Loading...
HomeMy WebLinkAbout20170742 Ver 1_SR 2310 Application_20170616STA.TE OF NORTH CARQL[NA DEPARTM�-;N'I� QF TRt�1VSPORTAT�4� R�Y COOE'ER Go��E�noa June 16, 2017 Mr. Eric Alsn7eyer U. S. Army Cor�s Qf �ngineers Raleigh Re�ulatozy Fielc� Office 3331 Heritage Trade Drive, Suiie 105 Wake �c�resi,l�C 2758i Subject: Natianwide Permit #14 SR 2310, Groce Road Wilkes C�unty, No�th Carolina Praject Number: 11C.097028 (DWR Permit Fee: �240) L�ear Mr. Alsrneyer: 1AMES I�. '�'RQGDON, ZII S�CRF.TARY `�`d�e NC Departinent of Transpor-t�tion is scheduled to grade, drain, base and pave S�i 231 �, Groce Road in Willtes Caunty. Total project length is 0.96 miles. Impervious surface area will increase by about 0.12 acres. This project wi�l ret�uit•e the repl�cer�eni af two bridbes with pipe and one additional wet pipe as shown below: Stream �m acts• E�istina S�ati��n �tructure Proposec� Riprap Dewat+eri�ag Tmtal Nu�nber S�ze �'ipe S�z� Im�aacts Impaets 117"x 79"x 40' 35+68 ��ridge #527 C��,4 with 2� 4p 10� headwalls 36+53' �2"x 25' 42''x 56' 10 40 75 43+00 1'reviousty permitted in 2013 but not constructed yet. Will be built in 2017. (Brid e #525) See attached ennits. Perm�Qent Streambe� Fill = 65' $a�nk Stab�liaation = 30' Tesn orary Dewaterin = 8�' Total Pro'ect Im acQs =�75' ' This pipe is currently perched with a plunge poo� �t the autlet. T�e new pipe wil� be slightly steeper but we should be aUle to unperch t�ie pipe. ,Llailtng Address^ Telephpne.• (33C) b67-91 1 1 Locatron: NC ISEPAR"F'MENT �F TRt�NSPO[�T'ATION Fax: (336) 667-4549 ApUitk55 2 DMS[C3N 11 Custamer Sen�ice: 1-877-358-4968 C1T1', NC Z1P 401 S'I'A'l'F.SUILLL 120AD NOftTN WILKESSC)R�O, NC 28659 1f'ehsAre. wv,nu.�acdotgov Mr. Eric Alsmayer SR 2310, Groce Road June 16, 2017 All three stream crossings cany different UTs to East Swan Creek (class: WS-I'V) in the Yadkin River Basin. The replace�neat of these structures will require temporary dewatering. An impervious sandbag dike will be constructed upstream of the existing structures to create a small pool. Clean water will temporarily be pumped around the construction areas and will be discharged downstream. Any dirty water located inside of the construction areas will be purnped into a silt bag if necessary, Once tl�e new pipes are in place, �he impervious dikes will be removed and preconstrt�cti�on streambed elevati�ons will be restored. This project was revi�ewed for the presence of threatened and endangered specie� in the field and I have a.lso included a query of the NCIVIIP database. Based on the project area rnapped with my request, the database search indicates #hat there are no records for rare species, important natural commuuities, natural areas, ar conservation/managed areas w�it�ain the proposed projeet boundary, ar within a one-mile radius of the project boundary. There ruilt be approximately 1.7 acres of tree �cutting at the praject Iocation due to cuf and fill work. The NLEB is lisied as a protected species in this county but the project does not fall vv�thin 0.25 miles of any red HUC identified in the SL(�PES spelIed aut in tk�.e Naiionwide Permit Regional Conditions. We do not anticipate any unpact to any other federally listed species. This project is not iocated within a traut watershed. Cultural resaurce campliance work has been completed. �To a�rchaeologicai resources or historic properties will be affected by this project (see attached). The project impacts are nat sigrufcant in �ature and shQuld not remove ar degrade existing water quality uses. Stormwater will be routed through grass or rock pined ditches, depending on the ditch line slope. Dissipater pads will be insta.11ed at pipe nutlets as appropriate. Pipe sizes used will be the minimum necessary to create a safe roadway. By utilizing the erosion ca�trol measures ou�iin.ed in the attachments to this applicatian, downstream water quality standards wi11 be protected. Overall water quality in the area will be impraved by paving the ABC travel lanes. All appropriate BMPs will be used during