Loading...
HomeMy WebLinkAboutSW3170601_Supplement-EZ Form_20170606SUPPLEMENT -EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project Quantity Location(s) Infiltration System Bioretention Cell Wet Pond 4 Lot 40, Lot 62, Lot 111, Lot' 197 Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Name and Title: John H. Ross, P.E. Organization. Eagle Engineering, Inc. Street address: 2013-A Van Buren Ave. City, State, Zip Indian Trail, NC 28079 Phone number(s): 704-882-4222 Email: jross@eagleonline.net Designer a SEA = 0.. 1495 Signature of Designer / Zo/q- I Date Project Name: Moore Farm Address Waxhaw-Indian Trail Road City / Town Union Coupty Unincorporated Applicant: Company Graham Enterprises of the Carolinas, LLC Contact Melvin F. Graham Mailing Address: PO Box 78926 ' City, State, Zip. Weddington, NC 28173 Phone number(s) 704-552-5338 Email mel@grahamenterprises.org Certification Statement I certify, under penalty of law that this Supplement -EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board Cover Page 1 4.21 PM 6/2/2017 WETPOND Moore Farm THE DRAINAGE AREA Drainage area number 1 Break down of BUA in the drainage area (both new and existing): 1 Total coastal wetlands area (sq ft) Parking / driveway (sq ft) Total surface water area (sq ft) Sidewalk (sq ft) 21500 sf Total drainage area (sq ft) 742567 sf Roof (sq ft) 216000 sf BUA associated with existing development (sq ft) Roadway (sq ft) 59107 sf Proposed new BUA (sq ft) 296607 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 40% Total BUA (sq ft) 296607 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify) Design rainfall depth (in) 1 0 in. Water Quaility per NCDEQ Stormwater Design Manual GENERAL MDC FROM 02H .1050 Minimum volume required (cu ft) Design volume of SCM (cu ft) 25340 cf 28152 cf #1 Is the SCM sized to treat the SW from all surfaces at build -out? YesV#71ficable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? 'Nohe mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 31he drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No SCM is on a single family lot, does the plat comply with General MDC (10)? Yes #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yesre an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yesre an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatenng the SCM for maintenance? WET POND MDC FROM 02H.1053 Drawdown Orifice #13 Was the SCM designed by an NC licensed professional? Yes #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 11686 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 35856 cf #6 Elevation of top of shelf (fmsl) 600 5 It #2 Average depth of the main pool (feet) 3 ft #6 Elevation of bottom of shelf (fmsl) 599.5 ft #2 Was the vegetated shelf included in the calculation of average depth? No #6 Slope of vegetated shelf (H V) 61 #2 Elevation of the bottom of the permanent pool (fmsl) 595 5 ft #7 Diameter of drawdown onfice (inches) 2.5 in #2 Elevation of the top of the permanent pool (fmsl) 600 0 ft #7 Drawdown time for the temporary pool (hours) 77 hrs #2 Elevation of the top of the temporary pool (fmsl) 601 25 ft #7 Does the onfice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 6 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Descnbe any measures, such as berms or baffles, that will be taken to improve the flow path #9 If yes, is documentation provided per Wet Pond MDC (9)? #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 10067 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Centipede #5 Depth of forebay at entrance (inches) 60 in #11 Describe the planting plan for the vegetated shelf #5 Depth of forebay at exit (inches) 60 in #5Does water flow out of the forebay in anon -erosive manner's LinA #5 Clean-out depth for forebay (inches) #5 Willthe forebay be cleaned out when the depth is reduced to less than the above? ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review 3 SPECIES OFSHALLOW LAND HERBACEOUS PLANS ON UPPER SHELF, AND 3 SPECIES OF SHALLOW- HALLOW-#5 WAIr-i1=11 ERGENT PLANTS ON THE LOWER SHELF ' Wet Pond 1 4 49 PM 6/2/2017 WET PORI® Moore Farm THE DRAINAGE AREA Drainage area number 2 Break down of BUA in the drainage area (both new and existing) - 2 Total coastal wetlands area (sq ft) Parking / driveway (sq ft) Total surface water area (sq ft) Sidewalk (sq ft) 16630 sf Total drainage area (sq ft) 473497 sf Roof (sq ft) 105000 sf BUA associated with existing development (sq ft) Roadway (sq ft) 48410 sf Proposed new BUA (sq ft) 220040 sf Other, please specify in the comment box below (sq ft) 50000 sf Percent BUA of drainage area COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM ITotal BUA (sq ft) 220040 sf Stormwater program(s) that apply (please specify) IDesign rainfall depth (in) 1 0 in Water Quaility per NCDEQ Stormwater Design Manual & Detention per Union County Requirements IMinimurn volume required (cu ft) Design volume of SCM (cu ft) 18476 cf 21398 of GENERAL MDC FROM 02H.1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated sods? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 31 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? ;No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? Yes #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Drawdown Orifice WET POND MDC FROM 02H.1053 1#13 Was the SCM designed by an NC licensed professional? Yes #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 6741 sf #6 Location of vegetated shelf Q Normal Pool #1 Volume of the main permanent pool (cubic feet) 25906 cf #6 Elevation of top of shelf (fmsl) 620 5 ft #2 Average depth of the main pool (feet) 4 ft #6 Elevation of bottom of shelf (fmsl) 619 5 ft #2 Was the vegetated shelf included in the calculation of average depth? No #6 Slope of vegetated shelf (H V) 6.1 #2 Elevation of the bottom of the permanent pool (fmsl) 613 ft #7 Diameter of drawdown orifice (inches) 2 0 in #2 Elevation of the top of the permanent pool (fmsl) 620 ft #7 Drawdown time for the temporary pool (hours) 71 hrs #2 Elevation of the top of the temporary pool (fmsl) 621 5 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 6 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path #9 If yes, is documentation provided per Wet Pond MDC (9)? #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 5545 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Centipede #5 Depth of forebay at entrance (inches) 841n i #11 Describe the planting plan for the vegetated shelf #5 Depth of forebay at exit (inches) 84 in #5 Does water flow out of the forebay in a non-erosive manner? Yes #5 Clean-out depth for forebay (inches) 6 in #5 Will the forebay be cleaned out when the depth is reduced to less than the above? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review 3 SPECIES OFSHALLOW LAND HERBACEOUS PLANS ON UPPER SHELF, AND 3 SPECIES OF SHALLOW WATER EMERGENT PLANTS ON THE LOWER,SHELF Other BUA is for Future Amenity Site Wet Pond 1 4.50 PM 6/2/2017 WETPOND Moore Farm THE DRAINAGE AREA 3 Drainage area number 3 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) Parking / driveway (sq ft) Total surface water area (sq ft) Sidewalk (sq ft) 16550 sf Total drainage area (sq ft) 472288 sf Roof (sq ft) 120000 sf BUA associated with existing development (sq ft) Roadway (sq ft) 46340 sf Proposed new BUA (sq ft) 217118 sf Other, please specify in the comment box below (sq ft) 34228 sf Percent BUA of drainage area COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM 46 % Total BUA (sq ft) 217118 sf Stormwater program(s) that apply (please specify) IDesign rainfall depth (in) 1 0 in Water Quaility per NCDEQ Stormwater Design Manual & Detention per Union County Requirements GENERAL MDC FROM 02H.1050 IMinimurn volume required (cu ft) Design volume of SCM (cu ft) 18252 cf 21710 cf #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 31 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? Yes #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Drawdown Orifice WET POND MDC FROM 02H.1053 #13 Was the SCM designed by an NC licensed professional? Yes #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 8647 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 