Loading...
HomeMy WebLinkAbout20170372 Ver 1_More Info Received - Email_20170530Carpenter,Kristi From: Hood, Donna Sent: Tuesday, June 13, 2017 3:03 PM To: Carpenter,Kristi Subject: FW: Request--NCDOT - Replace Bridge 86 on Sr 1105--Anson County Attachments: 17BP.10.R.58_HYD_SMP_04.30.14 Rev 05.25.17.pdf; 17BP.10.R.67 _HYD_SMP_04.18.14 Rev 05.25.17.pdf Follow Up Flag: Follow up Flag Status: Flagged Kristi Lynn, I found it! This was also a response for the hold on 20170372 the one saved as 17BP.10.R.67 is for 20170372. I should have clarified!! Let me know if you have any questions! Donna From: Thompson, Larry B Sent: Friday, May 26, 2017 11:41 AM To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Hood, Donna <donna.hood@ncdenr.gov>; Amschler, Crystal C SAW (Crystal.C.Amschler@usace.army.mil) <Crystal.C.Amschler@usace.army.mil> Cc: Howard, Joel M<jhoward@ncdot.gov>; Haywood, Luther G <ghaywood @ ncdot.gov> Subject: FW: Request--NCDOT - Replace Bridge 86 on Sr 1105--Anson County Kristi, Donna and Crystal: Attached you will find updated stormwater management plans for R.58 and R.67. Please let me know if you need anything further from me. Thanks! La rry Larry Thompson, PWS, LSS Division Environmental Officer NC Department of Transportation Highway Division 10 716 West Main Street Albemarle, North Carolina 28001 704-983-4437 office 704-301-4881 mobile Ithompson@ncdot.�ov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Wainwri�ht, Dominic Sent: Friday, May 26, 2017 11:33 AM To: Thompson, Larry B Cc: Havwood, Luther G; Howard, Joel M Subject: RE: Request--NCDOT - Replace Bridge 86 on Sr 1105--Anson County Larry, Attached are updated stormwater management plans for R.58 and R.67 with a statement added to each one about grass swales. Note that we did not design these small bridge replacement projects to meet any specific stormwater requirements due to the limited right-of-way and small increase to impervious area compared to existing conditions. We did however try to incorporate grass swale treatment into our drainage design where it was practical to do so. We do have grass swale treatment on both projects and that language as well as the computations for those swales have been added to the stormwater management plans. Other proposed ditches on these projects were too steep and required permanent liners to avoid erosion issues. Hopefully the Hydraulic Predesign Reports I sent earlier this week were helpful even though we didn't have any bridge scoping sheets. Please let me know if you need any additional information. Thank you and enjoy the holiday weekend! Dominic M. Wainwright, PE D 919.232.6648 M 919.696.1543 ���� n�w� hdri nc.com/follow-us From: Wainwright, Dominic Sent: Tuesday, May 23, 2017 7:33 PM To: 'Thompson, Larry B' Cc: Haywood, Luther G; Howard, Joel M Subject: RE: Request--NCDOT - Replace Bridge 86 on Sr 1105--Anson County Larry, I am working on getting the Stormwater Management Plans updated for R.58 and R.67. As far as the bridge scoping sheets for these projects, are you referring to the sheets normally prepared by the Division? I don't believe I ever saw those for HDR's group of bridge projects. I have attached the Hydraulic Predesign Report for R.58 in case that has the stream info that Donna is looking for. I will send the Hydraulic PDR for R.67 in a second email due to file size. Thanks, Dominic M. Wainwright, PE D 919.232.6648 M 919.696.1543 h d r i n c. c o m/fo I I ow- u s From: Thompson, Larry B [mailto:lthompson@ncdot.gov] Sent: Monday, May 22, 2017 10:35 AM To: Wainwright, Dominic Cc: Haywood, Luther G; Howard, Joel M Subject: FW: Request--NCDOT - Replace Bridge 86 on Sr 1105--Anson County Good morning Dominic, Donna Hood has sent us a request for additional information for projects 176P.10.R.58 and R.67 (R.58 correspondence can be seen below). In summary, Donna would like to see our bridge scoping sheets as well as stormwater management plans that address the increased stormwater runoff from both projects. The stormwater management plans do not need to be highly detailed but we must state how we plan to treat the stormwater runoff, whether it be via grassy swales or whatever the case may be. Would you help us with these requests? Thank you! La rry Larry Thompson, PWS, LSS Division Environmental Officer North Carolina Department of Transportation 704-983-4437 office 704-301-4881 mobile Ithompson(a)ncdot.qov 716 W. Main Street Albemarle, NC 28001 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hood, Donna Sent: Wednesday, May 17, 2017 6:55 PM To: Thompson, Larry B<Ithompson@ncdot.�ov>; Howard, Joel M <ihoward@ncdot.�ov> Cc: Amschler, Crystal C CIV USARMY CESAW (US) <Crvstal.C.Amschler@usace.armv.mil> Subject: Request--NCDOT - Replace Bridge 86 on Sr 1105--Anson County Hi Larry, I visited Old Ruby SC Road and I had a request. First, and most importantly, for the stormwater management plan there needs to be some description of how the additional stormwater is handled not just a description of the impacts. Second, could you send me the bridge scoping sheet for this one? I think that has more stream info on it that I would like to see. Thanks, Donna Donna Hood - Donna.Hood@ncdenr.�ov North Carolina Dept. of Environmental Quality Division of Water Resources Transportation Permitting Branch 610 E. Center Ave. Mooresville, NC 28115 Ph:704.663.1699 Ce11:704.682.2839 Fax: 704.663.6040 ���������������������������������ti�������������������������������������ti Email correspondence to and from this address is subject to the North Carolina Public Records law and may be disclosed to third parties unless the content is exempt by statute or other regulation ������������������������������������������������������������������������ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.