..O,,Sff GRApING \r�-EXJSTING` / l !\2 O ITIgINS 4o6a`1rE \ \ N\\� \\ hh �� 'N „ \T�r�LTS\pFlil\G-_ -�\ e\\ , — -- \ _ �' n n _ , `\ \\S E\p' N -\ ,T, `\ JJJJ \�, __ -' /"-•\ _ ,I} .. \ \ `\ \ �` 15 L.F. OF STREAM IMPACF`� / , svuC�^\ \ \\ \\\ .\ \.\ -3E€ET, THIS IMPACT-- � \ \— -'/. /-1 1 \ ,/ �� moi/ /,/' /' i .✓ ,EPHEMERAL s/aEAN \,//1(' I \ \ \ \ INSET, THIS El {�\ �� / >\ ,' �• ��12te't'cwlMc� E'srAuen vs \ /`.c/ "g7R6C \` EXIST]-- x1Sil18' CU GERiI `_.' \,�/ / 3Ein�tiE�36? \\ \ \\i" 9---_ N 601165.9] J� / ' \ f • ,' /'' / SecML���\ 1 / \ \ \ \L F. OF 1�'�RC>P CLASSiiI\RCP\\ ` / / I 1\ / S A�iB� 71F Y --EF`+ E�� SJ LL \ OP C 5 AND P FS A�RYTJtN9J,l1 [TF.F7CTlO: 5 I / / ... — �oFE'pSHBST4T cv .D7' SCR BED N PuT.Gfr5F�6� N �L `•- H R MAT-STR AM v TIME � \ lr oF,TKa R/0 E IE-IFs ;101N o FEF r✓<Es-s.0y ].\ /. i PROPOSE \� .' C I \R' -CROSSING, (TYPJ 6� -ALL \ - I zonEo,c \`\ — WEATHER ACCE$S`� ,� ,.�;,. v v DETA�/6HEET 05.01 _ \\ / / / \\ � x- . - "! 1�1-]S \ROAD 7YP.__ `a�/ \ � �•—''//'' / /w/ / / / — i4 = \\\ / _`"�\_— \ —�\v X725 /,''�T ` ` ,,� // /• / E12'\�! 601059.]6 N 601165.6] 145638].22 i SON AID S: 4 D. JOHNSTON-- �'��-- 019-n-107 ZONING: CB �' PECO BuE.. 11 \ pw -�— —�'\ 1 I 1 il1/'1/1111( � ;�'/�—��. \ \ �' / /'/,'-'�,;!�/ / / , / � �'� ; / l ) `�`—\\\-\; •/ iU/•E%ISTINO PUWWA L1411'blo Y�''? r'� x\ \ 1 rl x// •<l' 111; r t i t OA L. AMEARB TRIBUTARY TKE CREEK \\ 1 I I I l 11/1�11 l � �':' � it I 1 1 1 � - it II 1\"m\\\ \\ \ \ \ • 1 '� ``�------; � \\ \ 1111 I 1 1 I I 1 1 1 1 1 1 1'/// �-;%//;',' --� \', 1`11��\ � 1X�> 1 1 1 1 1 I ���� \—_----- \ 111'�111lillll�l 1 1 / � ��• 1 I I I I I ll,1( 11 ////; /� ,\\\\\\�\\\\�'• J /1 )) I I \\ 1 1 1 1 1 1 lillil�lllll l/ '; I I I I t I II 11 � I� �� ; ,/ l� � �\, �\'? �\\�� � :-�' ,/ ,/ ,/,/�•�,' �— �/�� \`. \\ \\ 1 I I I I I I I�I�I/ ' ; i;� �r(< < \\ 11 Dewberry' Dewberry Engineers Inc. Conn Pehwey. Sole 22C CMrbM. NC 28289 AMM. 704.309.9918 Fw�'. TD4.309A93T .Bewee. NCBEl9 pF-092939 Z J O fr Z ~ m O (A Z O W p a Z2 z� O pZ 'F— ^ >> VJQ N W Q Z j_ W0 0 O O O W SEAL 1111// .�QqN CAgO(i 's PREW I�1dY` FOR GD ST ('J ION :PO 671CINEEQ' T.� �� BFR7glNU�•: KEY PLAN SCALE: 1- 01 50' 0• 25' 50' 100' REVISIONS TITLE EROSION AND SEDIMENT CONTROL PLAN PROJECT NO. 50097270 C3.01 SHEET NO. 4 OF 5 EAM DRAWN BY RSN APPROVED BY RSN CHECKED BY MARCH 17, 2017 DATE TITLE EROSION AND SEDIMENT CONTROL PLAN PROJECT NO. 50097270 C3.01 SHEET NO. 4 OF 5 I IF GENTLE SLOPES STEEP SLOPES 100 lbs/ocre tall fescue 30 lbs/ocre Sericea lespedezo (-s-611,d after August 