Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3170305_Project Report_20170613
June 9, 2017 Stormwater Permitting Program Land Quality Section NCDEMLR I NCDEQ 1612 Mail Service Center Raleigh, North Carolina 27699-1612 R. Joe Harris & Associates, Inc. 127 Ben Casey Drive, Suite 101, Fort Mill, S.C. 29708 (803)802-1799 Re: Larkin Multi -Family Development Stormwater Management Permit—Second Submittal RJH Ref.No.: 2382 To Robert Patterson, P.E.: On behalf of Dependable Development, Inc., we have enclosed the following items for the review and approval of the above referenced project: 1. Two (2) copies of the Larkin MF Development Construction Plans — dated 5/05/17 2. One (1) copy of the Revised portions of the Project report — dated 5/5/17 3. One (1) copy of the Response to Comments letter — dated 5/05/17 4. Updated BMP Supplement forms (included in Section VI of the Project Report) 5. Detailed project summary (included in Section I of the Project Report) 6. One (copy) of the Engineering report for Seasonal High Water Table Determinations If you should have any questions or require any additional information, please feel free to contact me at (803) 802-1799 or via email at abowersox@rloeharris.com. Sincerely, R. JOE HARRIS & ASSOCIATES, INC. c Ad7; am Bowersox Project Manager www.rjoeharris.com f .1 SUMMIT ENGINEERING . LABORATORY. TESTING April 26, 2017 Jeff Reasner Dependable Development, Inc. 2627 Breckenridge Centre Dr. Monroe, North Carolina 28110 Email: jreasnergtruehomesusa.com Subject: Estimated Seasonal High Water Table (ESHWT) Determinations Larkin Multi -Family Fox Den Circle & 10' Green Street Charlotte, North Carolina SUMMIT Project No. 4280.504 Dear Mr. Reasner: SUMMIT Engineering, Laboratory and Testing, P.C. (SUMMIT) is pleased to submit this letter summarizing our findings within Borings B-1, B-2 and B-3 with regards to the Estimated Seasonal High Water Table Elevation (ESHWT) determination. Boring B-1 was performed at the location of the proposed pond to be constructed at the subject site. This report contains a brief description of the project information provided to us, general site and subsurface conditions revealed during the exploration. PURPOSE OF STUDY The purpose of this study was to obtain information regarding the subsurface conditions within the proposed stormwater BMP ponds and determine the estimated seasonal high water table mark (if evident). This report contains the following items: • Photographic Logs, Site Vicinity Map and Test Boring Location Plan, • Summary of Test Boring Observations, visual soil classifications and descriptions, and laboratory results, • A general review of the subsurface soils and estimated seasonal high water table depth from existing ground surface (if evident), • Groundwater level measurements. 0 Summary of ES14WT Determination SUMMIT Project Number 4280.504 Larkin Multi -family, Statesville, North Carolina April 26, 2017 EXPLORATION PROCEDURES On April 20, 2017, SUMMIT visited the site and performed a soil test boring within the proposed stormwater BMP ponds. The approximate locations of the boring (identified as B-1 thru B-3) are shown on "Figure 2, Boring Location Plan" provided in Appendix 2. The client (Galaxy NC LLC) provided SUMMIT with a "Grading Plan" prepared by R. Joe Harris & Associates, Inc. dated February 3, 2017 and showed the approximate location of each of the proposed stormwater BMP ponds. The test locations were staked in the field by a representative from R. Joe Harris & Associates, Inc. The soil test boring was performed using an ATV -mounted CME 550X drill rig. The boring was extended to a depth of about 20 feet below the existing ground surface. Hollow -stem, continuous flight auger drilling techniques were used to advance the borings deeper into the ground. Standard Penetration Tests (SPT) were performed within the mechanical borings at designated intervals in general accordance with ASTM D 1586 to obtain a soil sample for visual classification in general accordance with ASTM D-2488. Water level measurements were attempted at the termination of drilling and at 24 hours after the completion of drilling. The classification symbols are depicted on the "Boring Log" provided in Appendix 3. GENERALIZED SUBSURFACE STRATIGRAPHY General subsurface conditions observed during our geotechnical exploration are described herein. For more detailed soil descriptions and stratifications at a particular test location, the respective "Boring Log" provided in Appendix 3 should be reviewed. The horizontal stratification lines designating the interface between various strata represent approximate boundaries. Transitions between different strata in the field may be gradual in both the horizontal and vertical directions. Beginning from the ground surface, a veneer of topsoil (surficial organic soils) approximately 4 to 6 inches in thickness was observed. Residuum (undisturbed natural soil) was encountered below the surficial soils and extended to maximum boring termination depth of 20 feet below the existing ground surface. Residual soils consist of loose to medium dense silty sands (SM), stiff sandy silts (ML), and firm to stiff lean clays (CL). Standard penetration testing (SPT) within the residual soils exhibited N -Values ranging from 6 to 14 blows per foot. Summary of ESHWT Determination SUMMIT Project Number 4280.504 Larkin Multi -family, Statesville, North Carolina April 26, 2017 GROUNDWATER LEVEL MEASUREMENTS Groundwater was not observed either at time of drilling (ATD) or at 24 hours after the completion of drilling. ESTIMATED SEASONAL HIGH WATER TABLE The ESHWT is defined as a change in the color of the soil layer due to water staining (typically, gray redoximotphic depletions and mottling). "Spotting" or "blotching" of different colors or shades of colors are interspersed with one dominant color within the soil matrix and is commonly referred to as "mottling." Mottling is caused by intermittent periods of saturation and drying, and may be indicative of poor aeration and drainage. Mottling is a historically recognized "general indication of groundwater" flow through a soil layer. However, in some instances it can be difficult to determine if said groundwater flow was recent. The above referenced Estimated Seasonal High Water Table (ESHWT) indicators were not observed within the depths sampled in borings B-1, B-2, and B-3. The following table summarizes the boring sampled depths, existing ground elevations, the approximate depths and elevations of the ESHWTs, the approximate depths of groundwater (GW) at time of drilling (ATD), and groundwater (GW) after 24 hours. Summary Table of the Boring Depth, Existing Ground Elevation, ESHWT Depth and Elevation, and Groundwater Depths 1 Depths from existing ground surface. 2 Existing ground elevation was provided by R. Joe Harris & Associates, Inc. MSL — Above Mean Sea Level NE — Not Encountered Groundwater Boring Boring Ground ESHWT ESHWT Depths ID Depth Elev. Depth Elev. (Ft)' (MSL)2 (Ft) t (MSL) ATD 24 Hours (Ft) (Ft)' B-1 20 855.22 NE NE NE NE - B-2 20 866.13 NE NE NE NE B-3 20 873.72 NE NE NE NE 1 Depths from existing ground surface. 2 Existing ground elevation was provided by R. Joe Harris & Associates, Inc. MSL — Above Mean Sea Level NE — Not Encountered Summary of ESHWT Determination SUMMIT Project Number 4280.504 Larkin Multi -family, Statesville, North Carolina April 26, 2017 CLOSING SUMMIT appreciates the opportunity to provide our professional services for you on this project. If you have any questions concerning the information in this proposal or if we may be of further service, please contact us at 704.504.1717. Sincerely, SUMMIT CAR S�J�iJ�� 6. \ 'E - Manager LIST OF APPENDICES UMMIT. �. Engineering, Laboratory & W m is Testing, P.C. _Q� az J % C-4361 I Photographic Log 2 Figure No. 1 — Site Vicinity Map Figure No. 2 — Test Boring Location Plan 3 Boring Logs Robert L. Price, P.E. Senior Geotechnical Engineer Summary of ESHWT Determination SUMMIT Project Number 4280.504 Larkin Multi -family, Statesville, North Carolina April 26, 2017 APPENDIX 1 PHOTOGRAPHIC LOG Summary of ESHI-F3 i Determination SUMMIT Project Number 4280.504 Larkin Multi -family, Statesville, North Carolina April 26, 2017 Photo 1: Boring B -I from Oft. to ]Oft. Photo 2: Boring B-1 from 10 ft. to 20 ft. Summary of ESHWT Determination SUMMIT Project Number 4280.504 Larkin Multi -family, Statesville, North Carolina April 26, 2017 Photo 3: Boring B-2 from Oft. to ]Oft. Photo 4: Boring B-2 from ]Oft. to 20 ft. Summary of ESHWT Determination SUMMIT Project Number 4280.504 Larkin Multi -family, Statesville, North Carolina April 26, 2017 .�-:, t - .�W"..�_ - • a Wv', �r.�ae+•. .,mac. .. �„�. _.,=.�¢ _—.i.�rr_--,•. •_ _ - '�.00fly Photo 5: Boring B-3 from Oft. to ]Oft. Photo 6: Boring B-3 frons 10 ft. to 20 ft. Summary of ESHWT Determination SUMMIT Project Number 4280.504 Larkin Multi -family, Statesville, North Carolina April 26, 2017 APPENDIX 2 Figures s. Larkin MF Development 1���y� Response to Comments Dated April 04, 2017 ��ll..►► Date of.Response: May 05, 2017 JCl�J11 �� .hs V Stormwater Permitting Program (Robert Patterson) "��MgTFR��Uq��� 1. All SCMs must comply with all MDC in 15A NCAC 02H.1000 and the latest SCM Design Manr�l SCMS checked against new MDC design standards in the SCM Design Manual. 2. The person signing the application and O&M agreement must be an officer of the corporation listed on the NC Sec. of State's website. Or provide a signed letter from one of the officers listed giving Michael Foss -signature authority. We are still currently waiting on receiving the newly signed 0&M agreement and authorization letter from the owners and will provide those once received. 3. The rules require the runoff from all BUA to be treated. As currently proposed, approximately 20% of the roof areas is not being treated in a SCM. Evaluate adding piping and/or swales to capture the rear roof areas on lots 2, 3, 14-17, 19, 20, and 25-29. Grading plan revised with rear yard ditches to route rear roof runoff to be treated in a SCM. 4. Where does the roadside ditch along Amity Hill Road, where the wet pond discharges, drain to? Does it drain to Third Creek, or Duck Creek to the south? The roadside ditch along Amity Hill Road drains to the south into Duck Creek prior to draining into Third Creek. This has been updated on the Stormwater Management Permit Application. 5. Provide signed and notarized O&M Agreements for the SCMs (General MDC 11). The new O&M EZ form is available on our website. The new O&M EZ form has been filled out, signed, and provided with this submittal package. 6. Please consider using the discrete SCS method of Simple Method for calculating the WQV. Using composite CN will yield an artificially lower volume. General MDC 1 requires a sufficient sized SCM. See also Part B of the SCM Manual. The Simple Method was applied in calculating the WQV. 7. The DA and BUA is not consistently shown between SWU-101, Sht. Post DA, and the supplement forms. Revise so all are consistent. The DA and BUA have been checked and adjusted where applicable to be consistent on the SWU-101, supplement forms and Sht. Post DA. 8. Note there are new supplement forms using Supplement EZ found on our website. The new supplemental forms for wet ponds and sand filters have been completed and submitted with this package. 9. All 3 SCMS: a. The CN is not consistent between Sht. Post DA and the calcs. The CN values used for the calculations have been updated on the Sht. Post DA. b. Provide supporting calcs. for the WQV based on the 1" design rainfall depth. (General MDC 1) Supporting calculations for WQV provided with this revised submittal. c. Extend the SCM easements to the nearest public RoW. (General MDC 8) The SCM easement has been extended to the nearest public RoW 10. Wet Pond #100: a. Provide supporting calcs. for the surface area using SA/DA tables or HRT method in MDC 1. Supporting calculations provided for calculating surface area using SA/DA method. b. Provide supporting calcs. for the main pool depth using option 1 or 2 in MDC3. Main pool depth provided in calculation design book for permanent pool. c. Provide supporting calcs. for the forebay size (MDCS). Supporting calculations for forebay size provided with this revised submittal. d. Provide supporting calcs. demonstrating the WQV draws down in 2-5 days (MDC7). Supporting calculations provided with this submittal package showing that the WQV draws down in 2-5 days in accordance with MDC7. e. Add contours to Sht. BMP -2 to show the actual excavated depth for the sediment storage. Also, add the elevation to the profile of the bottom of the sediment storage. Contours and contour labels have been added to sheet BMP -2 to show the actual excavated depth and bottom of the sediment storage. 