HomeMy WebLinkAbout20170718 Ver 1_Bridge #149, Application_20170606STATE OF I`�ORTH CAROLINA DEPARTMENT OF TR�NSPORTAT'ION x.a�r Cao��u GOVE[tNOR June 6, 2017 Mr. Eric Alsmeyer U_ S. Army Corps of Engineers Raleigh Regulatory Fie�d Office 3331 Heritage Trade Drive, Suite 105 Wak� Forest, I`�TC 27587 7AMES H. TIzOGDOtv, III SfiCi�ETARY Subject: Nationwide Permit #14 Replace Bridge #149 on SR �351 witk� 3-sided Bottomless Culvert Watauga County, Narth Carolina Prfl�eGt Number: 17BP1�.R.1'13 {DWQ Fermit Fee: $240) Dear Mr. Alsmeyer: The North Carolina Department of Transportation is scheduled to replace Bridge #149 wiih a 3-sided bottonaless culvert at the same locatian. The existing single span timber and steel bridge is 25' long by 20' wide. The new bottomiess c�lvert will be 24' wide by 3' tall by 61.5' long. Class II riprap will be countersun� inside c�f the structure to maintain channel width. No on-site detour is proposed. Stream �pacts: Station Egisting Proposed Temporary Riprap Tat�IImpacts Number Structur� Structure Dewatering Impacts �� �h�s Stat�an S�z� Si�z� {feet) (feet} (feet} 61.5' long x Sridge #149 25' x 2Q' 24' wide x 3' 33 (beyond 991 132 bridge tall 3-sided RR limits} culvert Perm. FilURiprap Imp�cts = Total Pro,�ect Impacts = 99 feet 132 feet 1 The ripra� total here includes all bank stabilization and bank hardening associated with the new structur� and riprap that is beyand the footprint of the existing strueture and wing MuitingAddress: Telephone� (336} b67-41 E 1 iVC DEP.4RTNFENT dF TI2ANSPORTATION I'ax: (336} 6C7-4549 DNISIQI'd 11 Customer Service: 1-877-368-44b8 80l STATESVII_LE RQAD NOItTfT WILKESBpRt7, NC 28659 Website: WWW.nCd4t.gOv Mr. Eric Alsmeyer Watauga Sridge #149 June 6, ZO1'7 walls. It includes the floodplain construction as well. Tmpacts are higher than nor�nal due to the skevv of the crossing. The repiacement of the e�sting bridge with the proposed ne�vv bot�aml�ss culvert will require temporary dewatering duxirig footer constructian and riprap installation. An imperviotzs �andbag dike will be constnzcted upstreatn of the proposed impact area to create a small pool. Clean water will temporarily be pumped around or piped thraugh the constructian area and will be discharged downstream. Any dirty vvater lacated inside the constructian area �will be pumped inta a silt bag i� necessary. Once the new structure is in pla.ce, the impervious dikes will be removed and preconstruction streambed elevations will be �estored. Construction of th�is project will require impacts to waters of the United States in the New River Basin. The existing bridge crosses Grassy Creek {Class: WS-IV -}-} arid is �ocated in a trout watershed. This project dves not drain to designated critical habitat fvr the elk toe mussel. This project vvas reviewed for the presence of threatened and endangered species in the field and I have also included a query of the NCI�JHP database. Based on the project area mapped with my reques°t, the database seareh indicates that there are no records of any federally listed threatened or endangered species, impartant natuaral cozn.munities, natural areas, or cozzsexva#ion/managed areas within the propased project boundary. There will be ap�roximately 0.2 acres of tree cutting at the project lc�catian due to cut and fill work. The NLEB is listed as a protected species in this county but the project daes not fall within 0.25 miies af any red HCJC identified in the SLOPES spelled out in the PJatic�nwide Permit Regional Conditions. We do not anticipate any irnpact to any other federally listed species. Cultural resource compliance woxk has beezx cazx�pleted. No archaeological resaurces ar historic properti�s will be affected by this praject (see attached). The project impacts are not significant in nature and shauld nat remove or degrade existing water quality uses. Stoa�mwater will he routed through girass vr rack lined ditches, depending on the ditch line slope. Pipe sizes �xsed will be the minimutn necessary to create a safe roadway. By utalzzing the exosion eantrol measures outlined in the attachments ta this applicatian, downstream water quality standards will be protected. ,All appropriate BMPs will be used during construction. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map and a mar�ed topography map. By copy of this eiec�ronic letter, it is requested that Mrs. Marla Chambers with the North Carolina Wildlife Resources Commiission camument directly to you concezx�ing the 4Q4 Nationwide Perm.it application �vith a copy sent to me. Mr. Eric Alsmeyer Watauga Bridge #149 June 6, 2017 By ec�py of this electronic letter, it is requested that the Division of Water Resources, 4�llWetiands Unit, issue the appropriate permzt �ar canstruction of this project. I� is requested that any comments related t4 the �O1 certificatian be �lectranically farwarded dire�ctly to me with a copy sent to the US Army Corps of Engineers. We would like to begin cons#ruction as soon as possible. �f further information is required, please let me know. Yo�r early review and cfln�ideration will be appreciated. Sincerely, � Heath Slaughter Division En�virournental O�eer Enclosures cc: Marla Chambers, NCWRC Amy Chapman, Divisian of Water Resources Dave Wanucha, Di�isian of Water Resources Mark 3ohnson, Divisian Bridge Pragrarn Tecl�nician Zack Souther, Roadside Environmental Field Operatians Technician Uffice Use Only: Corps actian 1D no. DWQ praject no. Form Version 1.3 Dec 10 2008 Fre-Cons�ruction Notification PC Form A, A licant Infarmation 1. Processing 1 a. Type(s) of approval �ought from the Corps: � 5ection 404 Permit ❑ 5ection 10 Permit 1 b. Specify Nativnwide Permit (NWP) numb�r: 94 or General Permit (GP) number: 1 c. Has the NWP or GP number been rrerified by the Corps? ❑ Yes 6.� No 1 d. Type(s) of approval saught from the DWQ (check aU that apply): � 401 Water Quality Certification — Regufar ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certif�catian —�xpress ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the recard only for DWQ 40'I Far the record only for Corps Permit: because written approval is not required? Cerkification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-iieu fee program propased for mitigatian �,�,es � No of impacts? If so, attach the acceptance letter #ram rr�iiigation bank or in-lieu fee program. 1 g. Is the project located in any of NCs twenty ccsastal counfies. If yes, answer 1 F� ❑ Yes � No below. 1 f�. Is the projeci located within a fVC DCM Area of �n�ironmental Concem (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Bridge #149 on SR 1351 2b. County. Watauga 2c. Nearest municipality I town: Boane 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state 17BP.11.R.173 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT 3b. Deed Book and Page IVo. 3c. Responsible Party {ior LLC if applicable): 3d. Street address: 801 Statesuille Road 3e. Ciiy, state, zip: Narth Wilkesboro, NC 28659 3f. Telephone no.: 336-903-9202 3g. Fax no.: 336-667-4549 3h. Email address: hslaUghter@ncdot_gov Page 1 of 10 PCN Form — Version 1.3 December 10, 2�08 Version 4. Applicant Infot�naatiqn (if diffenent frorr� owner) 4a. Applicant is: ❑ Agent ❑ �ther, speciiy_ A�b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. Gity, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. AgentlConso�tant Infiormatiort (If applicabie) 5a. Name: 5b. �usiness name (if app{icable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g_ Email addre5s: Page 2 of 10 PCN Form — Version a.3 !]ecember 10, 2008 Version B. Project Informatian and Prior Project Histary 1. PrapErty Identi�cation 1 a. Properky identification na (tax PI[V or parcel ID}: 1 b. Site coardinates (in decimal degrees): Latitude: 36.26967 Longitude: - 81.5944fi (DD_DDdDI]�) (-AQ_D�DDDD) 9 c. Praperty size: 0.9 acres 2. SurFac� Wat�rs 2a. Name af nearest 6ody of water (stream, r��er, etc.) to Grassy Creek propased project: 2b. Water Quality Classification Qf nearest receiving waier: WS-IV + 2c. River basin: New 3. Project [3escnption 3a. Describe the existing canditions on the site and khe general land use in the vicinity of the project at the time of this application: Substandard bridge to be replaced with 3-sicfed ct�l�ert in a rural area 3b. List the total es#imated acreage af al1 existing we#lands an the property: 0 acres 3c. List the to#al estimated linear feet of all exis#ing streams (intermittent and perennia�) on the property_ 1(ld linear feet 3d. Explain #he purpose of t�re propos�d project: Upgrade substandard stream crassing 3e. Describe the o�erall project in detail, incl[ading the type of equipment to be used: See attached cvver letter. 