15) t0lbs/ocre Kobe lespedezo Ttmetrarro Exteptlom FALL August 25 - October FALL: August 25 - October IS None Late winter. February 15 -April 15 Lata winter. February 15 -April 15 SEEDING To extend spring Beetling into June, add To extend Pring Beetling into June. add DATES 15 lbs/etre hulled Bermudagross 75 lbs/acre hulled Barmudagrosa 7 days for awpeg gfeater uw SO' In IerlgtR Overseeding of Kobe lespedezo over fall -seeded Overseeding of Kobe leapedeza over fall -seeded Nana, except lor perimalert and NQW ZOnea. tall fescue is very effective. toll fescue is veryeffective. SEEDING Apply lime orltl fertilizer per sail tests, or 4000 Apply lime and fertilizer per sail tests, or 4000 AMENDMENTS lbs/acre limestone antl 1000 lbs/acre 70-10-10 lbs/acre limestone and 1000 lbs/acre 10-10-10 fertilizer. fertilizer. TRAP ORIGINAL fl FILTER FABRI T A B K FILTER FABRI[ STREAM BE NOTE 1 Ground Cavar--PmfeMlve nnvrr mnef M 1nM1liehM nn nll SOIL STABILIZATION SHALL BE REQUIRED ON AN7 AREA OF A vi thin 71 IenHnr dn„s nffsr SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULEI A) ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (31) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CLAENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. B) ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LLE LAND DISTURBING ACTIVITY. To- of_e''w �Ls � STANDARD PS TS SEEDING SCHEDULE 10/14/09 DRAWING lNORTH CAROLINA 521.1 SEEDING MIXTURE NOTES: 1. A STABILIZED ENTRANCE PAD OF /5 WASHED STONE OR RAIL ROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTON SIZE ONTO A PUBUC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBUC STREETS OR E%ISTNG PAVEMENT. THIS MAY REWIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE. WHEFLS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING q PUBLIC STREET. WHEN WASHING IS REWIRED, IT STIALL BE DONE IN AN AREA STABILIZED VAT1 CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. LA0. 515.1. 6. TOWN MAY REWIRE A STANDARD COMMERCIAL DRIVEWAY (ST). I00.1 - 116.1) TO ACCESS THE CONSTRUCTION SITE IF THE e0 IDs/acre of tall Issue 100 lbs/ocre tall fescue 30 lbs/ocre Sericea lespedezo (-s-611,d after August 15) t0lbs/ocre Kobe lespedezo Ttmetrarro Exteptlom FALL August 25 - October FALL: August 25 - October IS None Late winter. February 15 -April 15 Lata winter. February 15 -April 15 SEEDING To extend spring Beetling into June, add To extend Pring Beetling into June. add DATES 15 lbs/etre hulled Bermudagross 75 lbs/acre hulled Barmudagrosa 7 days for awpeg gfeater uw SO' In