Loading...
HomeMy WebLinkAboutNC0003417_Approval to Repair-Scope 2 State Dam ID WAYNE-009_20170119Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Final Approval of Repair January 19, 2017 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. George T. Hamrick Senior Vice President Duke Energy 400 S. Tryon Street, ST06A Charlotte, NC 28202 RE: Approval to Repair— Scope 2 H. F. Lee Power Station Cooling Lake Dam Wayne County State Dam ID. WAYNE-009 Dear Mr. Hamrick: ROY COOPER Governoi WILLIAM G ROSS, JR Acting Seci elary TRACY E DAVIS Ein eclor RECEIVEDINCDEQIDWR JAN 1 9 2017 Water Q alltY permitting Section This concerns the subject high hazard dam repaired pursuant to issuance of an Approval to Repair dated September 9, 2016, as required by the Dam Safety Law of 1967. The repair pertained to Scope 2 - Engineering plan to remove selected trees and their root balls. Record Drawings and the engineer's certification were received on December 5, 2016 The repair was certified by Mr. Jeffrey A. Mann, PE, AMEC. An inspection of this dam was made by Land Quality Section staff of the Washington Regional Office on December 12, 2016. The dam was found to be in general conformance with the approved plans and specifications, and continued operation of the dam is hereby approved. The Land Quality Section staff will make periodic inspections of this dam to verify that the dam is being maintained in good operating condition. These inspections, however, will be relatively infrequent. It is advised that you closely inspect and monitor your dam, and that you notify your engineer and the Division of Energy, Mineral, and Land Resources if you see or suspect any problems concerning its safety. The Emergency Action Plan must be reviewed and updated as needed by the owner or the owner's representative on an annual basis. State of North Carolina I Environmental Quality I Energy, Mineral, and Land Resources 1612 Mail Service Center 1 512 N Salisbury St I Raleigh, NC 27699 919 707 9220 T Mr George T. Hamrick H F. Lee Power Station Cooling Lake Dam Final Approval of Repair -Scope 2 WAYNE-009 January 19, 2017 Page 2 of 2 Please contact the Washington Regional Office at (252) 946-6481 or a staff member of the Dam Safety Program in the Raleigh Central Office at telephone number (919) 707-9220 should you have questions concerning this matter Sincerely, Brian Shane Cook, PE, LSIT State Dam Safety Engineer Land Quality Section BSC/fmt cc: Mr. Jeffrey A Mann, PE, AMSC. Mr. Samir.Dumpor, PE, CPM, DEMLR Regional Engineer, WRO Mr. Jeff Poupart, Division of Water Resources Mr. Randy Hart, Duke Energy Filename WAYNE-009 20170119 COFA HFLeaPoweStatlonCoolmgLalceDamScope2 State of North Carolina I Environmental Quality I Energy, Mineral, and Land Resources 1612 Ma_I Service Center 1 512 N Salisbury St I Raleigh, NC 27699 919 707 9220 T