construction. Attached is a Preconstruction Nc�tific�tion Form, plan sheets wati� proposed erosian control mea,sures, a nna.rked county map and a marked topography map. By capy of this electror�ic letter, i� is requested that the Division of Water Resources, 401/Wetlands Unit, issue the approp�iate permit for cor�;st�uction of this praject. It is requested that any comrnents related to the 401 certification be electronically forwarded direcily to me with a copy sent to the US Army Corps of Engineers. We would like to begin constructian as soon as possible. If ftrrther inforination is required, piease let nne �Zow, Youx early xeview az�d consideration will be appxeciated. Mr, Eric Alsmeyer SR 2310, Crroce Roaci June 16, 2D17 Sincerely, Hea�h Slaugbter Division En�v�ranmental +Qfficer Enclosures cc: Amy Chapman, Divisiaz� of Waier Resources Dave Wanucha, �?ivision af Water Resources Brian Hamby, CoUnty Maintenance Engineer Zack Svuther, �oadside Environmental �'ield Operations Technician I•�" _ ,�'"'i �. -:� � � ���'� � � � ' �' '';� �:;���_ �.� Office Use Onty: Corps action IQ na. DWQ project no. Form Version 1.3 Dec 10 �00$ Prc-Construction Notificafion C Form A. A licant Infarmation 1. Processing 1 a. 7ype(s} af approual sought from the Corps: � Seciivn 4Q4 Permit [] Sectian 10 Permit 1 b, Specify Nationwide Permit (NWP} numb�r: 14 or General Permit (GP} number: 1 c. Has the NWP or GP number been rrerified by the Corps? ❑ Yes � No 1 d. 7ype(s} of approvai saught from ttte DWQ (check all that apply): � 401 Water Quality Certificatian — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quaf iiy Certificatian — Express ❑ Riparian Buffer Authorizatian 1e. ls this natification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approvaE is nat rec{uired? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No of impacts? Ef so, attach the acceptance letter from mitigatian bank ar in-lieu fee prograrn. 1g. Is the praject located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. fs #he project located within a NC DCM Area of E�vironmental Concem (AEC)? ❑ Yes � No 2. Project Inforrnation 2a. Name af praject: SR 2310, Grrsce Road 2b. County: Wilkes 2c. Nearest municipaiity 1 town: Boane 2d. Subdivision name: 2e. NCD�T aNy, T.i.P. or state � 1 C.497028 project no: 3. �wner knformatian 3a. Name(s} on Recorded Deed: EVCDOT 3b. Deed Book and E'age No. 3c. Responsible Party (for LLC if a}aplicable): 3d. Street address: 8D7 Statesville Road 3e. City, state, zip: North Wilkesboro, NC 28659 �f. Telephone na.: 335-903-9202 3g. Fax no.: 336-667-45�9 3h. Email address: hslaug�ter@ncdot.go� Page 1 of 3 D PCN Fnrm — Version 1.3 December 1�, 2008 Version �4. Applicant Informatian (if difFerent from owner) 4a. Applicant is: ❑ Agen# ❑ Other, specify: 4b_ Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: � 4f. Telephbne no.: �g. Fax no.: 4h. Email address: 5. AgentlConsuftant Informatian (if appficable} 5a. Name: 5b. �usiness narne (if applicable): 5c. Street address: 5d. City, state, zip: 5�. Telephcane na.: 5f. Fa�c no.: Sg. Email acidress. Page 2 af 10 PCN Form — Versivn 1.3 december 1Q, 20�8 Version B. Project Information and Prior Project Hjstory 1. Property Identification 1a. Property identificatian no, (tax PiN or parcel ID): 1 b. Site caordinates (in decimal degrees}: Latitude: 36.17'94B Lc�ngitude: - 80.88251 (DD.D�dddD) {-DD.DDD��D) 1 c. Property size: 5.7 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UTs to East Swan Creek proposed project: 2b. Water Quality Classification o'f nearest recei�ing water: WS-IV 2c. Ri�er basin: Yadkin 3. Praject Description 3a. �escribe the existing conditions on the site and the generaf land use in the vicinity of the project at the time of this appl ication: Unpaved secondary road in a rural area.. 3b. List the tata! estimated acreage of all existing wetfands on #he property: 0 acres 3c. List the total estimated linear fee� of a!! existing streams {intermit�ent and perennial) on the property: 2pp linear feet 3d. Explain the purpose of the proposed project: Secondary Road Improvement 3e. Describe the overail prajec# in detaii, including the #y�e of equipment to be used: See attached c�over letter. 