Loading...
HomeMy WebLinkAbout20170723 Ver 1_Email_20170607Carpenter,Kristi From: Liz Ward <WardME@booth-assoc.com> Sent: Wednesday, June 07, 2017 5:23 PM To: Carpenter,Kristi Subject: RE: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station Attachments: 8450_DEQTrans_2017-05-30.pdf Follow Up Flag: Follow up Flag Status: Flagged Uh oh... not the right one. I meant to change the address to 1617 Mail Service Center, Raleigh, NC 27699. It was sent to: NCDEQ Division of Water Resources — Kristi Lynn Carpenter 943 Washington Square Mall Washington, NC 27889 How should I proceed? Sorry for the mixup! From: Carpenter,Kristi [mailto:kristilynn.carpenter@ncdenr.gov] Sent: Wednesday, June 07, 2017 5:12 PM To: Liz Ward Subject: RE: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station Liz, Which office/address did you send the package to? Maybe I can help track it down to facilitate faster service. Thanks, Kristi Lynn From: Liz Ward [mailto:WardME@booth-assoc.com] Sent: Wednesday, June 07, 2017 3:07 PM To: Carpenter,Kristi <kristilvnn.carpenter@ncdenr.�ov>; Ward, Garcy <�arcv.ward @ ncdenr.�ov> Subject: RE: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station Thanks Kristi, The tracking report shows it was delivered Wednesday 5/31 to the front desk to Tyson, so I hope it makes its way to you soon. O We have everything available on our FTP site and the scanned application package I sent is named: 8450 DEQTrans 2017-05-30 The FTP access is: http://fi lez1. booth-assoc.com Username: armycorps Password: goarmy042817 Please let me know if you have any questions. Best regards, Liz Ward Permit Coordinator wa rd m e@ bo ot h-a ssoc. co m Office: (919) 851-8770 x121 Fax: (919) 859-5918 5811 Glenwood Avenue, Suite 109 Raleigh, NC 27612 ��1111� � I �.�7L'Itlt��'i� � .� J( : �i�MiYLrtIM{i i1�IQi�IiEiN� From: Carpenter,Kristi [mailto:kristilynn.carpenterCa�ncdenr.gov] Sent: Wednesday, June 07, 2017 1:23 PM To: Liz Ward; Ward, Garcy Subject: RE: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station Liz, I did receive an email stating that an application was coming, however I have not received the application. Because all paper mail comes to us through a Mail Service Center and there was a holiday since you stated the application as being sent I would assume it just has not made it to me quite yet. If you could provide an electronic copy I can get the information into our system so it can be released for review as soon as the fee is received. Please let me know if there is any way I can be of assistance in this or any other matter. Thanks, Kristi Lynn From: Liz Ward [mailto:WardME@booth-assoc.com] Sent: Wednesday, June 07, 2017 12:17 PM To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.�ov>; Ward, Garcy <�a rcy. wa rd @ n c d e n r. �ov> Subject: RE: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station Good afternoon, Can you please give me an update on the status of this permit application? The status/project was not on the permit tracker. I will be out for 2 weeks starting June 19 and I want to make sure I have provided everything required. Please let me know if you need anything further. We plan to submit our State Stormwater and ESCP applications this week to complete the permitting process for Cape Hatteras Electric Cooperative. Best regards, Liz Ward Permit Coordinator wardme@booth-assoc.com Office: (919) 851-8770 x121 Fax: (919) 859-5918 5811 Glenwood Avenue, Suite 109 Raleigh, NC 27612 f3� ��t I I �.1Q+a�+�x'Itlt��� I .I �( : ���l�YI��IMii if�1li�MiiM� From: Liz Ward Sent: Wednesday, May 24, 2017 1:39 PM To: 'Kristilynn.Carpenter@ncdenr.gov' Subject: FW: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station Good afternoon Kristilynn, I will be sending the WQC application and plan drawings with attachments via UPS on Friday. Please take a look at the information provided on our FTP site to see if we have everything to go ahead and get logged into the system. Best regards, Liz Ward Permit Coordinator wa rd m e@ bo ot h-a ssoc. co m Office: (919) 851-8770 x121 Fax: (919) 859-5918 5811 Glenwood Avenue, Suite 109 Raleigh, NC 27612 ��1111t � I �.�lR'I�lt�'!�i= � .� � . �Ci�N�liL'flM�i iM��M1i�R� From: Ward, Garcy [mailto:garcy.ward@ncdenr.gov] Sent: Tuesday, May 23, 2017 11:59 AM To: Liz Ward Subject: RE: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station Liz, I spoke with Anthony and we agreed that I would be handling this one because of its association with Bonner and my familiarity with the project. You can send a copy of the PCN application to me and please cc Kristi Lynn Carpenter. Her email address is Kristilynn.Carpenter@ncdenr.�ov. Thank you, Garcy Ward Environmental Senior Specialist North Carolina Division of Water Resources 943 Washington Square Mall Washington, NC 27889 ph: 252-946-6481 From: Liz Ward [mailto:WardME@booth-assoc.com] Sent: Tuesday, May 23, 2017 10:17 AM To: Ward, Garcy <�arcy.ward@ncdenr.�ov> Subject: FW: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station Good morning Garcy, Clay Willis with NCDOT suggested I reach out to you to keep you in the loop with the Cape Hatteras Electric Cooperative transmission circuit relocation for the new Bonner Bridge. Booth & Associates is handling permitting for the transmission line. I recently received the forwarded email/NW14 permit from USACE. We plan on submitting applications under express review for the WQC, State Stormwater General Permit, and NPDES/ESCP plan this week. I reached out to Anthony Scarbraugh to see if we could bypass the sit down meeting since we have everything available on our FTP site. The FTP access is: http://fi lez1. booth-assoc.com Username: armycorps Password: goarmy042817 Please let me know if you have any questions. Best regards, Liz Ward Permit Coordinator wardme@ booth-assoc.com Office: (919) 851-8770 x121 Fax: (919) 859-5918 5811 Glenwood Avenue, Suite 109 Raleigh, NC 27612 ��1111� � I �.�lL'I�lt#'�+= � .� � : �OM3YLrtIMLi i1�1Qi�MIEiN� -----Original Message----- From: Biddlecome, William J JR CIV USARMY CESAW (US) [mailto:William.J.Biddlecome@usace.army.mil] Sent: Monday, May 22, 2017 4:30 PM To: George Price; Liz Ward Cc: 'steve_d_thompson@nps.gov'; Arthur bever@fws.�ov Subject: Cape Hatteras Electric Cooperative Permit for Permanent Access Road to their Sub-Station AI I, See attached and let me know if you have any questions. Thanks! Bill Biddlecome Chief, Washington Regulatory Field Office 2407 West 5th Street Washington, North Carolina 27889 (910) 251-4558 william.j.biddlecome@usace.army.mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey.