Loading...
HomeMy WebLinkAboutNC0000396_Lake Julian Dam State Dam ID:BUNCO-088_20170307Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 07, 2017 Mr. George T. Hamrick Vice President Duke Energy 400 S. Tryon Street, ST06A Charlotte, NC 28202 RE: Asheville Steam Station Lake Julian Dam Buncombe County State Dam ID: BUNCO — 088 Dear Mr. Hamrick: ROY COOPER Governor MICHAEL S REGAN Secretary TRACY E DAVIS Director RECEIVEDINCDEWWR r _, MAR 22-2017 Water o S� on Permitting t' A review has been made of the plans, specifications and design data submitted under cover letter dated February 23, 2017 and received in this office on February 23, 2017 for the water line replacement and realignment of the referenced high hazard dam. Prior to issuance of an approval to repair, additional information or revision is requested for the following items: 1. Please provide stability analyses for the referenced dam along with soft copies. 2. Please provide detail H&H analyses along with soft copies. 3. Installation of atleast 3 survey monuments are required. 4. Please provide clarification for standards of grout mixture of being non -shrink product. 5. Drawing No :"ASV_C904.001.006" for typical trench detail (W.21) does not reflect/ show dimensioning for depth of excavation. It would greatly aid further application review if a response to each of the above comments were made in a cover letter submitted with two sets of the revised plans, specifications and design data State of North Carolina I Environmental Quality I Energy, Mineral, and Land Resources 1612 Mail Service Center I Raleigh, North Carolina 27699 919 707 9220 T Mr. George T. Hamrick Revision Request March 07, 2017 Page 2 of 2 Asheville Steam Station Lake Julian Dam BUNCO - 088 Please contact this office should ou have any questions concerning the above items. Sir l Yusuf A Sharif, PhD Assistant State Dam Safety Engineer Land Quality Section cc: Mr Richard L. Hiner, P.E., AMEC, North Carolina. Mr. Stanley Aiken, PE, Land Quality Regional Engineer Mr. Jeff Poupart, Division of Water Resources Mr. Randy Hart, Duke Energy Filename BUNCO -088 20170306_COAR_Scope 3_Rev_Req_Water Line Replacement and Realignment State of North Carolina I Enviroarnental Quality I Energy, Mineral, and Land Resources 1612 Mail Service Center I Raleigh, North Carolina 27699 919 707 9220 T