26568 cf #6 Elevation of top of shelf (fmsl) 614 ft #2 Average depth of the main pool (feet) 3 5 ft #6 Elevation of bottom of shelf (fmsl) 613 ft #2 Was the vegetated shelf included in the calculation of average depth? No #6 Slope of vegetated shelf (H V) 61 #2 Elevation of the bottom of the permanent pool (fmsl) 608 5 ft #7 Diameter of drawdown orifice (inches) 2 0 in #2 Elevation of the top of the permanent pool (fmsl) 613 5 ft #7 Drawdown time for the temporary pool (hours) 92 hrs #2 Elevation of the top of the temporary pool (fmsl) 614 75 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 6 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path #9 If yes, is documentation provided per Wet Pond MDC (9)9 #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 17267 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Centipede #5 Depth of forebay at entrance (inches) 54 in #11 Describe the planting plan for the vegetated shelf #5 Depth of forebay at exit (inches) #5 Does water flow out of the forebay in a non-erosive manner? #5 Clean-out depth for forebay (inches) #5 Will the forebay be cleaned out when the depth is reduced to less than the above? ADDITIONAL INFORMATION 54 in Yes 6 in Yes 3 SPECIES OFSHALLOW LAND HERBACEOUS PLANS ON UPPER SHELF, AND 3 SPECIES OF SHALLOW WATER EMERGENT PLANTS ON THE LOWER SHELF Please use this space to provide any additional information about this wet pond that you think is relevant to the review Other BUA is for Future Amenity Site Wet Pond 1 4 50 PM 6/2/2017 VVET POND Moore Farm THE DRAINAGE AREA 4 Drainage area number 4 Break down of BUA in the drainage area (both new and existing). Total coastal wetlands area (sq ft) Parking / driveway (sq ft) Total surface water area (sq ft) Sidewalk (sq ft) 39590 sf Total drainage area (sq ft) 1145042 sf Roof (sq ft) 373100 sf BUA associated with existing development (sq ft) Roadway (sq ft) 110852 sf Proposed new BUA (sq ft) 523542 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM ITotal BUA (sq ft) 523542 sf Stormwater program(s) that apply (please specify) IDesign rainfall depth (in) 1 0 in Water Quaility per NCDEQ Stormwater Design Manual GENERAL MDC FROM 02H.1050 IMinimum volume required (cu ft) Design volume of SCM (cu ft) 44037 cf 45463 of #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 3 1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? Yes 94 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? WET POND MDC FROM 02H.1053 Drawdown Orifice #13 Was the SCM designed by an NC licensed professional? Yes #1 Method used SADA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 29602 sf #6 Location of vegetated shelf Above Normal Pool 91 Volume of the main permanent pool (cubic feet) 135450 cf #6 Elevation of top of shelf (fmsl) 615 ft #2 Average depth of the main pool (feet) 4 5 ft #6 Elevation of bottom of shelf (fmsl) 614 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H V) 61 #2 Elevation of the bottom of the permanent pool (fmsl) 608 ft #7 Diameter of drawdown orifice (inches) 3 0 in #2 Elevation of the top of the permanent pool (fmsl) 614 ft #7 Drawdown time for the temporary pool (hours) 99 hrs #2 Elevation of the top of the temporary pool (fmsl) 615 02 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 6 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path #9 If yes, is documentation provided per Wet Pond MDC (9)? #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 41073 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Centipede #5 Depth of forebay at entrance (inches) 721n #11 Describe the planting plan for the vegetated shelf. #5 Depth of forebay at exit (inches) #5 Does water flow out of the forebay in a non-erosive manner? #5 Clean-out depth for forebay (inches) #5 Will the forebay be cleaned out when the depth is reduced to less than the above? ADDITIONAL INFORMATION 721n Yes 6 in Yes 3 SPECIES OFSHALLOW LAND HERBACEOUS PLANS ON ENTIRE SHELF Please use this space to provide any additional information about this wet pond that you think is relevant to the review Wet Pond 1 4:50 PM 6/2/2017