4. Jurisdictional �eterminations 4a. Ha�e jurisdictional wetfand or stream determinations by the Corps or State been rsquested flr obtained far this praperty / � Yes � No ❑ Unknown project (including all priar phases} in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type � preliminary ❑ Final of determination was mac4e? 4c. If yes, who delineated the jurisdictional areas? AgencylConsultant Company; Name (if known}: Other: 4d. If yes, list the dates of the Carps jurisdictional determinatians or State determinations and attach documentation. S. Project History 5a. Have permits or certifications been requested or obtained #or 0 Yes � No ❑ UnEcnown this project (inciuding all prior phases} in the past? 56_ If yes, explain in detail according to "help filen instructions. 6. Future Prvject Plans 6a. !s this a phased project? ❑ Yes � No fib. If yes, explain. Page 3 0# 10 PCN Form — Version 1.3 December 1 Q, 20{l8 Version C. Proposed Impacts In�en#ory 1, Impacts Summary 1 a. Which sections were completed belaw for your project (check all tha# apply): ❑ Wetiands � Streams - #nbutaries ❑ Buffers ❑ Open Waters ❑ Pond Constructian 2. Wetland impacts If there are wetland impacts proposed on the site, then complete this question fQr each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impac# Type of ]urisdictian number — Type of impact 7ype of wetEand Forested (Corps - 404, 1 D Area of impact Permanent (P) or (if known} DWQ — nvn--�D4, otE�er) (acres) Tem ora W1 ❑ P � T ❑ Yes ❑ Corps ❑ Nfl ❑ DWQ W� � P� T ❑ Yes ❑ Corps [] No ❑ DWQ W3 ❑ P[] T ❑ Yes ❑ Corps ❑ IVo ❑ DWQ W4 ❑ P❑ T ❑ Y�s ❑ Gorps ❑ No ❑ DWQ W5 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P � T ❑ Yes ❑ Carps 0 t�o ❑ DWQ 2g. Total wetland impacts 2h. Commer�ts: 3. Stream Impacts If there are perennial or intermittent stream impacts (includEng iemporary impacts) proposed on the site, then complete this question for all strea�m sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type o# impact Stream name Perennial 'Type of jurisdiction A��rage Impac# number - (PER) or (Carps - 4U4, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (Tj {IN7)? ���r� (feet) fee#) Bottomless � PER � Corps S1 � P� T Culvert, Riprap & Grassy Creek 10 132 Dewatering � �� � �WQ S2 ❑P[]T ❑PER ❑Corps ❑ fNT ❑ DWQ S3 ❑ P❑ T ❑ PER [a Corps ❑ lNT ❑ DWQ S4 ❑ R❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ �'�R ❑ Corps ❑ INT ❑ DWGi S6 ❑ P CI T ❑ PER ❑ Carp�s ❑ INT [� DWQ 3h. Total stream and tributary impacts 9 32 3i. Comments: 33 feet dewat�ring, 99 hank hardeninglripraplflaodplain {including what is inside the culv�rt), Page 4 of 1 fl PCN Form — Version 1.3 December 1 D, 2008 Versian 4. Open Water Impacts If there are prpposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Aiiantic Ocean, or any vther open water of the U.S. then individualiy list all open water impacts below. 4a. 4�. 4c. 4d. 4e. Qpen water Name af waterbndy impact number — (if applicable} Type of impact Waterbody type Area o# impact (acres) Permanent {P) or Tem ora 01 ❑P�T �2 ❑POT 03 ❑P�T 04 ❑P�T 4f. Total open water impacts 4g. Commer�ts: 5. Po�d or Lake Constructian ff ond or falce consiruction ra ased, then com lete the chart below_ 5a. 5b. Sc. 5d. 5e. Wetlancf Impac#s (acres) Stream Impacts (feet) Upiand Pand IQ Proposed use or purpase (acres) nurnber of pond Flooded Filled Excavated Flooded Filled Excavated Flaoded P1 P2 Sf. Tota! 5g. Comments: N/A 5h. Is a darrt high hazard permit required? ❑ Yes � No If yes, permit ID na: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres}: 5k. Method of canstruction: 6. Buffer Empacts (for DWQ) If project will impact a protected riparian buffer, then camplete ihe char# below. ff yes, then individually list all buffer impacts below. If an im acts re uire miti atian, thEn ou MUST fill out Section D of this form. 6a. ❑ Aleuse ❑ Tar-Pamlica ❑ Other. Praject is in which pratecied basin? ❑ Catawba ❑ Randfeman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanen# {P} or for Stream name mitigation (square feet} (square feet} Tem ora im act re uired? B1 ❑P❑T ❑Y� ❑ No 62 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P❑T ❑Yes ❑ No 6h. Total batFer impacts 6i. Comments: Page 5 of 10 PCN Form — Version 1_3 December 10, 20E}8 Version b. Impact Justi�ication and Mitigatian 1. Ar►oidance and Minimization 1 a. Specifically descrihe measures taken to avoid or minimize the proposed impacts in designing projec#. Th� cul�ert is �ottomless and the length is the minimum need�d ko improve safety at this Incation. 1 b. Specificalfy describe measures taken to a�oid or minimize the propased impacts through construction techniques. All apprapriate BMPs wi11 be used during construction 2. Compensatory Mitigatian for fmpacts to Waters af the U.S. or Waters of t�e State 2a. Ddes the project require Compensatory Mitigation for ❑ Yes � No impacts tc� Waters of the U.S. c�r Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ COrpS ❑ Mitigation bank 2c. If y�s, which mitigation option will be used for this project? ❑ Payment to in-lieu fee prograrn ❑ Permittee Responsibie Mi#igation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigai�on Bank: 3b. Credits Purchasetf {attach receipt and letter) 7ype Quantity 3c. Comments_ 4. Complete if Making a Rayment to tn-lieu Fee Program 4a. Appro�al letter from in-lieu fee program is a#kached. ❑ Yes 4b. Stream mitigation req�aested: Einear feet 4c. ff using stream mitigation, stream iemperature: ❑ warm ❑ coal ❑cold 4d. 8uffer mitigation requested (DWQ anly): square feet 4e. Riparian wetland mitigation requested: acres 4f. Nan-riparian wetland mitigation reques�ed: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complet� if Using a Permittee Respansible Mitiga#ian Pian 5a. If using a permittee respansible mitigation plan, provide a descriptian of the praposed mitigation plan. Page b of 10 PGN Form — Versian 1.3 December 10, 20fl8 Version 6. Buffer Mitigation (S#a#e Regulated Riparian Buffer Rules� - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that r�qu��es � Yes � No buffer mitigatian? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calcuiate the amount of mitigation required. 6c. 6d. 6e. Zor1e �eason far impact Total impact MultipEier Required mitigation {square feet} (square feet} Zone 1 3{2 iar Catawba) Zone 2 1.5 6f. Totaf buffer mitigat�on required: 6g. if bufifer mitigatian is required, discuss what type o� mitigatian is proposed (e.g., payment ta pri�ate mitigation bank, permittee responsible riparian k�uffer restoration, payment inta an approved in-lieu fee furtd). 6h. Comments: Page7af1a PCN Form - Version 1_3 December 1 a, 2QQ8 Versian E. Stormwater Management and Diffuse F1ow Plan (reyuired by DWQj 1. Diffuse Flow Plan 1 a. Does the projeci include or is it adjacent to protected riparian buffers ideniified � Y�s � No within one of the NC Riparian Buffer Pratectian Fiuies? 1 b. If yes, then is a diffuse flow plar� included? lf no, expiain why. ❑ Yes ❑ No Gomments: 2. Stormwater Mana ement Plan 2a_ What is the overall percent imperviousness of this project? 40 °!o 2b. Does this project require a Stormwater Management Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If #his project D0�5 require a Storrnwater M�nagement Plan, then pro�ide a brief, narra#ive description of the pfan: 5ee attached ❑ Certified Local Govemment 2e. Who wil! be responsible for the rewiew o# ttte Stormwater Management PEan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified LocaE Gnvernment Stormwater Review 3a. In whEch local go�ernment's jurisdiction is this prajec#7 ❑ Phase II 3b. Which of the following Iocally-impiemented starmwater management programs ���W apply (chack al� that apply): [] USMP ❑ Water Supply Watershed ❑ Other_ 3c. Has #he appro�ed Stormwater Management Plan uvith proof Qf appra�al been ❑ Yes ❑ EVo attached? 