HomeMy WebLinkAbout20170723 Ver 1_CHEC_SUPpkgs_20170607Booth�Associates, LL�
engineering for the future since 1960
4/4/ 17
David Hallac
Superintendent
Cape Hatteras National Seashore
1401 National Park Drive
Manteo, North Carolina 27954
Via Electronic Mail
Subject: Request for Special Use Permit for Construction Activities
To Install Underground Electric Utility as part of NCDOT
TIl' Project B-2500 (Phase I), Dare County, North Carolina
Dear Mr. Hallac:
In response to the North Carolina Department of Highways (NCDOT) Project TIP B-
2500, Cape Hatteras Electric Cooperative (CHEC) is required to relocate its existing
underground transmission power line to facilitate its realignment with the new bridge. CHEC
proposes to replace its existing with a new line all within its existing right-of-way and within
the right-of-way easement granted by the National Park Service (NPS) to the NCDOT for the
above captioned project. The existing power line is encased in a cement "duct bank", two feet
by four feet (2'X4') concert vault, which will be left in place after the new construction with
the understanding that it will be removed by CHEC, if at any time it becomes exposed and
NPS so requests its removal. The proposed work detailed below comes after consideration of
numerous line routes and construction methods. The proposed route avoids as much
environmental impact as practicaL Through the course of design, the alignment has been
simplified by utilizing NC DOT right-of-way. Conflicts with road access to the nearby
fishing center and area wetlands are mitigated as much as practical by utilizing a horizontal
directional bore installation method for a portion of the transmission power circuit route. The
proposed work is in the vicinity of the Cape Hatteras National Park Service facility at Oregon
Inlet, Dare County, North Carolina.
The "Proposed Project" consists of constructing the following:
l. A ten foot (10') wide temporary access road using removable matting and location
approved by the NPS from Oregon Inlet Road to the existing CHEC substation
north of Bonner Bridge (approximately 365 feet in length). This road will mitigate
impacts to the maintained wetlands to the substation and the matting will be
enlarged to between fifteen and thirty feet around the substation to allow large
utility vehicles to access the substation during this project The initial phase of
construction will include hand clearing (if needed) and matting to support
transmission power circuit relocation construction efforts.
Mr. David Hallac
Apri14, 2017
Page 2
2. Installing a new underground 115kV transmission power circuit consisting of:
a. A total of five (5) conduits in duct bank described below — four 6" conduits
and one 2" inch conduit
b. Approximately 1,225 linear feet of four (4) foot wide and one (1) foot tall
concrete duct bank utilizing a high early mix design for faster setting and
higher likelihood to close ditch sooner than is typical.
c. Approximately 420 linear feet of horizontal directional bore under Oregon
Inlet Road to the proposed permanent easement drive near the substation —
Total of five (5) conduits — four 6" conduits and one 2" inch conduit. Avoids
impact to maintained wetlands in front of the substation.
d. One below-grade utility vault — approximately ten (10) feet by twenty (20) feet
by six (6) feet tall
e. No less than three (3) feet below grade to top of duct bank/vault
f. Duct bank to be open-cut trenched the total length of circuit from the new
proposed bridge end bent #2 to Oregon Inlet Road
Once the new transmission power circuit is installed and commissioned, power shall
be transferred off the existing circuit to the new. The existing CHEC duct bank is planned to
be abandoned in place, with the understanding that the National Park Service may require its
removal at a future date.
Proposed Total linear circuit length to be installed within the park is 1,645 lf.
Proposed Total temporary matted access road to be installed is +/-490 lf from
Oregon Inlet Drive pavement to Substation fence.
Proposed Total 404 Wetland Impacts include 0.027 acres (temporary) and
0.153 acres (permanent).
Proposed Total CAMA/401 Wetland Disturbance includes 0.000 acres.
Per emailed confirmation on September 8, 2016 from Mr. David Hering, LG, PE
(NCDOT), any required wetland mitigation resulting from transmission circuit relocation may
be covered by the NCDOT B-2500 wetland restoration site. Impacts to park land were
minimized in design by relocating the duct bank into the NC DOT right of way, boring under
Oregon Inlet Road, and boring under wetlands in front of the substation adjacent to NC 12.
Final restoration of impacts within National Park Service property will meet or exceed all
requirements required by the National Park Service and all applicable regulatory agencies.
Mr. David Hallac
April 4, 2017
Page 3
It is our understanding that as soon as the above project is finalized and operational,
CHEC will file "as built" drawing of the completed project with the Park, to be included in a
comprehensive Permit of Right-of-Way (ROW) document, describing and renewing all of
CHEC's active ROW's within the Park, for another term of years, pursuant to its SF-299
application filed with the Park, 12/19/2016. In the ROW application a request will be
included to replace the ten (10) foot temporary access road and matted thirty (30) foot areas
south and east of the substation with permanent gravel access to the substation for future
maintenance.
Please feel free to contact our office with any questions.
Sincerely,
BOOTH & ASSOCIATES, LLC
William P. Jordan, PE
WPJ/kpp
Enclosures
cc: Ms. Susan Flythe (CHEC)
Mr. George Price (CHEC)
15-6803-9001
National Park Service
Outer Banks Group
(Cape Hatteras NS, Wright Brothers NM & Ft. Raleigh NHS)
1401 National Park Drive
Manteo, NC 27954
Telephone 252-475-9000
Fax 252-473-2595
Application for Special Use Permit
General
HATIONAL
PARK
SERVECE
-� =-�.=-.
Please supply the information requested below. Attach additional sheets, if necessary, to provide
required information. A nonrefundable processing fee of $ waived must accompany this application unless
the requested use is an exercise of a First Amendment right. You must allow sufficient time for the park to
process your request. You will be notified of the status of the application and if approved, the necessary
steps to secure your final permit. Your permit may require the payment of cost recovery charges and proof of
liability insurance naming the United States of America as also insured.
*
Do not enter social security number of tax ID number unless you are specifically requested by the Park to do so,
and then only one, both are not required.
Applicant Name: Mr. George Price, PE Telephone #: 252-995-5616 x236
Organization Name: Cape Hatteras Electric Cooperative Cell phone #: 252-475-0178
Social Security or Tax ID #:*
Street/Address: 47109 Light Plant Road
City/State/Zip Code: Buxton, NC 27920
Describe proposed activity: Please see attached letter.
Fax#: 252-995-4088
Email: GeorgeP@chec.coop
Preferred Date Preferred Location S Preferred Time
01/30/2017 to Staging area near substation, trench location along DOT right Weekdays
12/31 /2019 of way to new bridge deck. Cable connection at end bent # 2 6am-8pm
Maximum Number of Participants 10 Maximum Number of Vehicles 7
List of equipment, materials and items to be brought to the site:
Equipment: Power utility bucket truck, concrete trucks for duct bank, directional boring rig, medium sized
support trucks, trench excavator, dewatering equipment (if necessary), cable reel and pulling machine
Materials and other items: PVC conduit and underground transmission cable, concrete, wetland matting
as approved by NPS, silt fencing, safety fencing & signs, temporary electrical riser structure (within
substation), fill material (as necessary)
Individual in charge of activity onsite and authorized to make decisions related to the permitted
activity if different than listed above (include cell phone number):
Have you visited the requested area? �Y ❑N
Is this an exercise of a First Amendment rights? ❑Y �N
The applicant by his or her signature certifies that all the information given is complete and correct,
and that no false or misleading information or false statements have been given.
Signature:
NPS Form 10-930s New 06/2013
Date:
OMB Control No. 1024-0026
Expires O8/31/2016
Note: This is an application only, and does not serve as permission to conduct any special activity in the
park. The information provided will be used to determine whether a permit will be issued. Send the
completed application along with the application fee in the form of a personal, business, bank check or
money order only made payable to "National Park Service" to National Park Service at the Park address
found on the top of the first page of this application.