11. Both Sand Filters: a. Provide a soils report for the SWHT elevation for each sand filter. This must be based on an in-situ soils evaluation. (MDC 1) A soils report of the in-situ soils to determine the SHWT elevation was produced by Summit Engineering and the report has been included with this submittal. b. Provide a mechanism to evenly distribute flow over the sand surface. (MDC 5) Both sand filter ponds use a rip -rap apron along the forbay to evenly distribute the flow over the sand surface. c. Specify on Shts. BMP -4 and, BMP -5 that ASTM C33 or equivalent sand must be used. (MDC 6) A note has been added to sheets BMP -4 and BMP -5 stating that ASTM C33 or equivalent sand is to be used. d. Revise the stage storage tables to show the cumulative volume at the design WQV elevation. The design storage table has been updated to show the cumulative volume at the design WQV elevation for each sand filter pond. e. Revise the stage storage tables to breakdown the areas, stage, and volumes for each sediment chambers and the sand chambers. Additional pages have been added to show the storage breakdown for each sediment and sand chamber. 12. Sand Filter #200: a. Open sand filters require 2' of separation from SHWT elevation to the bottom of the sand layer (MDC 1). The supplement form states there is negative separation. Based on the soils report of the in-situ soils there is greater than a 2 foot separation between the bottom of the sand layer and the SHWT. This has been updated on the new Supplemental forms. b. The elevations are not consistent between the supplement forms and the plans. The elevations between the supplemental forms and the plans have been revised where applicable to be consistent. 0 _'IV �p L rv�rFRFFRq(�rr Project Report for Larkin Multi -Family Development Iredell County, North Carolina Date: May 53 2017 Client: True Homes 2649 Brekonridge Centre Drive, Suite 104 Monroe, North Carolina 28110 Engineer: R. JOE ffikI RIS & ASSOCIATE,S. LNC.. Engineering a SttrVE�7II6 • Planning s A"Ieaikeeiilent 137 Ben Casey Drive, Suite 101 Fort \Till, SC 29708 P: (803) 803-1799 vv %,v %.rjoeharris.com .'toll If'%IIIIIIIIIft :•••u•ROS�''I,'� �'•..•� CARO*!",,, ,, o fEs ��•�OF ESSIp� •: : �:'Q�0 i SEAL X1 = = sW SEAL: C-4168 i ^ 036636 =; ;-Aa�i � i •ti /1!• �RN ��,Ir11r111t�� 7 �1 �,fpllllll�� - Report - 2nd Submittal to NCDEQ Larkin MF Development Project Report Section 2: Project Information Overall Project Information Larkin Multi -Family Development Project Report A. PROJECT DESCRIPTION Project Summary The Larkin Multi -Family Development is a Planned Development located west of Interstate 77, at the intersection of Fox Den Cir and 10th Green Ct, north of Amity Hill Rd in Iredell County, North Carolina. This development consists of approximately 4.79 acres consisting of 29 townhome units. This property has a Tax Parcel Number of 80031471, Deed Book number of 2390 and Deed Book Page Number of 3. The site is currently cleared with the exception of a couple existing buildings and trees that will be removed. The site is also moderately sloped. The predominant soil types within the proposed limits of construction are Cecil sandy loam, and Cecil - Urban land complex; all of which belong to the Soil Hydraulic Group B (as taken from the Web Soil Survey 2.1— National Cooperative Soil Survey by NRCS). The disturbance for the site will encompass roughly 4.00 acres. The site will encounter two phases of erosion and sediment control management, beginning with an initial phase. Initial clearing, grading and infrastructure placement will occur during this phase. The last phase (stabilization or final phase) will include paving and stabilization of the site. Given the amount of grading work that will take place, the majority of the erosion control is best managed through the use of sediment basins with temporary diversion ditches to help channel flow to the aforementioned basins. Accessory features such as inlet protection, silt fence, and concentration outlets will also be used to assist with bypass areas and smaller areas of concentrated flow. Three sediment basins have been specified for the initial phase erosion control. The three basins will remain active during the final phase of erosion control and sediment management. The storm drainage installation will either be staged (stub pipes) or include temporary pipes to effectively discharge the storm water into the basins until all work has been completed. At this point, the sediment basins will be converted into permanent BMP ponds and the temporary pipes will be discarded and permanent pipes installed in order for the storm systems to effectively discharge into the permanent BMP ponds. B. STORMWATER MANAGEMENT Pre and Post development flows were analyzed at two different locations on the Larkin MF Development site due to a high point on the site during the pre -development stage and the storm system during the post development stage. The first point of analysis is an existing catch basin located in the North West corner of the site on 101" Green Ct. The second point of analysis is located at an existing ditch in the South West corner of the site were the ditch discharges water off the site. For the purposes of this analysis the pre -development conditions account for potential proposed impervious area as a result of previous designed residential development for this site. With the installation of the proposed BMP Wet pond and BMP Detention Ponds with Sand Filters on this site, it was observed that the post development condition improved on that of the pre -development conditions Pre and Post Development runoff summaries can be found in Section III of this project report and in summary for the 2 -Year and 10 -Year Storm Events. Larkin Multi -Family Development Project Report Project Summary Description: Pre -Development Runoff (North West) Pre Area #1 Post Development Runoff (North West) Post Area #2 Post Area #3 Bypass Area #4 Bypass Area #5 Combined Pre -Development Runoff (South West) Pre -Area #2 Post Development Runoff (South West) Post Area #1 C. WATER QUALITY Area (Ac.) 2 Yr (cfs) 10 Yr (cfs) 3.86 9.21 17.55 1.05 0.54 4.80 0.77 0.09 2.54 1.08 1.72 3.82 0.66 1.60 3.06 3.56 3.40 13.34 1.20 2.23 4.87 1.15 0.06 0.59 There are 5 main drainage areas that make up the two points of discharge locations. Four of the five areas are collectively discharged into an existing storm system by means of an existing storm structure located in the North West corner of the site. The remaining area discharges into an existing ditch which discharges water of the site in the South West corner. There are no proposed impacts to jurisdictional Waters of the State (WoS). In order to achieve the intended water quality the storm outfalls for this site have been routed into the permanent BMP ponds where the water is to be detained for a period of time between 48 and 96 hours before being released into the into the designated discharge locations. BMP Detention Pond with Sand Filter #200 and BMP Detention Pond with Sand Filter #300 will discharge into the existing storm structure in the North West corner of the site, while BMP Wet Pond #100 will discharge into the existing ditch in the South West corner of the site. The BMP Detention ponds were designed to collect the 100 -year flow from the site and allow it to collect in the wet pond to an elevation of that not exceeding that of the emergency spillway in each pond, or 1ft of freeboard between the water elevation and the top of the berm of each wet pond. D. STORM DRAINAGE SYSTEM An analysis of all receiving storm drainage systems within the Larkin Multi -Family Development was conducted to verify that the drainage systems would not surcharge or be beyond capacity due to the drainage areas and the storm water runoff from the site for the 10 -year, 24-hour rainfall intensity. All of the street catch basins have been evaluated for inlet spread using the 1 -year, 24-hour rainfall intensity, and all yard inlets have been evaluated for sump capacity using the 10 -year, 24-hour rainfall intensity. For the analysis of the infrastructure, RJH utilized a combination of field -run topography for the area and proposed lot/road grading to evaluate each of the storm drain systems. All storm systems are new systems designed from drainage within the limits of the Marthas Ridge Subdivision and also from off-site drainage. All storm systems function within the design parameters set forth by the Town of Statesville, Iredell County and NCDOT for both pipe design and inlet spread capacity. Larkin Multi -Family Development Project Report Project Summary All systems have been fitted with a properly sized riprap apron at the outflow for energy dissipation. All proposed storm drain profiles have been designed to limit the hydraulic gradient line (HGL) to no closer than 0.5' below the weir/rim elevation. End Report Larkin MF Development Project Report Section 6: Water Quality Calculations Permanent Wet ]Pond 100 B. Shelf Pool T. Shelf T. Berm PROJECT NAME PROJECT #: DESCRIPTION: Larkin MF Development DATE: 2382 DESIGNER: Pond #100 - Permanent Pond Volume ENGINEER: PERMANENT POOL STORAGE VOLUME: 9 -Nov -16 A. Bowersox A. Bowersox ELEV. (FT.) CONTOUR AREA (S.F.) ELEVATION DIFFERENTIAL (FT.) INCREiNIENTAL VOLUME (C.F.) ACCUM. VOLUME (C.F.) 862.50 390 0.0 0 0.00 863.00 757 0.5 282 282 86400 1,597 1.5 1,151 1,433 86500 2.586 2.5 2,072 3,505 865.50 3,170 3.0 1,437 4,941 866.00 4,093 3.5 1,811 6,752 866.50 5.005 4.0 2,271 9.023 867.00 5,575 4.5 2,644 11,666 868.00 6,767 5.5 6,161 17,828 869.00 8,025 6.5 7,387 25,215 870.00 9,367 7.5 8,687 33,902 871.00 10,026 85 9,695 43,597 Top PROJECT NAi�1E: Larkin MF Development PROJECT #: 2382 DESCRIPTION: Pond #100 - Forebay PERMANENT POOL STORAGE VOLUME: DATE: 9 -Nov -16 DESIGNER: A. Bowersox ENGINEER: A. Bowersox WIN Larkin MF Development Statesville, North Carolina Project Number: 2382 November 9, 2016 COMPOSITE SCS RUNOFF CURVE NUMBERS 24. Hour Storm Event BMP Wetpond #100 Soil Type: Cecil sandy clay loam, Cecil -Urban Land Complex - HSG "B" Total Drainage Area = 1.18 ac. Paved Roads/Sidewalk/Structures 0.55 ac. CN = 98 Wooded Area CN = 60 0.00 ac. Good Grass (>75% of area) 0.63 ac. CN = 61 Newly Graded Composite CN 78.25 0.00 ac. SUPPLEMENT -EZ FORM COVER PANE Please indicate the types, quantities and locations of SCMs that will be used on this project: -- ---- Quantity G - -- - -- - -- infiltration System_ _ -- -Location(s)---- - --- - - ! Bioretention Celt - - - - ----- - Wet Pond 1 _. _ - _ `Southern portion of porperty boundary u- Stormwater Wetland Permeable_ Pavement -------------_-__-__-_ Filter _- - ---- 2 - Entrance to property at 10th Green Court and intersection of Driveway 2 & Driveway 1 --- -Sand -------- - Rainwater-Harvesting- ainwater -Harvesting _ - --- - - - — ------ --- +-------_------------ ---------------___-- Green Green Roof i - - Level Spreader -Filter Strip Disconnected Impervious Surface 4 - --- - - - - Treatment Swale ------}------ - ------- --- ---- ----- DryPond Designer information for this project: Name and Title: Patrick urphy, P.E. / Engineering Director Organization: R. Joe Harris & Associates, Inc. — - - - Street address: 127 Ben Casey Drive, Suite 101 -------- --------- --- --- - --------------------------- - City, State, Zip: Fort Mill, SC 29708 Phone number(s): --[803-802-1799 Email: -- __---------�pmurphyaCirjoeharris.com Designer eI A CAS �j . 0.00 a � +�EIAL �o 36GIM o Signature of Dbsigner �lV11 Date Applicant: E - Cnv(ronnrrn �lu++tny Project Name: Larkin MF Development Address 198 Fox Den Circle City / Town Statesville Company: (Dependable Development Inc. Contact: _ 1Michael Foess Mailing Address: 2649 Brekonridge Center Drive, Suite_ 104_ City, State, Zip: Monroe, NC 22110 Phone number(s): 704361-9119 - Certification Statement: I certify, under penalty of law: that this Supplement -EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. :over Page 1 1:52 PM 5/5/2017 WET POND Larkin MF Development #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No 3.1 #8 Does the mam_etenance_acces_s comply with General MDC (8)? 49 Does the drainage easement comply with General MDC (9)? _Yes Yes #3 What are -the -side slopes of the SCM (H V)? #3 Does _the _SCM have retainirIg walls, gablon wailsor other2rside slopes? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #11 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Yes #5 is there _a_a bypass for flows in excess of the design flow? #6 What is the method for dewatering the SCM for maintenance? Yes1#13 _ _ #12 Is there an O&M Pian that complies with General MD_C (12)? Was the SCM designed by an NC licensed professional? Yes Yes Pump (preferred) uvve i rvlvu tv_iu4 rrt�iw uen .w53 #1 Method used SAIDA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 4094 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) _ 6735 cf #6 Elevation of top of shelf (fmsl) 866.5 ft #2 Average depth of the main pool (feet) _ 3.5 ft _ 116 Elevation of bottom of shelf (fmsf) _ 865.5 ft #2 Was the vegetated shelf included in the calculatwn_of_average depth? Yes #6 Slope of vegetated shelf (H V) _ 882.5 it #7 Diameter of drawdown orifice (inches) 10:1 rt _ 1.25 in #2 Elevation of the bottom of the permanent pool (fmsl) #2 Elevation of the top of the permanent pool (fmsl) #2 Elevation of the top of the temporary pool (fmsi) �^ 866 it _ #7 Drawdown time for the temporary pool (hours) _ _ _ _ 866 43 it m #7 Does the orifice drawdown from below the top surface of the permanent pool? _57 firs _ ^Yes 4!3_Depth provided for_sediment storage (inches) _ _ 94 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? 12 in _ _ #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #9 Are fountains proposed? ~ �u T! _Yes No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path_�_Tmm #9 If yes, Is documentation provided per Wet Pond MDC (9)? berm with a rock filled dam between the main pond and forebay used to improve flow. y #10 is a trash rack or other device provided to protect the outlet system? Yes Yes #5 Volume of the foreba cubes feet) 1814 #11 Are the dam and embankment planted in non -clumping turf grass? #5 Is this 15-20% of the volume in the main pool? No #11 Species of turf that will be used on the dam and embankment Centipede Grass �� #5 Depth of forebay at entrance (inches) _ 36 in #11 Describe the planting plan for the vegetated shelf T ~ #5 Depth of forebay at exit orches^ _~ — -' 36 in Plantings along the shallow water -lower half and the shallow land -lower half are spaced 2'0 C. and the plants on the upper — half or shallow water and upper half of shallow land are spaced 3' O C. Aquatic vogetaton chosen from the approved list In Yes the NCDEO BMP Manual. _ 12 In _ Yes #5 Does water flow out of the forebay in a non-erosive manner? #5 Clean-out depth for forebay (inches) 1f5 With. forebay be cleaned out when the depth is reduced to less than the above? use this space to provide anv additional information about this wet pond that you think is relevant to the review. Wet Pond 1 11:44 AM 5/5/2017 Larkin MF Development Wet Detention Pond #100 September 23, 2016 Drainage Area: 1.18 Acres % Impervious: 46.31 Percent Pond Depth: 3.5 Feet SADA: 1.8 Required Surface Area = (1.8/100) X 1.18Acres X 43,560 S.F./Ac. = 925 Sq.Ft. (OK - See Surface Area of Permanent Pool = 4,093 sq ft.) Runoff Coefficient = 0.05 +.009 (% Impervious) = 0 467 in./in. Volume (To Be Controlled) = Design Rainfall X Runoff Volume X Drainage Area _ (1 in. Rainfall) X (0.467in./in.) X (1/12 feet/in.) X (1.18acres) X (43,560 sq.ft/acre) = 1,999 cuff. (OK - 2,005 cu.ft. @ 866.28' MSG when there is no release) Release Rate = (1999 cu.ft.)/((2 days) X (86,400 sec./day)) = 0 012 cu.ft /sec. From Hydrograph Model (3 -yr Storm Event) Peak Discharge Rate = 0.019 cu ft./sec. (@ 866.27 MSG) Average Discharge Rate = [ (0.000+0.019) /2 ] = 0.010 cu.ft./sec. Time to Drain V Rainfall = Volume/Avg Discharge _ (1999 CF)/(0.01 CFS) = 210,468 sec. - 58.463 hours = 2.44 days Water Quality Volume = 6,752 cu.ft. See Attached Permanent Pool Chart Required Forebay Volume = (20%) X (Water Quality Pool Volume) ' At permanent pool level = 1,350 cu.ft, Forebay Volume Provided = See Attached Forebay Volume Chart = 1,814 cu.ft. = 26.87% (OK - Forebay volume should be minimum 20% of permanent pool volume) HydrographSummary Re p Fiy�d allow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc. v10 5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0 949 1 718 2,005 -- ---- ---- Wet Pond #100 2 Reservoir 0.019 1 1146 1,746 1 86628 1,264 Wet Pond Wet Pond #100.gpw Return Period: 3 Year Friday, 0515 / 2017 2 Hydrograph Repot Hydraflow Hydrographs Extension for AutoCAD® Civil 31DO 2016 by Autodesk, Inc. v10.5 Friday, 05 / 5 12017 Hyd. No. 1 Wet Pond #100 Hydrograph type = SCS Runoff Peak discharge = 0.949 cfs Storm frequency = 3 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 2,005 cuft Drainage area = 1.150 ac Curve number = 78.1 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Wet Pond #100 Q (cfs) Hyd. No. 1 — 3 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 010 0 00 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydraflow Hydrographs Extension for AutoCAD®R Civil 3138 2016 by Autodesk, Inc. v10.5 Friday, 05 / 5 / 2017 Hyd. No. 2 Wet Pond Hydrograph type = Reservoir Peak discharge = 0.019 cfs Storm frequency = 3 yrs Time to peak = 1146 min Time interval = 1 min Hyd. volume = 1,746 cuft Inflow hyd. No. = 1 - Wet Pond #100 Max. Elevation = 866.28 ft Reservoir name = Wet Pond #100 Max. Storage = 1,264 cuft Storage Indication method used Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 0 300 Hyd No. 2 Wet Pond Hyd No. 2 -- 3 Year 600 900 1200 ® Hyd No. 1 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 020 0.10 0.00 1500 1800 2100 2400 2700 3000 Time (min) [E= Total storage used = 1,264 cult Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2016 by Autodesk, Inc. v10 5 Pond No. 1 - Wet Pond #100 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation Begining Elevation = 866 00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 866.00 050 866.50 1.00 867.00 200 868.00 300 869.00 400 87000 5.00 871 00 Contour area (sqft) 4,093 5,005 5,575 6,767 8,025 9,367 10,026 Incr. Storage (cult) 0 2,270 2,643 6,161 7,386 8,686 9,694 Total storage (cuft) 0 2,270 4,914 11,075 18,461 27,148 36,841 0 Friday, 05 / 5 / 2017 Culvert/ Orifice Structures Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Weir Structures Storage / Discharge Table [A] [B] [C] [PrtRsr] Stage [A] [B] [C] [D] Rise (in) = 15.00 1.25 6.00 0.00 Crest Len (ft) = 8.00 173.00 0.00 0.00 Span (in) = 15.00 1.25 12.00 0.00 Crest EI. (ft) = 869.00 87000 000 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 333 3.33 Invert EI. (ft) = 866.00 866.00 867.00 0.00 Weir Type = 1 Ciplti - -- Length (ft) = 63.00 0.00 0.00 000 Multi -Stage = Yes No No No Slope (%) = 1.59 0.00 0.00 n/a -- 0.00 000 -- --- - - 3.244 4.00 27,148 N -Value = 013 .013 013 n/a 0.00 - --- - --- 10.76 500 36,841 871.00 Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0 000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Civ A CIV B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 86600 0.00 0.00 0.00 -- 0.00 000 - -- -- --- 0.000 0.50 2,270 866.50 0.03 1c 0.03 1c 0.00 --- 0.00 0.00 - -- - - - 0.027 1 00 4,914 867.00 0.04 is 0 04 is 0.00 -- 0.00 0.00 -- --- - -- 0.039 2.00 11,075 868.00 2.16 lc 0.05 is 2.08 is --- 0.00 000 - --- -- - 2.131 3.00 18,461 869.00 3.271c 0.06 is 3.18 is -- 0.00 000 -- --- - - 3.244 4.00 27,148 870.00 10.76 is 0.01 is 0.57 is - 10.18s 0.00 - --- - --- 10.76 500 36,841 871.00 12.34 is 0.00 is 0.26 is -- 12.05s 576.09 -- --- -- - 588 4C Larkin MF Development Project Report Section 6: Water Quality Calculations Permanent Detention Pond with Sand Filter 200 Larkin MF Development Statesville, North Carolina Project Number: 2382 November 9, 2016 COMPOSITE SGS RUNOFF CURVE NUMBERS 24 Hour Storm Event BMP Detention Pond with Sand Filter #200 Soil Type: Cecil sandy clay loam, Cecil -Urban Land Complex - HSG "B" Total Drainage Area = 1.05 ac. Paved Roads/Sidewalk/Structures 0.51 ac. CN = 98 Wooded Area CN = 60 0.00 ac. Good Grass (>75% of area) 0.54 ac. CN = 61 Newly Graded Composite CN 79.0 0.00 ac. Larkin MF Development THE DRAINAGE AREA - - I Cmtnaga area number 2 Break down of BUA in the dminego area both now and ox)stfn9) _ Total coastal weltands area (sq R) f •Parkin ldmoway (sq R} tats d Total surface wator oma (sq R} 45707 at • Sidewalk (sq 10 ' ' Talal dm_maga emit (sq ft) 45707 d - Roof (sq 10663 at BUA associated w.th uscuttg dowlopment (al) R) - - Road mylsq ft) % 54`0 d Proposed now BUA (sq 4) 22317 sf • Omer, please specify m the comment be. below (sq R) - Percent SUA of drainage aro. 49% Total BUA (sq (1) 22317 si COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM - Ssrmwalor mm s) that appl (please cdyl Cosign —1.11 depth (m) { 1 S m Atimmum wlume required (cu h) I 7145 d Cosine wiume of SCA1(w n) I 21558 d GENERAL MDC FROR102H AM - p1 Is the SCM seed to treat tho SW from a8 s.idaces at buddbut? Yes :7 If applicable, with the SCM be maned out ager construction? Yes z2 Is this SCM netted on or nasi contaminated sar'a? � No d8 boas the memelanonrs access compi wdh General MDC (8)? Yas 93 What are the side slopes of the SCM (H V)T 31 *9 Coes the drainage eosament compry wnh Garaml MOC (8)? Yes c3 Coes the SCM haus retain , walls abron waifs orotheran meemd s.tla slo s? { No #10 if the SCM is an a single family lot does the plat comply with Genual MCC (10)1 Yes *4 Are the inter, outlets and sim-9 stream protected from.ream (10•year slortn)? I Yes all is mem an OEM Agreement that compifeswdh General MCC (till { Yes 45 Is mem a a bypassfor flows fn excess of the design flow? Yes *12 Is them an O&M Plan that complies with General MCC (12)1 Yas '33 What is the method for dewatenng the SCAT tar mmntenance" Pump (preferred) 1413 Was me SCM designed by- NC Iicensad prefessmnaP { Yes SAND RLTFR MDC FROM 02H.1056 =1 SH4YT elevation (final) WA d3 Volume of stormxaterfrom dmmaq, oma aurng design stens (cuD�c fee0 9528 d d1 Type of said filter (open or closed) Open #3 Total velum. that can be stored.barre the sediment and sand chambers (cebro feat) 7378 of 91 If closed, descnba d the filter will be pre-test or sour -in -prate :3 Is this sard filter designed to attenuate peak IEaws? Yes *3 E'evelbn of Um bypass device ifmsl) l 854 R a1 If dosed, too of grew elevation (fms0 i d3 Describe the bypass device, 42 Volume that can be retained to the sediment chamber (cubmtaut) p2 Will:hero be a permanent pool in the sediment chamber? ) 6021f i No 10 fact wide emergency spt)hmy 412 Sodom of ilio sediment chamber tfmsl) i 849 R *4 Pending depth from the top of the sand re the bypass device (ft) __3't 42 Aroa of the sediment chamber (squaw testi 419d *5 Cescnbe the mechanism for distributing lbw over the sand surface. *2 Physeal depth of the sediment ehambor (orches) 30 m Rp'Rap apron .2 Pond'.g depth in the sediment chamber, above ny permanent pool (Inches) I 38 m de Sand specification forsand chamber r2 El—t— of m of war between chambers final) d2 Volume that can be retained In the sand chamber cubtc feet) l 8528 l 2216 d ASTM33 or aquivakM *2 Bottom of the sand chamber (final) 849 R #7 Depth above urdammin pipe (inches) 15 m or, Area of the sand chamber (square feet) I 13C9 sf *e Wil) the medm he maimamed to drain al least two inches per hour at the sand surface? Yes *2 Physical depth of the sand phernber(Inches) 38 in #9 Is al (sect ono daan,out pipe provided al the fox point of each urdordmin foe? Yes *2 Pending der h In the sand chamber, above any permanent poet (inches) ( 38 in #9 V.SII cf..—tit p:r^as be capped? Yes ADDITIONAL INFORMATION ' Please use this soars to pmvda any additional information about this sand Iter that you umink is relevant to the mview THE DRAINAGE AREA -- - - Drainage oma number { 3 Smak down of BUA In the drainage area both new and oxistingt Total coastal wettands area IN R) . Parking 1 dnwxay (sq ft) 838 d Total surface water oma (sq ft) 33488 Sf - SAawalk (sq ft) 1 Total dmmega awe (sq R) ; 33488 sf - Raol (sq fl) { 10663 at SUA associated wdh ax)sting development (sq RJ - - Roadway (sq R) 3710 sf Proposed now BUA (sq ft) 1 15209 sf - Other, please specify in the comment box below (sq R) { - Parcem BUA o drainage onto I 45% Total SUA (sq R) 1520g sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM - Stormwamr p rein!., that apo ( 'ease sceL Cesgn minfa8 depth (in) Mwmum wtumla regwntd (w R 8517 d Ces:gn wluma of SCM (w R) 1930 d GENERAL MDL FROM 02H .1050 - *1 Is the SCM sculd to treat the SW from a I surfacas at bwld7 ur- I Yes a7 If applicable, with the SCM be cleaned out attar Constvcbona I Yas d2 Is me SCM brand on or Haar contaminated soda? I No *e Cee. the mama, n access issinow,with General MOO (3 )7 Yas 93 What area the s.d. slopes of the SCM (H V)7 1 31 a9 mea the diem a easement camp) wdh General MDC a)? I Yas *3 Does the SCA1 haw ramming waits, gabiwit webs or other en moored stile slopes? I No *t0 .F the SCM a on a si to fared tot does the plat comol wnh General MCC 10)? ) Yes 94 Am the inlets, outlets. and recoi nng stream protected from erosion (1 ar storm)? Yes *1 t Is there an O&'A Agreement that complies i,tfth General MGC 11)? I Yes #5 Is them a a byposs for flaws m excess of the dac=gn flow? Yes *12 Is them en 08.M Pon that cm lies with Cepeml MCC 121? Yas *6 Whet is the method for de.am-2 the SCM far rimme•mance? I Pump (prof timed) *13 Was the SCM dasgrod by an NC licensed profassmnal? Yes SAND FILTER MDC FROM 02H .10S6 ' pt SNW w eleueson (fmsf) WA #3 Volume cf stemlwame from dmmege area dung design storm (cubic teat) I 8839 d rift Type of sand filter (open w closed) I Opo, 93 Total wluma that can be stored ab w the sediment and sand chambers (cubic feet) 1 8289 d Rt If closed, descnbs d the film -11 be pre- st or pour -In-place 93 Is this samf Idler designed to alienate peak flows? Yes #3 E'evsuon of the bypass device (fmsl) 867 R #1 If closed, top of grate elevation (fms0 i *3 Cssenbe the ass device, #2 Volume that can be retained in the sediment chamber orbic feet) #2 Will the. ba a permanent pool in the sediment chamber? 12W d N. 10 feet wide emorgencysPdtxey 02 Bottom of the sed,ment chamber (frost) ) 882'1 IW Pending depth rrom the top of the sand to the bypass d—ca (R) 3 R #2 Area of the sediment chamber(squarefeet) { 780 sf *5 Describe the mechanism for distnbutir Flow owrlha ,and surface - 02 Physical depth of the sediment chamber 1_mliss) 38. RipRap apron a2 Ponding depth In the sedtimnt clamber, above any permanent (mol (inches) 38 in d8 Sand specifiwuon for sand criamber #2 Elevation cf to o(wev between chambers rmsl) 32 Volume that can be retained In the send chamber (able feet) I 885 it { 2080 d ASTMM orequnaffird 02 Bottom of the sand chamber fmsi) 802 R 97 Cepth above underd. it p.pe (niche.) t5 m #2 Ams of the sand chamber (square root) 1788 d #8 Will the media be maintained to dram at least two inches per hour at the send surfacoT Yes *2 Physical depth of the sand chamber Inchos 38 or *9 is al feast one dearwul pipe provided at the low point of each undefdrain Una? { Yes n Ponding depth In the sand chamber, above anypemmanent pool (mches) 3g m d9 )YII claanbin peas be capped? Yes ADDITIONAL INFORMATIONPlease use this space to previds any addamnal Information about' ha sand Polar thatyou think is rele-1 to the renew' Sand filter 1 L31 PM 5/4/2017 Project: Larkin MF Subdivision Sand Filter #200 Engineer: R. Joe Harris & Associates, Inc, Location: Statesville, NC Date: November 9, 201E Client: True Homes, LLC By: M. Birmingharr BMP Type: Surface Sand Filter (Pond #200) Compute Surface Sand Filter Area and Volume to Treat Water Quality Volume (WQv) 1.0 Check Surface Sand Filter Area based on Darcy's Equation (assumed value of 1.75 in/hr for the design coefficient of permeability for the sand filter media) Af = (WQ,,)(df) / [(k)(hf + df)(tf)] «««««« 191_= sq.ft. Surface Area Used = Sand Filter Dims @ Filter Media = 282 sq.ft. Develop Stage -Discharge for Bioretention Filter Media 10:Width (ft) Length (ft) Where: WQv 2796.28 cu. ft. Water Quality Vol. df - v ' 2 ft filter bed depth (2.5' optimal, 2.0'std) k- ._--3.5'ft/dy permeability_ coeff. hf-� � 3 f avg. height of water tf --�1.67`days filter bed drain time Outflow computed using following equations: Af = (WQ,,)(df) / [(k)(hf 7 df)(tf)] Qo = WQv / tf Qo = [(Af)(k)(hf + df)] / df Where: Af = surface area of filter bed (sq.ft.)(Required Surface Area) _ -2 sf df = filter bed depth (ft) k = coefficient of permeability of filter media (ft/day) hf = avg. height of water above filter bed (ft) Elevation Contour Area (SF) Depth (Incr.)(ft) Volume (cf) Incr. Accum. Discharge (cfs) (Filter Media) , = This is For Filter -Media Only " Comments 849.0 302 0.0 0 0 `vt 0.0 ° Assume "0" Discharge at Top of Soil Media 849.5 486 0.5 197 1974 850.0 670` 0.5 289 486 850.5 905 0.5 394 880 =_Q02f1 851.0 1139 0.5 511 1391 4i)2 851.3 1309.5 0.3 404 1795 s"- 00,= Max Depth of Pond (Media to First Orifice) Project: Larkin MF Subdivision Sand Filter #200 Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, NC Date: November 9, 2016 Client: True Homes, LLC By: M. Birmingham BMP Type: Surface Sand Filter - Pond #200 Size Underdrains for Surface Sand Filter The calculations utilized are taken from the NC DEQ BMP Manual, Section 5.7 Underdrain Systems 1.0 Compute number of pipes needed for the underdrain system as follows: Design flow rate thourgh sand media at WQ Peak eIev. 65 1.3 3 = 0�2 cfs Input Data: Rougness factor, manning's n 0.011 Internal slope, s (%.) 0.5 Underdrain Design flow, Q (cfs) 0.025 Underdrain Safety Factor - SF 10 Diameter: Equation in NC DEQ Section 5.7: D = 16[(Q*SF*n)/S^0.5))^(3/8) D - Li � j in Table 5-1: `; �'`�`�� Number of 4" Pipes Needed: 2 Loc5': 31n_ Table 5-1 \z�T7�hPr of Pines Recnlired in the Underdrain If D is less d1a11n of 4" i es If D is less than # of 6" pipes 5.13 2 7.84 2 5.95 3 9.11 3 6.66 4 .._..10.13 .. 4 7.22 5 7.75 6 8.20 7 Add the following pipe and perferation specifications, from NC DEQ BMP Manual Section 5.7, to construction plan details: All piping within the underdrain system shall have a minimum slope of 0.5 percent and shall be constructed of Schedule 40 or SDR 35 smooth wall PVC pipe. The size of pipes shall be 6 -inch diameter. The spacing of collection laterals shall be no greater than 10 feet center to center, and a minimum of two pipes should be installed to allow for redundancy. A minimum of 4 rows of perforations shall be provided around the diameter of the pipe and the perforations shall be placed 6 inches on center within each row for the entire length of the drainage lateral. Perforations shall be 3/8 -inch in diameter. The underdrain pipes shall have a minimum of 3 inches of washed #57 stone above and on each side of the pipe (stone is not required below the pipe). Above the stone, either filter fabric or two inches of choking stone (#8 or #89) is required to protect the underdrain from blockage. PROJECT: Larkin PROJECT #: 2382 DESCRIPTION: Sand Filter #200 POND STORAGE VOLUME: DATE: 9 -Nov -16 DESIGNER: NIWB ENGINEER: PLM DESC. ELEV. (FT.) CONTOUR AREA (S.F.) ELEVATION DIFFERENTIAL (FT.) INCREMENTAL VOLUME (CX.) ACCUM. VOLUME (C.F.) Bottom 849.00 302 0.0 0 0 849.50 486 0.5 197 197 850.00 670 1.0 289 486 850.50 905 1.5 394 880 851.00 1,139 2.0 511 1,391 WQV 851.33 1,310 2.3 404 1,795 851.50 1,428 2.5 233 2,027 Weir 852.00 1,716 3.0 786 2.813 852.50 1,999 3.5 929 3,742 853.00 2,281 4.0 1,070 4,812 Spillway 853.50 2,559 4.5 1,210 6,022 Top 854.00 2,837 5.0 1,349 7,371 WQVEIev 851.33 PROJECT: Larkin PROJECT #: 2382 DESCRIPTION: Final Sediment Basin #200 POND STORAGE VOLUME: DATE: 14 -Sep -16 DESIGNER: RAS ENGINEER: PLM DESC. ELEV. (FT.) CONTOUR AREA (S.F.) ELEVATION DIFFERENTIAL. (FT.) INCREMENTAL VOLUME (C.F.) ACCUM. VOLUME (C.F.) Bottom 849.00 24 0.0 0 0 849.50 75 0.5 25 25 850.00 125 1.0 50 75 850.50 190 1.5 79 153 851.00 255 2.0 111 265 851.50 337 2.5 148 413 852.00 419 3.0 189 602 0.21 Hydraflow Express Extension for Autodesk@ AutoCAD@ Civil 3DO by Autodesk, Inc Basin #200 Final Invert Elev Dn (ft) = 846.70 Calculations Pipe Length (ft) = 50.17 Qmin (cfs) Slope (%) = 0.60 Qmax (cfs) Invert Elev Up (ft) = 847.00 Tailwater Elev (ft) Rise (in) = 15.0 Shape = Circular Highlighted Span (in) = 15.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n -Value = 0.012 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 854.00 Hw/D (ft) Top Width (ft) = 18.00 Flow Regime Crest Width (ft) = 42.00 ��y�c.�� ���j�r .+s:Lysz 3y. � ✓ if. s"��,��"i-���. Etev (ft) Saco 3Si 00 853 652 CO 831 33000 84900 31800 847'.0 moo 03500 Basin UM Final Thursday, May 4 2017 = 4.80 = 4.80 = (dc+D)/2 = 4.80 = 4.80 = 0.00 = 4.30 = 5.13 = 847.77 = 847.89 = 848.45 = 1.16 = Inlet Control K. Depth (ft) CUCUVC{ dvet( HGL Embank Retch (ft) 800 700 sin 300 400 300 200 100 0 0Q -100 .200 ��y�c.�� ���j�r .+s:Lysz 3y. � ✓ if. s"��,��"i-���. v` s`s Ogg AR f� n S )n iS 2n 25 30 36 40 45 60 is 60 as 70 75 CUCUVC{ dvet( HGL Embank Retch (ft) 800 700 sin 300 400 300 200 100 0 0Q -100 .200 Project Name: Larkin Ballast Pad Design for Detention Pond wl Sand Filter #200 RJ Ref 92382 854 ft, Top of Basin Riser Size: Barrel Size: Top of Basin: Bottom of Basin Riser Weir: Spillway Height from top of Basin: Uplift @ Pear Elevation: Peak Elevation =853 ft. - 847 ft. Peak Elevation = 6ft. Uplift Force= (62.4)(3 ft.)(2 ft.^2) Uplift Force= 748.8 lbs Volume of Concrete Required to Stabilize Riser: 1175.616 lbs X 1!150 lbs/ft^3= 7.83744 cubic feet Ballast Pad Dimensions: Try Volume of: 4 ft. X 4 ft. X 2 ft. 32 cubic feet Ok 32 c.f. > or equal to 7.83744 c.f. True Pad 15 in. RCP 24'7.D.PCS Ballast Pad 4ft. 2ft. 4 ft. Ballast Pad Dimensions: 4 ft. X 4 ft. X 2 ft. 0.5 ft. Spillway Height 853.5 ft. Spillway Elev. 24 in 853 ft. Riser Weir 15 in 7-7-42,VTD.PCS 854 ft. 847 ft. 6 ft �� " " `:'` 6.5 853 ft. 847 ft. Bottom of Basin Volume of Concrete Required to Stabilize Riser: 1175.616 lbs X 1!150 lbs/ft^3= 7.83744 cubic feet Ballast Pad Dimensions: Try Volume of: 4 ft. X 4 ft. X 2 ft. 32 cubic feet Ok 32 c.f. > or equal to 7.83744 c.f. True Pad 15 in. RCP 24'7.D.PCS Ballast Pad 4ft. 2ft. 4 ft. Ballast Pad Dimensions: 4 ft. X 4 ft. X 2 ft. HydrographSummary e P ytlraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. 00.5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.343 1 718 4,705 ______ —___ ____. Sand Filter #200 2 Reservoir 0.077 1 864 2,869 1 851.95 2,725 Sand Filter#200 Sand Filter #200 gpw Return Period: 1 Year Thursday, 05 / 4 / 2017 FrAydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10 5 Hyd. No. 1 Sand Filter #200 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 1.050 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.02 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 2.00 1.00 0.00 0 120 240 Hyd No 1 Sand Filter #200 Hyd. No 1 -- 1 Year 360 480 600 720 840 Thursday, 05 14 1 2017 = 2.343 cfs = 718 min = 4,705 cult = 78.9 = Oft = 5.00 min = Type II = 484 Q (cfs) 3.00 200 1.00 ' 0.00 960 1080 1200 1320 1440 1560 Time (min) Pond Report , 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10 5 Thursday, 05 / 4 / 2017 Pond No. 1 - Sand Filter #200 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begintng Elevation = 849.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 84900 302 0 0 0.50 849.50 486 195 195 1.00 850.00 670 288 483 1.50 850.50 905 392 875 2.00 851.00 1,139 510 1,385 250 851 50 1,428 640 2,025 3.00 85200 1,716 785 2,810 3.50 85250 1,999 928 3,738 4.00 85300 2,281 1,069 4,807 4.50 85350 2,559 1,209 6,016 5.00 85400 2,837 1,348 7,364 Culvert / Orifice Structures Note CulverVOnrice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Weir Structures Storage 1 Discharge Table [A] [B] [C] [PrfRsr] Stage [A] [B] [C] [D] Rise (in) = 15.00 2.00 5.00 0.00 Crest Len (ft) = 800 124.00 0.00 0.00 Span (in) = 15.00 2.00 12.00 000 Crest EI. (ft) = 853.00 853.50 000 0.00 No. Barrels = 1 1 4 0 Weir Coeff. = 3.33 3.33 333 3.33 Invert El. (ft) = 847.00 851 33 85200 0.00 Weir Type = 1 Clplti --- - - Length (ft) = 50.00 0.00 000 000 Multi -Stage = Yes No No No Slope (°lo) = 0.60 0.00 000 n/a 0.00 000 - -- -- --- 0.000 2.50 2,025 N -Value = .013 .013 .013 n/a 0.00 - -- - - -- 0.031 3.00 2,810 85200 Orifice Coeff. = 0.60 0.60 060 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 000 Note CulverVOnrice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage i Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 000 0 84900 0.00 000 0.00 -- 0.00 0.00 -- - -- --- 0 000 0.50 195 849.50 6.20 oc 0.00 0.00 -- 0.00 0.00 --- -- - 0.000 1.00 483 85000 6.20 oc 0.00 000 _-- 0.00 0.00 -- -- -- -- 0.000 1.50 875 85050 6.20 oc 0.00 000 - 000 000 --- -- --- 0.000 2.00 1,385 851.00 6.20 oc 0.00 0.00 --- 0.00 000 - -- -- --- 0.000 2.50 2,025 851 50 6.20 oc 0.03 lc 0.00 - 0.00 0.00 - -- - - -- 0.031 3.00 2,810 85200 6.20 oc 0.08 is 0.00 --- 000 000 - -- --- --- 0.080 3.50 3,738 85250 6.20 oc 0.11 is 4.33 is - 0.00 0.00 --- --- --- --- 4.443 400 4,807 853.00 6.20 oc 0.13 is 7.14 is -- 0.00 0.00 --- --- -- -- 7.273 450 6,016 85350 9.42 oc 0.15 ic 9.12 lc -- 9.42 0.00 -- - - --- 1869 500 7,364 85400 14.69 oc 0.17 is 10 74 is - 14.69s 145.99 --- -- -- - 171.59 Larkin MF Development Project Report Section 6: Water Quality Calculations Permanent Detention ]Pond with Sand Filter 300 SAND F11-cK Larkin MF Dev_elooment THE DRAINAGE AREA Drainage ema number Total coastal wallands area tsq fl) _I 2 i Break down of RUA in the drainage area [both now and oxishn0L-.,,._ •.f4� - Parking 1 dnwway (sq ft) 1685 sf -owl surface aster ama(sq it) I 45707 of -Sd.w.lk(sq ft) - Total drainage area (sq it) ; 45707 sf • Roof (sq It) 15179 of _ SUA associated with enslmg dewlopmenl (sq ft) n«......