4. DWQ 5tormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater managernent prograrns apply (� pRW (check all that apply}: ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Managemen# Plan w�th proof of appro�al been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Re�iew 5a. Does #he Stormwater Mar�agement Pfan meet ihe appropriate requirements? ❑ Yes ❑ Na 5b. Have al! of khe 401 Unit submittal requirements been .met? ❑ Yes ❑ No Page$of1a PCN Farm — Version 1_3 December 10, 20a8 Version F. Suppiementary Information 1. Environmental Documentation (�WQ Requirementy 1 a. [)aes the project in�olve an expenditure of public (federallstate/local} f�,rnds or the � Yes ❑ No use of pubiic (federal/state) land? 1 a. If you answered "yes" to the aboue, does the project require preparation of an environmental documant pursuant to the requirements of the Nationai or 5tate ❑ Yes � Na (North Carolina) Environmental PaficyAct (NEPAISEPA)? 1 c. If you answered "yes" to the aboue, has the documen# review been finaEized by the State CEearing House? (If sa, attach a copy of the NEPA or SEPA final appro�al letter.) ❑ Yes ❑ No Cornments: 2. ViQlations {DWQ Requiremenfi} 2a. Is the site in viokation af DWQ Wetland Rules {15A f�CAC 2H .0540), Esolated Wetland Rules (15A NCAC 2H .13Q0), DWQ Surtace Water ar Wetland Stanciards, ❑ Yes � Na or Ripar�an BufFer Rules� (15A NCAC 2B .02D0}? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered °'yesu ta one ar both of the above questians, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based an past and reasonably anticipated future impacts) result in � Yes � No additional deveiopment, which cauld impact nearby downstream water qualit� 3b. If yau answered "yes" to the above, submit a qualitative or quaniitaiiVe cumulative impact analysis in accardance with the most recent DWQ policy. If you answered °na," provide a short narrati�e description. 4. Sewage L}ispasal(DWQ Requirement} 4a. Clearly detail the ultimate treatment methods ar�d dispasit�on (non-discharge or discharge) of wastewater generated from the propc�sed project, or availabie capacity of the sub�ect facility_ N/A Page 9 of 10 PCIV Form — Version 'i,3 []ecember 10, 2Q�8 Version 5. Endangered Species and �esignated Cri#ical Habitat (Corps Requirement) 5a. Will this pratect occur in or near an area with �ederalEy protected species or � Yes � No habitat? 5b. Have you checked with the 11SFWS concerning Endangered Species Act � Yes � No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office yau ha�e con#acted. ❑ Asheville 5d. What data sources did you use to deiermine whether your si#e would impact �ndartgered Species or Designated Critical Habitat? GfS and visual observation and Natural Heritage Program 6_ Essential Fish Habitat (Gorps Requiremer�t) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 8b. What data sources did you �ase to deter�ine wfiether your site wauld impact Essential Fish Habitat? N�AA 7. Histaric or Prehistoric CulturaE Resources (Corps Requirement) 7a. Wili this projec# accur in or near an area thak #he state, federal or tribai go�emments have designated as having historic or cultural preservation � Yes � No status (e.g., National Mistoric Trust designation or properties signifcant in North Carolina history and archaeology)? 7b. What data saurces did yau use ta determine wheiher your site woulci impact historic or archeological resources? Project was reviewed by the OHE. Project was determined to ha�e no effect. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No $b. I# yes, explain how projeet rr�eets FEMA requiremen#s: Project was rerrEewed by NCD4T HydrauAcs Unit. Sc. What source(s) did you use to make the flondplain determination? FRIS J. Heath Slaughter e����� 616117 Applican�/Agent's Printed Name ApplicantlAgent' ignature Date (AgenYs signature is valid anly if an au rization letierfrom the appiicant � is pro�ided. Page 10 of 10 PCN Form — Version 1.3 December 10, 20D8 Version