Loading...
HomeMy WebLinkAbout20161257 Ver 1_Knierim revised plan and application forms_20170613Strickland, Bev From: Coats, Heather Sent: Tuesday, June 13, 2017 2:37 PM To: 'Hair, Sarah E SAW' (Sarah.E.Hair@usace.army.mil); Mairs, Robb L; Weychert, Curtis R; Bodnar, Gregg Cc: Dail, Jason Subject: Knierim revised plan and application forms Attachments: knierim revised app-06132017143053.pdf Hi all, Adam has submitted the attached revised MP forms to reflect the plan I previously sent about a month ago. After further review of the plan and discussion, it was determined he did not need to reduce the size of the platform in this case. Please note that he is proposing all 4 slips on the waterward side of the float due to small vessel size, and does not intend to dock on the back side of the float. Let me know if you have any questions or further comments. Thanks! Heather Heather Coats Assistant Major Permits Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heather. coats(a)ncdenr.gov 127 Cardinal Drive Extension Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 V, Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated cubic yardsmuddy sand +1- 500 cubic yards C. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas. N/A d. High -ground excavation in cubic yards. N/A 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Northeast New Hanover Conservancy disposal area 40,000 sq. ft. ( approx 200 x 200) - c. (i) Do you claim title to disposal area? ❑Yes NNo LINA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL NNone (ii) Describe the purpose of disposal in these areas: N/A d. (i) Will a disposal area be available for future maintenance? NYes ❑No ❑NA (ii) If yes, where? same f. (i) Does the disposal include any area in the water? ❑Yes NNo ❑NA (ii) If yes, how much water area is affected? N/A .1.V.,•L�r•M. n•.: ...it. r. -..� 8ge r.,ent.ree4 re 'sec!:. ?2.28'G6 Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization) Length 150 Width 30 Avg. Existing _20 -NA NA Depth Final Project -5.0 NA NA Depth 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated cubic yardsmuddy sand +1- 500 cubic yards C. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas. N/A d. High -ground excavation in cubic yards. N/A 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Northeast New Hanover Conservancy disposal area 40,000 sq. ft. ( approx 200 x 200) - c. (i) Do you claim title to disposal area? ❑Yes NNo LINA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL NNone (ii) Describe the purpose of disposal in these areas: N/A d. (i) Will a disposal area be available for future maintenance? NYes ❑No ❑NA (ii) If yes, where? same f. (i) Does the disposal include any area in the water? ❑Yes NNo ❑NA (ii) If yes, how much water area is affected? N/A .1.V.,•L�r•M. n•.: ...it. r. -..� 8ge r.,ent.ree4 re 'sec!:. ?2.28'G6 Form DCMMP-2 (Excavation and FUL Page 2 of 2.1 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP -4 — Structures) a. i ype or shoreline staonizanon: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward o1 NHW or NWL e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill_ Other_ i. Source of fill material. D. Lengm Width: d. Maximum distance watemard of NHW or NWL: f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No F-1 NA (ii) If yes, state amount of erosion and source of erosion amount information. It, Type of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No E] NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Silt Fence a (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. N/A 6/7/2017 Date Mark and Roxann Knierim Project Name submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: , b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? skidsteer to transport disposal material J, (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. N/A Adam Knierim Ap can at pplicant Signature • ' t ` - �- L/ � j� r) C" WI LPIIiIIGTON, NC 25? {,7b c?0. . 1 c.:. -K e. Y.s x3T _. Vv o- ..tea a 5 at'n anageme 0. t-.-P'PI- rvvised: 12;"t3;06 v1, Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable, a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑PublidGovernment ®Private/Community ❑Yes NNo c (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? []Yes NNo (n)Number 1 If yes: (iii) Length 344 (ii) Number (iv) Width 6 (iii) Length (v) Floating ❑Yes NNo (iv) Width (v) Floating []Yes []No e. (i) Are Platforms included? NYes []No I, (i) Are Boal included? []Yes NNo If yes: If yes: (ii) Number 2 (ii) Number - (iii) Length 16 60 (iii) Length (iv) Width 16 8 (iv) Width (v) Floating NYes NNo Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 4 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 0 ❑ Dockage, fuel, and marine supplies N Dockage ("wet slips') only, number of slips: 4 ❑ Dry storage, number of boats. ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: I. Describe the typical boats to be served (e.g., open runabout, ❑ Land out and access channel charter boats, sail boats, mixed types). NOpen water; dredging for basin and/or channel skiffs and small outboards []Open water; no dredging required ❑Other; please describe: k. Typical boat length. 161624 I. (i) Will the facility be open to the general public? []Yes ❑No - m. (i) Will the facility have tie pilings? " []Yes NNo (ii) If yes number of tie pilings? Form DC#1 MP -4 pazte d of 4! f 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C, Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. I . Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. I . What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin Flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes []No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes []No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a (i) Is the boathouse structure(s) ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile; etc. if a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a_ (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s). ❑Commercial-❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b_ Number it Description of buoy (color, inscription, size, anchor, etc.) Fut —rI DGM rg)i`t.rr.. iSrrwc.wf es page 4 of 4 a. Proximity of structure(s) to adjacent riparian property lines +f 00 feet Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 65-85 e. (i) Will navigational aids be required as a result of the project? [-]Yes ®No TINA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. +300 feet d. Water depth at waterward end of structure at NLW or NWL avq -2.0 feet C@ NLW 8. OTHER El This section not applicable a. Give complete description: The applicant proposes to conduct maintenance excavation within an existing channel and to construct a private 4 -slip docking facility 6/7/17 Date Mark and Roxann Knierim Project Name Adam Knierim Ap ntJiamp ,o Applicant Signature ♦ a ♦..� _ - ...It'. -{,?lit. J ..cu 1 of Ino � ti a 1 A JLB ENTERPRISES, LLC PROPERTY . ET '� <• s PIVER PROPERTY �r LSiI O.HE} �'e t ,l.P q'ENi RFAflIAN FI— FIT A,, :314 � PIL0. 41 HI 431 I. • Y I, .e w Flu � s,uvoo • ? ` FI 1. 3 SHELLFISH I O.I RESOURCE N R%4P 'RO•yr! -- Sf[00IXUEiNRESOURCE L 11 FOR UIMLNSIONS\ l.•Xr � i i;J 1 FLOOD NIX MARITECH DREDGING Innovative Solutions for fire Marine Emirowne;n 108 CIRCLE DRIVE OFFICE: 91 0.270.4058 HAMPSTEAD, NC 28443 FIELD: 910.279.7710 SURVEY DATE: FAX: 9 1 0.270.4058 URC )C[TO -5.0 MLW CREEK >I I nV t F R q HN AAAHO an EBB r'nr; . 5 MARITECH DREDGING Innovative Solutions for fire Marine Emirowne;n 108 CIRCLE DRIVE OFFICE: 91 0.270.4058 HAMPSTEAD, NC 28443 FIELD: 910.279.7710 SURVEY DATE: FAX: 9 1 0.270.4058 URC )C[TO -5.0 MLW TY�PS fL TWO YABAN COUVTY NORTH UAN ;r IR,Lomx 90 vp JOB No.0212-1 2011 y 7, 0' 50' 100' 100E, KNIERIM PROJECT Receiv .( PENDER COUNTY, NORTH CAROLINA PROPOSED LAYOUT DATE: DRAWING NAME: HORIZONTAL DATUM: I VERTICI)M SCALE: 2017 KNIERIM_REV6.DWG NAD 83 Ac Nln-r . . • . y + PIm IER y v " v " v • SHELLFISH • • • • • • • RESOURCE Y , , • 6'„p . . . • . . �+AZf80 01 A PIER / O Y , N y 2� v • • • , v DOCK DETAIL - PLAN ,VIEW 0' 25' 50' SCALE : I" = 25' PIER , RAMP FLOATING DOCK MEAN LOW WATER EXISTING �� $., GRADE (TYPJ FINAL GRADE 30, ►{ TYPICAL CROSS SECTION PIER, DOCK, AND TEMPLATE N. T. S. NOTES: DEPTHS ARE REFERENCED TO LOCAL MEAN LOW WATER (LMLW). BASE MAP PROVIDED BY PROGRESSIVE LAND DEVELOPMENT CONSULTANTS, PLLC AERIAL PHOTO: NC ONE MAP; 2012 AERIAL SHORELINE DIGITIZED FROM AERIAL PHOTO AND USED FOR CHANNEL MEASUREMI STRUCTURES SHOWN IN TYPICAL CROSS SECTION ARE A SKETCH ONLY AND DO NOT REFI FINAL CONSTRUCTION. �—SHE I 1 01 >I I HF1' N tOR HN AAAHO UIPF POINT ROAD 1 my Y�roiNr ' TY�PS fL TWO YABAN COUVTY NORTH UAN ;r IR,Lomx 90 vp JOB No.0212-1 2011 y 7, 0' 50' 100' 100E, KNIERIM PROJECT Receiv .( PENDER COUNTY, NORTH CAROLINA PROPOSED LAYOUT DATE: DRAWING NAME: HORIZONTAL DATUM: I VERTICI)M SCALE: 2017 KNIERIM_REV6.DWG NAD 83 Ac Nln-r . . • . y + PIm IER y v " v " v • SHELLFISH • • • • • • • RESOURCE Y , , • 6'„p . . . • . . �+AZf80 01 A PIER / O Y , N y 2� v • • • , v DOCK DETAIL - PLAN ,VIEW 0' 25' 50' SCALE : I" = 25' PIER , RAMP FLOATING DOCK MEAN LOW WATER EXISTING �� $., GRADE (TYPJ FINAL GRADE 30, ►{ TYPICAL CROSS SECTION PIER, DOCK, AND TEMPLATE N. T. S. NOTES: DEPTHS ARE REFERENCED TO LOCAL MEAN LOW WATER (LMLW). BASE MAP PROVIDED BY PROGRESSIVE LAND DEVELOPMENT CONSULTANTS, PLLC AERIAL PHOTO: NC ONE MAP; 2012 AERIAL SHORELINE DIGITIZED FROM AERIAL PHOTO AND USED FOR CHANNEL MEASUREMI STRUCTURES SHOWN IN TYPICAL CROSS SECTION ARE A SKETCH ONLY AND DO NOT REFI FINAL CONSTRUCTION. �—SHE I 1 01