-. 33488 sf • Roarhvay (sq h) 5450 sf Proposed new SUA (sq (t) _... _v_.... _ Percent SUA of drainage area I 22317 of 49% • Other please specify'. the comment box below (sq ft) Total SUA (sq f) 1 27,317 at COMPLIANCE WITH THE APPLICABLE STORUWATER PROGRAM 15209 sf - Other, please specify in the comment box below (sq k) I Stonrwater proqw,rital that 3PDl fplooW SMci i 45% Desgn minfail depth (In) 1.5 m COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Minimum wtiam. required (ra it) 7146 of Design volume of SCM (cu ft) I 2056 of GENERAL MDC FROM OZH .1050 I 1Sm ai Is the SCM sized to treat the SW from all surfaces at buVd•outl ) Yes aionl Yes a2 Is the SCM rotated on or near contaminated sods? No a8 Coes the mainatenanoe access w.g!X with General MOD (Sl? i Yes #3 What are the side sapas of the SCM (H V), I 31 #9 Coes the drainage easement complyx,th General MCC (91 1 Yes 93 0 .. the SCM haw rammingwads qat4n wags or other en msemd side slopes? j No 910 If the SCM Is pit asin Iia famdY Iol, does the plat wmply wdh Genami R:DC t10� Yas d4 Are the mists, outlaw, and ra—ving stream protected from eresian (lo -year s'ann)7 ! Yos ai 1 is there an O&M Agreement that complies wdh General MCC (11)1 i Yes 95 Is there a a bypass for flows m excess of the design flow'r j Yes 912 is them an 0841 Pian that compileswith General MCC (1211 ( Yes �6 Whaf is the method for dawatenmg'he SCM for maintarance7 Pump (pref(irred) 413 Was the SGA designed by an NO licensee] c ofessmnall Yes SAND FILTER MOC FROM 525.205 Yes 96 What rs time method for dawafenrm the SCM for mam15ra 7 i It (FIX, mad) st SHWT elavalwn (final 1N!A #3 Yolume of stormnatar from drmnage area during des.'gn storm (cuLnt fiat) 9526 of Al Type of sard filtar topen or closed) «� -� Open TMT t� Total volume That can be stored above the sed ment and send chambers (c„bm feat) 7370 of a1 If cased, desenbe d the I 8850 d a is this saM fdterdosigned to attenuate peak flows? Yes #3 Total wtuma that can be stored above the sediment and sand chambers (wiac feet) j wag of mmm F #3 El-aftin of the bypass dsvlce (fmsl) 854 R .1 If closed, to. of grate elevation (fmsl) I Yes 93 Describe the bypass daatce #2 Volume that can be misiaed m th. sediment chamber(cubic foe!) 2 Wiq them be a pannu nem pool In the sadimsnt chamberl 602 of j No 10 foot wide emergency spdavay 1 92 Bonom of the sodunont chamber {final I 849 it 94 Pending depth from the top or the seed to the bypass dovice (ft) j 3 ft 72 Area of the sediment ehambor (square fast) I 410 sf 95 Describe the meehamem for dwhibuting Row over the sand surface 862 ft 2 Physical depth of the sediment chamber (inches)36,n 3 0 Rip•Rap apren 780 at hes) In sediment chamber, above any Dermanom pool (hes) =2 Pandi 1— 36 m Sand specification for sand chamber i 36m 2 Elewhon of roe of weir between chambers (met) a2 Volume that can be retained in the sand chamber (orbic fee11 i 552 it 2216 of ASTM33 or equw %nt i 38 In a2 Bottom of the sand chamber (fmso 540 h 19.7 Depth above undardram pipe (orches) { 15,n #2 Ama of the sand of-int—(square feat) 1309 sf - Will the media 14 maintained !o dram at least two inches perhour at the sand surface? Yes 42 Physsal depth of the sand ehambor(Inch") i 36 m c9 !sat leavl one c'aanaut pipe provided at the aw point of each undafdrem Sne? Yea 92 Ponding depth In Ira sand chmnber, abcve any penranem pool (mriess)I ?8 m 199 Wi3 clean-out pipes be cappedl 1 Yes D17TIONAL INFORMATION Yas a2 Ponding depth in the sand chamber, above any pemisram owl (inches) i 35 in owaso use this space to made any addmowlinformation about this sand filterthal you think is mlewrt to the revaW I Yes ADDITIONAL INFORMATION ' Ptease use this space to Provide any additional information about this sand hltar that you think 4s mlewnt to the review THE DRAINAGE AREA Drainage area number i 3 Sneak down of BUA in the drainage area(both now and existin Totaf coastal wetlands area NA R) ' - Parking t dnwway (sq ft) j 836 d Total side. water area (sq it) 33480 of • Sidewalk (sq ft) j Total drainage ema (sq fl) 33488 sf • Roof (sq ft) 10M sf BUA associated with emlmg development (sq fit ; - Roadway (sq ft) j 3710 of Proposad new SUA (u1 ft) 15209 sf - Other, please specify in the comment box below (sq k) I Percent SUA of drainage ami i 45% Total SUA {sq ft) ( 15209 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM ' StPamaater ito^ramisl that aPDl (phrase spec ) Design minfail depth (in) I 1Sm Minimum volume mqu{md (cu ft) Design wtume of SCM (cut) I 6517 d i 1930 of GENERAL MDC FROM 02H.1050 - #g Is the SCM stmd to treat Lha SW I-om e t surfaces at bu•:d-cut? Yes a7 It ap IKable. with the SCM be claimed out after consavetwn7 I Yas 92 Is the SCM located on or near contaminated souls? I No 96 Dees Ilia =.ale ... oa access comeLfadh General MOC 8)? { Y- 93 What are the side slopes of the SCM (H V)? 1 31 a9 Does the drainage easement =mply with Gereml MGC 011 1 Yes d3 Does the SCIA haw nitaIntrut waft abwn wags or other engineered sde slopes? j Pro :10 If the SCM Is on a single fam3lot. does the plat comp) with Geneml MOO 10)? I Yes 94 Are the mlals, outlets, and receiving stream protected from erosion (10 -year storm)? I Yes all IS there an O&M Arimemont that compges with General MCC 1111 1 Yes #5 Is there a a bypassfor flows In excess of tha design lbw? 1 Yes 912 Is there an O&M Plan that comptas with Gereml MOC 121? Yes 96 What rs time method for dawafenrm the SCM for mam15ra 7 i It (FIX, mad) -13 Was the SCM Ess rad byan NO licensed Professama17 You SAND FILTER MDC FROM 02H .1056 at SHWT.1—hon (firs) i WA 93Volume or sw—to, from drainage ami d, -,ng dea.gn stow (wor- feet) I 8850 d 01 Type of sand hlter(open or dosed) Opan #3 Total wtuma that can be stored above the sediment and sand chambers (wiac feet) j wag of #i If closed, describe if the filter will be precast or wur:m-p"ace a3 Is this send fiker deugred to attenuate peek flows? I Yes #a Elevation of the b ass dance (fmso I 887 ft #1 If closed, top of grate .lavation (!mol) 1 93 Ceacnbe the byooss device, 02 Volume that can ba retained in the sediment chamber cubic feet #2 Wiu there be a permanent pool In the sediment chambelr 1208 d I No 10 root wide emetgancyspillway f#2 Bodam of ilia sediment chamber (f=l) 862 ft #4 Ponding depth from the top of the sand to the Vass dewoe (ft) 3 0 2 Am of the sediment chamber (square feet) 780 at 95 Describe the mechanism for dismbuting flow over the send surface #2 Physical depth of the sediment chamber inches i 36m RIp•Rap apron #2 Ponding depth in the sednnant chamber, show any permanent pool (imlm ti i 38 In 96 Sand specficst— for sand chamber a2 Etawtion of top of aeir between chambers inial 22 Volume that can be retained in the send chamber (cubic feet) ( twit 2080 of ASTM33 or equwatent 92 Sonora of ft sand chamber (fmsl 1 602 It 97 Depth above undardmm pipe (itches) 15m 92 Ama of the sand chamber (square feet) i 1168 sf a5 Willme madm be maimamad m them 3! least Hro inches par hour at the sand audita? ! Yes 2 P vol depth of the sand chamber mehos I 38 m 99 is of least one cleanout pipe pmvdad at ma tow poem of each urdeMmin Imo? Yas a2 Ponding depth in the sand chamber, above any pemisram owl (inches) i 35 in -9 Will clearwut pipes be capped' I Yes ADDITIONAL INFORMATION ' Ptease use this space to Provide any additional information about this sand hltar that you think 4s mlewnt to the review Sand Filter 1 1.53 PM 5!5/2017 Larkin MF Development Comprehensive SWPPP (C-SWPPP) Pre & Post Analysis Section 3: Pre & Post Analysis Summary Larkin Statesville, North Carolina Project Number: 2382 October 4, 2016 POINT OF ANALYSIS - NORTH WEST INTO EXISTING STORM PIPE Area 2 YR 10 YR 25 YR 100 YR Pre vs. Post Hydrology Pre -Development Flow (cfs) Pre Area #2 1.20 2.23 4.87 6.64 9.70 Post -Development Flow (cfs) Area 2 YR 10 YR 25 YR 100 YR (acres) Pre -Development Flow (cfs) Pre Area #1 3.86 9.21 17.55 22.95 32.05 Post -Development Flow (cfs) Post Area #2 1.05 0.54 4.80 6.14 6.77 Post Area #3 0.77 0.09 2.54 4.39 6.06 Post Bypass #4 1.08 1.72 3.82 5.25 8.30 Post Bypass #5 0.66 1.60 3.06 4.01 7.57 Combined Area 3.56 3.40 13.34 1949 28.35 POINT OF ANALYSIS - SOUTH WEST INTO EXISTING DITCH Pre vs. Post Hydrolog Area 2 YR 10 YR 25 YR 100 YR (acres) Pre -Development Flow (cfs) Pre Area #2 1.20 2.23 4.87 6.64 9.70 Post -Development Flow (cfs) Post Area #1 1.18 0.07 0.66 1.46 2.29 Larkin MIF Development Comprehensive SWPPP (C-SWPPP) Section 3: Pre & Post Analysis Pre -Development Curve Numbers Pre Curve Numbers Larkin Statesville, North Carolina Project Number: 2382 October 24, 2016 COMPOSITE SGS RUNOFF CURVE NUMBERS 24 Hour Storm Event Pre -Development Area #1 Soil Type: Cecil sandy clay loam, Cecil -Urban Land Complex - HSG "B" Total Drainage Area = 3.86 ac. Paved Roads/Sidewalk/Structures 1.60 ac. CN= 98 Wooded Area CN= 60 0.00 ac. Good Grass (>75% coverage) 2.26 ac. Newly Graded CN= 61 CN= 86 Composite CN 76.34 ac. Larkin Statesville, North Carolina Project Number: 2382 October 24, 2016 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Pre -Development Area #2 Soil Type: Cecil sandy clay loam, Cecil -Urban Land Complex - HSG "B" Total Drainage Area = 1.20 ac. Paved Roads/Sidewalk/Structures 0.25 ac. CN= 98 Wooded Area C •e 0.00 ac. Good Grass (>75% coverage) 0.95 ac. Newly Graded CN= 61 W03101.1 Composite CN 68.71 0.00 ac. Larkin MF Development Comprehensive SWPPP (C-SWPPP) Section 3: Pre & Post Analysis Post -Development Curve Lumbers Post Curve Numbers Larkin Statesville, North Carolina Project Number: 2382 October 24, 2016 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development Area #1 Soil Type: Cecil sandy clay loam, Cecil -Urban Land Complex - HSG "B" Total Drainage Area = 1.18 ac. Paved Roads/SidewalklStructures 0.55 ac CN= 98 Wooded Area CN= 60 0.00 ac. Good Grass (>75% coverage) 0.63 ac. Newly Graded CN= 61 CN= 86 Composite CN 78.25 0.00 ac. Larkin Statesville, North Carolina Project Number: 2382 October 24, 2016 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development Area #2 Soil Type: Cecil sandy clay loam, Cecil -Urban Land Complex - HSG "B" Total Drainage Area = 1.05 ac. Paved Roads/Sidewalk/Structures 0.51 ac. CN= 98 Wooded Area 0.00 ac. Good Grass (>75% coverage) 0.54 ac. CN= 61 Newly Graded Composite CN 78.97 0.00 ac. Larkin Statesville, North Carolina Project Number: 2382 October 24, 2016 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development Area #3 Soil Type: Cecil sandy clay loam, Cecil -Urban Land Complex - HSG "B" Total Drainage Area = 0.77 ac. Paved Roads/Sidewalk/Structures 0.35 ac. CN= 98 Wooded Area CN= 60 0.00 ac. Good Grass (>75% coverage) 0.42 ac. Newly Graded CN= 61 CN= 86 Composite CN 77.82 0.00 ac. Larkin Statesville, North Carolina Project Number: 2382 October 24, 2016 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development Bypass Area #5 Soil Type: Cecil sandy clay loam, Cecil -Urban Land Complex - HSG "B" Total Drainage Area = 0.92 ac. Paved Roads/Sidewalk/Structures 0.32 ac. CN= 98 Wooded Area CN= 60 0.00 ac. Good Grass (>75% coverage) 0.60 ac. Newly Graded CN= 61 CN= 86 Composite CN 73.87 0.00 ac. PROJECT: Larkin MF Development SUB -BASIN ID: PRE DEVELOPMENT AREA #1 DATE. 1013/2016 SHEET FLOW MANNING'S'n' 2- YEAR, 24- HR. RAIN FALL (IN) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) LAND SLOPE(FT/FT) TIME OF CONCENTRATION (HRS) SHALLOW CONCENTRATED FLOW SURFACE DESCRIPTION (P OR U) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) WATERCOURSE SLOPE (FT)FT) AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S'n' AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW TOP WIDTH (FT) DEPTH(FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S'n' AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) SEG #1 SEG #2 0 030 364 243 000 876 4 000 8700 000 0 027 0.000 0 077 0 000 0.077 SEG #1 SEG #2 U 208 0.00 8700 000 8590 0 00 0053 0000 3 714 0 000 0016 0000 0016 RECTANGULAR CHANNEL SEG 01 SEG 02 SEG #3 SEG #4 SEG #5 SEG #6 SEG #7 SEG #8 TRIANGULAR CHANNEL SEG 01 SEG #2 SEG #3 SEG #4 SEG #5 SEG #6 20 000 00 