If your request is approved, a permit containing applicable terms and conditions will be sent you. For a the
permit to be valid, it must be signed by a responsible person and returned to the park or be placed in the
US Mail, postage prepaid and addressed to: Superintendent, National Park Service, 1401 National Park
Drive, Manteo, NC 27954
Notice to Customers Making Payment by Personal Check: When you provide a check as payment,
you authorize us either to use information from your check to make a one-time electronic fund transfer
from your account or to process the payment as a check transaction. When we use information from your
check to make an electronic fund transfer, funds may be withdrawn from your account as soon as the
same day we receive your payment, and you will not receive your check back from your financial
institution.
NOTICES
Privacy Act Statement: The Privacy Act of 1974 (5 U.S.C. 552a) provides that you be furnished with the
following information in connection with information required by this application. This information is being
collected to allow the park manager to make a value judgment on whether or not to allow the requested
use. Applicants are required to provide their social security or taxpayer identification number for activities
subject to collection of fees and charges by the National Park Service (31 U.S.C. 7701). Information from
the application may be transferred to appropriate Federal, State, and local agencies, when relevant to civil,
criminal or regulatory investigations or prosecutions.
Paperwork Reduction Act Statement: We are collecting this information subject to the Paperwork
Reduction Act (44 U.S.C. 3501) to provide the park managers the information needed to decide whether or
not to allow the requested use. All applicable parts of the form must be completed in order for your
request to be considered. You are not required to respond to this or any other Federal agency-sponsored
information collection unless it displays a currently valid OMB control number.
Estimated Burden Statement: Public reporting burden for this form is estimated to average 15 minutes
per response, including the time it takes to read, gather and maintain data, review instructions and
complete the form. Direct comments regarding this burden estimate or any aspect of this form to the
Information Collection Clearance Officer, National Park Service, 1849 C Street, NW (1237), Washington,
D.C. 20240.
Title 18 U.S.C. Section 1001 makes it a crime for any person knowingly and willfully to make to any
department or agency of the United States any false, fictitious, or fraudulent statements or representations
as to any matter within its jurisdiction.
NPS Form 10-930s New 06/2013 � OMB Control No. 1024-0026
Expires 08/31/2016
Q CATEGORICAL EXLCUSION REQUEST
A. PROJECT INFORMATION
Project Title: Bonner Bridge Cable Replacement Utility Easement
Project Type: Utility & Development
Project Location: Cape Hatteras National Seashore - 1401 National Park Drive, Manteo,
Dare County, North Carolina
B. PROJECT DESCRIPTION
The North Carolina Department of Transportation (NCDOT) replacement of the Herbert C.
Bonner Bridge and NC-12 Long Term Management Plan requires relocation of the Cape
Hatteras Electric Cooperative (CHEC) transmission circuit that provides service to Pea Island
National Wildlife Refuge and communities on Hatteras and Ocracoke Islands.
The existing transmission power circuit originates from the Oregon Inlet Riser Station located at
the intersection of Oregon Inlet Road and NC 12 near the fishing center entrance across from
Oregon Inlet Campground. The transmission circuit crosses west under NC12 and is encased ir
a concrete duct bank from the National Park Service (NPS) underground utility Right-of-Way
Grant No. ROW-5190-82-1. The power circuit exited the underground duct bank and was
attached to the existing Bonner Bridge structure that will be demolished after construction of the
new Bonner Bridge. The only feasible alternative for providing uninterrupted power service is to
replace the transmission circuit onto the new bridge.
The NCDOT TIP # B-2500 Phase I project Final Environmental Impact Statement and Section
4(f) Evaluation (FEIS) certified in 2008 as well as the Environmental Assessment (EA) certified
in 2010 included the National Park Service as a member of the Merger Team. Although future
phases will be subject to further NEPA documentation and permits, as appropriate, the 2015
court settlement regarding the Record of Decision approved construction of Phase I of the
Project. This selected alternative was determined to meet the requirements of NEPA and
Section 4(f).
The DOI utility easement for the existing transmission circuit was renewed until 2005. The
Bonner Bridge Replacement will require a new transmission circuit to be attached to the new
bridge to maintain uninterrupted power service. Several interagency meetings were held with
NCDOT, NPS, and CHEC to determine the construction route and methods that will provide the
least impact to park land for the new transmission cable. The consensus was to install the new
transmission circuit within the NCDOT right-of-way prior to the completion of the new bridge.
The resource impacts provided in Section C for the desired cable construction methods and
route were determined using the existing FEIS and EA. All applicable permits will be submitted
by CHEC for the transmission circuit construction. The existing cable and duct bank will be
abandoned in place to limit impacts, with the provision for removal by CHEC if required at a
future date. A new DOI easement application will be processed following construction of the new
transmission circuit according to the Special Use Permit (SUP) filed by CHEC in 2017.
The intent of all agencies involved is to minimize disturbance to park land, reduce potential
environmental impacts, and provide a cost effective and efficient method of installing the new
transmission cable onto the new bridge to continue providing electrical service to the area.
Measures required by the NCDOT SUP issued in 2015 for protection of park resources will
apply to future CHEC construction.
15-6803-9005/111 Page 1
OO January 2017 ��
� sociates
C. RESOURCE IMPACTS TO CONSIDER: ENVIRONMENTAL SCREENING FORM
Categorical Exclusion - C.15 Installation of underground utilities in previously disturbed areas
having stable soils or in an existing utility right-of-way.
Resource Potential for potential Issues & Impacts
Impact
Air None
Air Quality
Issue: All construction vehicles will be pressure
cleaned with water prior to arriving at and
Biological Potential departing from the construction site to minimize
Nonnative or Exotic Species
the potential for introducing exotic plant
species.
Issue: Only lights approved in the Biological
Biological Opinion and subsequent consultations are
Species of Special Concern or Their Potential required to minimize illumination of the nesting
Habitat beach and nearshore waters. Identified
locations of nesting habitats will be avoided.
Issue: Restoration of the site will include, but
not be limited to: grading, smoothing, filling, and
Biological Potential restoring native vegetation. Wetland impacts
Vegetation
will be mitigated in concurrence with the NCDOT
approved mitigation plan.
Issue: Disturbance or destruction of wildlife and
Biological vegetation will be avoided to the greatest extent
Wildlife and/or Wildlife Habitat including Potential and any concerns will be brought to the
terrestrial and aquatic species
attention of the POC immediately.
Issue: The Park's Cultural Resource Program
Manager will be notified during construction of
the presence of culturally significant objects or
structures. Operations shall not injure, alter,
destroy, or collect any object, structure, or site
Cultural Potential of historical, archeological, or cultural value.
Archeological Resources
Should construction unearth previously
undiscovered archeological resources, work will
be stopped in the area of any discovery. The
Permittee shall immediately contact the Park's
POC.
Cultural
Cultural Landscapes None
Continued on next page
15-6803-9005/111 Page 2
OO January 2017 ��
� s ciates
Lontinuea trom previous page
Resource Potential for potential Issues & Impacts
Impact
Cultural None
Ethnographic Resources
Cultural None
Museum Collections
Cultural None
Prehistoric/historic structures
Geological
Geologic Features None
Geological
Geologic Processes None
Lightscapes None
Lightscapes
Other Issue: Safety fencing and signage will be
Human Health and Safet Potential
y provided around all construction areas.
Socioeconomic None
Land Use
Socioeconomic
Minority and low-income None
populations, size,
migration patterns, etc.
Issue: Directional boring will be used to limit
Visitor Use and Experience Potential impact to Oregon Inlet Drive access for Fishing
Recreation Resources
Center visitors.
Visitor Use and Experience Issue: Temporary one lane access on NC12 as
Visitor Use and Experience Potential required during construction.
Water
Floodplains None
Continued on next page
15-6803-9005/111 Page 3
OO January 2017 ��
c� SpC1S�S
Continued from previous page
Resource Potential for potential Issues & Impacts
Impact
Issue: Barge may be required for cable
Water Potential installation onto new bridge. Coordination with
Marine or Estuarine Resources NCDOT ongoing construction will be required for
future approval if access required from park.
Issue: Dewatering may be required which will
Water Potential only occur after concrete has hardened and will
Water Quality or Quantity
be filtered before dispersion as permitted.
Water Issue: Wetland impacts will be mitigated in
Wetlands Potential concurrence with the NCDOT approved
mitigation plan.
Issue: Effects of noise, vibrations, and barriers
Wilderness Potential from ongoing NCDOT construction should be
Wilderness provided in any updated biological opinions to
implement with CHEC construction.
15-6803-9005/111 Page 4
OO January 2017 0�
c� S C1 �
�►—�>— �\y��
��
FISHING CENTER
ua � - 7o s� iNSTu�o msc (cHEc)
� s�a�ro�/�o<ano� '"°" � cea�me wen.�
f�iilacre:l �acresl �la�rezla M°a '^mum'N _— u _ io ac iNsiu�Eo �orvs urvE
� s�n��ano�on�aPe�me�e. . . . . `�•' oN accnsie msee�aE�,nwEo (ci��ec>
AIItTtovWx oTL.e]'� � . o.a1x o.Wt «"o � � DouNrvOrvISpO��iiOn E�CC�Ri�
V ��$7A1�o�p.� TOTALPROIECTIMPARS�ACRES�: 0.204 0.1]]
/�'�wo E�.�- �vw— �u•"— ro � To BE REfAIrvEo IaNs
J
" -s� ,r s. y -�- /s � � /� ( �E �/J —� SF SF-� � Up �
]sla /E o � _- .� .� ,r— i - _ ,. - � � . _. _ �e�7 ' �
+a0 � r � .� -_ . -a -s —� —
/' I � �.� ��T
— — — — — — — �� sc—/o � � 1—��.. —�soc — - �� , °� �—�� — rra� n- �.;�..�_---_`�li
�� -w��a _ _ — —� _E�.= _ — — — — — _
Ii.. _
� /�., �.� � � __ _ _ —._ _ _ _ _ -- i�n.c MumwnoN
_v. �„� ���i _— -- v�m r
� \E,., _— �- �
�-APG
HATTCRAS
NATIONAL
SCASFiORC
(NPS)
,d s� Ybsd �k °- �. � ' C. P,M P,
� " tias WETLANDS
�:, �� ssoavF. amaNeti �_Te Nce�eaaeMoveo ._„�,..,...__.�
_ a�,. �.o =°.P,.;�,� �� srA.�o�,Foo
o �� ���,F ��<�
1 p'�"O:0 \ � ey�vA,�. :.. �
�..ss DU'CT BANK DETAIL""` eoRea.n es.00�\ I \�\�
µ.s ���o.m wo .11.o auo w.o aw wm \ ..r- \.
A- A r� � �
. � �� a� � e fq
ii%'e� d��.E _ �E�.-.F.,, \ \ �r,o I���� r�Q � �
/ ---�'�
' .o��ao�AMAwE,�ANos
� aoweaFau�n�Frvr
PaoPosm�ov.iow.sn F MEE
� s� Exi51iNG SiL1 FENCE
—SF — PROPoSEo Si�i rEr�CE
� �s��osEo circ vEaMnNCNr ur�irv ensemEN.
o.�em A<. (1ornU
\\\\\\\ �� o.osx A��( oonLrer u1�n cnsemem.
Me�lEONAL wEGiS"rt� OVE Hi510N�cPLP��S [LJBiLily pN� n55E55E� FOF
C,AFF
HAIILZA�
NnTioNni_
sEnsr+oRE
(NPs)
>a � � —� —� r sF --sF �. —s —s�- � —' �-- � � � - — . � � � -. - -- — — — — — — — — — �
_ a.�,. � —�---- � �— — — -- —� --� �' � « ,. — —,
, . � . .o I.� 4 a I a�9..00aucEne NooN I I i i i�.,
"� '�� v . a. z e.. ,.nn c�.. u„_c�.. � E,��— , �3 c. i c�., w,� . o, �a . c�„�/ ,0 0� � I
��f�
DUCi BANK DETAIL��� — -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
B-B
a o�u��
cAm ca io
f=r� � , �, � t
�� CAMPGROUND PARKING ��_ .
< ��
o e>PE�„ '� _ . . . . . . �.��''*,,,:,."`t
G . \; � . . e: ( 4..-:...... ..........................._.�����'.
. �a�� � � ' - , ' ' '
UUCT BANKppt'In'L
C-C
z�
_ _ J ��
��� 02
p� oc;�J
c?�o
r az i i.x�i�r i i��c;
� i izi o, t_, u�.>>>� -
�o� t oiz
�o�, i w� u�rion
CAPE HAiiERAS ELECiRIC COOPEFtA71VE
. r�rv. NoarH c�oi.wn
BONNER BRIDGE CABLE REPLACEMENT
U7ILITY EASEMENT REWIRQAEN75
U.S. NA710NAL PARK SERVICE
13 [h�,\sFo. es I.I C-
.�a m nHana m�si ua urv msc (cHEc)
I //O �\ � s�zuu�/iu�zno� ruilz�req �lauezl ^'czn: mmuni u iorvs wE
�.►��� �`��� reF'cnuiEas o�n3� \� laa�resld M - io ec irvsiA��co
�0\ \\ � t subs2cio�onve&aenmere. c,o VN uNo 1 kv E�EciEL eTR"
� Dt� o�sa FGF�o 1 5 RIC (CI�IEC)
\ �iPflV9�N E FI6HINGGENTER ao � oo�, omi 000� R V R allo 0o e�c �Mov�msnenNocriao
''� nu iPOR °,o�" r rvoeacoouvmorv�saowea�on
y �_ V(�SiE �M.� n TOTPLPROJERIMPARS(ACRES�: 0.1]9 0.153
���MPErvElm�iilN�Hnoa¢)�� ` N�EFGROUN� COIAMUNI
�2
� � � =�— — _ _ — lo aE R�A����A
� E,� _ __ _ ��— _ _� _ __ _ Eo�E oF ��sn�� R���. oF wA.
—� � �� � �� o�— � — � , r —
�� Exs.�� s�, FE��E
E�
� F� r_ � � o o�E � '���
— ��_�T
�
,
t ��
� � � �o � �.o� � �_—�� � , � __�___� �
� � � _ ��—°� _ �� �z — �� 10 aE R�A��
��4.� ,�s.ao �o o � � � _ — — — — — — i=
� i �, ' „�.�� _ _ _ �- _ �.� " , . .. _ o PROP�sEo „s k� E��,� � ,� w x �a � �A��r
.,
_ �� �� 1u- -- — � -- �� �—,er,00— ' � � ` ��""�'°'- � ��' � -
—e-- _�_ o
�� �o ` � -�-- ii � � � _ � — � —► � �,S _ _ _ _ s osEo �circ vEaMnNCNr uri rv ensemEN.
u —� o� n�. (ro1nU
— > _— _= =n = � � — — — — - - � t -� �,,;_ -; \\\\\\� �� EM�oRA �r�.r EASEME�,
�_ ,�_ _ _�_-----__------`--`�--- _ oosta���r�,>R.
