Loading...
HomeMy WebLinkAboutNC0003425_Approval of Repair-Scope 1 Sate Dam ID:PERSO-038_20170202Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Final Approval of Repair February 2, 2017 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. George T. Hamrick Senior Vice President Duke Energy 400 S. Tryon Street, ST06A Charlotte, NC 28202 RE: Approval of Repair- Scope 1 Ro bi r6 -West AshTond-Darn - - - - Person County State Dam ID: PERSO - 038 Dear Mr. Hamrick: ROY COOPER Governor MICHAEL S. REGAN secietaiy TRACY E DAVIS Director RECEIVEDINCDENWR FEB 1 6 2017 Water Quality Permitting Section This correspondence concerns the referenced high hazard dam repaired pursuant to issuance of an Approval of Repair dated April 15, 2015, as required by the Dam Safety Law of 1967. The repair documentation pertaining to Scope 1- (Engineered plan for slope modification to address stability issues) certified by Mr. Jeffrey A Mann, PE, AMEC, was received by our office on February 19, 2016. An inspection of this dam was made by the Land Quality Section staff from the Raleigh Regional Office on February 12, 2016. The dam repair was found to be in general conformance with the approved plans and specifications, and continued operation of the dam is hereby approved. The Land Quality Section staff will make periodic inspections of this dam to verify that the dam is being maintained in good operating condition. It is advised that you closely inspect and monitor your dam, and that you notify your engineer and the Division of Energy, Mineral, and Land Resources if you notice or suspect any problems concerning its safety. The Emergency Action Plan must be reviewed and updated annually, or as needed by the owner or the owner's representative. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 1612 Mail Service Center 1 512 N Salisbury St I Raleigh, NC 27699 919 707 9200 T Mr. George T. Hamrick Roxboro West Ash Pond Dam Final Approval of Repair -Scope 1 PERSO-038 February 2, 2017 Page 2 of 2 Please contact the Raleigh Regional Office at (919) 791-4200 or a staff member of the Dam Safety Program in the Raleigh Central Office at telephone number (919) 707-9220 should you have questions concerning this matter Sincerely, Brian Shane Cook, PE, LSIT State Dam Safety Engineer Land Quality Section BSC/fmt cc: Mr Jeffrey A. Mann, PE, AMEC Mr. John Holley, PE, DEMLR Regional Engineer Mr. Jeff Poupart, Division of Water Resources Mr. Randy Hart, Duke Energy Filename PERSO-038 20170202_COFA Roxboro West Ash Pond Darn—scope- I