000 000 000 000 000 002 000 0 00 000 000 0.00 0.00 000 00010000 0 00 000 000 000 000 000 000 000 000 000 000 000 23514 000 000 000 0100 000 000 000 0 000 0 000 0 000 8490 00001 0 000 0 043 0 000 0 000 0 000 00 0 000 00001 013 !2, 00001 0 000 00001 00001 00001 00001 1 109 1 00001 0 000 0.000 0 000 0 000 0 000 0 059 0 000 0000, 00001 00001 00001 0 059 00001 0 cool 0.000 0 000 00001 00001 00001 0 000 00001 00001 0.0001 0 017101 0 0001 00001 00001 0.000 0 000 TRIANGULAR CHANNEL SEG 01 SEG #2 SEG #3 SEG #4 SEG #5 SEG #6 20 000 00 000 000 000 000 000 002 000 0 00 000 000 0 OD 000 200 000 0 00 000 000 000 000 001 000 0 00 0.00 000 000 000 23514 8590 0 000 0 000 0 000 0 000 8490 00001 0 000 0 043 0 000 0 000 0 000 00 0 000 00001 013 !2, 00001 0 000 00001 00001 00001 00001 1 109 1 00001 00001 0.0001 00001 0 000 0 nnni 0 059 0 0001 0.0001 00001 00001 00001 0 059 CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH(FT) SIDE SLOPES (91-1' 1 V) (FT) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S'n' AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S'n' AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) TOTAL TIME OF CONCENTRATION (HRS) 0 151 9 07 MINS TRAPEZOIDAL CHANNEL SEG #1 SEG #2 SEG #3 SEG 04 SEG 05 CIRCULAR CHANNEL (Gravity Flow) SEG #1 SEG 02 SEG #3 SEG #4 SEG #S 000 000 000 000 000 000 000 000 000 000 000 000 000 000 0 00 000 000 000 000 0,00 000 000 000 000 000 0 000 0 000 0 000 0 000 0 000 00001 0 000 0 000 0 000 0 000 00001 00001 00001 00001 00001 0 000 00001 00001 00001 00001 0 000 00001 00001 00001 00001 0 nnni 0 000 CIRCULAR CHANNEL (Gravity Flow) SEG #1 SEG 02 SEG #3 SEG #4 SEG #S 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 0 000 0 000 0 000 0 000 0 000 00001 00001 O 000 0 000 0 000 00001 00001 00001 00001 00001 0 000 PROJECT. Larkin MF Development SEG #2 SUB -BASIN ID: PRE DEVELOPMENT AREA #2 DATE: 1 01312 01 6 155 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0 030 000 2- YEAR, 24- HR. RAIN FALL (IN) 364 000 FLOW LENGTH (FT) 80 000 ELEV UP (NGVD FT) 8760 000 ELEV DOWN (NGVO FT) 8750 0.012 LAND SLOPE (FT/FT) 0 013 0 000 0.00 TIME OF CONCENTRATION (HRS) 0.043 0 000 0.043 SHALLOW CONCENTRATED FLOW SURFACE DESCRIPTION (P OR U) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) WATERCOURSE SLOPE (FT/FT) AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) SEG #1 SEG #2 U 155 000 000 8760 000 000 8680 0.00 000 0 052 0 000 000 3 666 0 000 000 0.012 0 000 0.012 RECTANGULAR CHANNEL SEG 41 SEG 92 SEG #3 SEG #4 SEG #5 SEG #6 TRIANGULAR CHANNEL SEG #1 SEG 92 SEG 93 SEG 44 SEG #5 SEG #6 000 000 000 000 000 000 0.00 000 0.00 0.00 000 000 000 000 000 000 0.00 000 000 0.00 000 000 000 0.00 000 K4.3 0 000 0800 0 000 0,00o 0 000 0 000 0 000 00001 0 000 0 000 0 000 0 000 0 000 0 000 0 000 0.000 0 000 :0:0:0 0 000 0 000 0000100001 0 000 0 oda 0 0 000 0 000 0 000 0 000 0 d00 00001 00001 0 000 TRIANGULAR CHANNEL SEG #1 SEG 92 SEG 93 SEG 44 SEG #5 SEG #6 TOTAL TIME OF CONCENTRATION (HRS) 0 068 CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (7H 1V) (FT) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" 0 000 AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.013 4 07 MINS. TRAPEZOIDAL CHANNEL SEG #1 SEG #2 SEG 03 SEG #4 SEG #5 000 000 000 000 000 000 0.00 000 000 000 000 000 000 000 000 0.00 000 000 000 000 000 000 000 000 000 K4.3 0 000 0800 0 000 0,00o 0 000 0 000 0 000 00001 0 000 0 000 0 000 0 000 0 000 0.000 0 000 0.000 0 000 00001 0 000 0 000 0 000 0 000 0 000 0 000 0 000 0 000 0 000i 00001 00001 00001 0 000 TOTAL TIME OF CONCENTRATION (HRS) 0 068 CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (7H 1V) (FT) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" 0 000 AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.013 4 07 MINS. TRAPEZOIDAL CHANNEL SEG #1 SEG #2 SEG 03 SEG #4 SEG #5 CIRCULAR CHANNEL (Gravity Flow) SFr. ei SFr: it? SFC: 93 SFC: #d SFC. f1.5 000 000 000 000 000 000 0.00 000 000 000 0.00 000 000 000 000 000 000 000 000 000 000 000 000 0.00 000 0 000 0 000 0 000 0,00o 0 000 0 000 0 000 00001 0 000 00 0 0 000 0 000 0 000 0 000 0 000 0.000 0 000 00001 0 000 0 000 0 000 0 000 00001 00001 0 000 CIRCULAR CHANNEL (Gravity Flow) SFr. ei SFr: it? SFC: 93 SFC: #d SFC. f1.5 0 000 000 000 000 000 000 000 0.00 000 000 000 000 000 000 0.00 000 0 000 0 000 0 000 0,00o 0 000 0000 0 000 0 000 0 000 0 000 0 000 0 000 0 000 0 000 0 000 0 000 PROJECT: Larkin MF Development 120 SUB -BASIN ID: POST DEVELOPMENT AREA #1 DATE: 10/3/2016 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0 030 0.00 2- YEAR, 24- HR RAIN FALL (IN) 364 000 FLOW LENGTH (FT) 41 000 ELEV UP (NGVD FT) 8763 000 ELEV DOWN (NGVD FT) 8750 000 LAND SLOPE (FTIFT) 0,031 0 000 000 TIME OF CONCENTRATION (HRS) 0.017 0 000 0.017 SHALLOW CONCENTRATED FLOW SURFACE DESCRIPTION (P OR U) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) WATERCOURSE SLOPE (FT/FT) AVERAGE VELOCITY (FTlSEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH(FT) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) SEG #1 SEG #2 U 42 8750 8731 0.044 0 000 3 395 0 000 0.003 0.000 0.003 RECTANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 SEG #6 TRIANGULAR CHANNEL SFr. #1 SFr. #? SFr. #3 SFG 04 SFG #5 SEG #6 CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H•1V) (FT) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" 0 000 AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 20,0 120 123 02 10 0.00 000 000 0100 000 000 000 0,00 000 000 0.00 000 000 60-0 000 0.00 000 0,00 0,00 000 0.00 000 000 0.00 61.16 17.00 8731 8650 0.000 0 000 00001 00001 00001 0 000i 0 000 0 000 0 000 0 000 4.902012 0 000 0.0211 0.047 0 000 0.000 0 000 00001 ox0ol 00001 00001 0 000 00001 00001 00001 00001 0 000 1 0 000 TRIANGULAR CHANNEL SFr. #1 SFr. #? SFr. #3 SFG 04 SFG #5 SEG #6 CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H•1V) (FT) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" 0 000 AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 20,0 120 123 02 10 0.00 000 393 000 208 6.00 000 000 000 000 000 20.00 1217 000 0.00 000 0.00 000 0.10 049 0.00 000 000 0.00 61.16 17.00 8731 8650 0.000 0 000 00001 00001 0.000 8719 864.2 4.902012 0 000 0.0211 0.047 0 000 0.000 0 000 0.000 0 01101 0 013 0 030 0 018 i i 3.610 6 710 00001 00001 00001 0 000 0.005 00011 00001 00001 00001 0 000 0.005 CHANNELFLOW PIPE DIAMETER (IN) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S'n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) TOTAL TIME OF CONCENTRATION (HRS) 0.044 2 65 MINS. TRAPEZOIDAL CHANNEL SEG #1 SEG #2 SEG #3 SEG 94 SEG #5 CIRCULAR CHANNEL (Gravity Flow) SEG #1 SEG #2 SEG #3 SEG 94 SEG #5 0 000 15 123 000 000 0.00 000 393 000 000 000 000 000 000 000 000 000 000 000 000 0.00 0,00 000 0.00 000 8683 8660 0.007 0.000 0.000 0 000 00001 00001 0.000 0,000 4.902012 0 000 0.000 00001 0.000 0 000 0 000 00001 0 01101 0 000 0 000 CIRCULAR CHANNEL (Gravity Flow) SEG #1 SEG #2 SEG #3 SEG 94 SEG #5 0 000 15 123 000 000 0.00 000 393 000 000 000 0 00 031 000 000 000 000 316 8683 8660 0.007 0.000 0.000 0 000 0 Too 0 4.902012 0 000 0 000 00 00 0,000 0.018 0 000 0 000 0 000 0 000 0 018 PROJECT: Larkin MF Development SEG #2 SUB -BASIN ID: POST DEVELOPMENT AREA #2 DATE: 101312016 146 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.030 000 2- YEAR, 24- HR RAIN FALL (IN) 364 2.08 FLOW LENGTH (FT) 49 0.00 ELEV UP (NGVD FT) 8768 000 ELEV DOWN (NGVD FT) 8750 0.011 LAND SLOPE (FT/FT) 0 037 0.000 000 TIME OF CONCENTRATION (HRS) 0.019 0.000 1 0.019 SHALLOW CONCENTRATED FLOW SURFACE DESCRIPTION (P OR U) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) WATERCOURSE SLOPE (FTIFT) AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'$ "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) SEG #1 SEG #2 U 146 20 0.2 869.5 000 000 862.1 30 2.08 0 051 0.000 0.00 3 637 0.000 000 0011 0 000 0.011 RECTANGULAR CHANNEL SFG #1 SFG 92 REG 93 SEG #4 SEG #5 SEG #6 TRIANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 SEG #6 20.0 50 20 0.2 000 000 000 30 30 2.08 000 000 0.00 0.00 000 000 000 0.00 000 000 000 000 000 000 000 000 0.00 000 000 0.00 000 8760 8621 0..000 0,000 0.000 8730 869 5 8556 0 032 0 032 0.000 0.209 0 000 0.000 0 000 0 000 0,000 0 013 12.088 0.0001 0 000 0.000 0 000 0 000 0.000 0 000 0 000 0.000 i 00011 00001 00001 0.0001 0.000 00001 0.0001 00001 0,0001 0 000 0,000 00001 0.0001 00001 00001 0 000 0.000 TRIANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 SEG #6 20.0 50 20 0.2 000 000 000 30 30 2.08 000 000 000 000 000 2000 0.00 0.00 000 000 000 010 000 000 000 000 000 31.00 110 8760 8621 0..000 0,000 0.000 8730 869 5 8556 0 032 0 032 0.000 0.209 0 000 0.000 0 000 0 000 0,000 0 013 12.088 10 269 00001 0 000 01000 115001 0 000 0 000 0 000 0.000 0 000 00011 00001 00001 0.0001 00001 0 000 TOTAL TIME OF CONCENTRATION (HRS) 0.035 CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (7H 1V) (FT) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S 'n' AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNELFLOW PIPE DIAMETER (IN) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (NRS) 0.001 2.10 MINS. TRAPEZOIDAL CHANNEL SFC. #t SFG #2 SF_G #3 SFr, #4 SEG #5 200 50 20 2.0 000 000 000 30 30 000 000 0.00 5200 2200 000 000 0,00 3265 1765 000 000 000 159 125 000 000 000 63 110 8760 87301 0..000 0,000 0.000 8730 869 5 0 032 0 032 0.000 0 000 o" 0 030 0 030 00001 000 0 000 0 000 12.088 10 269 00001 0 000 01000 0 001 00031 0.0001 0,000 0 000 CIRCULAR CHANNEL (Gravity Flow) SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 15 123 000 000 000 000 3.93 000 000 000 0.00 0.31 000 000 000 000 105 8556 852.0 0 034 0 000 0..000 0,000 0.000 0.013 9 719 0 000 0 000 0 000 0 000 0 003 0 000 00001 000 0 000 0 000 0 004 0 003 PROJECT: Larkin MF Development 20 SUB -BASIN ID: POST DEVELOPMENT AREA #3 DATE: 10/312016 SHEET FLOW SEG #1 SEG #2 MANNING'S 'n" 0 030 000 2- YEAR, 24" HR RAIN FALL (IN) 364 000 FLOW LENG1 H (FT) 22 000 ELEV UP (NGVD FT) 876,0 000 ELEV DOWN (NGVD FT) 8760 000 LAND SLOPE (F17FT) 0 002 0 000 000 TIME OF CONCENTRATION (NRS) 0.033 0 000 0 033 SHALLOW CONCENTRATED FLOW SURFACE DESCRIPTION (P OR U) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) WATERCOURSE SLOPE (FT/FT) AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNELFLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (F77FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNELFLOW TOP WIDTH (FT) DEPTH (FT) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) TOTAL TIME OF CONCENTRATION (HRS) SEG #1 SEG 02 U 67 8620 8563 0.085 0 000 4.706 0 000 0.004 0 000 0 004 RECTANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG 04 SEG 95 SEG #B TRIANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 SEG #6 20.0 20 10 02 0.02 0.00 000 30 20 000 000 000 000 000 000 000 000 000 000 000 0.00 000 0,00 000 000 000 0 00 3042 21037 8760 8720 8563 67301 872.01 8710 848.9 0 000 200 0 013 1 o000 0.000 00001 00001 0 000 0,000 0 000 0013 0013 41001 00001 0 000 01000 0000i 00001 00001 0.000 00001 0 000 0.0001 00001 00001 0 000 0,0001 0 000 TRIANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 SEG #6 20.0 20 10 02 0.02 0.00 000 30 20 208 0.02 0.00 0.00 000 000 2000 2.00 000 000 000 000 0.10 001 000 000 000 000 3042 21037 8760 8720 8563 67301 872.01 8710 848.9 0 000 200 0 013 1 o000 0.034 0 035 0 000 0 000 0.000 0.000 0013 0013 41001 00001 0 000 01000 4.6211 1.004 0 000 0 000 0 000 0 000 0 002 00581 00001 00001 00001 0 000 0 110 CHANNELFLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H 1V) (FT) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" 0.000 AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNELFLOW PIPE DIAMETER (IN) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.060 658 MINS. TRAPEZOIDAL CHANNEL SFr. 91 SFr. #7 SFr. #'1 SFr. #d SFC: #5 40 20 10 10 000 0.00 000 30 20 393 000 000 700 400 000 000 0,00 1032 647 000 000 000 068 062 000 000 000 99 77 8760 8730 67301 872.01 1 000 0 000 200 0 013 1 o000 0 000 0 000 0 030 0 030 i 10 944 66641 41001 00001 0 000 01000 00041 00051 00001 0 000 0 000 CIRCULAR CHANNEL (Gravity Flow) SFr #1 SFr #2 SFG #3 SFr. #d SFr. #5 0 009 15 123 000 0.00 000 000 393 000 000 000 0,00 031 000 000 000 000 137 8671 8620 0 037 000 0 000 0 000 0 000 0 012 10 944 0 000 0 000 0 000 00 00031 0.0001 00001 00001 000010 003 PROJECT: Larkin MF Development 20 SUB -BASIN ID: POST DEVELOPMENT BYPASS AREA #4 DATE: 1 01312 01 6 SHEET FLOW SEG #1 SEG #2 MANNING'S "n' 0 030 000 2- YEAR, 24- HR. RAIN FALL (IN) 3.64 0.00 FLOW LENGTH (FT) 97 000 ELEV UP (NGVD FT) 8734 000 ELEV DOWN (NGVD FT) 869.6 000 LAND SLOPE (FT/FT) 0.039 0 000 000 TIME OF CONCENTRATION (NRS) 0 032 0.000 0.032 SHALLOW CONCENTRATED FLOW SURFACE DESCRIPTION (P OR U) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) WATERCOURSE SLOPE (FT/FT) AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n' AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) SEG #1 SEG #2 U 122 8696 8623 0.060 0 ODD 3 968 0 000 0 009 0 000 0.009 RECTANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG 95 SEG #6 TRIANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 SEG #8 20 20 002 002 000 000 0.00 0.00 000 000 000 0.00 000 000 000 000 000 000 000 000 000 000 000 0.00 0.00 146.51 210.37 862.3 8563 856.3 8489 0.000 0 000 0 000 0 000 00001 0 000 i 0 000 0 000 0.000 0 000 0 013 0 013 0 000 0 000 0 000 0 000 0 000 0.0001 00001 00001 00001 0 000 0.0001 00001 00001 00001 0.000 0 000 TRIANGULAR CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 SEG #8 20 20 002 002 000 000 0.00 0.02 0.02 000 000 000 000 200 2.00 000 000 0.00 000 0.01 0.01 000 0.00 0.00 0.00 146.51 210.37 862.3 8563 856.3 8489 0.000 0 000 0 000 0 000 00411 0.035 0 000 0.000 0.0001 0 000 0 013 0 013 0 000 0 000 0 000 0 000 1.087 1.004 0 000 0.000 0.000 0 000 0.037 0 058 0.000 0 000 0.000 0 000 TOTAL TIME OF CONCENTRATION (HRS) 0136 CHANNELFLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H -1V) (FT) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" 0.000 AVERAGE VELOCITY (FT/SEC) TIME OF CONCEN ORATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (NRS) 0 096 8.14 MINS, TRAPEZOIDAL CHANNEL SFC, e1 SFR f19 SFR fli SFR &A SFr: fig CIRCULAR CHANNEL (Gravity Flaw) SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 0 000 000 000 000 000 0.00 000 000 000 0.00 000 000 000 000 000 000 000 000 000 000 000 000 000 000, 0 000 0 000 0.000 0 000 0 000 0 000 0 000 0 000 00001 00001 00001 0050-1 0 000 0 000 0 000 0 000 0 000 0 000 0000--6650 0 000 0 000 CIRCULAR CHANNEL (Gravity Flaw) SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 0 000 000 000 000 000 0.00 000 000 000 000 0.00 000 000 000 000 0.00 0 000 0 000 0.000 0.000 0 000 00001 00001 00001 0050-1 0 000 00001 00001 0 000 00001 00001 0700 0 PROJECT: Larkin MF Development SUB -BASIN ID: POST DEVELOPMENT AREA #5 DATE: 1013/2016 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.030 0.00 2- YEAR, 24- HR. RAIN FALL (IN) 364 000 FLOW LENGTH (FT) 23 0.00 ELEV UP (NGVD FT) 876.8 000 ELEV DOWN (NGVD FT) 8730 000 LAND SLOPE (FT/FT) 0.165 0 000 0.00 TIME OF CONCENTRATION (HRS) 0.006 0.000 0.006 SHALLOW CONCENTRATED FLOW SURFACE DESCRIPTION (P OR U) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) WATERCOURSE SLOPE (FT/FT) AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (NRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA (SO FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) 'ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) SEG #1 SEG #2 U U 181 28 873.0 857.5 8630 855.0 0.055 0 089 3 792 4.821 0.013 0 002 0 015 RECTANGULAR CHANNEL SEG #1 SEG #2 SEG 43 SEG 94 SEG #S SFG #A TRIANGULAR CHANNEL SEG 91 SEG #2 SEG 93 SEG 94 SEG #5 SEG as 20 00 000 0.00 0.00 0.00 000 000 0.00 0.00 000 000 000 000 0.00 000 0.00 000 0.00 0.00 0.00 000 000 0.00 15900 000 000 0.00 000 8550 848.9 0 ODO 0 000 0000 0.000 0 000 0.000 1 00001 0.0001 001 0 000 030 20 0200 0 000 0,000 01000 0.0001i 00001 00001 0.0001 0.0001 000 onnni 00001 00001 00001 00001 0 000 TRIANGULAR CHANNEL SEG 91 SEG #2 SEG 93 SEG 94 SEG #5 SEG as 20 00 000 0.00 0.00 0.00 002 0.00 000 0,00 000 000 200 0.00 000 000 0.00 0.00 001 0.00 000 000 006 000 15900 000 000 0.00 000 8550 848.9 0 ODO 0 000 0000 0.000 00381 0 000i 0 000 0,000 0.000i 0.000 030 20 0200 0 000 0,000 01000 0 456 00001 00001 00001 00001 0 000 0.0971 0.0001 00001 00001 00001 To 0_0 TOTAL TIME OF CONCENTRATION (HRS) 0.121 CHANNELFLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1 V) (FT) AREA (SQ FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" 0.000 AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) o.os7 7 27 MINS TRAPEZOIDAL CHANNEL SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 60 20 000 0.00 0.00 0.00 30 000 0.00 000 0.00 2400 000 000 000 000 18.65 000 0.00 0.00 000 1 29 000 000 0.00 000 156 8630 0 ODO 0 000 0000 0.000 857,5 0035 0200 0 000 0,000 01000 0 030 5055 0 . 0001 00001 00001 0.000 11 043 0 000 0 000 0.000 0 0.004 0.000 u001 0 000 00001 o.00a CIRCULAR CHANNEL (Gravity Flow) SEG #1 SEG #2 SEG #3 SEG #4 SEG #5 000 000 0.00 0.00 0.00 000 000 0.00 000 0.00 000 000 000 0.00 000 0 000 0 ODO 0 000 0000 0.000 0 000 0 000 0 000 00001 0 000 00001 0 000 0 . 0001 00001 00001 0.000 Larkin MF Development Comprehensive SWPPP (C-SWPPP) 2 & 10 -year Storm Event Hydrogrraph Analysis Section 3: Pre & Post Analysis Hydrograph Hydrograph P ydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc, v10.5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 9.206 1 720 20,847 ------ - - — -- Pre -Development Area #1 2 SCS Runoff 2.233 1 718 4,592 — -- - - — - -- Pre -Development Area #2 3 SCS Runoff 3 573 1 718 7,181 ------ ----- ------ Post Development Area #1 4 SGS Runoff 3.260 1 718 6,558 - -- - -- - --- Post Development Area #2 5 SCS Runoff 2 301 1 718 4,622 ------ -- -- Post Development Area #3 6 SCS Runoff 1 717 1 719 3,739 ---- - --- ------ Post Development Bypass #4 7 SCS Runoff 1.596 1 719 3,366 --- - -- ------ Post Development Bypass Area #5 8 Reservoir 0 068 1 1023 5,112 3 867.03 5,074 BMP Wetpond #100 9 Reservoir 0 541 1 728 4,722 4 85210 3,002 BMP Sand Filter #200 10 Reservoir 0.090 1 826 3,293 5 864.83 2,571 BMP Sand Filter#300 11 Combine 3.395 1 719 15,120 6, 7, 9, ---- - -- Post Development Area #1 10 Pre vs Post with SF.gpw Return Period: 2 Year Friday, 05 / 5 / 2017 s Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc v10.5 Hyd. No. 2 Pre -Development Area #2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 1.200 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.64 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 2.00 1.00 0.00 ' 0 120 240 Hyd No. 2 Pre -Development Area #2 Hyd. No. 2 -- 2 Year 360 480 600 720 840 3 Friday, 05 15 1 2017 = 2.233 cfs = 718 min = 4,592 cuft = 68.7 = Oft = 5.00 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 - 0.00 960 1080 1200 1320 1440 1560 Time (min) Hdrorah Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2016 by Autodesk, Inc v10 5 Hyd. No. 3 Post Development Area #1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 1.180 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.64 in Distribution Storm duration = 24 hrs Shape factor Post Development Area #1 Q (cfs) Hyd. No. 3 -- 2 Year 4.00 3.00 1.00 rd A", ESI Friday, 05 / 5 / 2017 = 3.573 cfs = 718 min = 7,181 cuft = 78.3 = Oft = 5.00 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 mom 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) ® Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2016 by Autodesk, Inc v10.5 Hyd. Pio. 4 Post Development Area #2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 1.050 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of cone. (Tc) Total precip. = 3.64 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 4.00 " 3.00 2.00 1.00 0.00 ' 0 120 240 Hyd No. 4 Post Development Area #2 Hyd. No. 4 -- 2 Year 360 480 600 720 840 61 Friday, 05 / 512017 = 3.260 cfs = 718 min = 6,558 cuft = 78.9 = Oft = 5.00 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 ' 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 6 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2016 by Autodesk, Inc v10.5 Friday, 05 / 5 12017 Hyd. Pio. 5 Post Development Area #3 Hydrograph type = SCS Runoff Peak discharge = 2.301 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 4,622 cuft Drainage area = 0.790 ac Curve number = 77.4 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.60 min Total precip. = 3.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Development Area #3 Q (cfs} Hyd No. 5 -- 2 Year Q (cfs} 3.00 3.00 2.00 200 1.00 1.00 i 0.00 - 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 7 ydro raph Repot Hydraflow Hydrographs Extension for AutoCAD® Civil MO 2016 by Autodesk, Inc v10 5 Friday, 05 / 5 / 2017 Hyd. No. 6 Post Development Bypass #4 Hydrograph type = SCS Runoff Peak discharge = 1.717 cfs Storm frequency = 2 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 3,739 cult Drainage area = 1.080 ac Curve number = 67.9 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.10 min Total precip. = 3.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Development Bypass #4 Q (cfs) Hyd. No. 6 -- 2 Year 2.00 1.00 INVIO Q (cfs) 2.00 100 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) yrorahReport Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@ 2016 by Autodesk, Inc v10.5 Hyd. No. 7 Post Development Bypass Area #5 8 Friday, 0515 J 2017 Hydrograph type = SCS Runoff Peak discharge = 1.596 cfs Storm frequency = 2 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 3,366 cuft Drainage area = 0.660 ac Curve number = 75.6 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.30 min Total precip. = 3.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Development Bypass Area #5 Q (cfs) Hyd. No. 7 -- 2 Year 2.00 1.00 Q (cfs) 2.00 1.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) P Hydraflow Hydrographs Extension for AutoCAD® Civil 3DB 2016 by Autodesk, Inc. v10 5 Hyd. No. 8 BMP Wetpond #100 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 3 - Post Development Area #Max. Elevation Reservoir name = BMP Wetpond #100 Max. Storage Storage Indication method used Q (cfs) 4.00 3.00 2.00 m 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No 8 Hyd No, 3 [LC.LLm Total storage used = 5,074 cuft BMP Wetpond #100 Hyd. No 8 -- 2 Year Friday, 05 / 5 / 2017 = 0.068 cfs = 1023 min = 5,112 cuft = 867.03 ft = 5,074 cuft Q (cfs) 4.00 300 will] 1.00 0.00 3000 Time (min) Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2016 by Autodesk, Inc v10.5 Pond No. 1 - BMP Wetpond #100 Pond Data Contours -User-defined contour areas Conic method used for volume calculation. Begining Elevation = 866.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 866.00 4,093 0 0 050 866.50 5,005 2,270 2,270 1.00 867.00 5,575 2,643 4,914 2.00 86800 6,767 6,161 11,075 300 869.00 8,025 7,386 18,461 400 87000 9,367 8,686 27,148 5.00 871.00 10,026 9,694 36,841 Culvert / Orifice Structures [A] [B] [C] [A] [B] [C] [PrfRsr] Rise (in) = 15.00 1.25 600 000 Span (in) = 15.00 1 25 12.00 0.00 No. Barrels = 1 1 1 0 Invert El. (ft) = 866.00 86600 867.00 0.00 Length (ft) = 6300 0.00 0.00 000 Slope (%) = 1.59 000 0.00 n/a N -Value = .013 013 013 n/a Weir Structures HN Friday, 05 / 5 / 2017 Orifice Coeff. = 0.60 Multi -Stage = n/a [A] [B] [C] [D] Crest Len (ft) = 10.00 17300 0.00 000 Crest EI. (ft) = 869.00 870.00 0.00 000 Weir Coeff. = 333 333 3.33 3.33 Weir Type = 1 Ciplti --- CIV B Multi-Stage = Yes No No No Orifice Coeff. = 0.60 Multi -Stage = n/a 0.60 060 No No 0.60 No Exfii.(in/hr) TW Elev. (ft) = 0.000 (by Contour) = 000 Note. Culvert/Onfice outflows are analyzed under inlet (ic) and outlet (cc) control Weir risers checked for onfice conditions (ic) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Civ A CIV B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 866.00 '000 0.00 0.00 - 000 000 -- --- - - 0.000 0 50 2,270 866.50 000 0.03 is 000 -- 0.00 000 - -- --- 0 027 1.00 4,914 86700 0.00 0.04 ic 000 000 0.00 -- -- - 0.040 2.00 11,075 868.00 0.00 0.06 ic 2.08 is - 0.00 0.00 --- --- - - 2.142 3.00 18,461 86900 0.00 0.07 is 3.18 is -- 0.00 0.00 -- -- -- --- 3.255 4.00 27,148 87000 10.80 ic 0.08 is 3 99 is --- 10 79 s 0.00 --- --- - -- 14.86 5.00 36,841 871.00 12.35 is 0.09 is 4.66 ic -- 12.30s 57609 - -- --- 593.14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2016 by Autodesk, Inc. v10.5 Hyd. No. 9 BMP Sand Filter #200 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 4 - Post Development Area #2/lax. Elevation Reservoir name = Sand Filter #200 Max. Storage Storage Indication method used Q (cfs) 4.00 KIND 2.00 m 000 0 180 360 540 720 900 1080 1260 1440 1620 Hyd No. 9 ® Hyd No. 4 [LCIIWLD Total storage used = 3,002 cuft BIVIP Sand Filter #200 Hyd. No. 9 -- 2 Year 11 Friday, 05 / 5 12017 = 0.541 cfs = 728 min = 4,722 cult = 852.10 ft = 3,002 cult Q (cfs) 4.00 K OH 2.00 1.00 0.00 1800 Time (min) Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@2016 by Autodesk, Inc v10.5 Pond No. 2 - Sand Fitter #200 Pond Data Contours -User-defined contour areas Conic method used for volume calculation Begining Elevation = 849.