_�--__ «ra �o �N�a,�aN ao> wE,�Avos F�o„�o FROM R�FERE��E�
_ �.-- -- -- — s�Ko�A��FFo��, E�.�_ ,_. _�. �� �ErER _N_
E��, -�
— _ _ _ �— —cr_ RAM� RaN F�E�o
�APE ,�MaER MArr�N N
NATTERAS �� ����
NATiONAL
SEASHORE cnMn wer�nno5
(NPS) nacNneo�ocicn� aesouaces oiscoveaeo ouairvc
c�rvsraucnoN.iF .wr wsroeic Aa vneo�aaica� eesouaces
naE ENco�NrEaEo �uaiNc coNsmucnoN, consmucnoN
wORx nFFECiiNG iHE RFSOURCF. WiLL CEnSF.iuMEDIATELr
. . RESOUFCE G 0 FOR
� ,a�€�sa � ' � � caMa
. � � ° w' R° ,tias WETLANDS
° C,AFr
�`%� �"� icanve� "T Ns,n N� " FMweo HAIILZA�
' �rkucroNON �� � Foa Exs
c7
,,,� � � sT^*� w tioExcnvnroti ' NAT�U�AI_ �-- ��
` ,F \ E� SEA.,HORE �����=—`
— ��_� �. �� ��� � (NPS) I
" O : � � � , � ronvoior.nMnwe,utios
Eo �..�:0 \ �R
.���.a � PoaE��o� — � —� _ �\2 �s'' ses,�,ioN PoweaeouiPMFH,
..Rcu mcvw wor. �E P i Ai S�A te
reua.ss DUCT BANK DETAIL "" ` -- 9 0� o�\ I �\ zo
Aµ A �a�� — _,,.o _ wa R � uuuNowrv uc ���m am ow� —a ^�—� , _— NCE
� �
'� C rv, nro7 � — �
; : i �fi3e� ��4� .� ' - � _ . A \ � _ s �
� I
n �/
- —_ \ �r,,, oss.� ,, 7 _' � I � � ` x � � � ,
yT � a.�„LL �-- -- — =���`— �---���_„'�_= II —,� — F u;� �,4 �—�—=�—u—=—�— �—= — =— -- -- —
� � � �
,_ „,� „� � Y��, � � � _ ��o �
— — � �;aaE
�-- _ �I—�.o� � �-- � ��_� i � � ti�����,�v � ' � �� � � � � � � ° . ,suoa � � ' � ' � ' ,
v ,z i / � i � � P�A � i
���,,, .C� � b ' � .�� 9�.00 —
� �„��.o. w ,E w_ ,��. E.����. ,a �— � ���fl u ���� m � � �_ � ,��,,. m —��_— _— �
s. �, , I
DUCiBANKDETAIL�a� ' — -- -- -- -- -- -- -- -- -- -- -- —��ESN�m a i r.o��c�ATrvs I —� — —_ -- _—' _— -- —_ -- _— _— -- —� _ _— —
B-rB aaqN o Eo iNE II or Ho�E cAmaca ov
Y P�� ��;��v—�—
��� rar i, x„� i�, i��c;
h " � i izi o t u�.>>>�-
CAMPGROUND PARKING � �p] l l�lt
c , -6�
�0�• I H� C"I�10�\
Rz ;':oi "` .pvx,�,� I -- � — ��` �9 �J`'�� � CA U7ILITY unarH ca��
- _ RAS ELECiRIC COOPEFtA71VE
' —_ auzrorv. �i.wn
_ s„G � P BONNER BRIDGE CABLE REPLACEMENT
�� � � � EASEMENT REWIREMEN75
� � p�%�o�e-J U.S. NA710NAL PARK SERVICE
UUCT BANKp7tln'L O�G� 13 I\: II.0
C � — III � /
ri.� i G n�
\ ` _ Ec o u=, o.
_��� ' � / . '
GONSIJLTING ENGINEERS
engineering for the future since 1960
February 27, 2017
Via Electronic Mail
Mr. Arthur Beyer
Assistant Refuge Manager
Point of Contact B-2500
Pea Island National Wildlife Refuge
14500 NC-12, Rodanthe, North Carolina, 27968
Subject: Request for Special Use Permit for Construction Activities
To Install Underground Electric Utility as part of NCDOT
TIP Project B-2500 (Phase I), Dare County, North Carolina
Dear Mr. Beyer:
In response to the NCDOT Highway Project TIP B-2500, Cape Hatteras Electric
Cooperative (CHEC) is required to relocate an existing underground transmission power
circuit. The majority of the proposed relocation is planned to be installed within the Right-of-
Way Easement granted by the United States Fish and Wildlife Service (USFWS) to the North
Carolina Department of Transportation for the project referenced above. The remaining
installation is in close proximity to the existing overhead transmission installation authorized
by Amendment 7 of the original right-of-way Permit ES-0852. The proposed wark detailed
below comes after consideration of numerous line routes and construction methods. The
proposed route avoids as much environmental impact as practical. Through the course of
design, the alignment has been simplified by utilizing NC DOT right-of-way.
The "Proposed Project" consists of constructing the following:
The initial phase of construction will include hand clearing (if needed) and matting
(with USFWS approved material) the area about an existing transmission pole
(Pole Structure #13) and proposed riser location (Pole Structure #12). Access to
each area will be off of NC Highway 12. The temporary wetland impact area will
be less than 0.06 acres.
2. Installing a new underground 115kV transmission power circuit consisting o£
a. A total of five (5) conduits in duct bank described below — four 6" conduits
and one 2" conduit
b. Approximately 225 linear feet of four (4) foot wide and one (1) foot tall
concrete duct bank utilizing a high early mix design for faster setting and
higher likelihood to close ditch sooner than is typical
c. No less than three (3) feet below grade to top of duct bank
d. Duct bank to be open-cut trenched the total length of circuit, from proposed
bridge End Bent #1 to new riser pole Structure #12
Mr. Arthur Beyer
February 27, 2017
Page 2
3. Extending the existing overhead transmission pole line consisting o£
a. 145 linear feet of new overhead 115kV transmission line and two (2) new
pole structures (Structures 12 and 13)
b. Removal of 1,375 linear feet of existing overhead 115kV transmission line
and six (6) pole structures
c. Abandon in place existing 735 linear feet of existing underground 115kV
transmission power circuit
Once the new transmission power circuit is installed and commissioned, power shall
be transferred off the existing circuit to the new. The existing CHEC duct bank is planned to
be abandoned in place. The existing CHEC overhead transmission pole line is planned to be
removed and easement abandoned. At this time, it is anticipated that Amendment 8 to Permit
ES-0852 will be filed after completion.
Proposed Total 404 Wetland Impacts include 0.06 acres (temporary) and 0.0
acres (permanent).
Proposed Total CAMA/401 Wetland Disturbance includes 0.0 acres.
Per emailed confirmation on September 8, 2016 from Mr. David Hering, LG, PE
(NCDOT), any required wetland mitigation resulting from transmission circuit relocation may
be covered by the NCDOT B-2500 wetland restoration site. Impacts to USFWS land were
minimized in design by relocating the duct bank into the NCDOT right-of-way. Final
restoration of impacts within USFWS property will meet ar exceed all requirements required
by the USFWS and all applicable regulatory agencies.
Please feel free to contact our office with any questions.
Sincerely,
BOOTH & ASSOCIATES, LLC
William P. Jordan, PE
WPJ/kpp
Enclosures
cc: Ms. Susan Flythe (CHEC)
Mr. George Price (CHEC)
15-6803-9001
�T'$�,�g� '�'@I�I'�i"�� �C�IV1�1�$ DN18Control#;d18-{}302 �
�� Expiration aate: 66p�30�2p] 7 �
�pe�ial Use Perrr�it App����t��on
I�ef�ge: �'�a Is��n�d Nat�4naP '�N'ildlife Refug�e
A�d�ice��: �'�Q Box 19��
�►itl: (Rsfu�e Offieualp �� B��'��
�-Mai�: Artt�ur_beyer�fws.��u
Phar�e #: ��2-�, �-� 1�z xz�s
�ar Off�icial Use Oniy:
Permit #:
5tat�an �:
Pern�it T�rr�n: from � to�!