4, Jurisdictiona! De#ecminations 4a. Have jurisdictionai wetland or stream determinatinns by the Corps or State been requested or obtained for this property ! project (including a{I prior phases) in the Rast? ❑ Yes � No ❑ Unknown Comments: 4b. If the Corps made th�e jurisdictfonal determination, what type � Preliminary ❑ Final of deterrrtination was made? 4c. If yes, who delinea#ed the jurisdictional areas? Agency/Consultant Company: Name (ii knovrm): Ot�ter: 4d. If yes, list ti�e dates of the Corps jurisdictional determinations or S#ate determinations and attach documentakion. 5. Project History 5a. Ha�e permits or certifications been requested or obtained far � Yes � No ❑ Unknown this proje�t (including all prior phases) in tt�e past7 5b. If yes, explain in datail according to "help fiie° instructions. B. Future PraJect Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, expkain. Page 3 af 1 a PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts 5ummary 1 a. Which sections ►rvere completed befow for your project (check all that apply): ❑ Wetlands � S#reams - tributaries j] Buffers ❑ Open Waters ❑ Pond Constr'uction 2. Wetland Impacts If there are wetland impacts proposed on #he site, then complete this questian for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdietion number— Type of impact Type of wetland Forested (Corps - 40�4, 10 Area of impact Permanent (P) ar (if knnwn) DWQ — non-4�4, other} (acres} Tem ra W� � P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W� � P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P 0 T ❑ Yes ❑ Corps ❑ No ❑ DWQ �4 � �, ❑ ;� ❑ Yes ❑ Carps ❑ No ❑ DWQ w� � P� T ❑ Yes ❑ Corps ❑ Nt� ❑ DWQ �6 ❑ � ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland imp�cts 2h. Comments: 3. Stream Impacts tf there are perennial or intermittent stream impacts (including #erriporary impacts} praposed on the site, then complete this question for all stream sites impactecl. 3a. 3b. 3c. 3d. 3e_ 3f. 3g. Stream impac# Type o# impact Stream name Perennial Type af jurisdiction Average Impact numt�er - (PER) or (Corps - 4d4, 10 stream length Permanerrt (P) or intermittent pWQ — non-404, wid#h (linear Temparary (l� (��T)? other) (feeC) f�et) S1 � P� T Piping, Riprap and UT #1 to East � PER � Corps � ,�a� dewatering Swaan Creek � INT � DWQ s2 � P� T Piping, Riprap and UT #2 to Eask � PER � Corps 2 75 dewatering Swan Creek ❑ INT � DVI1Q S3 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P❑ T � ❑ PER ❑ Corps ❑ INi ❑ DWQ S5 ❑ P Q T ❑ PER ❑ Corps ❑ !NT ❑ DWQ S6 ❑ P❑ T ❑ P�R ❑ Corps ❑ {NT ❑ DWQ 3h. Total stream and tributary impacts 175 3i. Comments: 65' piping, 30' riprap, 84 temporary dewatering Page 4 of 10 PCN Form — Version 1.3 Decerrtber 10, 2008 Version 4. �pen Water Impacts If #here are praposed irnpacts to lakes, pands, estuaries, tributaries, saunds, ihe A�antic Ocean, or any ather open water af the U.S. then indi�idually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name caf waterbody impact number — (if appiicable} 7ype of impact Waterbody type Area of impact (acres) Permanent {P} or Tem ora 01 ❑P�]T 02 ❑P[]T 03 ❑P❑T 04 ❑P�T 4f. Total open water impacts 4g. Comrr►ents: 5. Pond or Lake GonstructSon If ond or lake canstruction ro osed, then com fete the chart beiow. 5a. 5b. Sc_ 5d. 5e. Wetland Impacts (acres) Stream Impacts (feefi) Upland Pond ID proposed use or purpase (acres) numher of pond Flooded �illed Exea�ated Flooded Filied Exearrated Flooded P4 P2 Sf. Total 5g. Comments: N/A 5h. is a dam high hazard permit required? ❑ Yes � No If yss, permit ID no: 5i. Expected pond surface area {acres}; 5j. Size of pond watershed (acres}_ 5k. Method of constructaon: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then compkete the chart below. If yes, then indi�idually list all buffer impacts belaw. If an im acks re uire miti ation, then ou MUST fill out Section D af this farm. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which pratected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. Be. 6f. 6g. Buffier impact number — Reason Suffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (sq�are feet) (square feet) Tem ara im act r uired? B1 ❑P�T ❑Yes ❑ No B2 ❑P[]T ❑Yes ❑ Na B3 ❑P��" ❑Yes ❑ tdo 6h. Tota[ buffer impacts 6i. Comments: Page 5 of 1 fl PCN Form — Version 9_3 aecember 1 �, 2008 Version D. Impact Justi�cation and Mitigation 1. Avoidance and Minimization 1 a. Specificaily describ� measures talcen to avoid or minimize the proposed impacts in designing project. Proposed pipe le�gths are the shartest needed ta adequately construct the roadway. 1 b. Specifically describe measures taken to avoid ar minimize the propased impacts through construction techniques. All appropriate BMPs will be used during canstruciian 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensa�ory Mitigatian for � Yes ❑ No impacts to Waters of the U.S. or Wakers of the State? 2b. If yes, mitigation is required by (check a11 that apply): ❑ DWQ � Corps � M'rtigation bank 2c. If yes, which mitigation option will be used for tt�is ��o�e�� ❑ Paymer�t to in-lieu #ee program ❑ Rermittee Responsib9e Mitigation 3. Complete ii Using a Mitigatian Bank 3a. Name of Mitigaiion Sank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Camments: 4. Complete if Making a Payment to In-[ieu Fee Program 4a. A�proual letterfrom in-lieu fee program is attached. � Yes 4b. Stream mi#igation requested: 13D iinear feet 4c. If using stream mitigation, strearn temperature: ❑ warm � cool ❑cold 4d. Buffer mitigatian requested (DWQ oNy): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wet{and mitigatian requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. ff using a pern�ittee responsible mitigation plan, pro�ide a description of the propased mitigation pfar�. Page 6 of 1 D PCN Farm — Version 1.3 December 1 Q, 20D8 Versian 6. Buffer Mitigaiian (State Regulated Riparian Buff�r Rufes) — required by DWf,1 6a. Will the project result in an impact within a protectec! riparian buffer thafi requires ❑ Yes � No buffer mitigatias�? 6b. If yes, then identify the square feet af impact to each zone of the riparian buffer that requires rnitigation. Galculate the amount of mitigation required� 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square fieet) (square feet) Zone 1 3(2 for Gatauv�a) Zone 2 1.5 6f. i0tal buffer mitigation required: Bg. I� buffer rni#igation is required, discuss what type of mitigation is proposed {e.g., payment tQ private mitigation bank, permittee resp�nsible riparian buffer restaration, payment into an approved in-lieu fee fund). 8h. Carr�rr�er�ts: Page 7 of 10 PCN Form — Version 1.3 December 10, 20a8 Version E. Starmwater Management and Diffuse Flaw Plan (required by DWQj 1. Diffuse Flow Plan 1a. Does the project inc[ude or is it adjace�i ta protected riparian buffers identified [f Yes � No within one oithe NC Riparian Buf#er Protection Rules? 1 b. If yss, then is a diffuse flow plan includec!? If na, expFain why. Comments: ❑ Yes ❑ No 2. Stormwater Mana ement Plan 2a. What is the o�erall percent imperviousness of this project? 40 °lo 2b. Does this project require a Stormwater Management Plan'? � Yes ❑ No 2c. If this project �OES MOT require a S#armwater Management Plan, explain why: 2d. !f this project �OES require a Stormwater Management Plan, then provide a brief, narrative descriptinn of the plan: See cover letter. ❑ Certified Local Govemment 2e. Who uvill be responsible #vr the revi�w of the Starmwater Management Plan? ❑ DWQ 5tormwater Program � {�WQ 401 Unit 3. Certi�ed Local Government StorrrFwater Review 3a. ]n which local govemment's jurisdickion i5 this project? ❑ Phase II 3b. Which of the following locally-implemented starmwater management programs ❑ N5W apply (check af! that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Fias the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stprmwater Pro rarn Review ❑ Goastal counkies ❑ H4W 4a. Which