Loading...
HomeMy WebLinkAbout20170741 Ver 1_SRTE OFFICE17061621130_20170616o�OFWATFRpG Office Use Only: � � Corps action ID no. _ r�, �� o -~c DWQ project no. _ Fortn Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: 0 Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps7 0 Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): 0 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑401WaterQualityCertification—Express ❑ RiparianBufferAuthoriza[ion 1e. Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit: because written approval is not required? 401 Certification: � Yes ❑ No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank ❑ Yes ❑X No or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h � Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Projectlnformation 2a. Name of project: Replacement of Bridge 59 over Big Marsh Swamp on SR 1924 (Baker Ten Mile Rd.) 2b. County: Robeson 2c. Nearestmunicipalilyltown: St. Pauls 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state project no: TIP B-5693 (Bridge 770059) 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if not applicable applicable): 3d. Street address: 500 Transportation Drive (PO Box 1150) 3e. City, state, zip: Fayetteville, NC 28301 (PO Zip 28302) 3f. Telephone no.: (910) 364-0834 3g. Fa�c no.: (910) 486-1959 3h. Email address: jjrerko@ncdot.gov Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: not applicable 4c. Business name 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. AgentlConsultantlnformation�ifapplicable) 5a. Name: not applicable 5b. Business name 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Propertyldentification 1a. Property identification no. (tax PIN or parcel ID): I not applicable 1b. Site coordinates (in decimal degrees): Latitude: 34.782133 1c. Property size: 2. Surface Waters 2a. Name of nearest body of water to prop 2b. Water Quality Classification of nearest 2c. River basin: water: 1.94 Longitude: �8 922722 acres Big Marsh Swamp C; Sw Lumber 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing condition of the site is a Uansportation facility through a floodplain. the surrounding land use is rural resldential antl agricukural. 3b. List the total estimated acreage of all existing wetlands on the property: 0.3 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 81 3d. Explain the purpose of the proposed project: Bridge 59 is consideretl strudurally deficient. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacement of existing bridge 59, a 153 ft long bridge, with a 3 span (80 ft each span) 180 ft long bridge on the same alignment. An oft-site detour will be utilized and standard 6ridge construction operations will be employed. No temporary causeway or work bridge is proposetl. 4. Jurisdictional Determinations 4a. Have jurisdictionai wetland or stream determinations by the � Yes Corps or State been requested or obtained for this propeAy / nrniuct /inrL vlinn nll nrinr nh�mcl in TL.o ..��19 Comments: ❑ No ❑ Unknown 4b. If the Corps made thejurisdictional determination, what type m preliminary ❑ Final of determination was made? 4c. Ifyes, who delineated thejurisdictional areas? Agency/ConsultantCompany: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. SAW-2016-0061915/4/16 (see attached) 5. ProjectHistory 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? 6b. If yes, explain. ❑Yes ❑ Yes ��ID ❑X No ❑ Unknown Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 7. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): 0 Wetlands � Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type ofwedand Forested Type ofjurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Tem ora W1 P Fill Riverine Swamp Forest Yes Corps 0.01 y�/Z T Hand Clearing Riverine Swamp Forest Yes Corps 0.04 y�/3 - Choose one Choose one Yes/No - 1/�/4 - Choose one Choose one Yes/No - �/�/5 - Choose one Choose one Yes/No - 1/1/g - Choose one Choose one YesMo - 2g. Total Wetland Impacfs: 0.05 2h. Comments: Total permaneM wetland impacts: 405 sq. ft. (0.009 acres) 3. SVeamlmpacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. S[ream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (IN�? jurisdiction stream length Permanent (P) or width (linear Temporary (n (feet) feet) S1 T Excavation Big Marsh Swamp PER Corps 56 20 S2 - Choose one - - S3 - Choose one - - S4 - Choose one - - SS - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts zo 3i. Comments: Surtace water impacts less than 0.01 acres (79 sq. ft.) Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent(P)or type Tem ora 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (fee[) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one p2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? � Yes � No If yes, permit ID no: Si. Expected pond surface area (acres): 5. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. Project is in which protected basin? � Neuse � Tar-Pamlico � Catawba � Randleman ❑ Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number— mitigation impact impact Permanent (P) or required? (square (square Tem ora feet feet 61 - Yes/No B2 - Yes/No B3 - Yes/No B4 - . Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: raye o or i u D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Replace in-place was incorporated to minimize impacts. Bridge length has been eMended to provide setbacks from stream banks and no piers are proposed in surface waters. 2:1 fll slopes proposed In wetland areas to avoid antllor minimize impads. Sheet flow from shoulders and side slopes into wetlands with no ditches proposed. Rip-rap outlet pads at pipe outlets to reduce velocitfes. 1 b. Specificaily describe measures taken to avoid or minimize the proposed impacts through construction techniques. NCDOT Best Management Practices for Construction and Maintenance Activities will be employed. 2. Com ensato Miti ation for Im acts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑X No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this � pa ment to in-lieu fee ro ram project? y P 9 ❑ Permittee Responsible Mitigation 3. Com lete if Usin a Miti ation Bank 3a. Name of Mitigation Bank: Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: Type: Choose one Quantity: 3c. Comments: 4. Com lete if Makin a Pa ment to In-lieu Fee Pro ram 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes �X No 6b. If yes, then identiTy the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 � .5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Pian 1 a. Does the project include or is it adjacent to protected riparian buffers identified Yes �X No within one ofthe NC Ri arian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Yes � No 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? 38 % 2b. Does this project require a Stormwater Management Plan? XYes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? NCDEQ ! DWQ 3. Certified Local Government Stormwater Review 3a. In which local overnment's'urisdiction is this ro'ect? not appiirable Phasell 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check alI that a I 8 USMP PP y�� Water Supply Watershed � Other: 3c. Has the approved Stormwater Management Plan with proof of approval been Yes ❑No attached? 4. DWQ Stormwater Pro ram Review Coastal counties ❑-IQW 4a. Which of the following state-implemented stormwater management programs app�y RW (check all that apply): �ession Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? �Yes No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the 0 Yes ❑ No use of public (federal/state) land? 1b. If you answered "yes° to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes � No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑Yes ❑No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes 0 No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑Yes OX No 2c. If you answered "yes° to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in �Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance wiih the most recent DWQ policy. If you answered "no," provide a short narrative description. Due to minimal transportation impact from this bridge replacement lhis project will neither irrtluence nearby land use nor stimulale growth. THerefore, a tletailed indirect or cumulative effecls study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act DYes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh Sd. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Field surveys and USFWS County Lisl. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whetheryour site would impact Essential Fish Habitat? NCMFS Caunty Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal govemments have designated as having historic or cultural preservation � Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentatlon 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulia Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM James J. Rerko, PWS � �� ��10�7 ApplicanUAgenYs Printed Name �� pplicanU9geqt%'s $ignature Date (F\qenYs signalure is valid only if an authorization ( letterfinm the a licant is rovided. Page 10 of 10 U.S. AIiMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2016-00619 County: Robeson U.S.G.S. Quad� NGSAINT PAUI.S NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: North Carolina Department of Transportation PDEA, Attn: Mr. PLitlip S. Harris, III, PE, CPM Address: 1598 Matl Service Center Raleig6, North Carolina 27b99 Size (acres) Nearest Waterway USGS HLTC I,ocation descriQtion: Wa �iQ Marsh Swamn 03040203 Indicate Which of the Foliowine Annlv: A. Preiiminary Determination Nearest Town St. Pauls River Sasin Lumber Coordinates I.atitude:34.78211 Longitude: - . 271 ���� �` ..