Note: We do not rec�q,aire all inforrr�ation fu�r each use. See instru�tiou�s at th� end af the n�4ice and ccrntact th� refuge ide�tifed abave
tt� deterntine applicabid�ty of a particu'dar item. Attach �d�'itior�al sheets to ihe application if 4tae text spaces provided are inadequate.
'�} Identify the ty�e of Perm6t you are applying for: �C�w � RenewaV '�AAodification � O#hee �
Appli�ar��t Ir�forr�at�+an
2� ��ti r��r��: Ge�r�e Price s} ��ar,��t�on: Cap� H'a�teras Electric Cc�o�erativ�
4y Stre�t AdcEress
�� c�ty�stat�rz��:
8) Phane #:
Sh �-mail
47� �l'� Li��i F�I'a�t iRaad
g�Xt�tl, fVC 2�g2a
{��2) 995-5�16 �} Fax �: �252) 9'95-4�7$8
c� ec�rge�� c�ec. ce�v�
9) LISd kf9�Wn �SSISt�lltSlSUb�Cb�lrf�Ct�GSISUb�]�fmif�2@S: (Gn;y Tet�uured �f the assrstantslsubca�tractorslsubpern�itkees will he opaeating an khe refuge wethouS the permittee
bei c� g ,pres�nt. )
A�c#ivit�► Infarr��tian
10J Actiuity tY�e: ���ent �'4�Wr�od Cutting � Gtau� Vusi4 ��c�a�catianal Acti�ity
� CabiralS���$��St�nc� c���n *"' Other B�nner @rid'ge tr�nsrni�si�n cab�� relocalion
�lote: mepe�nding on t�e actuvity for which you a�r� �equesting a perroiit, we may as& you for the folMmwing activityr inforQnatuon.
�lease cmnAact the specific eefuge where the activiiy is being con�iuct�d to deterrn�ne w�a4 ie�fao�mation is required.
11 } S�eci�eall'y i�entify tirv�ing, freq�e�ency. and how khe activity is expected tv proc�ed
�a�e Fiatleras �lectric Cmoperatrve (CH�Cj is requestmg a SUP to conduct transnadssion eabPe �efocatiort E� cqnjuncUo� wilh the new �ionner �ridge canstructian.
fihe replacement oi the �ridge ��equores Ihe followorsg:
1. extend the existfng ov2rheadi tran&missian pole dine 145 linear feet,
2. 6nsta9l (2) new ppfe strsic�ures (Structures 12 and 13j,
3. rernpve 9,375 linear Feet of exis�ing ove�tsead 115kV cransmisseon line,
4. remov� six (6j pole structures,
5, �ab��tdan ic� pdace 735 linear (�et of exist�ng undergraund 115kV tra�sm�ssian power circuiT
Go:�sCrucEian is curreratly scheelul�d to eammence Augus# 2'f3� 7. FinaE sysEem tests and cle�nup aa�e scheduied before ,Euly 2018. 7he ca�Ee will be eroerglaed afler
campleEion of the new briclge and prior to dest�uction of the ald bridgs.
�WS Forrn 3-1383-G
�5/14
OM$ Contral # 1fl18-d1�2 P �
ExpiraYipr� Date: Oh/3Q/2fl17 I
i Zj �IC�IVI'��'�Sif� OCCUp�11Clf �III'lQOI�90: {Specifscally identiiy heginning and �nd�ng d�tes. si6� �ceupatican Eimel+ne. hours, clean-up, and othee majar events.j
C�Qrast���tur�n is �urr��tly sch�d'u,led tca co�me�ce August 2017. Final syste�n tests ar�d �Ieanup are
�����ui�� ����r� ,���y ,�a�s. Tn� c��i� w�ii be e�u�rgf�zed a�te� �ornp�e�ion �f t�e ��w b��dge �und prior
ta destructia� �f t�e old brid�e. �ons�ructic�n will �r�ir�c6�ie with current �J�a(�Ti agu�eed w�rk h�urs
wi#hir�� the Y�mits specifiec� c�n the att�che� plan d�auvir�g.
13} Expected number of parkicipants, if applicable: Chi�ldren (1-18 j IP'�11,Q ,4d�t4s � Tatal �
14�) Grade le+r�l of educaiional group, ii applicabVe: Grade �1J j�{
� 5aj tr"ti,+iU staf� timelass�stance be re�uireti for grtiup activitie�7 Yes � Nc� � N1q �
15b) If yes, what's the antici�axed t�me frame?
16a) Ptlan o6 C3p�ra#�on required? Yes'� No ��11A � ��b) �I�n� o# C�perati�n attached? Yes'� �1� �
��� �pG'CIfG���y fdBf7lPfy �DC$tfflfl�S}: EGPS Poc�tiondsj pr�fe�red)
Wark 4ocati�ns are shown on the attached s�ueets.
�Sa} Is map df I�catian(sy required?
Yes � No � N!A �
1�b) Es map of lacation(s) atiachec�?
Yes� No�
f�s�ra�nc� �aver�g�JLic�nsel�ertific�eti�r�sJP�rrr���s
Note: Contact t�he spe�ific refuge headqu2vter� o�ce where the activity is goimg to be c�andueted to determine if any type of
i�nsurance, certification{sj, ar perrrtit(s) w691 be requured. We may proc�ss thi� $peCiad Use Perr�pit while the applicant obt�lll�s t1��rt1.
19} List any insuranc+e e�verage yo� have such as general Roabrlity, avia�ian, �raunding liability, contaminants applicator, mediCal e+�ac�aation, or
others, if req�uired:
Prosvrance Type
ra;a,
Carrier Narne
CDj ldentiiy li�erases, certifications, and permits, if required:
L6cense/Ce�rf�fieationJPer�n it
N.xA
MUmb�r (�A applicable�
Policy Nur�ber
ISS�le� �O:
Cvpy A#taehed?
Yes or �a
�Op]f ptt�C�!@�?
�+e'S Or IVQ
FWWS Farm 3-1383-G
[35,! 14
ar�� cont�oi � ao�s-oioz 3
Expiration Date. fl6J3[l�'2�17
'L��istic� ar�� Trar�saar�ati�on
hlo2e: Not all inforni�4it�n i� r�quired f�r eaeh use. Please contact t�ae s�ecifibe refa�ge who�e the aetivity os bein� conductedl ta
deleemime what iniormation is �requir�;d, Attach addi�io�ar sheets to tF�€ apprication if the t�xt spaces provided are inadeq�at�.
2a } Does activity require personnef ta stay overn�ght onsite7 Yes � Nv �i
�2) List narr�es of persorsnel involv�d:
L�st Na�mes Li5t Narr�es List Narnes
23y Speci��afly describe ail majcar ec�uipmenU'g�ar �R�i materlals us�ecY, if r�quirted
Pavfrer l�ine "B�c�et" Truc�s, Crar�e, Cable reel, tre�ci� excav�t�r„ �imaer mat�ing, silt fenci�ng, safety
fe�acinc� & signs, co�dui�, duct bank and coc��rete truc4�, fif� rnaterial.
