Loading...
HomeMy WebLinkAbout20170719 Ver 1_Fee Requested_20170609Carpenter,Kristi From: Carpenter,Kristi Sent: Friday, June 09, 2017 4:16 PM To: 'Meghan Makoid' Cc: wbs; Cathleen Johnson; David Charters Subject: RE: DOLRT 1132B / 0204 - 404/401/Jordan Buffer Pre-Construction Notification - Nationwide Permit #6 and General Certification #4085 - Durham-Orange Light Rail Transit Project Meghan, If Project is being DOT funded have DOT provide me with the WBS Element code that would allow internal transfer. If Project is not being DOT funded: A. A check made out to NC Division of Water Resources can be mailed to: Transportation Permitting Unit/Wetlands Attn: Kristi Lynn Carpenter 1617 Mail Service Center Raleigh NC 27699-1617 B. A check made out to NC Division of Water Resources can also be hand delivered to the Archdale Building in Raleigh NC located on: 512 N Salisbury Street 12th floor, Room 1219 G Raleigh NC 27604 As for whether the application is needed with the check it would be preferred to have an identifier with the check that would match the electronic paperwork being sent to ensure the check is being matched to the correct project, however a paper copy of the entire application is not necessarily needed as long as the entire application has been received via electronic copy. In this case I just downloaded the electronic copy of the application and have assigned it a BIMS tracking number of 20170719. As long as your check references that BIMS tracking number we should be all set. Please note project review is on hold until fee is received. If I can be of further assistance please don't hesitate to contact me. Thank you, Kristi Lynn From: Meghan Makoid [mailto:MMakoid@gotriangle.org] Sent: Friday, June 09, 2017 3:40 PM To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Cc: wbs <wbs@gotriangle.org>; Cathleen Johnson <cjohnson@gotriangle.org>; David Charters <DCharters@gotriangle.org> Subject: RE: DOLRT 1132B / 0204 - 404/401/Jordan Buffer Pre-Construction Notification - Nationwide Permit #6 and General Certification #4085 - Durham-Orange Light Rail Transit Project Ms. Carpenter, A couple of quick follow-up questions to my email. When mailing the $240 application fee check to N.C. Division of Water Resources, what is the address for where the check should be mailed? And, is it necessary to include a copy of the full application with the check or should the check be mailed alone? Thanks, Meghan Phone: 919-485-7554 mmakoidCa�_qo trian_qle. or_q Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Meghan Makoid Sent: Friday, June 09, 2017 3:17 PM To:'kristilynn.carpenter@ncdenr.gov' <kristilynn.carpenter@ncdenr.�ov> Cc: wbs <wbs@�otrian�le.or�>; 'jean.b.gibby@usace.army.mil' <jean.b.�ibby@usace.army.mil>; 'rob.ridings@ncdenr.gov' <rob.ridings@ncdenr.�ov>; David Charters <DCharters@�otrian�le.or�>; 'Mitchell, Stanley' <stanley.a.mitchell@dot.�ov>; 'Jamison, John R.' <John.Jamison@hdrinc.com>; 'Maness, Shannon C CIV USARMY CESAW (US)' <Shannon.C.Maness@usace.army.mil>; 'travis.wilson@ncwildlife.org' <travis.wilson@ncwildlife.or�>; 'carol.m.banitis@usace.army.mil' <carol.m.banitis@usace.army.mil>; 'Hosey, Michael L II CIV USARMY CESAW (US)' <Michael.L.Hosev.11@usace.army.mil> Subject: FW: DOLRT 11326 / 0204 - 404/401/Jordan Buffer Pre-Construction Notification - Nationwide Permit #6 and General Certification #4085 - Durham-Orange Light Rail Transit Project Ms. Carpenter, I apologize. I neglected to include you on the email below. I transmitted GoTriangle's Pre-Construction Notification (PCN) for a Nationwide Permit #6 and General Certification #4085 via AMDREC SAFE transfer. You should receive an email from the AMDREC system when the file is ready for download. As I mentioned in the email below, a check for $240 will be mailed to the N.C. Department of Water Resources for the purpose of this PCN application. Please let me know if you require any additional information. Thanks, Meghan Phone: 919-485-7554 mmakoid(a�_potrian_qle. or_p Email correspondence to and from lhis sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Meghan Makoid Sent: Friday, June 09, 2017 3:03 PM To:'jean.b.gibby@usace.army.mil' <jean.b.�ibby@usace.army.mil>; 'rob.ridings@ncdenr.gov' <rob.ridin�s@ncdenr.�ov> Cc: wbs <wbs@�otrian�le.or�>; David Charters <DCharters@�otrian�le.or�>; 'Mitchell, Stanley' <stanlev.a.mitchell@dot.�ov>;'Jamison, John R.' <John.Jamison@hdrinc.com>; 'Maness, Shannon C CIV USARMY CESAW (US)' <Shannon.C.Maness@usace.army.mil>; 'travis.wilson@ncwildlife.org' <travis.wilson@ncwildlife.or�>; 'carol.m.banitis@usace.army.mil' <carol.m.banitis@usace.armv.mil>; 'Hosey, Michael L II CIV USARMY CESAW (US)' <Michael.L.Hosev.11@usace.armv.mil> Subject: DOLRT 1132B / 0204 - 404/401/Jordan Buffer Pre-Construction Notification - Nationwide Permit #6 and General Certification #4085 - Durham-Orange Light Rail Transit Project Ms. Gibby and Mr. Ridings, I transmitted GoTriangle's Pre-Construction Notification (PCN) for a Nationwide Permit #6 and General Certification #4085 package via AMDREC SAFE transfer. You should receive an email from the AMDREC system when the file is ready for download. This permit application package details the temporary impacts that would be anticipated to result from geotechnical surveys to be performed along the 17.7 mile Durham-Orange Light Rail Transit Project alignment in/around jurisdictional waters and buffer areas. Based on the direction in the PCN checklist, a check in the amount of $240 will be mailed to the N.C. Department of Water Resources for the review of this PCN application. Please note that I also copied you on GoTriangle's non-recreational land outgrant request for your reference (also transmitted via AMDREC). The purpose of the non-recreational land outgrant request is to use government property (i.e., Jordan game lands) and/or transportation right-of-way/easements located on government property (i.e., NC-54 and George King Road) to perform geotechnical surveys on government property. These geotechnical surveys will inform the design of the Durham-Orange Light Rail Transit Project. I realize that it is not required to provide the non-recreational land outgrant request for the purpose of your PCN application review, but I wanted to make sure that you were aware that GoTriangle also submitted the appropriate paperwork for geotechnical surveys on government property. Please let me know if you would like a hard copy of either package mailed to you. If you require any additional information for your review, please do not hesitate to contact me directly. Sincerely, Meghan A. Makoid, AICP Environmental Planner Phone: 919-485-7554 mmakoid(a�qotrianqle.orq Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.