Loading...
HomeMy WebLinkAbout20170742 Ver 1_WET PIPE 36+53_20170616PROJECT: 11 _209711 ROAD: SR 2310 "GROCE RD." COUNTY: WILKES TYPE: WET PIPE SURVEY PLAN SCALE: NO SCALE SHEET 1 OF 2 DATE: APRIL 12, 2017 STREAM NAME: UNNAMED TRIBUTARY TO EAST SWAN CREEK (2' average stream width� WS IV WRC-TROUT WATER YADKIN RIVER BASIN CENTERLINE PROPOSED R/W PROPOSED EDGE OF PAVEMENT � ia .►v EXISTING EDGE OF ROADWAY ---------- LOCATION: LAT= 36.1798 ° LON= -80.8813° NEW PIPE EXISTING PIPE _ _ 25' C: �� 35 ___�___�__�___�__4�__��__ �__ -------------------��� /j� BRIDGE �527 Stream _ � Std. # Description Symbol 1605.01 Temporary Silt Fence � � � � � � 1606.01 Special Sediment Control Fence _ _ . _ _ _ _ _ _ _ _ _ 1622.01 Temporary Berms and Slope Drains . . . . . . . . . . . . . . . . . . . . . . . . � � � 1630.02 Silt Basin Type B .............................. � � 1630.03 Temporary Silt Ditch ...................... Tso 1630.05 Temporary Diversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 'r� 1630,06 Special Stilling Basin �°°°°° 1632.03 Rock Inlet Sediment Trap Type C .............. �0� 1633,01 Temporary Rock Silt Check Type-A . . . . . . . . . . . . . . . . . . . . . � 1634.02 Temporary Rock Sediment Dam Type-B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . � a o 1635.01 Rock Pipe Inlet Sediment Trap Type-A ............... o�o EXISTING PIPE: Sta. 36+53 42" x 25' CMP 98° Skew at 4.0% (Perched 1.0') Temporary Rock Silt Check Type-A with °��000��° Matting and Polyacrylamide (PAM) - - � Temporary Rock Silt Check Type-B � � � � � � � � � ' Wattle .......... - � Infiltration Basin-------------------------------------� Wattle with Polyacrylamide (PAM)________________________________________ � PROPOSED NEW PIPE: Sta. 36+53 42" x 50' CMP 105° Skew at 4.8% (Submerged 0.5') s rear� IMPERVIOUS DIKE SPECIAL � STILLING BAS I N 1080.2', �C �� o 7 � Spot Elevations /within Stream L� (typical) 078.6' 25% / �. .' .' 38 '" - � '' � .' . ' �.� ��� � __- _,, ,���_- 25R��N ���� , � . `� z � IMPERVIOUS rn � � ... DIKE Armor Slope with Class "B" Rip Rap and Type IV Geotextile Fabric � � ► � y TEL. � � PED. ► , , � � � � �G- i � ��� �Q.� �p� � � �O � ' c� � �' 1083_4� Pl Sto 37+33.43 Temporary erosion control devices are not shown, �= 30° 56' 49.6" (LT) but will be installed as needed 0= 8' ll' 06.4" L = 378.09' SURVEY BY: CSB, SBD on 4/07/2017 v r= i93.%8� DESIGN and DRAWN BY: SB DARNELL � R= TOO.O�� NOTES: , � 1. STOCKPILE AREA 1N ROADWAY WITH SILT FENCE LOCATED ON LOWER SIDE 2. DEWATERING WILL BE PERFORMED ACCORDING TO BMP FOR PUMPING OPERATIONS 3. PLACE MATTING FOR EROSION CONTROL ON SLOPES ADJACENT TO PERMITTED WETLANDS AS WORK ALLOWS. 4. INSTALL PIPE(S) IN JURISDICTIONAL AREAS ACCORDING TO NC DOT BEST MANAGEMENT PRACTICES (4.2) FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. PROJECT: 11.209711 ROAD: SR 2310 "GROCE RD." COUNTY: WILKES TYPE: WET PIPE SURVEY PLAN SCALE: NO SCALE SHEET 2 OF 2 DATE: APRIL 12, 2017 STREAM NAME: UNNAMED TRIBUTARY TO EAST SWAN CREEK (2' average stream width� WS IV WRC-TROUT WATER YADKIN RIVER BASIN PROPOSED NEW PIPE Sta. 36+53 42" x 50' CMP 105° Skew at 4.8% (Submerged 0.5') I�:' I�: ►;► 1�75 � C/L . 2307 • . . � � � �� x � �� , � � } � a � � �- z�z `�N O: O � 2311 c��Z w�Y Y� c '� 2sos �;} edar Forest Rd � � � , 2309 � i 2309; � � � ` . � ��, . �- 2310 �� ' ,� .'\ � SITE � �� ; I � � / � VICINITY MAP LOCATION: LAT= 36.1798° LON= -80.8813° 5 1� 15 2� 25 3� 35 4� 45 5� 55 6� 65 7� SURVEY BY: CSB, SBD on 4/07/2017 Temporary erosion control devices are not shown, but will be installed as needed DESIGN and DRAWN BY: SB DARNELL