24a) Prowid� deta�led ir�iorrrraUon on 4he I�gistics far onsite, intersite, andlrar ship-ft�-shore transpartation to or an tYa� �e�uge, if �requered:
�JC �lighway 1� r�+vi�J be the priu�-t�ary m�ade c�� transp�rtati�� f�r the project. �JC �QT �r�� ass�cuated'
s��contracto�rs will coor�i�at� c�n sharin9 pcevi��s�y appr�ved �taging areas. Work wili be
cond��ted w�th tl�� t�rn�c�ra�r a�ud ��rm�c��nt easemerats indicated o� tf�e �ttached s�eets�
24b) Rrovide d�scraptions, licens� plate, ar I.D. n�rnbers of wehicles us�c6 far ons6t�, intersife, andl�r ship-to-shore transportatior�, if reqUir�d:
25} Sp�:cifically cfescribe �rr�site wor� an�ilof living accQ�n�mo�atians:
C)nsite vv�o-k invoe+�es instal�ing new transmi�sia� e�ble in a trench enea��d com�crete duct '����k frarn bridge end bent
#�1. ��d �oles and wires wilf b� remowed frrsr� n�ar th� bridge +�ithin the ex�sting e�s��nent up to t�e propp�ed aerial
riser structaare (pale structure #�2) to b�: �-eturned to the park, Thuer� wpll not be anyone li�irrg c��a�ite.
26j Speciiical9y desc�it�e �snsite haz�rdous �r�terial storage or ath�r onsufi� material siaraga space
There wull b� nQ h��a�rdous �materi�l stvra�� c�n the r�f�ge.
Sign, date. a�d print thi� form ar�dV retvrr� if 4a trye refuge'E,�t�rocassdng.
30j Sign�ture ofA�pdicant: _�_ �' c� bate ofAppdication:_ S'/�
�� — —
FWS Fofm 3-1383-G
��/].4
OMB Cantroi # 1018-016� I �
Expiratian Date:06�36�2017
MOtice
In accordance with the PrivacyAct [5 U.S.C. 552a) and the Paperwork Raduction Act {44 U.S.G. 3501), please nate the foflowing informat'rvn:
The issuanre of a permit and collaction of fees an lands af the National �Idlife Refuge System are authorized by t€�e Nationaf Wildlife Refuge Sysiem
Administrafian Act {16 U.S.C. 6fi8dd-ee) as amended, and the Ftefuge Racreatian Act {16 U.S.C. 460k-460k�).
The i�formation that you provide is voluntary; however, we require submission of requested information taevaluate the qualifications, determine eligibility,
and document permit applicanis under the aba�e Acts. It is nur policy not to use your name for any other purpose. We mat`ntain the information in
accordance with the Privacy Act. We will c.�nsider all informatian you provide in reviewing this application. Faise, fictitious, or fraudulent statements ar
represenfafions made in the application may be graunds for reaocation of the Special Usa Permit and may be punishable by fine or irr►prisonment {18
kJ.S.C. 10bi). Failure to pra�ide all required inforrnation is sufficient cause for the U.S. Fish and Wildlife 5ervice to deny a permit.
No Members af Congress or Resident Cammissioner shaU participate in any part af this cankract or to any henefit that may arise from it, but this provision
shall not pertain to this contract if made with a carporation for its general benefit.
Ths Permittee agrees to be bound by the equal oppvrtunity "nvndiseriminatian in empfoyment° clause af Exeeutive arder 11246.
Routine use disclosures may also he made: (a} to the U.S. departrnentofJusticewhen related to litigaaon aranticipated litigabon; {b} ofinfarmatian indicating �
violation or patential �iolation of a statute, ruie, arder, or license to appropriate Federal, State, local, or fareign agencies responsible far investigating or
prosecuting the viol2tion or far enforcing ar implementing the statute, rule, regulations, order, pr license; (c) from the recard of the indi�idual in respanse
to an inquiry frem a Congressional office made at the r�quest af the indi�idual {42 FR 19083; Aprif 11,1977); and (dJ to pro�ide addresses obiained from
the intemal Revenue Service to debt collectian agencies for purpases of locating a debtor to callect or compromise a Federa! Claim against the debtar,
or ta consumer reporting agencies ta prepare a commercial credit report for use by the Department of Justice (48 FR 54716; Qecem6er 6, 1983}.
An agency may nat conduct or spansor and a person is not required to respand to a collection of information unless it displays a currenUy �alid OMB
cantrol n�mber. OMB has appro�ed this information collecti�n and assigned control number 1018--�1a2. The public neporting burden far this
inforrnatian coUection varies based on the requested specifiG refuge use. We estinate the relevant public reporting burden for the General Acti�ity Special
Use Permit Applicatian form to average 0.5 hours per response, inGuding time for reviewing instructions, gathering and maintaining data, and
completing and reviewing the form. Mail camments on this form to the Infarmation Collection GEearance Dfficer, U.S. Fish and Wildlife Service, 4441 N.
Fairfax prive, MS BPHC, 5275 Leesburg Pike, Falts Ghurch, VA 22041-3803.
General Canditions and Requirements
1) Raspansibility of Pennittee: Vlkshaloa�si�rthe permittee, by operating on the premises, to have accepted these premises with all facilities, fixtures, or
improvements in their existing conditian as af the date of thrs permit. At the end of the period specified or upon earlier terminatian, the pertnittee shail
give up the premises In as gvvd order and condition as when received except for reasonable wear, isar, or damage occurring without fautt or negligence.
The permittee will fully repay the Ser�ice far any and all damage directiy or indirectly resulting from negligence or failure on his/her part, and/or the part
of anyone of hislher associates, to use reasonable care.
2) Operat'rng Rules and Laws: ihe permittee shall keep the premises in a nea# and orderly condition a# all times, and shall comply with all municipal,
county, and State laws applicable to the operations under the perrnit as well as all Federal laws, rules, and regulations governing national wildlife refuges
and the area described in this germit. The permitkee shatl comply witti al! instructions applicable ta this permit issued by the refuge o�cial in charge.
The permittee shall take all reasonable precautions to prevent the escape of fires and to suppress fires and shall render all reasonable assistance in
the auppressian of refuge fires.
3} Use Limitatians: The permitiee's use af tha described premises is limited tn the purposes herein specified and does not, untess provided for in this
permit, allow himlher to restrict other authorized entry onto hislher area; and allows kh� U.S. Fish and Wildlife 5ervice to �arry on whatever aCti�ities
are necessary for: (1) protectipn and maintenance of the premises and adjar,ent lands administered by the U.S. Fish and Wiidlife Service; and {2) the
management a# wildlife and fish using the premises and other U.S. Fish and Wildlife 5ervice lands.
4) Transfer of PriviEeges: This permit is not transferabfe, and no pri�ileges herein rnentioned may be sublet vr made available to any persfln or interest not
mentioned iR ihis permit. No interest hereunder may accrue through lien or be transferred to a third party without the approval of the Regianal �irector
of tha U.S, Fish and Wildlife Service and the permit shall not be used far speculative purposes.
5} Compliance: The L1.S. Fish and Wildlife Service's failure to require sVict compliance with any of this permit's terms, conditions, and requirem�nts shall
not constitute a waiver or be cansidered as a giving up af the U.S. Fish and Wildlife Serrrice's right to thereafter enforce any of the permft's terms ar
canditions.
fi) Canditivns of Permit not Fu�lled: If the permittee fails to fulfill any of the conditions and requirements set forth herein, the U.S. Fish arxi Wildlife Service
shal retain all mr�ney paid under this permit ta be used to satisfy as much of the permittee's obligation as possible.
7} Payments: A!I payment shall be made on or before the due date to the local representative of the U.S. Fish and Witdlife 5ervioe by a postai money
order or check made payable ta tfie U.S. Fish and Wildlife 5ervice.
