Loading...
HomeMy WebLinkAbout20170723 Ver 1_CHEC_DOTmitigationExecuted_20170607Booth�Associates, LLC engineering for the future since 1960 5/4/ 17 Via Electronic Mail LeiLani Paugh ICl/OSM Group Supervisor Natural Environment Section North Carolina Department of Transportation Subject: Verification of Mitigation Plan Coverage for Construction Activities To Install Underground Electric Utility as part of NCDOT TIP Project B-2500 (Phase I), Dare County, North Carolina Dear Ms. Paugh: In response to the North Carolina Department of Highways (NCDOT) Project TIP B- 2500, Cape Hatteras Electric Cooperative (CHEC) is required to relocate its existing underground transmission power line to facilitate its realignment with the new bridge. Booth & Associates, LLC has prepared the Pre-Construction Notification for submittal to the Wilmington District US Army Corps of Engineers Office. We will need to include this confirmation letter with the submittal package as evidence that the CHEC wetland impacts will be covered by the existing and approved NCDOT mitigation plan for the subject project. Per emailed confirmation on September 8, 2016 from Mr. David Hering, LG, PE (NCDOT), any required wetland mitigation resulting from transmission circuit relocation may be covered by the wetland restoration site. CHEC construction for the subject project will require an additiona10.15 acres of permanent impacts to Section 404 jurisdictional freshwater wetlands as shown in the attached drawing. Terrestrial upland communities in the project corridor are represented by three major community types: Man- Dominated (maintained/disturbed), Maritime Shrub Thicket, and Maritime Shrub Grassland. The delineated wetland community types located within the corridor include: Man-Dominated, Maritime Grassland, Maritime Shrub Thicket, and Maritime Shrub/Grassland. Neither streams nor open water are affected by construction within the corridor. The proposed route avoids as much environmental impact as practical. Impacts to park land were minimized in design by relocating the duct bank into the NCDOT right of way, boring under Oregon Inlet Road, and boring under wetlands in front of the substation adjacent to NC 12. Any clearing will be done by hand and no mechanized clearing or grubbing is required. Timber matting will be utilized in sensitive areas to reduce impacts to existing vegetation and reduce impaction from construction vehicles. Existing silt fence along the NCDOT right of way will be utilized to avoid sediment and runoff impacts to surrounding aquatic vegetation. Ms. LeiLani Paugh May 4, 2017 Page 2 Improvements to existing substation structures and connection of the new cable circuit requires expansion of the substation fence. A temporary chain link safety fence which does not require digging posts was chosen to further reduce impacts to existing vegetation. The location of this fence was modified to completely avoid a small section of CAMA wetlands. During coordination with NCDOT, it was determined to keep the transmission circuit installed all the way to the end of the new bridge deck to avoid future relocations as storm impacts and continued erosion impede stability of the original splice location. This design reduces the amount of temporary easement required on Pea Island National Wildlife Refuge and removes the necessity for a concrete duct bank installation and associated wetland impacts. Furthermore, existing pole structures will be removed by hand with bases to be left in place to avoid impacts to existing vegetation and wildlife habitat. Please sign below to acknowledge and agree, subject to approval by the regulatory agencies, the mitigation of wetland impacts from CHEC construction to be performed by NCDOT at the Bodie Island Lighthouse Pond SNHA (Site Id #1134) as described in the Final Wetland Mitigation Plan NC 12 Replacement of Herbert C. Bonner Bridge (Bridge No. 11) over Oregon Inlet. LeiLani Paugh ICl/OSM Group Supervisor Natural Environment Section NCDOT Digitally signed by LeiLani Paugh l�ei La n i Pa ug h Dnvir'oiPaugh@nc'dotgovNc �OT,ou=Natural oace: zov.os.oa n:taao-oa�oo� George Price Manager of Engineering & Operations Cape Hatteras Electric Cooperative Digitally signed by George Pnce C�eorge Price DNm=GeorgePrlce,o=CapeHatterasEleRric Cooperafive, ou, emall=grorgep@chx.coop, r—US oare:zon.osns is:icse-oa�ov Please feel free to contact our office with any questions. S incerely, BOOTH & ASSOCIATES, LLC Digitally signed by William P. Jordan William P. Jordan DN:rn=WilliamP.Jordan,o=BoothandAssociates, LLC, ou, email=jordanwp@booth-assocmm, r—US Date:2017.05.05 10:10:18 -04'00' William P. Jordan, PE WPJ/mew Enclosures cc: Ms. Susan Flythe (CHEC) Mr. George Price (CHEC) Mr. David Hering (NCDOT) Mr. Steve Thompson (NPS) 17-8450-9005