IerlgtR Overseeding of Kobe lespedezo over fall -seeded Overseeding of Kobe leapedeza over fall -seeded Nana, except lor perimalert and NQW ZOnea. tall fescue is very effective. toll fescue is veryeffective. SEEDING Apply lime orltl fertilizer per sail tests, or 4000 Apply lime and fertilizer per sail tests, or 4000 AMENDMENTS lbs/acre limestone antl 1000 lbs/acre 70-10-10 lbs/acre limestone and 1000 lbs/acre 10-10-10 fertilizer. fertilizer. NEW STABILIZATION TIMEFRAMES site area Daaalptlon Steba1"dio E Ttmetrarro Exteptlom Gari nisi dikes, swipes, ditches aro slopes 7 days None f+gh Quality Water (HOW) Zones 7 days None Slop" steeper than 9:1 7 days y II slopes are IT of lass In kmtil ark gra not steeper ftn 21. 14 days are akhred. p Slopes 3:1 or flatter 14 days 7 days for awpeg gfeater uw SO' In IerlgtR E� Ad aBror areas vriMl slopes Ilader Than 4.1 14 days Nana, except lor perimalert and NQW ZOnea. DRIVEWAY IS ON A THOROUGHFARE. PUBIC SIPEFT EwsTWc rapuND ' urvDEPTr6An0 rl FABMc� wA6HE0 sTOxE E,�/ga.a.iITEL STANDARD � a DRAWING NORTH CAROLINA STABILIZED CONSTRUCTION ENTRANCE SEEDU MATION PRESERJNION F REWIRED RIC a TREE BVRRIE q .REVEGETATE SURFACE ,..INTFI; uCE NOTE`;: 1 fRTETt BMRIfl5 SHALL BE MSPECTED BY THE RN ALLY RESPoNSIBIE PARTY OR HIS AGENT IMMEOwTELT MER EAd RNNFALL AND AT LAST ONLY WRING PROLONGED 0.NNFALL ANY REPgRs NEEDED SHALL BE MADE IMMEDRTELY. 2 sHWln THE FABRIC DECWPoSE OR BECOME NEiiECTNE PRIOR To THE END OF THE IXPECTD USABLE LIFE AND THE BIARIEs STILL 5 NECESSARY, THE FABRIC 5141E BE REPLACED PRdrPhY J SEDIMENT DEPOSITS SWULO BE R— WHEN a --N— MPRO%. WlF THE HOCM OF THE BAAH EP. SED MEM DEPoSlIS RELNMNG N PULE LATER TIE 9LT FENCE 5 REMOvEO $HNC BE DRESSED TO CONFORM TO THE pt511NG GPAOE PRFPAREp AND SEEDED. FOR PRUNING SEE INTERNAT�MAIL SOCILT' OF ARBORICULTURE SPECS. DEAD TREES AND SCRU GROWTH SHALL BE CUT ADJACENT GRADE. NO ,.� ALLOWED UNDER DRIP 2•x4• STANDARDS ♦ 1•x4• W OR ORANGE SAFETY FENCING MAY BE USED. RN MULCH, PLACE BARK 1 AT AREAS NOT :CTED BY BARRIER. T, T.of STANDARD I 10/14/09 I\1�j� DRAWING TREE PROTECTION Brp.RD. NORTH CAROLINA 6OL1 12' WIDE CONST. ACCESS DRIVE TEMPORARY CONSTRUCTION ROAD SECTION NTS I II. III - n n B '' n B Tr Ir Inc�P tl"u nom, � ii tr rc n B ural � n n n n fi n n B a=n n5n-11 n—n II�I n n� n n-1 I� �i R B B II II II II. Ira B 11 Ir -Ir ]I II. B U II II. II TI. II 11 -II i I B II II 11=11 I II ]I 11=11 ll B' B ll B 7 - II -II -Ir -11 - II 71 11 II IMI -I .II -I NF FORA, N�OiF� 1 FlLTER FABRIC FENCE SHALL BE A MINIMUM Of J2' IN WIDTH M10 S11N1 HAK A MINIMUM OF 6 UNE WIRES WITH 13 STAY SPACING. 