8�7ermination Policy: At the termination of this permit the permittee shall immediately give up possession to the U.S. Fish and Wildlife Servir.e
represeniative, reserving, however, the rights specified in paragraph 11 below. !f helshe fails to do so, he/she will pay the U.S. Fish and Wildlife
Service, as liquidated damages, an amount dauble the rate specified in this permik for the entire time possession is withheld. Upon yielding
FWS Form 3-1383-G
OS/24
DMB Control q 1018-0102 � �
Expiration l7ate: Ofi/3fl/ZQ17
possessian, we will still allow the perrnittee to reenter as needed to remove hislher property as skated in paragraph i1below. The acceptance af any fee
for the liquid8ted damages or any r�ther act of administration relating to the cantinued tenancy is rtot to be considered as an affirmation of the
perrnittee's acFidn nvr shal! it operate as a wai�er of the U.S. Fish and Wildlife ServiCe's r'rght ta terminate or cancel the permit for the breach of any
specified condition or requirement.
9J Revocation Policy: The Regional pirector af the U.S. Fish and Wildiife Service may revake this permit withaut notice €or noncompliance with the
terms hereof, or for viala#iort of general andlorspecific laws orregulafions governing nationaf witdfife refuges, orfornvnuse. It is at all times sub�ectto
discretionary revocation by ihe Director af the Service. Upc�n such revocation the U.S. Fish and Wildiife Serriics, by and through any authvrized
repr�:sentative, may take possession of said premises for its own and sole use, andlor may enter and possess the premises as the agent csf the
permi#tee and for hislher account.
10} Damages: The U.S. Fish and Wiidlife 5ervice shail not be responsible for: any loss or damage to praperty inciuding but not limited ta crops,
animals, and maahinery; injury to the permittee or hislher relati�es, pr to the afficers, agents, employees, ar any other(s) whv are instructed to be on
the premises; the sufferance from wi€dlife or emplayees or representa#ives of the U.S. Fish and Wildlife Service carrying out their afficial
responsik�ilities. The permittee agrees to hold the U.S. Fish and Wildlife Service harmless from any and aU cfaims for damages or lasses that may anse
fa be incident to the floading o# the premises rssulting from any associated government river and harbar, flaod cantral, reclamation, or Tennessee Val6ey
Autharity actiuity.
11 j Removal of Permittee's Praperty: Upan the explration or terminatian of this permit, if all rental eharges andlor damage claims due to the U.S. Fish and
Wildlife Service have been paid, the permittee may, within a reasonable period as stated in the permit or as detertnined hy the U.S. Fish and Wildlife
5ervice oftida! in charge, but not ta exceed 60 days, rema�e all s#ructures, machinery, andlor equipment, etc., from the premises for which helshe is
responsible. Within this period ths permiftee also must remove any other of his/her property including hfslher acknowledged share of praducts or crops
grown, cut, harvested, st�red, or stacketi on the premises. Upcm failure to rsmove any of the abo�e items within the afvresaid period, they shall t�ecorrte
the property of the U.S. Fish and �Idlife Servrce,
lnstructfans for Completing Applicatlon
Yo� may complete the application portion verbally, in person, or electrvnically and submit to the refuge for review. Note: Please read instructions carefully
as not all tnfarmatian is required far each act'tvity. Contact the speciflc refuge headquarters csffice where the acti�ity is going to be conducted to determine
applicahility of a particular item. We may add special canditions or permit stipulations tc� permit prior ta approval.
1 j Identify if permit appGcation is for new, renewal, vr modificatfon of an existing permit. Permit renewels may not need all informatifln requestecf. Contact
the spec�c refuge headquarters office where th� activity is going to be conducted if you have questions re�arding the applicability of a particular item,
2-8) ProVide full name, organi2ation (if applieable), address, phone, fax, and e-mail.
9) Provide knawn names and addresses af asslstants, suGcontracEvrs or subperrnittees. Names and address are only required if the assis;ants,
subcontractors or subpermittees will be operating on the refuge without the permittee being present. Vofunteers, assistants, subcontractors or
subpermittees that are accompanied by the perenittee need not be identified.
9aj Ac#ivity type: check Qrse af the following categories:
• Event;
• Wood cutting;
- Group �isit;
• CabinlSubsistence cabin {subsistenr,e caG'tns are only allawed on Alaska Refuges);
• Edu�ational activity; ar
• ather—any ather acti�ity(s) not mentioned above. Please descnbe "other" activity.
't 1} Provide detail+ed infarmation on the activity, including times, frequency, and haw the activity is expected to proceed, etc. Permit renewals may not
need activity description if the activity is unchanged from previous permit. Mast rapetitive activities, such as group visits, do nat require an activity
description for each visit. Cantaci the specifi� refuge headquarters o�ice where the acti�ity is goEng tv he conducted to deterrnine if we require an
activity description.
12} Identify beginning and ending dates, site occupation timeline, hours, dearrup, and other majpr events, Permit renewals may not need an acti�itylsite
occupancy timBline, if the acti�ty is unchanged from previous permit. Mast repetitius acti�ities, such as group visits, do nat require an activity/site
csccupancy t'rmeline fnr each visit Contact the speeific refuge headquarters offir,e where the activity is going to b� conducted to determine if we require
an acti�itylsite accupancy timeline.
13-14} Provide an estimate of the number of adults, and children and grade level af group, if applicabte.
15a-15b) fdentify if group acYrWit�es wiA require onsite refuge staff and the anticipatect 2ime frame, if applicable,
16a-16b) Identify and attach a Plan of Uperation, if required. Mast repetiti�e activities, such as group visits, do no# require a Plan of Operatian for each visif.
In addition, permit renewafs rnay not require a Plan of Operation if the acti�ity is essent�ally unchanged from the previous permit. Contact the speCific
re#uge headquarters office where the activity is going to be canducted to determine if a Plan af Operation is required.
FWS Farm 3-1383-G
05�14
�M$ Contra! ti 1d18-OS02 �
Expiration [7aZe: 06j3QJ2p17
1�� �dentNfy specific location (G€'S �oordinates prefe�red}„ if not a named' fac�lity. Me�st r�petitive aGtivities, such as group visits, da nmt requgre a
location. !n additiQn, permit r�newals may not require a Eocation if the activiity is essenfiaVEq unehanged irorn 4he previaus permit. Contact the sp�cif�c
refuge headquarters o�ce where the acti�ity is �Qing to be �onducted to det�rmine if we require a Oocation.
18a-1$b) A#tach a rt°ia,p af IaC7Cion, if requi�ed', and if the acfivity �s not conducted at a named facili[y. [vtost re}aetitive accivities. such as grou� visit�,
dcr not require a rna,p. In addi�ion, p�rmit reneuuals may nok require a ma� uf tfae activity as essentially unehanged frarai ihe prevEcrus �ermit. Contact t�te
specifc refuge headqua�ters offuce where the activity is going to be canducted do det�rmine if we require a map.
19p Pre�vide r�ar-o�, type, and ca�roer of ir�surance, if reqwre�. Contaet the s�ecific refuge headquart�rs o�ce where the activity is godng to be
c�nducte� to determine if we require insu�anc� a�nd ty�e of i�surance.
20) Speciticaily identify typ�(s) and numbar(s) o# other licenses, certificatians ar �ermits, df req�uired. Contact the specifc re#uge headquar�ers office
whsee ih� actgvity is gring Co be conducted ta ctetermine the type(s) af flcens�s, ceRifications or permits requored, and to caordina#e the sir�-rult�neaus
appl�icazian pf several types of ficenses, ce�kifications or perrrau�s. We r€tay fl� may not issue this Special Llse permit (SUP) while the permitt�� abiains
other Cicertses, ceriificati�ns, andJor q�rmit�.
21-22j Pr�vide nam�(s] af any persannel reqe�ired �o stay avernight, if ap�licable.
