HomeMy WebLinkAbout19951094 Ver 2_Acceptance Letter_20080919Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
September 19, 2008
Wilson County
EXPRESS REVIEW ACCEPTANCE LETTER - Revision
Wilson Economic Development Council
Attn: Ms. Jennifer J. Lantz
P.O. Box 728
Wilson, NC 27893
Project Name: Wilson Corporate Park - Phase III
On September 16, 2008, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a
request from Mr. E. Leo Green, III of Green Engineering, PLLC, regarding a project known as "Wilson
Corporate Park, Phase III" for acceptance into the Express Review Program. This letter advises you that your
project will be accepted into the Express Review Program once the following items are received:
1) The application fee of $3,000.00 [for 401 Water Quality Certification with minor impacts ($1,000) and
Neuse Riparian Buffer Authorization ($2,000)], made payable to the North Carolina Division of Water
Quality];
2) One (1) copy of the completed PCN Addendum
(http://h2o.en r.state.nc.us/ncwetlands/documents/MicrosoftWord-
PCN Addendum 10 01 06 OOO.pdf); and
3) Five (5) complete and collated copies of the PCN Application and supporting documentation - see PCN
Addendum (instead of providing 5 copies of the full size plans you may provide two copies of the full size
plans along with three copies of the 1 I X 17);
4) Stormwater Management Plan (please provide the following):
a. Three (3) copies of all supporting stormwater information pertaining to this project including
i. Entire site development/layout plans delineating all drainage areas;
ii. Design calculation sheets for all proposed BMP(s) sized for both on-site and off-site
drainage;
iii. BMP supplements for each proposed BMP and Required Items Check List (available at
http://h2o.enr.state.ne.us/su/bmp forms.htm) along with all required items;
iv. A Notarized Inspection & Maintenance Agreement for each stormwater management
facility;
b. Three copies of detailed construction drawing sheets shall include the following:
i. Erosion and sediment control plans;
ii. Installation and Planting schedules for the proposed BMPs;
c. Cross sectional details of all BMPs and outlet structures with elevations.
5) One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or color). If the
plans are too large to store in TIFF format, they can be stored in PDF.
Unfortunately, due to lack of staff availability this project cannot be accepted until October 1, 2008. Additionally,
a pre-application meeting (to include the property owner) is required prior to the submittal of your completed
application package. Please ensure that the property owner is listed as the applicant on the PCN form. The clock
for this project will not start until receipt of the completed application package and required fee are received. If
the impacts are greater than indicated on the Initial Interest Form and/or the services are different, you may be
one
NhCarolina
401 Oversight / Express Review Permitting Unit X turally
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: littp://h2o.etir.stite:nc.us/ncwetiands
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
required to remit an additional fee. If you have any questions or wish to discuss these matters further please do
not hesitate to call Lia Myott Gilleski at 919-733-9502.
Sincerely,
ndi Karoly, Supervisor
401/Express Review Oversite Unit
CBK/lmg
cc: File copy
Mr. Lee Green, 111, Green Engineering, PLLC, P.O. Box 609 Wilson, NC 27893
Mr. Matt Matthews, Wetlands and Stormwater Branch