Loading...
HomeMy WebLinkAbout20170694 Ver 1_SW Impact Analysis_20170605HIDDEN VALLEY STORMWATER IMPACT ANALYSIS MARCH 23, 2017 PREPARED FOR: Pulte Group 1225 Crescent Green Drive, Suite 250 Cary, NC 27518 Randy King 919.816.1146 PREPARED BY: Timmons Group, NC License No. C-1652 Jim Chandler, P.E. 5410 Trinity Road, Suite 102 Raleigh, North Carolina 27607 919.866.4507 phone 919.833.8124 fax jim.chandler(u�timmons.com www.timmons.com TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Hidden Valley Fuquay Varina, NC ect Number: 37913 Project Summary Introduction The Hidden Valley Subdivision is a 214 + acre tract of land located between Hwy. 55 and Purfoy Road about 3.5 miles south of Main Street in Fuquay-Varina, NC. The subdivision consists of 505 proposed lots, common areas, recreation areas, and natural areas. The existing site conditions vary between a former golf course to wooded areas. On Site storm drainage is collected through a series of structures and pipes that outlet, to storm water control measures before outlets to natural areas, streams, wetlands etc. This report analyzes the entire storm drainage system for using the 10 year storm event to size pipes and the 4" year storm event for gutter spread calculations and structure placement. Stormwater Methodology Y For each individual storm drainage inlet, a drainage area was measured as well as assigning impervious surface percentage. From this impervious percentage a rational 'C' value was calculated. Impervious surfaces were given a `C' value of 0.95. This data was used for pipe sizing. The average "C" value for the site is 0.65 Y RCP is specified for all storm pipe on site and off site with a Manning's N value of 0.013 Y The various inlet types are shown on the plan detail sheets. Flared end sections are used at all culvert inlet and discharge points. Y Spread calculations have been performed using the 4" storm event.. Y Spread calculations have been performed using a 5 minute ToC. Maximum allowable spread is 8 feet of a lane width. Y The storm water network has been designed to pass the 10 -year event. Y Structures are spaced/placed to prevent flow crossing an intersection at intersecting streets. Y Pipes are sized to handle the 10 -YR storm keeping the HGL within crown of pipe. Y The pipes were sized using "Hydraflow Storm Sewers. This program accepts the input data from each inlet, as well as physical characteristics of the storm system to be designed, and calculates flow rates and pipe sizes through the system. For rainfall data, the Town of Fuquay Published IDF curve was utilized. Each inlet was modeled to capture 100% of the drainage area flow. The minimum storm drainage pipe size used for this project is 15 inches. TIMMONS GROUP 1 1 www.timmons.com YOUR VISION ACHILILD THROUGH OURS. Hidden Valley Fuquay Varina, NC ect Number: 37913 Stormwater Treatment and Detention: Six wet detention basins have been proposed and designed to treat the requirements for 85% TSS removal, drawdown of the first inch of rainfall between 2-5 days and reduction of the peak flow for the 1 "- 24 hour storm event. In addition, we have also routed the 100 -year event to ensure safe passage through the site. As the site drains to two common point, treatment is being accomplished at both these points. Detention: This project is required to reduce the post -development peak flow rates for the 1 -year, 24 hour storm event such that it does not exceed the pre -development peak flow rates. Detention within the proposed BMPs will be used to achieve the required results. The results of the preliminary routing are provided below. Analysis Point 1 re -Development Tc Drainage Area Q1 Q100 Min Ac cfs cfs 5.0 61.90 66.93 426.16 Post - Development Tc Drainage Area Q1 Q100 Min Ac cfs cfs 5.0 61.90 24.02 415.66 Analysis Point 2 re -Development Tc Drainage Area Q1 Q100 Min Ac cfs cfs 5.0 20.40 20.38 136.83 Post - Development Tc Drainage Area Q1 Q100 Min Ac cfs cfs 5.0 20.40 15.00 121.34 v PondPack software has been used to calculate the peak flow rates using SCS Method. A report of all the calculations for the site has been included for review. Y The Natural Resources Conservation Service (NRCS) web based soils report has been used to identify that the onsite soil types consist primarily of Hydrologic Soil Group type "B". 21 www.timmons.com TIMMONS GROUP 1- -11- ACHIL iHH . OURS. Hidden Valley Fuquay Varina, NC ect Number: 37913 Rainfall Data Town of Fuquay-Varina OF Chart Table 110.01 -1-D-F Table* Duration 1 -year 2 -year 10 -year 25 -year 50 -year 100 -year (minutes) (inches/hour)" (inches/hour) (inches/hour) (inches/hour) (inches/hour) (inches/hour) 5 5.10 5.82 7.44 8.23 8.77 9.28 10 4.20 4.65 5.95 6.56 6.98 7.37 15 3.50 3.90 5.02 5.55 5.90 6.21 30 2.38 2.69 3.64 4.11 4.44 4.76 60 1.50 1.69 2.37 2.73 3.01 3.27 120 0.89 1.00 1.43 1.67 1.85 2.03 180 0.65 0.70 1.02 1.20 1.35 1.50 360 0.38 0.42 0.61 0.73 0.82 0.91 720 0.23 0.25 0.36 0.43 0.49 0.55 1440 0.13 0.15 0.21 0.25 0.29 0.32 24-hour 3.00 3.51 5.13 6.11 6.89 7.69 rainfall - Based on NOAA - National Weather Service Atlas 14 Volume 2 Version 2.1 ** - The 1 -year storm is a misnomer, since this would result in a 100% occurrence in any given year, but it is so named herein for ease of reference. 41 www.timmons.com TIMMONS GROUP