23y Iderotify aVV equupment and materials that will pe usecf, i# r�quired. MQst repetitiv� events, such �s grpup visits, da noi r�quire a fist af ee�uipment. In
�ddition, permit �ene+�rals may a��t require a Vist af equiprnent if the event is essenEially unchanged frpm dhe prewious permit. Conkac� the specific refuge
headt�uarters office where the activity us going to be coraducted to deterrr�i�e if we require a pist of equip�neni.
24a-24b) Pravide vehic0e deseriptions and license �IaQe or identificatiorr numbers af aIV vehicles, incVuding boats and air,planes, if required. We only nequir�
mfltor u�hicl� descriptions for p�rmittee ve�icle, andfor if the vehicle wifB be aper�ted on the refuge uvithout the perrtiittee being preser�t. V�lator vehicdes
accompar�ied by the peerriittee as part of s grQup (Canvay� activify ne�d nof �e identifie� if cl�ared �n advance by th� refuge supe�,risor. SpecificaBBy
d�scribe ship-to-shc�re, Intersite ibetween islands, eamps, or �4her sites} ar�d onsite trans�ar�ation mechanisms, and I'icense pla#e or identifieation
�umbers, if eeq�ired.
25) Sp�ci€�calEy describe onsite work andlo� living acc�r�madations, u# appfcabie.
26} Specifically descr�be onsite hazardous rraateriaf st�rage, �r other ansite material sforage space (i�cluding an anct offsitc fuel cachesy.
27} Sign, date, and print the appEication. Click or� the Print butkan to print the applicatian {oi u�ing #he fil}able versi�n). �ite refuge o�cial wol� rev6ew 2�nd,
af ap�roved, fill ou4 the r�maining informatican, sign, artd rekurn a co�ry to y�u far sig�a�atuT� and ac�eptance.
This applicatian iarrn is r�ot valWci as a permit
but ra7ay be vsed as a re6erenc� dmcurro�nt attached te the ofificual permit.
Or�ly offecial refuge personnel rr�ay assign a vadoc� permet number and permit terr�
to this �pplae�tion form after the �ermit has he�n approved.
FWS Form 3=13�3-�
m5/14
� CAMA - , s�en a��o� c �a m� om
WFTLANDS �1Ri / ,
/ - / , a�im� ie� e.i ie°a�5a
PEA ISLAND � �� �
� � � NATIONAL WILDLIFE ,,/ / � / r ��
REFUGE �
(FWS) � � � ��s���a�3�� _ aoe n ei��e,�ia�e
� �� /
_ _ -� _ _ 1S , �7R �' � \`" / / , � / TOTALPROIELiIMPARSIACPESI: 0.06 5
_ � _ � / ]�
�--� -� '-� iGBEABA�iu��ON�ED ,�' �'N\ ��/ / �
- _ � - __-__ - - ST GUo_ ' / / / - � . _/ / /
-- ~ � -� � _ '%STIhG 50' PU �'6E � /� /
� �4 10 6E REIAINEOC �
' _ �' - �nNo ' , � / / / i ,
11C'\F / _ /
� `�_ -� NocL REo i� / /// jY�� y v
_ / � \ %
_ � � „Eo 13R �,13 - / , � / i � . � m
�2�p0
� � � � � � �� i
_ � � __ � � - , i
,� _ / , - �
�
_ _ � _
� - . � i
� - �. - � ,� e.so � / „
� � ereai /
� ` --- -- / "I' � - � �
�„oo
� i, � � �
� ____ _ - F _ � '�'
� _ — so Pu�F� � � 30.00 /
� _ �
�_ __ _ r _�_ � -- —_ � ,��,� /
, � 'A>oo _ _ _ _ _ _ _ � �F�, _ 29 ,�° � j . , �
_ � — — — � z�.oa � / ,
�,� ao — -- -- -- -- -- �RE REo � y-_ � ,
� � � � — ���" �„� `°, oo z����� _— �- zs,a� Ati�� z��flo � , , ,
� , �,� � �,. a.�ro Ma,�Foa� � � � , ,
_ , \ ` ` ----,�, ,u ,y —. _,�, � — �T � _ �,_
,i�a. � � � � � � � , , � , �����'%3t� � _ — — — ��aa��,��
�� � a.�. �« � � � — �\ — —
,.,. p — , —
= ,"' ,�'FP,.�'�".�� °� ''° ARCHnro�ovrca� FEsouRCEs oisc vEFEo ouawc coNsmucnon�. � � -
�{ nisroaic nrecnnEo�ocic� a:souecrs nae r«couurEaEo ouawc � � � � � - _
DUCT BANK DE fAIL �"o�c,ov Nqrioun� R�msTEre oF HisroRic aucEs Euciawr�~ � A�o nssEs_c F�a � � �_ --� —_-
• iRnNSYdi55i0N S�R�CTURE LOCnTION - TO BE RETNNED CAMA
m ienrvsMissioti sraucruae �,ocnnoN - ro Ae eemoveo WETI_ANDS
knrvsanssiorv s*aucruae �ocanoN - a�oaoseo PEA ISLAND
13 mnNsr.nssoN smucruRe rvumaere »R NATIONAL WILDLIFF �-
��. , t RFFUGE ��
� � - nsrN au
c � io arawoa c e rc� --�- � ` io eE nea�ooruEo (FWS)
____ �-. _ (r --__.__- .__-_--
��
o . .:�D CHEG PE Ervi �i.TT SFMF,rvi �� ,,.� n� (i0'nl1 � -� II�-- _ / /
—__— -- .� _ _ _ ��__-- 8�R
a,,r eseo cHEc remeoanaY unutt ensFinervr - aoat n�_ Omaq � — - - — - _ —_ � � — — — - - - _
—__— __' r-- __ -- _-
_ _ - _ � � ". �_���
Ewsnrvc cHEc unurv Ens'�mENr - ro eE nanNooNco - i.eox n�. -- � ' -�
......... . ........ �'- � �.`�\
� '
_ _
�nMn wEnnNos � --� \ s_oo
z_ —_ _- -- -- -
roa we.uNos c�orreo veum aeaeseNces -� o � +'-�=o� - - - 44� - - - -I_ _ _
~I J+U� I \
35:00 6+00 , i \
a
� +00 3 / �
3�+00
'H 00 �
OVERHEAD IIS kV ELECiRIC i0 BE kEMOVEfI ���� � ��
--�_ . . i� t3i- �� i3. ..
- pVEFHEAD 115 kV ELECiRiC i0 BE REiFINED F- � y \ �, � � � —� �� �� — �3t- - ��
�>�
� — .._va�J -_ -
� U _ TO BE INSiALLE� TFIC (CHEC) — — — — — — — — — — — — — I _ — — — — — — — — — — — — — — — — — — — —
N n12 t h Rl[Il"1'll�'(;
UrvDERGROUND 115 kv ELECiRC (CHfCJ 1 LRI O k,�OVL]"-
CABLE 10 BE REuOVED/ABu�OaN�D Na�i� �o
EDGE OF E%iSPUG RiGni OF wnv 1nI HO�Z
aaoEas ' �50 CUVti1RL'CS10L�
CAPE HATiQ2AS ELECTRIC COOPERA7IVE
— E— o Ric (c�ec) ,� euxrom, r�ioar�i c aourvn
- Ta eE wsTnuFo p.`�� BONNER BRIDGE CABLEAREPLACEMENi
m UrvDERGROUND COMMUNiCni�ONS LiNE
�S�J`'��"`� - - UiILITY EASEMENi REWIREMEN75
�p`%'�o�,`�`J U.S. FlSH AND WILDLIFE SERNCE
� Boothe�Associ esLLC
�Mvoanrer corvs�uucnorv nau DaGo
- - - --- vaoPosEo cHEc snFErr FENCE
- o�.�e» o>r� ziz<i�, .. ... o�wc, ma
O z - - ososrws_suc