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) 0.00 84900 302 050 84950 486 1.00 85000 670 1.50 850.50 905 2.00 851.00 1,139 250 851 50 1,428 300 852.00 1,716 350 852.50 1,999 400 85300 2,281 4.50 85350 2,559 5.00 85400 2,837 Culvert 1 Orifice Structures [A] [Bl [C] [PrfRsr] Rise (in) = 15.00 2.00 5.00 0.00 Span (in) = 15.00 200 12.00 000 No. Barrels = 1 1 4 0 Invert El. (ft) = 84700 851.33 85200 0.00 Length (ft) = 5000 000 000 0.00 Slope (%) = 1 20 000 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 060 0.60 0.60 Multi -Stage = n/a No No No Incr. Storage (tuft) 0 195 288 392 510 640 785 928 1,069 1,209 1,348 Total storage (cult) Weir Structures 0 195 483 875 1,385 2,025 2,810 3,738 4,807 6,016 7,364 12 Friday, 05 / 5 / 2017 Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 000 [A] [Bl [C] [D] Crest Len (ft) = 800 12400 0.00 0.00 Crest EI. (ft) = 853.00 853.50 000 0.00 Weir Coeff. = 333 333 333 3.33 Weir Type = 1 Cipltl --- - Multi -Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 000 Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Clv A Civ B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 000 0 84900 000 0.00 0.00 --- 000 0.00 --- --- -- -- 0.000 0.50 195 849 50 6.93 is 0.00 000 --- 000 000 -- --- - -- 0.000 1.00 483 85000 6.93 is 000 000 --- 0.00 0.00 --- - --- - 0.000 1.50 875 85050 6.93 is 000 0.00 --- 0.00 0.00 --- -- - 0 00C 2 00 1,385 851.00 6.93 is 0.00 0.00 -- 000 0.00 --- -- - -- 0 00C 2.50 2,025 851.50 6.93 lc 0.03 is 0.00 --- 000 000 --- -- --- -- 0.031 3.00 2,810 85200 6.93 is 0.08 is 0.00 - 000 000 - --- --- - 0 08C 3.50 3,738 85250 6 93 is 0 11 is 4 33 is --- 0.00 0.00 -- -- - - -- 4.442 4.00 4,807 85300 6.93 is 0 13 is 7 14 is - 0.00 0.00 - - -- -- 7.272 4.50 6,016 85350 9.42 is 0 15 is 9 12 is -- 9.42 0.00 --- --- - - -- 18.6E 5.00 7,364 85400 14 74 is 0 17 is 10.74 is --- 14.74s 145.99 -- --- --- 171.64 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D© 2016 by Autodesk, Inc v10 5 Hyd. No. 10 BMP Sand Filter #300 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - Post Development Area #B/Iax. Elevation Reservoir name = Sand Filter #300 Max. Storage Storage Indication method used. Q (cfs) 3.00 - WOON 1.00 - 0.00 - 0 240 Hyd No. 10 E3MP Sand Filter #300 Hyd. No. 10 -- 2 Year 13 Friday, 05 / 5 12017 = 0.090 cfs = 826 min = 3,293 cuft = 864.83 ft = 2,571 cuft 480 720 960 - Hyd No. 5 1200 1440 1680 1920 2160 E-i.Tl._i-' Total storage used = 2,571 cuft Q (cfs) - 3.00 - 2.00 - 1.00 0.00 2400 Time (min) Pond Report 14 Hydraflow Hydrographs Extension for AutoCAD'') Civil 3D® 2016 by Autodesk, Inc v10 5 Friday, 05 / 5 / 2017 Pond No. 3 - Sand Filter #300 Pond Data Contours -User-defined contour areas Conic method used for volume calculation Begining Elevation = 862 00 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 862.00 178 0 0 050 862.50 393 139 139 1.00 863.00 608 248 388 1 50 86350 902 375 763 200 864.00 1,195 522 1,285 2.50 86450 1,597 696 1,981 300 86500 1,938 882 2,863 3.50 86550 2,252 1,046 3,909 4.00 86600 2,566 1,204 5,113 450 86650 2,979 1,385 6,498 5.00 867.00 3,189 1,542 8,039 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [S] [C] [D] Rise (in) = 1500 200 5.00 0.00 Crest Len (ft) = 800 162.00 0.00 0.00 Span (in) = 1500 200 12.00 0.00 Crest EI. (ft) = 86600 86650 0.00 0.00 No. Barrels = 1 1 4 0 Weir Coeff. = 333 3.33 3.33 3.33 Invert EI. (ft) = 86000 86402 86500 0.00 Weir Type = 1 Ciplti -- -- Length (ft) = 125.00 000 000 0.00 Multi -Stage = Yes No No No Slope (%) = 1.11 000 000 nla N -Value = .013 013 .013 n1a Orifice Coeff. = 0.60 0.60 060 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n1a No No No TW Elev. (ft) = 0.00 Note CulverVOnfice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage I Storage I Discharge Table Stage Storage Elevation Clv A CIV B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 862.00 0.00 000 0.00 -- 0 00 000 -- -- --- --- 0 000 0.50 139 862.50 6 88 oc 000 0.00 0.00 0 00 --- --- --- - 0.000 1.00 388 863.00 6 88 oc 0.00 000 - 0.00 000 --- -- - - -- 0.000 1.50 763 863.50 6 88 oc 000 0.00 - 0.00 000 -- -- -- 0 000 200 1,285 864.00 6.88 oc 0.00 0.00 -- 000 000 --- --- -- --- 0.000 2.50 1,981 864.50 6.88 oc 0.07 is 0.00 --- 000 0.00 --- --- - -- 0 066 300 2,863 865 00 6 88 oc 0 10 is 0.00 --- 000 000 -- -- --- --- 0 099 3 50 3,909 865.50 6.88 oc 0 12 is 4.33 is -- 000 000 --- -- -- - 4.458 4.00 5,113 86600 6 88 oc 0.14 is 7.14 is - 0.00 000 --- --- -- - 7.285 4.50 6,498 866.50 9 42 oc 0 16 is 9 12 is --- 9,42 000 --- - - --- -- 18.70 5.00 8,039 86700 12.49 oc 0 18 is 10.74 is -- 12.49s 19073 --- -- - - - 214.13 �+ yd0 orh ��pp p Yeo r_ 15 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D0 2016 by Autodesk, Inc 00.5 Friday, 05 / 5 / 2017 Hyd. No. 11 Post Development Area #1 Hydrograph type = Combine Peak discharge = 3.395 cfs Storm frequency = 2 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 15,120 cuft Inflow hyds. = 6, 7, 9, 10 Contrib. drain. area = 1.740 ac Q (Cfs) 4.00 3.00 2.00 1.00 Post Development Area #1 Hyd. No. 11 -- 2 Year Q (cfs) 4.00 3.00 2.00 M 0 180 360 540 720 900 1080 1260 1440 1620 Hyd No. 11 - Hyd No 6 - Hyd No. 7 - Hyd No. 9 Time (min) Hyd No. 10 16 Hydrograph umma e P 9yrdraflow Hydrographs Extension for AutoCAD® Civil 3DO 2016 by Autodesk, Inc v10 5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 17.55 1 719 39,754 ---- — - - --- Pre -Development Area #1 2 SCS Runoff 4.867 1 718 9,773 - -- ------ - - Pre -Development Area #2 3 SCS Runoff 6.534 1 718 13,349 ------ -- -- - Post Development Area #1 4 SCS Runoff 5.910 1 718 12,100 ------ ____ _____ Post Development Area #2 - 5 SCS Runoff 4 267 1 718 8,689 ------ ------ ------ Post Development Area #3 6 SCS Runoff 3 823 1 719 8,064 ------ ---- -- - Post Development Bypass #4 7 SCS Runoff 3 057 1 718 6,479 --- ---- ------ Post Development Bypass Area #5 8 Reservoir 0.658 1 744 11,207 3 867.32 6,870 BMP Wetpond #100 9 Reservoir 4.800 1 720 10,264 4 852.55 3,844 BMP Sand Filter #200 10 Reservoir 2 536 1 722 7,360 5 865.32 3,524 BMP Sand Filter #300 11 Combine 13.34 1 720 32,167 6, 7, 9, ---- --- - Post Development Area #1 10 Pre vs Post with SF.gpw Return Period. 10 Year Friday, 05 / 5 / 2017 17 Hydro ra h Report Hydrafiow Hydrographs Extension for AutoCAD© Civil 3DO 2016 by Autodesk, Inc v10 5 Friday, 05 / 5 / 2017 Hyd. No. I Pre -Development Area #1 Hydrograph type = SCS Runoff Peak discharge = 17.55 cfs Storm frequency = 10 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 39,754 cuft Drainage area = 3.860 ac Curve number = 76.3 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.10 min Total precip. = 5.33 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre -Development Area #1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 18.00 1500 12.00 9.00 6.00 3.00 0 00 18.00 15.00 12.00 9.00 600 3.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) yd ograph Report 18 Hydrafloww Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v10 5 Friday, 05 / 5 / 2017 Hyd. No. 2 Pre-Development Area #2 Hydrograph type = SCS Runoff Peak discharge = 4.867 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 9,773 cuft Drainage area = 1.200 ac Curve number = 68.7 Basin Slope = 0.0% Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.33 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 s1aT1 Pre -Development Area #2 Hyd No. 2 -- 10 Year Q (cfs) 5.00 IO 3.00 2.00 1.00 raTaTAIIII 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v10 5 Friday, 05 J 5 / 2017 Hyd. No. 4 Post Development Area #2 Hydrograph type = SCS Runoff Peak discharge = 5.910 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 12,100 cuft Drainage area = 1.050 ac Curve number = 78.9 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.33 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Development Area #2 Q (cfs) Q (cfs) Hyd. No. 4 -- 10 Year 6.00 5.00 4.00 300 2.00 1.00 0 00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 4 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v10 5 Friday, 05 / 5 / 2017 Hyd. Delo. 5 Post Development Area #3 Hydrograph type = SCS Runoff Peak discharge = 4.267 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd, volume = 8,689 cuft Drainage area = 0.790 ac Curve number = 77.4 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.60 min Total precip. = 5.33 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 m 3.00 2.00 1 00 Aw Post Development Area #3 Hyd. No 5 --10 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 5 22 Hydrograph Repoilt Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v10.5 Friday, 05 / 5 / 2017 Hyd. No. 6 Post Development Bypass #4 Hydrograph type = SCS Runoff Peak discharge = 3.823 cfs Storm frequency = 10 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 8,064 cuft Drainage area = 1.080 ac Curve number = 67.9 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.10 min Total precip. = 5.33 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 4.00 3.00 2.00 1 00 rawfiff Post Development Bypass #4 Hyd No. 6 --10 Year Q (cfs) 4.00 3.00 2.00 1.00 K!>[<!T!7 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 23 y ro rra h Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. 00.5 Friday, 05 / 5 t 2017 Hyd. No. 7 Post Development Bypass Area #5 Hydrograph type = SCS Runoff Peak discharge = 3.057 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 6,479 cuft Drainage area = 0.660 ac Curve number = 75.6 Basin Slope = 0.0% Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 7.30 min Total precip. = 5.33 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 4.00 c[l<ili] 2.00 m r1i in Post Development Bypass Area #5 Hyd No. 7 --10 Year I Q (cfs) 400 3.00 2.00 1.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Storage Indication method used. SNIP Wetpond #100 Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 7.00 7.00 600 � 6.00 5.00 5.00 4.00 4.00 3.00 .� 3.00 2.00 2.00 1.00 1 00 000 - 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 8 Hyd No. 3 RC1; Total storage used = 6,870 cult 24 Hydrograph por Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2016 by Autodesk, Inc. v10.5 Friday, 05 15 12017 Hyd. No. 8 BMP Wetpond #100 Hydrograph type = Reservoir Peak discharge = 0.658 cfs Storm frequency = 10 yrs Time to peak = 744 min Time interval = 1 min Hyd. volume = 11,207 cuft Inflow hyd. No. = 3 - Post Development Area #iMax. Elevation = 867.32 ft Reservoir name = BMP Wetpond #100 Max. Storage = 6,870 cuft Storage Indication method used. SNIP Wetpond #100 Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 7.00 7.00 600 � 6.00 5.00 5.00 4.00 4.00 3.00 .� 3.00 2.00 2.00 1.00 1 00 000 - 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 8 Hyd No. 3 RC1; Total storage used = 6,870 cult 25 rE E Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v10.5 Friday, 05 / 5 / 2017 Hyd. No. 9 BMP Sand Filter #200 Hydrograph type = Reservoir Peak discharge = 4.800 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 10,264 cuft Inflow hyd. No. = 4 - Post Development Area #2/lax. Elevation = 852.55 ft Reservoir name = Sand Filter #200 Max. Storage = 3,844 cuft Storage Indication method used. BIVIP Sand Filter #200 Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 6.00 6.00 500 5.00 4.00 400 3.00 3.00 2.00 2.00 1.00 1.00 0 00 - 0.00 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) Hyd No. 9 Hyd No. 4 [[=Total storage used = 3,844 cult Cry l dof :fit ' I Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v10 5 Friday, 05 J 5 / 2017 Hyd. Pio. 10 BMP Sand Filter #300 Hydrograph type = Reservoir Peak discharge = 2.536 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 7,360 cuft Inflow hyd. No. = 5 - Post Development Area #Wax. Elevation = 865.32 ft Reservoir name = Sand Filter #300 Max. Storage = 3,524 cuft Storage Indication method used BMP Sand Filter #300 Q (cfs) Hyd No. 10 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) Hyd No. 10 Hyd No. 5 Q=I_aLD Total storage used = 3,524 cuff Post Development Area #1 Q (cfs) Hyd. No 11 --10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 600 4.00 400 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 - Hyd No. 6 Hyd No. 7 - Hyd No. 9 Time (min) Hyd No. 10 27 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v10 5 Friday, 05 / 5 / 2017 Hyd. No. 11 Post Development Area #1 Hydrograph type = Combine Peak discharge = 13.34 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 32,167 cuft Inflow hyds. = 6, 7, 9, 10 Contrib. drain. area = 1.740 ac Post Development Area #1 Q (cfs) Hyd. No 11 --10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 600 4.00 400 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 - Hyd No. 6 Hyd No. 7 - Hyd No. 9 Time (min) Hyd No. 10