of the following state-impferriented storrrtwater management programs apply � ORW (check all tha# apply): ❑ Sessiort Law 2Q06-246 ❑ Other: 4b. hlas the appro�ed StorrrFwater Management Plan with praof of appraval been atkached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Doss #he Stormwater Manag�ment Plan meet #he appropriate requirements? ❑ Yes ❑ Na 5b. Ha�e ail of the 401 Unit submittal requirements �een met? ❑ Yes ❑ Na F'age $ of 1 a PCN Form — Versian 1_3 �ecember 1 Q, 2a08 Version F. Supplementary Information 1. Environmental DocumentatEon {DWQ Requirement) 1 a. Does the project involve an expenditure of public (f�derallstate/local) funds or the � Yes ❑ Na use of public (federallstate)land? 1 b. !f you answered "yes" to the abo�e, does #he project require preparation of art ernironm�ntal document pursuant ta the requirements of the National or S#ate ❑ Yes � IVa {North Carolina� Environmental Policy Act (NEP,AIS�PA)? ic. If y�u answered "yes" to the abo�e, has the document review besn fnalized by the State C9earing Hause? {If so, attach a copy of the NEPA or S��'A final approval le#er.) ❑ Yes ❑ Na Comments: 2. ViolatEons (DWQ Requiremenf) 2a. Is the site in �iolation of DVIIQ Wetland Rules (15A NCAC 2H .050fl), Isolated Wetland Ruies (15A NCAC 2�i .1300), DWQ SurFace Water or Wetland Standards, ❑ Yes � No or Ftiparian Buffer Rules (15A MCAC 2B .4200}? 2b. Is this an after-the-fact permit application? � Yes � No 2c. I� you answered "'yes" to o�te or both of the above questions, provide an explanation of the �iolaiion(s): 3. Cumulative impacts (DWQ Requirement) 3a. Will this praject (based on past and reasanably anticipated future irnpacts} result in � Yes � No additional development, which could impact nearby downstream water quality? 3b. ff you answered "yes" to #he above, submit a�ualiiati�e ar quantitati�e cumuEative impact analysis in accordance with the mos# recent DWQ policy. If you answer�d °r�o," provide a short narrative description. 4. Sewage Disposal (D1NQ Requirement} 4a. Clearly detail the ultimate treatment me#hods and dispasition (nan-discharge or discharge) af wastewater generated from #he proposed project, or availabfe capacity of the subject facility. NIA Page 9 af 10 f'CN Farrn -- Version 1.3 December 9 D, 2608 Versian 5. Endangered Species and Designated Critical Habi#a# (Corps Requireme�t� 5a. Will this project occur in or near an area with federally protected species or � Y�$ � NQ habita#? 5�. Ha�e yau checked wi#h the USFWS conceming Endangered Species Act � yes � No impacts? ❑ Raleigh 5c. If yes, indicate the US�UII5 Field Office you ha�e cantacted_ ❑ Asheville 5d_ What data sources did you use to deterrr�ine wheth�r yaur site would impact Endangered Species or Designated Crikica[ Habitat? NHP, GIS and visua! observation. 6. Essential Fish Habitat (Corps Requiremer�t} Ba. Will this prajec# oecur in or near an area designated as essential fsh habitat? ❑ Yes � No 6b. What data sources did yau use fo determine whether yo�r site wauld impact Essential Fish Habitat? NOAA 7. His#oric or Prehistoric Cultural Res4urces (Corps Requirementj 7a. �II this project occur in or near an area that the state, federal or tribal gaverr�rr�en#s have designated as ha�ing historic or cultura� preservation � Yes � No status {e.g., National Historic Trust dssignation ar properties significant in North Carolina history and archaeofogy)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resaurces? Project was review�d by the NGDOT HEU. 1Vo surveys were required. 8. Flood Zone Designatian �Corps Requirement) 8a. Will this project accur in a FEMA-designated 100-year floodpfain? ❑ Yes � No 8b. !# yes, expfain how project meets F�MA requirements: 8c. What saurce(s} did you ease to make the floodplain determination? ncfloodmaps J. Heath Slaughter ,� 6{161'f 7 Applicant/Agent's Printed Name ApplicantlAgent's nature Date (Agent's nature is valid only if an aut zation letker frn�n the applicant is ravided.) Page 10 af 1 q PCN Fnrm — Version 1.3 Dec�mber 10, 2008 Version