From: Beecher, Gary H CIV USARMY CESAW (US) <Gary.H.Beecher@usace.army.mil>
Sent: Tuesday, June 06, 2017 7:23 AM
To: Ginger Turner; Scarbraugh, Anthony
Subject: RE: Kia -Mazda of New Bern Fill request
Ms. Turner,
It doesn't appear that your project has tried to avoid or minimize the impact to the existing wetland on the site,
therefore I feel that we need to look at mitigating for the loss of the wetland. Probably the best and easiest way to
mitigate for the loss would be thru purchasing credits at a regional mitigation bank.
I'm heading out into the field right now, so I'll call you or e-mail you later today.
Respectfully,
Gary
-----Original Message -----
From: Ginger Turner [mailto:gturner@stroudengineer.com]
Sent: Wednesday, May 31, 2017 3:55 PM
To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Cc: Beecher, Gary H CIV USARMY CESAW (US) <Gary.H.Beecher@usace.army.mil>
Subject: [Non-DoD Source] RE: Kia -Mazda of New Bern Fill request
Anthony,
Following up to see if you received the additional justification emailed (addressed to Gary Beecher) last week. Please let
me know if you have any questions.
Thank you,
Ginger Turner, PE
Senior Engineer
Stroud Engineering, PA
107B Commerce Street
Greenville, NC 27858
252-756-9352 x233
Click here to upload files.
-----Original Message -----
From: Scarbraugh, Anthony [mailto:anthony.scarbraugh@ncdenr.gov]
Sent: Wednesday, May 24, 2017 2:21 PM
To: Beecher, Gary H CIV USARMY CESAW (US)<Gary.H.Beecher@usace.army.mil>; Ginger Turner
<gturner@stroudengineer.com>
Subject: RE: Kia -Mazda of New Bern Fill request
Ms. Turner,
The Division of Water Resources will require further demonstration of avoidance and minimization or additional
information justifying the purpose and need. I will be issuing a formal hold letter by the end of the week.
Thanks,
Anthony Scarbraugh
Environmental Senior Specialist
Division of Water Resources - Water Quality Regional Operations Department of Environmental Quality
252 948 3924 office
anthony.scarbraugh@ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message -----
From: Beecher, Gary H CIV USARMY CESAW (US) [mai lto:Gary.H.Beecher@usace.army.mi1]
Sent: Tuesday, May 23, 2017 12:19 PM
To: Ginger Turner <gturner@stroudengineer.com>
Cc: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Subject: RE: Kia -Mazda of New Bern Fill request
Ok thanks,
If they can re -design the parking lot and building and keep the impact under .10 acre they may not have to buy credits
from the mitigation bank.
Thanks again,
Gary
-----Original Message -----
From: Ginger Turner [mailto:gturner@stroudengineer.com]
Sent: Tuesday, May 23, 2017 12:12 PM
To: Beecher, Gary H CIV USARMY CESAW (US) <Gary.H.Beecher@usace.army.mil>
Cc: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Subject: [Non-DoD Source] RE: Kia -Mazda of New Bern Fill request
Gary,
Thank you for the quick response. We will provide additional information on possible minimization and avoidance. With
respect to the wetland bank I have been in contact with them and they have indicated there are credits available for
purchase (please see the attached email).
Thank you,
Ginger Turner, PE
Senior Engineer
Stroud Engineering, PA
107B Commerce Street
Greenville, NC 27858
252-756-9352 x233
Click here to upload files.
-----Original Message -----
From: Beecher, Gary H CIV USARMY CESAW (US)[mai lto:Gary.H.Beecher@usace.army.mi1]
Sent: Tuesday, May 23, 2017 11:48 AM
To: Ginger Turner <gturner@stroudengineer.com>
Cc: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Subject: Kia -Mazda of New Bern Fill request
Ms. Turner,
I've reviewed the Kia -Mazda of New Bern PCN that was submitted to this office on May 9, 2017.
The NWP 39 request is for .39 acres of fill. The avoidance and minimization document that you submitted only mentions
the reason why the existing Kia and Mazda buildings and parking lots are going to be expanded. It doesn't mention how
the wetland impact has been avoided or minimized. Can the proposed building and parking lot(s) be re -designed to
allow for a smaller wetland impact? Can additional neighboring "upland" land be purchased that would also minimize
the wetland impact?
In the PCN you mentioned that 0.4 acres of wetlands will be purchased from "Brices Creek Mitigation Bank". Have you
contacted the mitigation bank to ensure that they have the 0.4 credits available for purchase? Can you also send me any
documentation or transcripts that you have with Brices Creek Mitigation Bank on this project.
Respectfully,
Gary