��' �Cp�J�Son C�p X Based on preliminary inf'ortnatia�y there may be watera of the U.S. including weflands on the abave described proJect area. We strongly suggest you have thia property inspected to determine the estent of Department of the Army (DA) jurisdictiott. To be considered final, a jurisdicdonal determfnation must be veri6ed by the Corps. This prel5minary determinarion is not an appealable action under the Regolatory Program Administrative Appea! Process (Reference 33 CFR Part 331}. If yov wiah, you may request an approved JD (which may he appealed), by contacting the Corpa disMict for further inatrucdon. Atso, you may provide new informetion for furth¢r consideration by t6e Corps to reeveluate tHe JD. B. Approved Determination _'I'here are Navigabte Waters of the United States within the above described project area subject to the permit requirements of Secrion 10 of the Hivers and Harbors Act and Section 404 of the Ciean Water Act. Unless there is e change in the (aw or our published regulations, this determination may be relicd upon for a penad not to exceed five years from the date of this notifica6on. _ There are waters of the U.S. inctuding wettands on the above described project area subject to the permit requirements of Section 404 oFthe Clean Water Act (CWAx33 USC � 1344). Unless there is a change in the law or our published rcgulations, this determination may be reFied upon for a period not to exceed five years from the date of this notification We sU'ongly suggest you have the waters of the U.S. including wetlands on your project area delineazed. Due to ihe size of your property andlor our present wotkload, the Corps may not be able to accomplish this wetlund delinearion in a timely manner. For a more timely delineation, you may wish to obtain a consultam. To be considered final, any delineaUon must be verified by the Cocps. _ The waters of the U.S. including wetland s on your project area have been dehneated and the detineation has 6een verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by tbe Cotps. Once verified, this survey witl provide an accurate depiction of all areas subjec[ to CWA jurisdiction on your pmperty which, provided there is ao ehange in the law or our published regulations, may be relied upon for a period not to exceed five years. The waters ofthe U.S. inctuding wetlands have been detineated and sorveyed and are accurate(y depicted on the plat signed by the Corps Regulatory Official idenHfied below on _. Uniess there is a change in the law or our published regulations, this determination may be relied upon for a period not to e�cceed five years from the date of this noti£cation. Page 1 of Z _ There are no waters of thc U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Secpon 404 of the Clean Water Act (33 USC 1344). Unless thero is a change in the ]aw or our published regu]ations, this determination may be relied upon for a pe[iod not to exceed five years from the date of this notificazion. _ The property is located in one of the 20 Coasial Counties subject to reguladon under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252} 808-2808 to determine their requirements. Placcment o£ dredged or fill materiat within waters of the US anNor wetlands without a Department of the P,rmy permit may constitute a violation of Section 301 of the Clean Water Ac[ (33 USC § 1311). If you have any questions regazding this dete[mination and/or the Corps regulatory program, pteasa contact Sarah Aair at 430-251-40A9 or Sarah.E.Hair�alusace.armv.mil. C. Basis Fo1' Deterinination: Waters onsite meet the criteria as defiaed in t4e 1487 Corps of Engineers Wetland De6nearioo Manual and appropriate Regional Supplement. AddiNonally, the sfte contains waters whEch exhibit an OAWM D. Remarks: E. Atteniion USDA Program Participants This delineation(determination has been conducted to identify the limits of Corps' Clean Watet Act jurisdictio� for the particular site idenrified in this request. The delinearion/determinadon may not be valid for the wetland conservarion provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipaze participaUon in USDA programs, you should request a certified wettand detemunation from the local office of the Naturat Resources Conservarion Secvice, priar to s[arting work F. Appeals Informali0n (T6is informaHon applies only to approved jurisdictional determinations as indicated in B. above) This correspondence cpnstitutes an approved jurisdictional determination for the above described site. If you object to this determinatioq you may raquest an administrarive appeal under Corps regulations at 33 Ck1t Part 331. Enclosed you will 6nd a Notification of Appeal Process (NAP) fact sheet and reqaest for appeal (RFA) form. If you request to appeal thiz determination you must submit a completed RFA form to the Fo]lowing address: US Army Coips of Engineers South Atlanric Division Attn: Jason Steele, Review Of&cer 50 Forsyth Street SW, Room 10MI5 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that if is complete, that it meets the criteria for appeat under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA fottn, it must be roceivod at the above address by NlA. **It is not necessary to submit an RFA form to the Division Oftice if you do not object co the determination in this correspondence.** ,�,,,�,� HAIR.SARAH.E „�u ��„,,,,,,� Corps Regutatory Official: Liz Hair_ A.10546935 J 2"""`��•� Date� Mav 4, 2016 Expiiafion Date: '�,lA The Wilmington District is committed to providing the highest level of sugport ro the public. To help us ensure we continue to do so, please complete our Customer Sarisfacrion Survey, located online at http://regulatoro.usacesurvev.com/. Etectronic wpy furnished: Mr. Chris Rivenback, ECAP Eastem Regional Manager, NC DOT-NES Mr. $odger Rochepe, P.E., Technical Services Administrator, NC DOT-NES Mr. Jason Dilday, NC DOT-NES Mr. Iim Rerko, NC DOT Division 6 DEO Mr. Mason Aerndon, NC DWR