Loading...
HomeMy WebLinkAboutNC0038377_Quartely Progress Report for Jan.-March, 2017_20170420DUKE .. ENERGY® File Mayo 12520 B-1 Mr Danny Snuth, Surface Water Supervisor North Carolina Division of Water Resources 1628 Mail Service Center Raleigh, NC 27699-1628 Subject Duke Energy Progress, LLC Mayo Electric Generating Plant Special Order by Consent EMC SOC WQ S 10-012 Quarterly Progress Report for January - March, 2017 Dear Mr Smith April 20, 2017 RECEIVED APR 28 2017 STORMWDENRAER ND EUALITy RMITT 1NG In accordance with the NC Environmental Management Commission Special Order by Consent, EMC SOC WQ S 10-012, Duke Energy Progress, LLC (Duke) is hereby submitting this Quarterly Progress Report This quarterly progress report submittal covers activities and progress for the calendar quarter of January through March, 2017 If you have any questions, please contact Ms Lori Tollie (336) 854-4916 or Mr Bert Lea (336) 597- 7309 1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are significant penalties for submitting false information, including the passibility of fines and imprisonment for knowing violations Sincerely, Tom Copolo — Plant Manager Mayo Electric Generating Plant Enclosure TC/1 wt Cc Wastewater Branch NC Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 ' Duke Energy Progress, LLC. Mayo Electric Generating Plant Special Order by Consent EMC SOC WQ S10-012 Quarterly Progress Report January — March 2017 -Attachment A: Schedule - Action Item Reporting requirements Status (1) Investigations Provide written investigations Complete - The tegtitred investigative report to RRO and Central Office report was submitted to the Raleigh within 225 days of the effective Regional office and DWQ Central Office oil date of this order February 1, 2013 A follow up meeting to discuss the report was held on February 14, 2013 Approval of the report was received frons DWQ in a letter dated Mai ch 11, 2013 (2) Submit Construction Submit proposed schedule to RRO Complete - The Construction schedule was Schedule and Central Office submitted to DWQ on May 3, 2013 (3) Begin Construction Construction status must be As detailed in the Construction schedule communicated in quarterly report submitted May 3, 2013 and amended on October 17, 2013 and July 18, 2014 1 The partial Zero Liquid Discharge system for FGD wastewater began construction oil January 28, 2013 As of March 31, 2015, construction of this system was 100% complete The p-ZLD system was turned over to plant operations oil February 15, 2015 In accordance with the terms of the SOC, notification of completion ivas filed on March 9, 2015 2 The Dry bottom ash handling system began construction on December 14, 2012 As of March 31, 2014, construction of the project was 100% complete In accordance with the terms of the SOC, notification of completion was filed on October 17, 2013 3 The nionofill to be used to receive partial ZLD conditioned ash began construction on September 17, 2012 As of December 31, 2014, Phase 1 of the nionofill was 100% complete. Notification of the completion of the nionofill was noted as part of the required quarterly report dated January 22, 2015 4 Construction of the dryfly ash reliability project began on Jime 9, 2014 with the installation of some initial footers As of September 30, 2016, this project was 100% complete Notification of the completion of the construction oil the project was submitted on October 19, 2016 (4) End Construction Upon completion of construction written See dates of notice provided under item #3 notice must be provided to DWQ above (5) Achieve Compliance Operational Status must be communicated Pollutant loading reduction to achieve NPDES with NPDES Permit in quarterly report Provide Final Written Permit Limits is currently being demonstraned Lt mics Account illustrating pollutant loading reduction within 545 days of construction completion -Attachment B Interim Effluent Limitations and Monitoring Requirements - Action Item Reporting Requirements Status New interim limitations DMR/reporting modified Duke complied with all relaxed interim in effect accordingly monthly average and daily niaxiniuni tissue monitoring hints during the quarter for which this re ort is made -Addendum 1.0 - Action Item Reporting Requirements Status Additional lake and fish Quarterly Progress Report Complete - Duke sampling ongoing as tissue monitoring referenced per EMC SOC WQ SIO -012 Addendum 10 Reporting of monitoring Quarterly Progress Report Ongoing - Duke submitted results of additional reservoir and fish tissue monitoring to the NC DWR on September 25, 2012, September 19, 2013, September 23, 2014, September 28, 2015 and Septeniber28, 2016 Signage Quarterly Progress Report Complete - Installation completed the week of July 23, 2012 It was noted to the fall that the signage had been removed by someone so new signage was installed and a quartet ly preventative maintenance task of venfymg the boat dock signage is in place has been created