2. WOAN FILTER FAaOC BE USED WERE SILT FENCE R TO REMAIN FOR A PERgO OF MORE iHNI ]O OAK. 3. STEEL POSTS SHILL BE e'-0' 1N NEICM AND BE OF ME SELF-FAS,ENER AN GLE STEEL ADIACOJI TO SWN BUFFERS, STRUMS OR WETWlDS (REFER TO SWIM BUFFER ENVIR—O Y6�ATMLLv C�OP� C�5 PESEIW'EO FOR MSALL IpENTDUTON OF 6. DRNWLE AREA CAN NOT BE GPUIER THAN 1/4 ACRE PER 100 FT OF FENCE ). SLOPE LENGTHS CM NOT IXCEED CRITERN SHOWN IN TABLE 6.6U NORTH CARWrU EROSION AND SFDIMFNr CONRROL PlM'NINC AND DESIGN WNUN_ B. DO NOT INSTAll SEDIMENT FENCE ILPOSS SIRE ,ORCHES. WATERNAYS ON OTHER AREtS OF CONCENIIMTED ROW. Towa,ofe STANDARD DRAWING NORTH CAROLINA f. REMOJF Aly BWPoFR$ LPON tl1LIPLETOX DE PROJECT. . LNJp5GP1,NG PrANs SWLL SMOw THE LfIG,lOHS OF ILL TREE PROTECTON iFNCES. REFER i0 Cm Di CHNSOTTE WIDSGPE CONSTPULmOx STAND—S SECTION 01000 FOR GENERAL SFTSIFIGTN„I PECARONIG TPEE PROTECTION TEMPORARY SILT FENCE NOT O TFL�M}T"IY Of. STANDARD 1 `jNOORRTjH CCARR,OLINA DRAWING 507.1 STONE APPROACH pp �epp � ''tF pis EXTEND STONE UPWARD AND ik CHANNEL #i PROTECT CUT ASSLOPES ED TO DIVERSION LOV ^� q STREAM CHANNEL BRIDGE NOT TO %[EE ED 40' STONE APPROACH CONTRACTOR SHALL BE INSTALL TRAP DN EITHER SIDE RESPONSIBLE FOR MATERIAL OF CREEK. TRAP SIZE WILL SELECTION 6 INSTALLATION TO VARY ACCORDING TO LENGTH OF SUPPORT NECESSARY EQUIPMENT, ACCESS ROAD DRAINING TO THIS POINT EQ AL TO 50 CU. FT. PER PERSPECTIVE VIEW IDaFT OF ROAD SURFACE FLOW STONE APPROACH DIVERSION TO TRAP STONE BRIDGE NOT TO EXCEED D' gppROACM SURFACE FLOW ➢IVERSIINJ TO Y _--,/2• FlP. ,af 1 ,n• UNP. JDWn 4- PWTUG S1RP• •. W: JaxT A Caiatnuc"nax _ smr PVmrc A en21 LVRB TO MEET PRNEYMY • rye „- B 1 PLAN VIEW ,aP DF GU�1\�, a TA�GDP DF DDI T SECTION A - A Ce SFE NDIE A) 43% L T 6x SECTION 0 - B NOT TO SCALE RESIDENTIAL DROP CURB TYPE I 10/5/09 DRIVEWAY WITH PLANTING STRIP RrD. xo. (2'-6" CURB AND GUTTER) 111.1 REVISIONS TAM DRAWN BY RSN APPROVED BY RSN CHECKED BY MARCH 17, 2017 DATE TITLE CONSTRUCTION DETAILS PROJECT NO. 5DDe727 TRAP ORIGINAL fl FILTER FABRI T A B K FILTER FABRI[ STREAM BE LONGITUDINAL SECTION TIMBER MAT STREAM CROSSING NTS Dewberry' Dewberry Engineers Inc. R300 Hum Corm- Poxwey, suiry 22[ Chokes. NC 28200 Phone: T0A.6Oa.aa18 Fu: TOA30BJKx1> RLAUS wbory.rom NEBELS pF-0939 Z J O LEr f - I— O W U) U � � ~ U Z � Z p o W 0 U Z �_ Z H 000 Hr//W)/ C) 5 V J =M) V/ LL W � f - W Q Z DC W Z O o O rn O oC U W SEAL „r.... ,.SN CARp� 20P�ESS3 PREM I�1Y` T FOR CU Si�J ION �'eFR i S . N�A�`• KEY PLAN 0 C5.01 SHEET NO.